Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Kokkos User Support Infrastructure WBS STPM12 Milestone 2.

This report documents the completion of milestone STPM12-2 Kokkos User Support Infrastructure. The goal of this milestone was to develop and deploy an initial Kokkos support infrastructure, which facilitates communication and growth of the user community, adds a central place for user documentation and manages access to technical experts. Multiple possible support infrastructure venues were considered and a solution was put into place by Q1 of FY 18 consisting of (1) a Wiki programming guide, (2) github issues and projects for development planning and bug tracking and (3) a “Slack” channel for low latency support communications with the Kokkos user community. Furthermore, the desirability of a cloud based training infrastructure was recognized and put in place in order to support training events.

97 MATHEMATICS AND COMPUTING↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; Title 40 of the U.S. Code of Federal Regulations Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247: Radiation Protection – Air Emissions and 173-480: Ambient Air Quality Standards and Emission Limits for Radionuclides were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated offsite doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL Richland Campus) and in Sequim, Washington, (PNNL Marine Sciences Laboratory). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in 2017.

61 RADIATION PROTECTION AND DOSIMETRY↗

Targeted Mineral Carbonation to Enhance Wellbore Integrity [Final Report]

This project evaluated the potential to deploy targeted carbonation reactions to the leading edge of leaking CO 2 ganglion as a strategy for mitigating leakage from deep CO 2 injection sites. Tasks that were performed for this objective included (i) Maintaining and revising the project management and planning; (ii) Developing novel stimuli-responsive materials that release mineral silicates only below a target temperature; (iii) Imaging of subsamples from targeted carbonation demonstration experiments in porous media and fractured wellborn-zone environments; and (iv) Building models to best fit the experiment results and confirm the hypothesis driving this work.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Targeted Mineral Carbonation to Enhance Wellbore Integrity

This project evaluated the potential to deploy targeted carbonation reactions to the leading edge of leaking CO 2 ganglion as a strategy for mitigating leakage from deep CO 2 injection sites. Tasks that were performed for this objective included (i) Maintaining and revising the project management and planning; (ii) Developing novel stimuli-responsive materials that release mineral silicates only below a target temperature; (iii) Imaging of subsamples from targeted carbonation demonstration experiments in porous media and fractured wellborn-zone environments; and (iv) Building models to best fit the experiment results and confirm the hypothesis driving this work.

42 ENGINEERING↗

MCC On Boarding Section J-2 (Exhibit H) Quality Assurance Requirements [Slides]

Upon MATOC Award, SUBCONTRACTOR shall submit a Quality Assurance Program for evaluation in accordance with subcontract technical and quality requirements. This may be the Subcontractors corporate QA program. Acceptance by Triad of the SUBCONTRACTORS Quality Assurance Program (QAP), as prescribed in Exhibit H, QC-01A and 01B, allows the SUBCONTRACTOR to execute this contract using their approved QAP. SUBCONTRACTORS QAP as approved by CONTRACTOR must meet the applicable requirements of DOE Order 414.1D (see next slide) and must address flow down of the quality requirements to lower tier subcontractors. Triad acceptance of SUBCONTRACTOR’s QAP approval is required prior to Notice to Proceed with on-site work. A Project Specific QA plan may on rare occasions be required for a specific task

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; 40 CFR Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247 and 173-480 were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated off-site doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL-Richland Campus) and in Sequim, Washington, (PNNL-Sequim Campus, which formerly was known as the Marine Sciences Laboratory). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in January 2021 for calendar year ending 2020.

40 CFR 61 Subpart H↗

SECARB-USA: Needs Assessment Framework for Storage Complexes

The goal of this task is to develop an assessment to identify data needed to advance geologic storage projects, with a focus on the SECARB region. The GCCC team considers the needs of CO2 source, storage, and utilization operators and stakeholders, finance and insurance institutions, state and local government relators and agencies, property owners, local stakeholders at prospective storage complexes, and environmental non-governmental organizations (NGOs). Many of these needs are spelled out in the requirements of the Class VI permit. However, at the initial stages of project development, the workflow will not start with permit writing. A number of other factors must be evaluated prior to this major investment. The team’s goal in this report is to inventory the range of typical needs for a wide variety of projects. For subsequent tasks, the team will consider how these needs vary among projects and through the stages of investment, so that project developers can plan the early stages of capitalization.

