Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Relocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

APR1400 In-Core Instrumentation Penetration Failure by Zirconia Melt

Light water reactors have many penetrations at the reactor vessel lower head which are called ICI (in-core instrumentation tubes), ICM-GT (in-core monitoring guide tubes), CRGT (control rod guide tubes) and drain tubes. For Korean PWRs (pressurized water reactors), there are dozens of bottom-up type ICI penetration tubes (45 for OPR1000 and 61 for APR1400). For the typical BWRs (boiling water reactors), hundreds of penetrations are positioned at the reactor vessel lower head due to the structural complexity at the reactor upper head. These penetrations are regarded as the most vulnerable structures during a severe accident as they could be failed by high temperature of melt (or debris) and its decay heat. That is, tube rupture and/or tube ejection could occur because there exist an empty hole inside the penetration tube which can be a melt flow path, and they are attached to the inside of the reactor vessel by a partial weld with a gap between the tubes and reactor vessel. Therefore, the research on the penetration failure is of importance, as it could lead to melt discharge into the containment and subsequent release of radioactive materials to the environment due to the containment failure. This paper focuses on the experimental investigation on the tube ejection failure for the APR1400 ICI penetration. The tube ejection experiments were performed as it was exposed to high temperature of zirconia melt and high pressure. The tube ejection failure experiments were performed for the APR1400 in-core instrumentation penetration nozzle. Zirconia melt was used as a simulant of molten corium and interacted with the penetration specimen. The specimen was pressurized up to 2.6 bar during the interaction with melt to induce the tube ejection. The penetration weld was heated up to its melting temperature, and the penetration tube and weld above the reactor vessel surface were eroded severely by the melt. However, even though it was estimated that the weld failure occurred and the reactor vessel with stainless steel cladding was ablated severely by the melt, the tube ejection did not take place, and consequently the integrity for the APR1400 ICI penetration was confirmed in the present experimental conditions. The goal of this research is to improve the penetrations failure models in MAAP5 codes based on the experimental data. To achieve this goal, it is necessary to increase the heat flux and pressure acting on the penetration tube to find the conditions for the tube ejection failure. Moreover, the penetration failure experiments will be performed by delivering melt into the penetration specimen to simulate the melt relocation process in a real severe accident situation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The MELCOR Analysis of Chinshan Nuclear Power Plant Spent Fuel Pool for Fukushima-like Accident

