Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Project Risk Assessment and Monitoring for CarbonSAFE Illinois - Macon County (Task 2)

A risk evaluation performed for CarbonSAFE Macon County included performing a risk assessment for the overall project and the identification of technical project risks. These tasks were accomplished through a combination of risk assessment meetings, workshops, expert solicitation, and identifying and implementing risk mitigation or prevention activities. Information from previous carbon storage projects and from the execution of the project (including drilling a test well and conducting 2D seismic survey) were assessed to identify future risks towards the development of a storage complex.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Coastal Acoustic Buoy for Offshore Wind: Project Synthesis

The population of North Atlantic right whales is critically endangered and their habitat overlaps with offshore windfarm leases. It is therefore imperative that effective mitigation strategies be used to avoid impacts on right whales during the construction of offshore windfarms. The Department of Energy issued FOA Number DE-FOA-0001924 to encourage the development of technology that could monitor large exclusion zones for right whales in order to mitigate potential impact of construction noise on right whales. This report summarizes the past two years of the development and evaluation of the Coastal Acoustic Buoy for Offshore Wind (CABOW) project which aimed to develop technology to monitor large exclusion zones for North Atlantic right whales. Over the course of the project SMRU Consulting have implemented a rigorous design process including comparison of different approaches (e.g., single sensor vs multiple sensors), as well as consideration of placement and timing of acoustic monitoring. We have evaluated critical components of the CABOW system including, reliability, detection range, and bearing accuracy in areas adjacent to offshore windfarm leases in Maryland by conducting 3,536 playbacks of simulated right whale upcalls. The maximum call detection range was 7.5 km when noise was 99 dB re 1µPa rms (50-225 Hz), but this reduced to < 1 km when ambient noise levels were high. Our detection probability in the field was measured as a function of range as well as the source-to-noise level ratio allowing us to build a model to predict the probability of detection under various scenarios (sample size: 3,536 calls x 5 buoys = 17,680). The median bearing error was -0.25° but this is likely an underestimate of error due to experimental design. Using the published recall and precision of the two detectors we implemented in the CABOW system, we estimate that at a recall of 80%, our precision was > 80%, within the range of what we were aiming for in this project. To estimate our exclusion zone false negative and false positive rates, we built a simulation model using the empirical data from our field trial. We modelled three to nine CABOW units placed on the 10 km exclusion zone and estimated our false negative rate to be 1% or less (which was our project goal) and our false positive rate to be between seven and nine percent, slightly above our goal of 5%. However, we also modelled an equivalent PAM system that does not have bearing capabilities and found the false positive rates for that system to be six to eight times higher than the CABOW rate. This higher false positive rate of PAM systems with low spatial information could have significant cost repercussions for offshore wind developers by adding work shutdowns or delays without providing additional protection for right whales. The model we built allows us to explore the placement of PAM systems under various scenarios and will thus help facilitate planning of PAM mitigation systems to meet NOAA Incidental Harassment Authorizations for specific windfarms. We achieved an average system uptime of 98.3%, just below our goal of 99%. The issues that caused these short losses of data have been identified and fixed. Right whale detections and audio clips were typically transferred via radio from the buoys to the base station in two to four seconds. We therefore believe we have developed a highly robust real-time PAM system. Based on the above, we feel we have achieved the stated funding goal of developing a cost-effective and robust real-time PAM system that enables the monitoring of large exclusion zones for right whales during the constructions of offshore windfarms. This should lead to decreased costs and risks for the offshore wind sector while providing robust mitigation for right whales. It is important to state that PAM mitigation will need to be implemented with other mitigation strategies (e.g., visual observers) to provide a complete mitigation strategy to ensure that any effects on right whales from offshore windfarm construction is minimized.

17 WIND ENERGY↗

Tempus Project (Final Report)

This final technical report tracks the accomplishments of the Tempus Project to the statement of project objectives and resulting deliverables. The objective of the Tempus project was to develop and demonstrate the capabilities of a secure, modular, and customizable time synchronization platform that provides layers of protection from GPS spoofing attacks and other vulnerabilities. These vulnerabilities present a challenge to power system operators utilizing GPS-based time synchronization, as time synchronization increasingly plays a critical role in the efficient and reliable operation of power systems. The Tempus project addressed these concerns through the development of a secure, customizable time synchronization platform. The Tempus platform applies a layered approach to time security that protects from manipulation of timing systems used by power utilities. The Tempus platform consists of a component framework utilizing modularized time sources and customizable manipulation detection algorithms. With multiple time sources, and comparisons between sources and tracking sudden or subtle changes to the timing phase and time information, the Tempus system can detect and mitigate compromised timing sources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Measurement Acceptance Region (MAR) Assessment Results Based on Confirmation Sample Sludge Batch 10 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the 0.65 Weight Percent Sulfate Solubility Limit for Sludge Batch 10 Based on November 2022 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System glass property models and their associated Measurement Acceptance Region constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site 300 Small Firearms Training Facility Project Soil Sampling and Analysis Plan

