Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Phase 1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

SSME fuel preburner phase 1/phase 2+ comparison

An analytical comparison of the predicted combustion flowfields for the Phase 1 and Phase 2+ fuel preburner configurations using an advanced CFD combustion code is currently underway at Rocketdyne. The Phase 2+ injector has a modified element design. The redesigned element provides for improved atomization through a shift in the injector element/face bleed flow split while maintaining an acceptable pressure drop. Cold-flow tests of the new design have been encouraging. As a complement to those tests, the Advanced Rocket Injector Combustor Code (ARICC) was selected to conduct a detailed combustion flowfield simulation. ARICC models two-dimensional (or axisymmetric), transient, turbulent, two-phase mixing and combustion flowfields. It is derived from a member of the Los Alamos ICEd-ALE family of codes. Unique features of ARICC include explicit representation of the coaxial LOX jet and hydrogen gas flows, distributed atomization processes, droplet breakup, and supercritical vaporation processes. Predictions of temperature and OH concentration profiles for the Phase 1 and Phase 2+ injector flowfields indicate a trend toward more uniform temperature distributions and shorter flame lengths with the Phase 2+ design.

Jensen, R. J.↗

Quartz/fused silica chip carriers

The primary objective of this research and development effort was to develop monolithic microwave integrated circuit (MMIC) packaging which will operate efficiently at millimeter-wave frequencies. The packages incorporated fused silica as the substrate material which was selected due to its favorable electrical properties and potential performance improvement over more conventional materials for Ka-band operation. The first step towards meeting this objective is to develop a package that meets standard mechanical and thermal requirements using fused silica and to be compatible with semiconductor devices operating up to at least 44 GHz. The second step is to modify the package design and add multilayer and multicavity capacity to allow for application specific integrated circuits (ASIC's) to control multiple phase shifters. The final step is to adapt the package design to a phased array module with integral radiating elements. The first task was a continuation of the SBIR Phase 1 work. Phase 1 identified fused silica as a viable substrate material by demonstrating various plating, machining, and adhesion properties. In Phase 2 Task 1, a package was designed and fabricated to validate these findings. Task 2 was to take the next step in packaging and fabricate a multilayer, multichip module (MCM). This package is the predecessor to the phased array module and demonstrates the ability to via fill, circuit print, laminate, and to form vertical interconnects. The final task was to build a phased array module. The radiating elements were to be incorporated into the package instead of connecting to it with wire or ribbon bonds.

Source record↗

Amateur Radio on the International Space Station - Phase 2 Hardware System

The International Space Station (ISS) ham radio system has been on-orbit for over 3 years. Since its first use in November 2000, the first seven expedition crews and three Soyuz taxi crews have utilized the amateur radio station in the Functional Cargo Block (also referred to as the FGB or Zarya module) to talk to thousands of students in schools, to their families on Earth, and to amateur radio operators around the world. Early on, the Amateur Radio on the International Space Station (ARISS) international team devised a multi-phased hardware development approach for the ISS ham radio station. Three internal development Phases. Initial Phase 1, Mobile Radio Phase 2 and Permanently Mounted Phase 3 plus an externally mounted system, were proposed and agreed to by the ARISS team. The Phase 1 system hardware development which was started in 1996 has since been delivered to ISS. It is currently operational on 2 meters. The 70 cm system is expected to be installed and operated later this year. Since 2001, the ARISS international team have worked to bring the second generation ham system, called Phase 2, to flight qualification status. At this time, major portions of the Phase 2 hardware system have been delivered to ISS and will soon be installed and checked out. This paper intends to provide an overview of the Phase 1 system for background and then describe the capabilities of the Phase 2 radio system. It will also describe the current plans to finalize the Phase 1 and Phase 2 testing in Russia and outlines the plans to bring the Phase 2 hardware system to full operation.