The safety analysis of the nuclear power plant (NPP) is very important work in the NPP safety. Especially after the Fukushima NPP accident occurred, the importance of NPP safety analysis has been raised and there is more concern for the safety of NPPs in Taiwan. Because the earthquake and tsunami occurred, the cooling system of spent fuel pool failed and the safety issue of spent fuel pool generated in Japan's Fukushima NPP. Chinshan NPP is the first NPP in Taiwan which is BWR/4 plant and OLTP (Original Licensed Thermal Power) for each unit is 1775 MWt. Chinshan NPP finished SPU (stretch power uprate) and the operating power is 103.66% of the OLTP, which is 1840 MWt now. After Fukushima NPP accident occurred, in order to concern the safety of Chinshan NPP spent fuel pool, we performed the safety analysis of spent fuel pool by using MELCOR/SNAP which also assumed the cooling system of spent fuel pool failed. The geometry of Chinshan NPP spent fuel pool is 12.17 m x 7.87 m x 11.61 m and the initial condition is 60 deg. (water temperature) / 1.013 x 10{sup 5} Pa. And, the total power of the fuels is roughly 8.9 MWt initially. MELCOR is developed by Sandia National Laboratories. MELCOR is a fully integrated, engineering-level computer code that models the progression of severe accidents in light water reactor NPPs, including containment response and leakage of activity to the environment. A broad spectrum of severe accident phenomena in both BWRs and PWRs is treated in MELCOR in a unified framework. These include thermalhydraulic response in the reactor coolant system, reactor cavity, containment, and confinement buildings; core heatup, degradation, and relocation; core-concrete attack; hydrogen production, transport, and combustion; fission product release and transport behavior. Current uses of MELCOR include estimation of severe accident source terms and their sensitivities and uncertainties in a variety of applications. According to Dr. Carbajo's paper, MELCOR was used to perform the study of spent fuel pool of Fukushima Daiichi Unit 4. Niina E. Koenoenen used MELCOR to establish the spent fuel pool model of a Nordic BWR. The loss-of-pool-cooling accidents was simulated and analyzed by this model. The above studies indicate that MELCOR is capable of handling the simulation of the spent fuel pool. An increasing number of researchers are using MELCOR code to analyze test facilities and nuclear power plants. Jun Wang et al. used MELCOR to perform core degradation simulation and MELCOR results were compared with CORA experimental data. Through this work, they reviewed the performance of MELCOR COR package in detail. Tae Woon Kim et al. developed MELCOR model of APR1400 (an advanced pressurized water reactor). They used this model to perform the LBLOCA transient simulation and sensitivity study. Longze Li et al. established the MELCOR model of CPR1000 (a Chinese pressurized reactor 1000-MW power plant). The station blackout (SBO) with failure of the steam generator (SG) safety relief valve (SRV) transient was simulated and analyzed by this model. SNAP is a graphic user interface program that processes the inputs and outputs of MELCOR. In addition, there is an animation function in SNAP which can present the animation of analysis results. There are two main steps in this research. The first step was the establishment of Chinshan NPP spent fuel pool MELCOR/SNAP model. And the transient analysis of Chinshan NPP spent fuel pool MELCOR/SNAP model under the cooling system failure condition was performed. The next step was the comparison among the MELCOR, TRACE and CFD data. TRACE and CFD data were from INER reports. In addition, the animation model of Chinshan NPP spent fuel pool was presented by using the animation function of SNAP with MELCOR/SNAP analysis results. This study has developed MELCOR/SNAP model of Chinshan NPP spent fuel pool successfully. By using the above model, the safety analysis of the spent fuel pool was performed under the cooling system of spent fuel pool failed condition. The analysis results of MELCOR, TRACE and CFD were similar in this case. It indicated that there was a respectable accuracy in MELCOR/SNAP model. The analysis results depicted that the uncovered of the fuels occurred at 2.6 day and the metal-water reaction of fuels occurred roughly at 3.7 day after the cooling system failed. The above results indicated that the failure of cladding occurred after 3.7 day. This study's results can help to evaluate the safety issue of Chinshan NPP spent fuel pool. In addition, the cooling system and some mitigation measures of spent fuel pool is not simulated in the above model. However, we will do it in the future. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Port Hope Area Initiative Project Update - 19146

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. With funding of $1.28 billion CAD it is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from various locations within the community. The Port Granby Project will relocate approximately 450,000 cubic metres of historic low-level radioactive waste and marginally contaminated soils, located at an existing waste management facility on the shoreline of Lake Ontario, to a new engineered aboveground mound being built about a kilometre north of the current site. This paper will provide an update on both projects with an emphasis on successes to date and challenges yet be faced. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological Verification for the Remediation of LLRW at the Port Granby Project - 19210

The Port Granby Project is part of the Port Hope Area Initiative (PHAI) that Canadian Nuclear Laboratory (CNL) is using to manage long-term historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. Port Granby remediation scope includes constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure and excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF) which accepted waste until the 1980's to the newly constructed LTWMF. The PGWMF contains an estimated 450,000 cubic meters of LLRW deposited in unmarked and unlined trenches throughout the southern portion of the site that borders Lake Ontario. Project requirements include excavating contaminated material, verifying that the trench bottoms are below action levels using Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance, and final restoration. This paper describes challenges of meeting remediation verification requirements using traditional field and laboratory confirmation methods in areas of deep trench areas located in rugged terrain with ponded water and mud and presents a process that has expedited the traditional MARSSIM method for verification with greater productivity, and with enhanced safety and reliability as compared to the use of traditional methods alone. This enhanced process has been successfully employed for in-situ verification so that the excavated area can be backfilled and returned to a vegetative state. This enhanced process has been examined by federal regulatory staff through the course of their onsite audits and outcomes from these examinations have all been positive. The method involves a visual inspection and traditional walkover of the area to identify any areas with radiation measurements above the region's background followed by a full area survey performed using Wood's proprietary Orion ScanPlotSM system. The ScanPlotSM data is evaluated, mapped and overlaid on top of an aerial image of the surveyed area allowing remaining radiological material at surface or near surface to be quickly and easily identified for removal. Field staff then collect soil samples from evenly distributed points within the surveyed area and field screen the samples using an X-ray fluorescence (XRF) analysis for the three primary contaminates of potential concern (CoPCs) (arsenic, uranium and lead) that are indicative of the historical contamination. Samples passing XRF field screening are packaged and sent to a local laboratory for a full suite of analyses and checked against the CoPC list to assess whether the soil matches the profile for nearby native soils and passes the remediation goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site Characterization and Adaptation - Lessons Learned from the Port Granby LLRW Project in Canada - 19255