Lawrence Livermore National Laboratory's (LLNL) Project Management Office (PMO) is planning to execute a construction project at the Small Firearms Training Facility within LLNL's Experimental Test Site, Site 300 (S300). The proposed project will include extensive dirt work from a removal of a berm, the installation of a cinder block wall, and the replacement of a canopy and a fence with an access gate. This Sampling and Analysis Plan (SAP) outlines the procedures to collect environmental samples for the management and/or disposition of excess soil generated from the project site and geotechnical samples for building pad and pavement designs. This SAP has been prepared and is organized to be consistent with LLNL's Soil Screening and Management Plan (SSMP) (LLNL, 2021), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) programs (EPA, 2006).

54 ENVIRONMENTAL SCIENCES↗

Improving Subsurface Stress Characterization for Carbon Dioxide Storage Projects by Incorporating Machine Learning Techniques

The overall objective of this project is to develop a framework for reliable characterization and prediction of the state of stress in the overburden and underburden (including the basement) in CO 2 storage reservoirs using machine learning and integrated geomechanics and geophysical methods. Specifically, we propose to develop workflow encompassing of technologies and/or methods to predict stress and pressure changes due to CO 2 injection in an active tertiary recovery site and their impacts on subtle fault activation, fractures and occurrence of microseismic events and compare responses to field observations. In this project, we anticipate using dataset from the Farnsworth field Unit (FWU) which is operated by Purdure Petroleum. A novel elastic-waveform VSP inversion technique will be used to estimate high-resolution spatial and temporal changes of elastic moduli in CO 2 storage reservoirs, which will be combined with velocity-stress relationship derived from laboratory tests to obtain subsurface pressure and stress. Clustered microseismic data will be jointly inverted for improved focal mechanisms. Least-squares reverse-time migration of microseismic waveform data will be performed to directly image fracture/fault zones. Additionally, a deep neural network machine learning technique with convolutional and recurrent layers will be used for learning the spectro-temporal structures in microseismic waveforms. The results of this geotechnical data analysis will be integrated to develop a high-resolution 3D mechanical earth model extending from the overburden sealing formations to the underburden including the basement. Mechanical properties will be derived through integration of mechanical logs, tests, available results from chemo-mechanical laboratory tests, and elastic inversion of seismic data using a combination of Bayesian and stochastic methods as well as machine learning technique. Failure features (faults/fractures) will be represented and/or modeled based on seismic and core data analysis. A transient hydrodynamic-geomechanical model will be developed through coupling with the calibrated FWU reservoir simulation model. The full physics coupled model will be used to train a reduced order proxy model using machine learning algorithm for estimating stress which will then be used with appropriate constitutive relationships and forward seismological models to simulate pressure changes and induced microseismicity. An advanced optimization framework will be developed to perform a history match to minimize error between field observations and simulated. The history matched proxy model will be verified against the full-physics equivalent. The field observations that will be used in the coupled model calibration process include pressure/stress inverted from VSP, moment magnitude from microseismic analysis, real time downhole pressure measurements, production and injection data. Parameter sensitivity and uncertainty analysis will be performed to characterize the impact of model parameter uncertainty on stress estimates. The proposed project will have significant impact on future field implementation of the proposed technology. Because the project field site is an ongoing CO 2 EOR development, the value of the new technology will be demonstrated in an operational context and evaluated as a viable risk mitigation strategy. Cost/benefit will be evaluated together with the various commercial incentives for CO 2 sequestration available to oil and gas operators. The extensive available dataset and ongoing data acquisition under the SWP Phase III work plan provides flexibility for investigation of multiple approaches and reduces technical risk.