54 ENVIRONMENTAL SCIENCES↗

Low-Cost Recyclable Oxygen Carrier and Novel Process for Chemical Looping Combustion

The University of North Dakota, through its Institute for Energy Studies and Energy & Environmental Research Center, partnered with Envergex LLC, Barr Engineering and Microbeam Technologies to develop a transformational enabling technology for advancement of Chemical Looping Combustion technology. Industrial support was provided by Carbontec Energy Corporation. The project targeted the two biggest challenges to chemical looping combustion: (1) High costs of oxygen carrier replacement/loss due to expensive manufacturing and high replacement rates from physical attrition and/or decrease in reactivity, and (2) Inherently slow fuel char conversion which represents the rate-limiting step for chemical looping combustion and results in very large equipment sizes, and overall lower carbon dioxide capture efficiency. The project activities were addressed in a series of seven tasks. Task 1 extended throughout the entire project and oversaw project management and execution. Task 2 and 3 focused on development and evaluation of the novel oxygen carrier. Task 4 to 7 focused on design of the novel reactor, testing with the novel oxygen carrier and a techno-economic assessment of the process. The list of tasks are: Task 1 – Project management and planning, Task 2 – Laboratory scale oxygen carrier manufacturing and assessment, Task 3 – Modeling and laboratory-scale evaluation of oxygen carrier performance with coal, Task 4 – 10-kilowatt thermal integrated system installation, Task 5 – Scaled-up oxygen carrier manufacturing, Task 6 – 10-kilowatt testing, and Task 7 – Process design and techno-economic analysis.

01 COAL, LIGNITE, AND PEAT↗

NNSA Minority Serving Institute Partnership Program (MSIPP)--Indigenous Mutual Partnership to Advanced Cybersecurity Technology (ASPIRE, IMPACT and PAMER); FY22 Q2 Progress Report

The following report summarizes the status update during this quarter for the National Nuclear Security Agency (NNSA) initiated Minority Serving Institution Partnership Plan's (MSIPP) projects titled, Indigenous Mutual Partnership to Advanced Cybersecurity Technology (ASPIRE), Indigenous Mutual Partnership to Advanced Cybersecurity Technology (IMPACT) and Partnership for Advanced Manufacturing Education and Research (PAMER).

42 ENGINEERING↗

Potential safety impacts associated with production of gaseous PuF 6 due to reactions between 3013-compliant PuO 2 with Novec TM 1230 at temperature

A part of the NNSA/SRNS Surplus Plutonium Disposition (SPD) project is a planned expansion of an existing facility with capabilities to handle, process, package, and characterize large amounts of plutonium oxide materials for permanent disposition at WIPP. The facility design for this future processing capability will include glovebox operations, HEPA filters, and exhaust/ventilation systems. An NNSA review of the facility support systems included comments on the potential residual reactivity of previously-stabilized PuO 2 , and on the possibility of chemical interactions between stabilized PuO 2 and a new fire suppressant (Novec TM 1230), a replacement for chlorinated/brominated compounds such as HALON TM , to be employed in the event of a room/glovebox fire where PuO 2 will be processed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of SoLID

SoLID spectrometer was proposed to fully exploit the potential of JLab 12 GeV energy upgrade. It is a large acceptance detector which can handle very high luminosity. An overview of the rich physics program will be given, which includes number of planned measurements: a multi-dimensional mapping of semi-inclusive DIS asymmetries for tomography of the nucleon in momentum space in the high-x region and precision determination of the tensor charge; a measurement of parity-violating DIS to provide a precision test of the Standard Model, reaching a sensitivity to new physics at 10-20 TeV level; a precision measurement of J/psi photo- and electro-production cross sections in the threshold region to probe the strong color fields in the nucleon and to study the origin of the proton mass. The current status and the plan of the project will be discussed.