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in the Town of Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project is part of the broader PHAI being completed by Canadian Nuclear Laboratories (CNL). The scope of remediation activities at Port Granby includes: 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF) to the newly constructed LTWMF. Remediation design required extensive site investigations of waste buried in unmarked and unlined trenches across the PGWMF area. Investigations included reviews of historical records, interviews with past staff of Eldorado and Atomic Energy Canada Limited (the entity managing the PHAI cleanup prior to CNL), radiological surveys, and the advancement of boreholes across the site to facilitate the physical sampling of soil and groundwater contaminants indicative of the presence of LLRW. This paper describes the challenges associated with characterizing and quantifying waste prior to remediation and lessons-learned to adjust procedural adaptations during the characterization phase of a project to better anticipate the unanticipated nature and growth of the contamination profile that often occurs during remediation. Despite substantial pre-remediation investigative efforts, current PGWMF remediation activities have resulted in growth of both the areal and vertical extent of contamination. The contamination profile was shown to be dramatically influenced by leaching of contaminants deeper into native soils. In addition, remedial excavation discovered specific waste types such as unidentified compressed gas cylinders outside of the location indicated by historical records, as well as a quantity of unknown liquids and unmarked drums. These discoveries have resulted in higher waste quantity estimates and have required a partial redesign of the LTWMF mound (a higher final elevation and steeper slopes) to accommodate the increased waste volume. In addition, the means and methods necessary to execute the remedial construction had to be modified to account for the new conceptual model developed from the new contamination data. Despite extensive historical review and site characterization to define the nature and extent of LLRW buried at the PGWMF, actual conditions encountered during remediation efforts necessitated taking an adaptive approach to both the design of the LTWMF and the means and methods used for excavation and transport of waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Are Initiative Port Granby Project - Water Management in Extreme Weather Conditions - 19257

The Port Granby Project is part of the Port Hope Area Initiative (PHAI) through which Canadian Nuclear Laboratory (CNL) is managing long-term historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. Port Granby remediation scope includes 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF), which accepted waste until the 1980's, to the newly constructed LTWMF. This paper provides an overview of the challenges of water management (control of storm and groundwater at the LTWMF and PGWMF) on a large-scale construction project with changing and unpredictable weather patterns. Consistent with increased observations of extreme weather events, over two consecutive construction seasons, weather changed from one of the driest on record (high temperatures, dry conditions and strong wind) to one of the wettest on record (short duration high-intensity rainfall that flooded the LTWMF, excavations and on-site PGWMF and LTWMF retention ponds). This paper describes the collaborative approach among Wood (Constructor), AECOM (Engineer of Record), and CNL to adjust to extremes in weather to control dust and excessive water during construction. The summer of 2016, one of the driest summers on record in southern Ontario, was followed by one of the wettest in 2017. In 2016, the project team used water from the uncontaminated on-site storm water ponds, applied a polymer product for dust control across the site to augment water applications, obtained a Permit to Take Water from the provincial government to pump water from Lake Ontario, procured large tanks for storage of Lake Ontario water to meet peak demand, and retained additional water trucks/operators for day to day site operations. In stark contrast, to accommodate heavy rains in 2017 the project team installed ∼6 million liter aboveground storage tanks with secondary containment for contaminated water storage; procured 100+ mobile water storage tanks to supplement the on-site storage, utilized LTWMF cells sumps, excavations and retention ponds to store and manage onsite water; and adjusted additional staff resources (more staff and longer shifts) during anticipated periods of high-intensity rainfall, at times managing water around the clock. Recognizing the need to minimize the release of contaminated soil and water from the construction site at all times, these efforts illustrate the importance of anticipating and reacting to extreme weather events on a more regular basis. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Most Recent Chemical Decontamination for Decommissioning Projects - 19280