58 GEOSCIENCES↗

U328 Electrical Reliability Project Soil Sampling and Analysis Plan

Lawrence Livermore National Laboratory's (LLNL’s) Project Management Office (PMO) is planning to install an underground electrical duct bank at the 3200 block of the Livermore Site (project). The proposed project will include a new electrical substation and feeders, demolition and replacement of the U328C utility building with a new structure to the west, re-routing of utilities, and update of the parking lot. This Sampling and Analysis Plan (SAP) outlines the procedures to collect and evaluate environmental samples for disposition of the excavated soil during the project and geotechnical samples for pavement design. This SAP has been prepared and is organized to be consistent with LLNL's Soils Screening and Management Plan (SSMP) (LLNL, 2022), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) process (EPA, 2006). In addition to the environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection and evaluation of the geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

Building 151 NNMA Clean Laboratory Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Building 151 NNMA Clean Laboratory Project (project) located immediately south of Building 154. The purpose of the SAP was to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction in accordance with Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL, 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA, 2006). The SAP was developed in accordance with the SSMP and based on preliminary design information provided to EFA by PMO. In addition to environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection of geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

Microbiome controls on harmful algal toxin production in Lake Erie (Final Project Report)

Lawrence Livermore National Laboratory (LLNL) funded this project with the aim to understand how the microbiome influences the toxicity of harmful algal blooms in Lake Erie. Dr. Xavier Mayali from LLNL led the project. Dr. Dragan Isailovic led University of Toledo portion of the project also involving Dr. Thomas Bridgeman, and Dr. Gregory Dick led the portion of the project at the University of Michigan with Dr. Jenan Kharbush.

54 ENVIRONMENTAL SCIENCES↗

RADWIND Project Final Technical Report

The Rural Area Distributed Wind Integration Network Development (RADWIND) Project (January 2020-April 2023) was undertaken by NRECA Research, a not-for-profit subsidiary of NRECA focused on underwritten research, with the support of DOE. The project was part of the Wind Energy Technologies Office’s (WETO’s) Wind Integration for Rural Economic Development (WIRED) program, which was developed out of an October 2018 workshop in which NRECA participated in. RADWIND’s end of project goal was “to raise awareness of distributed wind as a solution for the energy, resiliency, and economic development needs of electric cooperatives, and to provide resources and information that reduce barriers and lower costs for co-ops seeking to deploy distributed wind. Through this project, NRECA Research seeks to establish a national distributed wind presence for and by NRECA’s members that delivers these benefits and plans to communicate NRECA’s members that properly deployed distributed wind can be a bankable technology option for rural America.”

17 WIND ENERGY↗

Project Title: Adaptive Vertical Grid Enhancement for E3SM (Final Technical Report)

During the first phase of the project (2018/05-2021/05), we proved the hypothesis that, without tuning, high vertical resolution improves the representation of unresolved, parameterized low altitude clouds such as stratocumulus clouds in global climate models. We evaluated the effectiveness of the newly developed computational framework, Framework for Improvement by Vertical Enhancement (FIVE) by implementing it into E3SM. FIVE aims to improve representation of the target cloud, low level cloud for this project, with use of a locally high vertical resolution for computation of selected processes. FIVE was assessed via direct comparison among E3SM, E3SM-FIVE, and satellite data as well as a newly developed ensemble artificial neural network methodology. We demonstrated that E3SM-FIVE remarkably improves marine stratocumulus representation. To advance the FIVE methodology, we took a first step toward the adaptive vertical grid in the FIVE method by modifying the E3SM single column model. For future application of FIVE to the global storm resolving model with a few km horizontal grid resolution, we developed the vertical-meridional two-dimensional (2D) Hadley circulation model, which allows one to run simulations with much higher vertical resolution and significantly longer duration than current three-dimensional global storm resolving model. During the second phase of the project (2021/05-2023/11; period for this technical report), we sought a way to appropriately transform FIVE to a regionalized version of FIVE, which allows one to select locations with/without FIVE. In parallel, we demonstrated that E3SM-FIVE with a 25-km mesh significantly reduced the bias associated with coastal stratocumulus. Furthermore, we showed that the same improvement was able to be obtained with the use of both the Regional Refined Model (RRM) targeted to one of the stratocumulus regions with 25-km resolution and FIVE. We explored a new implementation strategy of FIVE with our 2D Hadley circulation model. In parallel we applied the 2D Hadley circulation model to study the double intertropical convergence zone bias with storm resolving model resolution and aerosol-cloud interactions within the Hadley circulation with near large eddy simulation resolution. Last, we have been investigating Arctic mixed-phase stratocumulus clouds with large eddy simulations in order to improve their representation in global models. During the course of the entire project, 6 journal articles were published, and 3 manuscripts are currently in preparation. We gave a total of 30 presentations at various domestic and international conferences. In addition we gave 6 seminar talks at universities and a national laboratory. E3SM- FIVE is available as a branch of E3SM.