Bauer, F.↗

An Exploratory Evaluation of UAS Detect and Avoid Operations in the Terminal Environment

New technical standards for Unmanned Aircraft Systems (UAS) detect and avoid (DAA) systems mark recent progress toward realizing the goal of full integration of UAS into the National Airspace System (NAS). The DAA system is intended to provide a means of compliance with operating regulations that required pilots on board manned aircraft to remain "well clear" of other aircraft which is accomplished through out-the-window visual acquisition of other aircraft and application of a subjective judgment of safe separation. The requirements for the DAA system, including the specification of a DAA well clear threshold as well as functional requirements for detecting, tracking, alerting and guidance processing, and displays, are specified in DO-365, Minimum Operational Performance Standards (MOPS) for DAA Systems developed within RTCA (Radio Technical Commission for Aeronautics) Special Committee 228 (SC-228). Intended as the first in a series of phased versions, these requirements are frequently referred to as the "Phase 1" DAA system. The Phase 1 DAA system is limited for use by aircraft transitioning to and from Class A or special use airspace, through Class D, E, and G airspace. In particular, the Phase 1 DAA MOPS are not intended for terminal airspace operations, a critical gap for enabling a full range of UAS operations. The application of the Phase 1 DAA system and DAA well clear threshold within the terminal area is predicted to result in a high number of unnecessary alerts when the UAS is safely separated from other traffic. The goal of the present study was to examine pilot performance and operational issues related to the operation of the Phase 1 DAA system in a terminal area. This experiment was intended as an exploratory study that would be used to inform the development of a new terminal area-specific DAA well clear definition, and associated alerting and guidance requirements. The two main objectives of this study were to: 1) characterize pilot behavior in the terminal environment with the Phase 1 DAA system, and 2) investigate the effect of modifications to the Phase 1 DAA alerting and guidance structure. In particular, the authors were interested in determining whether the removal of specific alerting and guidance levels, without changing the DAA well clear definition or alerting thresholds, would impact pilot performance while conducting terminal operations. The results indicate that the Phase 1 well clear definition and alerting and guidance resulted in frequent alerting that degraded pilots' ability to discriminate between encounters where another aircraft was safely separated versus when a maneuver was necessary. The resulting impact on pilot performance was slower response times and higher frequency and severity of losses of DAA well clear compared to those observed for experiments examining pilot performance in the en route environment. There was no significant effect of alerting and guidance display configuration on pilot performance.

terminal area↗

An Exploratory Evaluation of UAS Detect and Avoid Operations in the Terminal Environment

New technical standards for Unmanned Aircraft Systems (UAS) detect and avoid (DAA) systems mark recent progress toward realizing the goal of full integration of UAS into the National Airspace System (NAS). The DAA system is intended to provide a means of compliance with operating regulations that required pilots on board manned aircraft to remain "well clear" of other aircraft which is accomplished through out-the-window visual acquisition of other aircraft and application of a subjective judgment of safe separation. The requirements for the DAA system, including the specification of a DAA well clear threshold as well as functional requirements for detecting, tracking, alerting and guidance processing, and displays, are specified in DO-365, Minimum Operational Performance Standards (MOPS) for DAA Systems developed within RTCA Special Committee 228 (SC-228). Intended as the first in a series of phased versions, these requirements are frequently referred to as the "Phase 1" DAA system. The Phase 1 DAA system is limited for use by aircraft transitioning to and from Class A or special use airspace, through Class D, E, and G airspace. In particular, the Phase 1 DAA MOPS are not intended for terminal airspace operations, a critical gap for enabling a full range of UAS operations. The application of the Phase 1 DAA system and DAA well clear threshold within the terminal area is predicted to result in a high number of unnecessary alerts when the UAS is safely separated from other traffic. The goal of the present study was to examine pilot performance and operational issues related to the operation of the Phase 1 DAA system in a terminal area. This experiment was intended as an exploratory study that would be used to inform the development of a new terminal area-specific DAA well clear definition, and associated alerting and guidance requirements. The two main objectives of this study were to: 1) characterize pilot behavior in the terminal environment with the Phase 1 DAA system, and 2) investigate the effect of modifications to the Phase 1 DAA alerting and guidance structure. In particular, the authors were interested in determining whether the removal of specific alerting and guidance levels, without changing the DAA well clear definition or alerting thresholds, would impact pilot performance while conducting terminal operations. The results indicate that the Phase 1 well clear definition and alerting and guidance resulted in frequent alerting that degraded pilots' ability to discriminate between encounters where another aircraft was safely separated versus when a maneuver was necessary. The resulting impact on pilot performance was slower response times and higher frequency and severity of losses of DAA well clear compared to those observed for experiments examining pilot performance in the en route environment. There was no significant effect of alerting and guidance display configuration on pilot performance.