In 2017, Westinghouse performed a full system chemical decontamination of Units 1 and 2 of the Bohunice V1 Nuclear Power Plant. Bohunice V1 is a VVER 440 design with six loops. The application was performed two loops at a time, with the reactor core bypassed. The Pressurizer and Pressurizer Relief Tank (Bubble Tank) were decontaminated as well, in a separate application. This was a recovery decontamination that had been attempted by another company prior to Westinghouse. Several modifications to equipment and design of process were required to make the decontamination successful. The project was initiated to perform pre-dismantling chemical decontamination of primary circuits of both V1 units using Decontamination for Decommissioning (DfD) to meet the following objectives (see References 1 and 2 for process descriptions of DfD): - Remove activity from the primary circuit components; - Reduce dose rates around piping and components; - Simplify access to the installations, making it possible to use hands-on techniques for dismantling, rather than the more expensive use of robotics or manipulators; - Minimize the potential for spreading contamination during decommissioning activities - Reduce the activity of components that they may be disposed of at a lower classification, therefore more economical, waste disposal category. Several techniques were employed that were unique, or first of a kind, to aid in the decontamination, including resin regeneration and bypass of the reactor core, while still providing enough flow to to allow sufficient dispersal through all the steam generator tubes. Equipment that was already available on site was evaluated and, when possible, combined with Westinghouse equipment to minimize application cost and schedule. The lessons learned from the first unit (Unit 2) were applied to the second unit (Unit 1) application. The partial relocation of equipment allowed for the most efficient schedule to complete the second decontamination. The paper will describe in more detail the results and lessons learned from the full system chemical decontaminations performed, as well as updates on another recent decontamination project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preserving the Mound Laboratory Legacy-The Mound Cold War Discovery Center - 19550

The Mound Cold War Discovery Center (MCWDC) opened at the former DOE Mound Laboratory in Miamisburg, Ohio, on April 23, 2018, approximately three years after the US Department of Energy (DOE) Office of Legacy Management, Dayton History, the Mound Science and EnergyMuseum Association (MSEMA), and the Mound Development Corporation signed the Mound Educational Center Memorandum of Agreement (MOA). This MOA designated each party's responsibilities for the facility and laid the groundwork for DOE to enter into a Cooperative Agreement with Dayton History to design, build, and perform initial operations of the educational center. Dayton History is a nonprofit organization that operates several historical facilities in Montgomery County, Ohio. The Mound Development Corporation is the nonprofit organization that operates the Mound Business Park, privately owned property previously associated with the former DOE Mound Laboratory. The US Atomic Energy Commission began operations at the Mound Laboratory in 1948 as an integrated research, development, and production facility that supported the nation's weapons and energy programs. In October 2015, DOE entered into a five-year Cooperative Agreement with Dayton History to preserve, protect, and make accessible legacy records and information about the history of the Mound site through the development of an educational center. Years One and Two were for design and construction, respectively. Years Three through Five were for operation of the new center. The new center, located in a building owned by the Mound Development Corporation, would carry on the mission started by the MSEMA, a nonprofit organization started by former Mound site employees more than 15 years ago after DOE mission work ended at the site. As part of the cooperative agreement, Dayton History is responsible for creating interactive displays and exhibits to draw, entertain, and educate the public on the Mound site's significant contributions to the protection of the nation; developing educational programs; and initiating marketing strategies for the long-term sustainability of the educational center. In 2016, parties to the MOA officially named the facility the Mound Cold War Discovery Center. The MCWDC was designed to preserve the history of the Mound site through effective, entertaining, and efficient communication of the history of the Mound Laboratory; the site's legacy to the US weapons production complex and space exploration program; and promote understanding of what has happened at the site since DOE mission work ended, including environmental cleanup under the Comprehensive Environmental Response, Compensation, and Liability Act and the regulator-approved end state of industrial/commercial land use with associated institutional controls. The cooperative agreement requires Dayton History to develop and implement marketing strategies to support the long-term sustainability of the MCWDC at the Mound site. Dayton History will submit a report after the first year of operation and every year thereafter during the period of the cooperative agreement. These reports will describe and status efforts to obtain sustainability and offer for consideration any operational changes, corrections, or suggestions that may improve the potential for sustainability. Prior to the end of the cooperative agreement, a sustainability assessment decision will be made by DOE to determine whether the MCWDC has enough community interest to financially sustain itself at the Mound site. The status of the MCWDC Legacy Fund established by Dayton History will be considered in DoE's assessment determination. If DOE determines that the MCWDC is not sustainable at the Mound site, the exhibits will be relocated to Carillon Historical Park in Dayton, with the five key exhibits that were predetermined in the MOA to be placed on permanent display, thereby maintaining the legacy of the Mound site. Dayton History is required to submit a final closeout report at the end of Year Five of the cooperative agreement. The report will describe all activities completed under the agreement, provide an assessment of how project goals were achieved or not achieved, and describe how the legacy of the site will be preserved. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concoction and Appraisal of Radiation Hardened Polyurethane Foams for DOE Decontamination and Decommissioning (D and D) Operations