54 ENVIRONMENTAL SCIENCES↗

Perceptions of Large-Scale Solar Project Neighbors: Results From a National Survey [Slides]

Driven by favorable economics, policy factors, and decarbonization goals, large-scale solar (LSS, defined here as ground-mounted photovoltaic projects ≥1 MWDC) has expanded rapidly in recent years, with more than 90 gigawatts (GW) now installed across the United States. Growth in LSS deployment is anticipated to accelerate in response to growing electricity demand and utility, state, and federal decarbonization goals. This continued expansion hinges, in part, on the continued support of local residents and decision-makers in communities hosting LSS projects. Understanding the perceptions and attitudes of existing LSS neighbors is critical to inform and enable future LSS deployment, and to improve outcomes for those host communities. As of 2022, there were more than 10 million U.S. homes within 3 miles of LSS plants. Yet, until recently, no comprehensive study had examined the experiences and perceptions of these LSS neighbors. In 2023, a Berkeley Lab team worked with the University of Michigan and Michigan State University to conduct the first-of-its-kind nationally representative survey of LSS neighbors as part of the Community-Centered Solar Development research project. The survey effort ultimately collected 984 responses from residents within 3 miles of existing LSS projects. The survey results are available for download via the full summary analysis slide deck report, as well as a shorter (~4 page) summary brief. The survey instrument (questionnaire) is also available for download for those interested in understanding the survey design or replicating questions in future research.

14 SOLAR ENERGY↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

13 HYDRO ENERGY↗

Sicangu Village Solar Project

The Sicangu Village Solar Project, spearheaded by the Rosebud Sioux Tribe in partnership with GRID Alternatives, aimed to enhance energy sustainability within the community through the installation of a 149 kW community solar Photovoltaic (PV) array and 13 residential rooftop solar PV systems. Located in Todd County, South Dakota, the project addresses longstanding challenges of rising electricity costs and economic disparities faced by the Tribe. By leveraging solar energy production, the project not only reduces electricity expenses for the community, but also serves as a pivotal step towards achieving the Tribe's energy sovereignty goals. Despite encountering interconnection challenges and delays, particularly exacerbated by regulatory and infrastructure complexities, the project has successfully demonstrated the feasibility of solar energy deployment within the community.

14 SOLAR ENERGY↗

PRIMO – The Plugging and Abandonment Project Optimizer

Conference presentation at the Methane Mitigations America. The presentation provides an overview of the PRIMO – The Plugging &amp; Abandonment project optimizer tool and showcases how PRIMO can be used to: 1. Rank candidate emission sources (based on user-based criteria) 2. Identify high-impact, high-efficiency project candidates 3. Compare competing mitigation projects quantitatively (through transparently computed project impact and efficiency scores).

Puranik, Yash [NETL Site Support Contractor, Natio↗

Selection of Global Climate Model Data for Downscaling With Generative Machine Learning and Use in the Power Planning for Alignment of Climate and Energy Systems Project

The range of results from climate models and scenarios is important to the understanding of uncertainty in power planning analysis. A U.S. Department of Energy-funded analytic project called Power Planning for Alignment of Climate and Energy Systems is developing data and analytic methods to reflect the effects of climate change on key variables for power system planning, as part of the Grid Modernization Lab Consortium. This project will select and prepare global climate model results for use in power system planning models. A related report (Evaluation of Global Climate Models for Use in Energy Analysis) assesses the performance of various global climate models from the Coupled Model Intercomparison Project Phase 6 data archive for their historical skill with respect to energy system performance and for their future projections under multiple climate change scenarios. Building from that report, we describe the selection of a climate scenario (Shared Socioeconomic Pathway [SSP] 2-4.5) and five climate models: TaiESM1, EC-Earth3-CC, GFDL-CM4, EC-Earth3-Veg, and MPI-ESM1-2-HR. We describe the model selection criteria, which were based on the quality of the match between model results under historical conditions and on the representation of the range of future values for several variables. These results will be downscaled via an open-source generative machine learning method called Super-Resolution for Renewable Energy Resource Data with Climate Change Impacts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Project Title: Demonstration High Temperature Superconducting NonPlanar Stellarator Magnet with Advanced Manufactured Assemblies