Rorie, Conrad↗

Optimized Test Section for Helium Flow Loop Experiment

Phase 3 of this project uses the knowledge and techniques gained from Phase 1 and Phase 2. The first outcome of Phase 3 is a new test section which can be manufactured and tested in the Helium Flow Loop Experiment to verify the results of the optimization study. The second outcome of Phase 3 is analyzing the features of this design and determining its performance under simulated TBM conditions: heat flux, pressure, mass flow rate, one-sided and volumetric heating. This will be accomplished by first using the results from the Phase 1 analyses and then applying the optimization strategy from Phase This phase uses the STAR-CCM+ Design Manager tool to apply the optimization strategy to the Helium Flow Loop Experiment (HFLE). The optimization algorithm used by the Design Manager tool is Simultaneous Hybrid Exploration that is Robust, Progressive, and Adaptive (SHERPA search algorithm). In addition to demonstrating the optimization features, a simple parameter sweep is also included in this phase. This report details the applied single objective optimization.

42 ENGINEERING↗

Conceptual design study of a nuclear Brayton turboalternator-compressor

A comprehensive analysis and conceptual design study of the turboalternator-compressor components using HeXe as the working fluid was performed. The study was conducted in three phases: general configuration analysis (Phase 1), design variations (Phase 2), and conceptual design study (Phase 3). During the Phase 1 analysis, individual turbine, alternator, compressor, and bearing and seal designs were evaluated. Six turboalternator-compressor (TAC) configurations were completed. Phase 2 consisted of evaluating one selected Phase 1 TAC configuration to calculate its performance when operating under new cycle conditions, namely, one higher and one lower turbine inlet temperature and one case with krypton as the working fluid. Based on the Phase 1 and 2 results, a TAC configuration that incorporated a radial compressor, a radial turbine, a Lundell alternator, and gas bearings was selected. During Phase 3 a new layout of the TAC was prepared that reflects the cycle state points necessary to accommodate a zirconium hydride moderated reactor and a 400 Hz alternator. The final TAC design rotates at 24,000 rpm and produces 160 kWe, 480 V, 3-phase, 400 hertz power.

Source record↗

Evolution of structural and magnetic properties due to nanocrystallization of mechanically milled amorphous Pr-Co-B powders

Pr{sub 2}Co{sub 14}B permanent magnet powders were prepared by mechanical milling of an arc-melted ingot. X-ray diffraction analysis revealed the presence of the 2:14:1 phase after 1 h of milling which transformed into an amorphous phase with additional milling time. Increasing the milling time also lowered the intrinsic coercivity while the saturation magnetization increased up to 105 emu/g. Differential scanning calorimetry measurements revealed a crystallization temperature of around 560 °C. Upon annealing 30 h of as-milled amorphous powders between 500 and 900 °C, we observed the precipitation of the 2:14:1 phase. The optimum post-milling annealing temperature was 600 °C with an intrinsic coercivity of 7 kOe and maximum energy product of 6 MGOe.