Since World War 2, a number of nuclear facilities have been relocating their nuclear waste to long term storage, or final disposition. These facilities face monumental challenges in cleaning up the fixated transferrable radioactive waste that is left in these facilities after initial cleaning operations have ended. SRNL has identified a solution that is utilizing two-part epoxy foams with heavy metal additives for fixating and shielding transferable radioactive material that has accumulated in non uniform volumes. The purpose of this experiment is to make a library of data of physical characteristics of each foam and additive combination that will have data concerning how the material cures and performs in different environments with varying temperatures and how it will act and perform after being irradiated. Materials Being Tested: - Foam iT 7FR, Foam iT 23FR, 3M Fire Barrier foam, and Hilti CP620 foam; - Additives Bi, Bi2O{sub 3}, Na{sub 2}WO{sub 3}, and WO{sub 3} at 12.5% and 25%. What's being investigated: - Expansion data from each foam; - Radiation shielding data for each foam combination; - Peak temperatures for each foam. Utilized a FLIR thermal camera to find peak temperature and time it took the foam to reach it. No noticeable difference in volume or weight after blank foam samples sat in the environmental chamber for 24 hours except the 3M foam at the extreme relative humidity of 90% highlighted above. The more additives used in the foam, the more they were able to shield. The foams begin to saturate around 100% wt% where more additive used will not increase the shielding capability of the foam. Similar thermal dispersion in blanks and in samples with Bi additive. Time taken to peak temperature is very similar between the two. Similar peak temperatures in blanks and in Bi samples. Hilti had slightly elevated temperatures. All foams maintained their physical properties post environmental chamber except the 3M foam. With the increased sponginess from the high relative humidity's, 3M may be disqualified for further testing if its mechanical properties also suffer. While curing all foams had their peak temperature occur between 40 deg. C and 70 deg. C except the Hilti which occurred above 90 deg. C with and without additive. With this information, no foams would be disqualified. After radiation shielding studies, it was found that IT 14 with Bismuth and Bismuth Oxide Additives provided the best shielding of Co-60 with over 9% attenuation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 34: US DOE Featured Site: Savannah River Operations Office: 70 Years of Service

The Savannah River Site celebrates its 70. anniversary on November 28, 2020. On this date in 1950, President Harry S. Truman requested the Dupont Company to design, build and operate what was then known as the Savannah River Plant in response to the Soviet Union's detonation of its first atomic weapon, which set the Cold War into motion. During the 1950's, six South Carolina towns were relocated for the construction of SRS and by 1953, the 310 square mile site was complete. Nearly 40,000 workers were employed t build five nuclear reactors and support facilities, two chemical separations plants, heavy water extraction plant, nuclear fuel and target fabrication facility tritium extraction facility and waste management facilities. SRS played a key role in winning the Cold War and for seven decades, SRS has been a leader within the DOE complex. Today, the site supports environmental stewardship and maintains the nation's nuclear deterrent while ensuring the safekeeping and disposal of domestic and international nuclear materials. The site continues to support the nation's nuclear defense as it explores new potential NNSA missions. SRS has a proud 70- year history and looks forward to a future of service as a national asset and strong community partner. The session was kicked off with a video message from Secretary of Energy, Dan Brouillette, who thanked employees past and current for their efforts. The video also provided an overview of the history and future of the Site. This panel provided an overview of the Savannah River Site's 70 years of service (history, challenges, opportunities, and future) presented by the SRS's Senior leadership and the local Aiken, South Carolina Mayor. Panelists with presentations: US DOE Secretary Dan Brouillette's Overview of DOE and SRS - A Legacy of 70 Years of Service (Amy Boyette); 70 Years of Service (Michael Budney); 70 Years of Service (Stuart MacVean); SRS Liquid Waste (Thomas Foster); National Nuclear Security Administration (Nicole Nelson-Jean)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The TRANSCEND Consortium - In-situ Identification of Surface Corrosion Products on Spent Nuclear Fuels - 20276