This is the final report for the project “Demonstration High Temperature Superconducting Non- Planar Stellarator Magnet with Advanced Manufactured Assemblies”, funded by DOE, and performed by Type One Energy from September, 2020, to March 2024 involving the Fusion Technology Institute at the University of Wisconsin–Madison, the Plasma Science and Fusion Center (PSFC) at the Massachusetts Institute of Technology (MIT) and Commonwealth Fusion Systems (CFS) to design and fabricate the first non-planar HTS (REBCO) coil for a high-field stellarator based on the SPARC tokamak’s VIPER cable concept. Stellarators at high fields make high-temperature superconducting magnets necessary for a compact fusion device. But the asymmetric and non-planar nature of its components, especially the magnets make it difficult for scalable producibility. To address these challenges, two promising technologies have emerged: advanced manufacturing (AM) for the supporting plates for forming the magnets, and high-temperature superconducting (HTS) cables inside the plates. AM has advanced enough to produce stellarator components with the necessary geometric complexity, size, and the precision, leading to potentially significant reductions in production time, cost, and waste. The cost of HTS tape has decreased dramatically, and progress in HTS planar magnet development has reached a point where it can be proposed for application to complex 3D non-planar magnets. The main objective of this project is to develop, demonstrate and pre-commercialize a novel, non-planar HTS coil shape that remains superconducting to achieve production scalable reductions in time and cost and performance. The proposed technology is based on the novel concept of a precision sub-scale HTS nonplanar coil assembly. This project focuses on the design, fabrication, material optimization of cable design, and validation and demonstration of the high current carrying capability of superconducting magnets and their support in a complex 3D shape needed for application to stellarator magnetic plasma confinement. The specific objectives of this research program include: (1) The successful application of metal AM to build a precision sub-scale HTS nonplanar coil, (2) An HTS cable and cross-section design that can conform to the required nonplanar coil shape (bend radii as tight as 10-cm) and remains superconducting at an engineering current density of 1.35 kA/cm 2 at 77 K and 1 tesla at the conductor (5 kA in the cable). To achieve the above challenging goals, we have formed a multidisciplinary research team consisting of members from Type One Energy and UW-Madison, MIT PSFC and CFS with complementary skills and strong facilities. The team worked collaboratively on fundamental and applied research on the following three major technical areas: (1) Design, fabrication, and optimization of non-planar HTS Cable The ultimate goal of the project is to determine if commercial REBCO tapes and additive manufacturing can be used to fabricate high field (≥ 10T) non-planar coils with tight bending radii (≃ 100mm) and with a degradation of the critical current (Ic) smaller than 20% with respect to the expected performance. We started with shorter length cable to evaluate the scalability of the production process and eventually reached multiple turns for higher magnetic fields. Our findings suggest that a stellarator coil system of a relevant size, characterized by its asymmetric and non-planar components, can be fabricated using a formed cable in plate method. This system can be simulated using a large-scale modeling approach. The use of hybrid modeling 3 techniques will be pivotal in reducing the complexity of the model and in assessing expected performance in designs. (2) Modeling and simulation of the non-planar HTS Cable Multiphysics simulations are performed using the commercial software and are carried out in self-field conditions, involving 2D and 3D models and twisted around one slot of twist-pitched VIPER cable. Multiphysics simulations are mainly focused on the coil for the critical current evaluation, the magnetic field map, self-Lorentz forces and mechanical, and magnetothermal behavior and the quench dynamics. The detailed model and prediction of the superconducting performance of a stellarator-relevant demonstration cable from numerical simulations supports the results from the actual testing backing the results. A detailed description and results are provided in the later sections. (3) Design, fabrication, and optimization of support for the non-planar HTS Cable The team developed an additive manufactured (AM) coil positioning plate that formed into the required non-planar geometry (with bend radii as tight as 10-cm) and to acceptable tolerances required for a stellarator magnet: (+0.25-mm from ideal on dimensions of coil positioning plates and up to +1-mm from ideal for position of wound coil). The plate materials is also included in this selection process from fabrication and 3D printing perspective and commensurate with eventual application to a fusion reactor. From the cost effectiveness point of view, the HTS coil and plate has the potential to cost less than that made in conventional methods with less waste (<75% waste) reducing time (<50%) and cost (<50%), especially as the AM field matures. The application of advanced manufacturing in the construction of the support plates will also lead to cost reduction, as the cables can be easily replaced, thereby making the assembly modular. With such high primary cost and time savings, high current densities and magnetic field, the funded R&D work has validated the designs, proven the feasibility, and characterized the performance of the HTS coil and plate assembly, paving the way for a relevant-size stellarator coil system.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