Chen, Jian-Ping↗

Second Target Station Target Segment PIE Dose Estimates

The purpose of the analysis described in this document is to support post irradiation examination (PIE) future decisions as related to the Second Target Station (STS) Project. The STS Project is discussing plans for future PIE studies, and the radionuclide inventories and dose rates included in this study will aid decision makers as they consider the need for various PIE-related machinery. Three configurations of the lasagna-type target segment are evaluated for this analysis: a single bare tungsten plate, a slice of the segment containing a single tungsten plate, and the upstream half of a segment. The lasagna type target segment used in this analysis has a precipitation hardenable nickel alloy (UNS N07718 or inconel 718) shroud, copper (C10100) cladding, and pure tungsten plates. The target segment is evaluated for 10 years of operation followed by two decay periods: 6 months and 2 years. For each decay period, decay gamma dose rates are tallied 30 cm from the upstream, downstream, top, bottom, and sides of the configurations. Radionuclide inventories are also provided in this report separated by material. The highest dose rates calculated in this study are 2872 rem/hr 30 cm away from the top and bottom of the half-target configuration after 6 months of decay.

36 MATERIALS SCIENCE↗

EGS Collab SIGMA-V Project: Stimulation Investigations for Geothermal Modeling Analysis and Validation Phase 1 Report. For the period February 2017 – March 2019

The EGS Collab project was initiated in March 2017 to enable the subsurface modelling and research community to establish validations against controlled, small-scale, in-situ experiments focused on rock fracture behavior and permeability enhancement. The EGS Collab project is to provide the opportunity for reservoir model prediction and validation, in coordination with in depth analysis of geophysical and other fracture characterization data with an ultimate goal of further elucidating the basic relationship between stress, seismicity and permeability enhancement. In addition, the project is to identify and quantify other key governing parameters that impact permeability as well as understanding how these parameters change throughout the three EGS development phases (identify/characterize site, create reservoir, operate power plant). The project is to use comprehensive instrumentation and data collection effort to inform baseline, predictive, and post stimulation reservoir modeling is essential. This report describes the activities performed in Phase 1 of the project. The work done to date is extensive, and a large number of participants have contributed significant effort to enable project success. From planning to execution, we have stayed on track to address the objectives established by the Department of Energy in the paragraph above.

15 GEOTHERMAL ENERGY↗

EGS Collab SIGMA-V Project: Stimulation Investigations for Geothermal Modeling Analysis and Validation: For the period February 2017 – March 2019 (Phase 1 Report)

The EGS Collab project was initiated in March 2017 to enable the subsurface modelling and research community to establish validations against controlled, small-scale, in-situ experiments focused on rock fracture behavior and permeability enhancement. The EGS Collab project is to provide the opportunity for reservoir model prediction and validation, in coordination with in depth analysis of geophysical and other fracture characterization data with an ultimate goal of further elucidating the basic relationship between stress, seismicity and permeability enhancement. In addition, the project is to identify and quantify other key governing parameters that impact permeability as well as understanding how these parameters change throughout the three EGS development phases (identify/characterize site, create reservoir, operate power plant). The project is to use comprehensive instrumentation and data collection effort to inform baseline, predictive, and post stimulation reservoir modeling is essential. This report describes the activities performed in Phase 1 of the project. The work done to date is extensive, and a large number of participants have contributed significant effort to enable project success. From planning to execution, we have stayed on track to address the objectives established by the Department of Energy in the paragraph above.

15 GEOTHERMAL ENERGY↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; Title 40 of the U.S. Code of Federal Regulations Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247: Radiation Protection – Air Emissions and 173-480: Ambient Air Quality Standards and Emission Limits for Radionuclides were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated off-site doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL–Richland campus) and in Sequim, Washington, (PNNL–Sequim campus). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in January 2024 for calendar year ending 2023.

40 CFR 61 Subpart H↗