The management of spent nuclear fuel is a major ongoing concern for the UK owing to the cessation of reprocessing operations at Sellafield and the large, complex inventory arising from Magnox, AGR, PWR and prototype reactors. Retrieval and relocation operations for legacy fuels are imminent and therefore, any models that enhance our understanding of fuel evolution will help mitigate the risks associated with fuel storage and disposal. The TRANSCEND Consortium on nuclear waste management comprises four work packages, within this current paper we provide a summary overview of progress to date and illustrative results from Theme 3: Spent Nuclear Fuels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Temporary Storage Sites in Support of the Port Hope Area Initiative - 20295

The Port Hope Area Initiative is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope which is located in Ontario, Canada. The Eldorado refinery, on the north shore of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium. Through the history of the operation, LLRW was deposited throughout the town of Port Hope as a result of fugitive emissions from the plant and/or through the re-use of process residues as building material and backfill. Historical clean-up activities conducted in the late 1970's involved the remediation of approximately 400 properties and the relocation of 100,000 cubic metres of contaminated soil to a disposal facility in Chalk River operated by Atomic Energy of Canada Limited (AECL). Owing to space limitations at that disposal facility, any LLRW identified through construction monitoring since that time has been stored in the community at three temporary storage sites located throughout the town. These include: the Centre Pier mound that contained approximately of 19,800 m{sup 3} of LLRW-impacted soil that originated from the construction of a new water treatment plant; two mounds located at a licensed storage facility containing LLRW obtained from residential clean-up activities (11,000 m{sup 3}); and a small pad adjacent to the municipal sewage treatment plant containing 2200 m{sup 3} of LLRW-containing sludge. With the construction of a new long-term waste management facility (LTWMF) that has been designed to house all of the LLRW identified within Port Hope, the three sites were early candidates for remediation. The clean-up of the three temporary storage sites was a significant milestone for the Port Hope Area Initiative. After a decade of planning and consultation, this work represents the first sites in the municipality to be remediated with the waste being safety removed and transferred to the newly constructed LTWMF. This paper discusses the challenges associated with the clean-up activities for these three sites and the strategies employed to address those challenges. These included weather-related challenges, owing to the seasons over which the work was conducted as well as those associated with working within a closely-knit community. Canadian Nuclear Laboratories (CNL), working on behalf of the federal government, has worked diligently to develop a positive and trusting relationship with the community. Consequently, the successful execution of this project needed to be sensitive to, and respectful of the needs of the community. In addition to the usual Health, Safety and Environment training, project staff received community awareness training that spoke to the history of this community-based initiative and the expected behavior when working within the community. Transportation routes were defined based on safety and the need to minimize disruption to local traffic while haul-times where scheduled around school bus hours to enhance public safety. The successful completion of this first of many remediation projects to be completed under the Port Hope Area Initiative reflected years of careful planning. Nevertheless, there were a number of 'lessons learned' that have been applied on other ongoing projects be completed under the Port Hope Area Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Areas Initiative's Port Granby Project: The Decontamination of Site Equipment from a Low Level Waste Facility - 20330

The Port Hope Area Initiative (PHAI) is the Government of Canada's response to the community recommended solutions for the remediation and safe, long-term management of historic low-level radioactive waste (LLRW) that was the result of uranium and radium processing operations in the Municipality of Port Hope, Ontario from the 1930's to the 1980's. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of approximately 1,200,000 m{sup 3} of historic low-level radioactive waste and marginally contaminated soil from the PGWMF to the newly constructed LTWMF. Since the project's inception in 2016, the bulk of the material has since been moved to the final long term storage cell. This has taken over 500,000 person-hours and a large amount of one site heavy equipment to accomplish including excavators, bulldozers, rock trucks, baker tanks and vacuum trucks. While many of the pieces of heavy equipment and water management equipment has further work to do on site, several of the sites larger items have already undergone the decontamination process prior to release from the site. This process has posed a serious challenge as the waste has a caustic nature to it and over the last few years it has had time to work its way into the metallic structures and framework of the equipment. Coupled with the tight work spaces and in some cases confined work areas there have been many issues that needed to be addressed to successfully reach a state where items can be free released to the unrestricted limits of the sites license. This ongoing process has led to a more refined decontamination program at the Port Granby Facility and has had a rather high success rate considering the length of time the equipment has been exposed to the waste materials on site. This paper discusses the varied challenges of decontamination faced at a low-level radioactive waste facility with a focus on the following aspects: - Challenges faced regarding different equipment types and the solutions implemented by Wood to address these challenges; - An examination of various decontamination methods employed throughout the project; and - Lessons learned over three years of remediation work and how they impact the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HBU R and D Cask Transportation Options - 20436

The TN-32B HBU Demonstration Cask was successfully loaded in November 2017 with 32 high burnup (HBU) fuel assemblies at Dominion's North Anna Nuclear Plant and is collecting thermal data as intended. The first two phases of this very successful project sponsored by DOE and EPRI was designed to collect thermal data of HBU fuel to support extended storage. The next phase of the project requires the cask be licensed for transportation so the cask can be relocated to a site (to be determined by DOE) to facilitate long term monitoring and additional research on the fuel. This is a unique challenge given the constraints that exist for this particular bolted metal cask. The TN-32B cask is a 234,288 lb. (storage configuration) dry storage system that was selected for this project and it was modified to provide thermal data and the ability to collect gas samples after loading. Several major issues must be addressed to obtain the transport license including protecting the seven lid penetrations that were made to allow for the insertion of the thermocouples into the selected fuel assemblies after the cask was loaded. In order to protect the integrity of the research, the payload must remain as is. Therefore, the cask system must be placed into the transportation configuration without rewetting the fuel, replacing the lid and without removing the thermocouple instrumentation that is currently installed. A critical portion of the design and engineering that was performed in the first two phases of the project was to ensure that future transportation of the cask was integrated into the approach. Efforts were made to accommodate requirements such as containment boundary leakage testing, installation of impact limiter brackets and lid bolts suitable for transportation. Due to the science requirements of the project, the fuel selected was intended to yield the highest payload temperatures permitted to provide the greatest value for the researchers. This resulted in higher than usual external dose rates and surface temperatures that warranted performing as much preparatory work prior to cask loading to ensure ALARA and personnel safety to the greatest extent practical rather than working on a loaded cask. In addition to the work performed prior to cask load, there are remaining challenges such as protecting the modified lid, design and fabrication of impact limiters that accommodate the modified cask lid and preserving the thermocouple connections for continued monitoring. The project team is currently performing the necessary calculations, engineering, and design to support the licensing as required by the US NRC. Pre-application meetings have been held to inform the regulator of the planned technical approach to ensure compliance with the applicable regulations. The current plan is to obtain the transportation C of C by the end of 2021. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transporting Non-Compliant TRU Wastes in the OPTIMUS{sup TM} Packages - 20493

The OPTIMUS{sup TM} product line of packages was developed with the purpose of providing a versatile and modular packaging option for shipping problematic wastes and fissile material contents. The product line includes a high-activity design in the OPTIMUS-H and a low activity design in the OPTIMUS-L. The two variants utilize a singular containment vessel design, that is enclosed in different protective components that offer different levels of shielding along with thermal and impact protection. The thick shielding provided by the OPTIMUS-H packaging allows for higher activity contents than the OPTIMUS-L to be transported. But the lightweight design of the OPTIMUS-L packaging allows for more packages to be transported in a single shipment. The containment vessel design shared between the two packages provides leak-tight containment of all radioactive contents along with the capabilities to easily leak test and the option to inert and backfill the contents, as necessary, prior to each shipment of the package. Together the OPTIMUS package designs offer significant flexibility and are capable of handling a wide variety of waste materials and other radioactive contents. One of the primary contents covered in the initial design effort for these packages is TRU waste contents beyond the standard waste materials that are compliant with the WIPP Waste Acceptance Criteria. More specifically, the initial content of interest is TRU Waste drums containing sealed containers with potentially flammable gases. While there are multiple other packaging options available for transporting standard WIPP compliant TRU wastes, the goal of the OPTIMUS packages is to offer a superior option for transporting both standard TRU wastes as well as the more problematic non-compliant wastes, among other contents. The non-compliant TRU waste contents explicitly included for the OPTIMUS packages are standard aerosol cans and DOT 3E lecture bottles. However, the methods applied for the package containment can be easily adjusted to cover other sealed container types with potentially flammable gases. The primary challenges with including these items are both the obvious issue of potential for flammable gases (e.g. aerosol propellants) in the package, but also the uncertainty in the exact state of the contents. Because these desired contents are waste materials, the characterization of the materials present in the waste may include some uncertainties. For example, though it may be known that there are one or more aerosol cans in a TRU waste drum, it may not be known if this can is full, spent, or anywhere in between. Also there may be equal uncertainty in the contents of the aerosol can, specifically in the potentially flammable propellant remaining in the can. To include these types of non-compliant items as acceptable contents for the package, the methods utilized in the safety analyses of the OPTIMUS packages must consider all of the uncertainties in the characterization of the waste. The methods utilized cover a range of concerns with transporting contents of this nature including pressure buildup, gas generation, and gaseous combustion for demonstrating the containment of the package. The ability to transport these problematic contents in the OPTIMUS packages gives TRU waste generating sites the option to relocate these drums to an offsite location where the non-compliant items can be properly managed through removal or destruction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Instrumentation Development for Transient Testing in TREAT

Development of nuclear fuels requires experimentation and modeling for behavior during transient power and cooling conditions. The Transient Reactor Test facility (TREAT) will provide unique capability in the U.S. to perform controlled experimentation of such conditions in a nuclear environment. To support experiment objectives and provide validation data for modeling and simulation tools, experiment instrumentation plays a critical role in monitoring test specimen behavior (temperature, dimensional changes, relocation, microstructural evolution, etc.) and specimen boundary conditions (thermal, mechanical, nuclear) at various length and time scales with the ultimate goal of reducing uncertainties in experiment conditions. This summary presents an overview of current instrument development objectives and progress for TREAT experiments with emphasis on near-term activities to support Reactivity Initiated Accident (RIA) experiments in LWR systems. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fukushima Containment Dose Assessment

Dose calculations for a BWR Mark I containment are conducted to complement source term research on the meltdowns at Fukushima Daiichi. These efforts are a primary component of Phase II of the OECD/NEA's Benchmark Study on the Accident at Fukushima Daiichi Nuclear Power Station (BSAF). Phase II of BSAF aims to evaluate radionuclide source terms to the containment and to the environment, radionuclide transport behavior, and dose rates inside and near the plant. The radionuclide-focused goals of Phase II make use of thermal-hydraulic and severe accident insights from Phase I of BSAF, which concentrated on severe accident thermal-hydraulics, core degradation and fuel relocation, reactor pressure vessel (RPV) lower head failure, and containment response. The details and assumptions involved in the severe accident progression have first-order impacts on radionuclide transport and consequent dose rates. An MCNP6 model is created to support the BSAF Phase II investigations. The MCNP6 input represents a boiling water reactor (BWR) Mark I containment and pertinent surrounding structures such the reactor building. This paper examines photon dose rates inside and adjacent to the containment. The spatial distribution and energy spectrum of the source, as well as the overall source magnitude, are informed by MELCOR radionuclide transport calculations in conjunction with ORIGEN-S decay calculations. Initial mesh and ring tally calculations are discussed in relation to plant data. Despite the simplified geometry model and uncertainties of the severe accident source, the preliminary calculations yield impressive agreement with the measured data. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Validation of advanced in-pin metallic fuel models of SAS4A

The SAS4A safety analysis code has been extended to include mechanistic and physics-based models of U-Pu-Zr and U-Zr metallic fuel pins. The predictions of the code for various phenomena such as fission gas behavior, clad wastage formation, thermal expansion, creep, and gas swelling induced axial fuel relocation, in-pin molten fuel ejection, and clad failure models have been significantly improved. The paper presents the validation effort of the new code using the results of eight sets of TREAT MSeries overpower experiments, prior to clad failure. Fuel axial expansion reactivity and clad failure behavior was benchmarked. The results show that the code predictions are satisfactory. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