36 MATERIALS SCIENCE↗

EPICS Version 4 - Implementing Complex Data Types

Through phase 1 and phase 2 SBIR grants, s fully functional I/O Controller and communication protocol for version 4 of EPICS is completed. This new software architecture provides a flexible and extendible architecture. Version 4 is implemented fully in Java. The performance metrics look promising. The final portion of phase 2 is to optimize the communication mechanisms. Subsequent work on different aspects of this are required to provide a viable solutions in various areas. Version 3 of EPICS is able to provide a platform for implementing channel based control, because the channel and attributes for time stamping, alarm, display and control were narrow, well defined, and complete. To extend EPICS functionality beyond this, it is necessary to define attributes needed for archive data, array, image data, and directory services. The proper handling of several array types enables the development of middle layer servers such as orbit and bump control in accelerators. Phase 1 should produce a well defined, reviewed, and agreed upon definition of the metadata required for these services. A Phase 2 grant would provide tools that implemented archiving, general array, imaging, and directory applications.

43 PARTICLE ACCELERATORS↗

Measured indoor PM2.5, black carbon, and oxidative potential before and after replacing gas with induction cooking in asthmatic households

Cooking is a major source of fine particulate matter (PM) in homes and evidence to date is inconclusive about the impact of cooking fuel on measures of residential PM exposure. The Cooking Energy and Ventilation Impacts on Children's Asthma (CEVICA) study measured cooking frequency, range hood use, indoor air quality (IAQ) and respiratory health indicators of children with asthma living in homes with gas stoves in California's San Joaquin Valley. Intensive measurements occurred over three 2-week intensive periods: at baseline and at the end of two consecutive 3-month study phases. Participants were randomly assigned to have their gas stoves replaced with electric induction at the start of Phase 1 or Phase 2. As part of the IAQ assessment, we collected particulate matter on Teflon filters using ultrasonic personal air samplers (UPAS). The filters were analyzed to quantify time-integrated PM 2.5 mass concentration, black carbon (BC) oxidative potential (OP). OP was measured using the SLF-OH assay, an acellular chemical assay that quantifies production of OH radicals in simulated lung fluid (SLF). Across all comparisons, PM 2.5 mass tended to be higher during gas cooking than induction electric cooking, although only one transition (Baseline to Phase 1) was statistically discernible at p<0.05. BC and mass-normalized OP showed no measurable differences across stove types or across phases. These preliminary findings suggest that stove fuel alone may not be the dominant determinant of indoor PM 2.5 concentrations in this sample, as previous studies have reported that indoor PM 2.5 during cooking can also be influenced by factors such as cooking practices, food and oil type, kitchen ventilation, and outdoor infiltration.

Lin, Zhuoying↗

SkyMine Beneficial CO 2 Use Project

This Final Report addresses accomplishments achieved during Phase 1 and Phase 2 of the SkyMine® Carbon Mineralization Commercial Scale Pilot Project. The primary objectives of this project were to design, construct, and operate a system to capture CO₂ from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO₂ into products having commercial value as an example of Carbon Capture and Beneficial Re-Use, show the economic viability of the CO₂ capture and conversion process, and thereby advance the technology to a level of commercial scale completion with the ability for further proliferation. The project also substantiates market opportunities for the technology by sales of chemicals into existing markets, and has identified opportunities to improve technology performance and reduce costs during the normal course of operations. The primary objectives of Phase 1 of the project were to elaborate proven SkyMine® process chemistry to commercial pilot-scale operation and complete the preliminary design for the pilot plant to be built and operated in Phase 2. During Phase 2, Pilot System Engineering Design, Construction and Testing, supporting research and development was conducted at a field test unit to collect data that aided in detailed designs of the commercial scale pilot unit; final detailed designs were completed; the commercial scale pilot plant is in its final stages of construction; and a test program has been designed and will be implemented to collect data from the facility to evaluate the technical viability of the process for resulting in an overall net reduction in CO 2 emitted into the atmosphere through a process that is run and conducted in a carbon negative manner. The objective of Phase 2b was to build the commercial scale pilot plant to be operated and tested in Phase 2c. By June 30, 2015, the plant was +99% constructed and completed.

54 ENVIRONMENTAL SCIENCES↗

DOE Residential Energy Code Field Study - Pennsylvania

This project consisted of three distinct phases – all focused on residential one- and two-family dwellings and townhouses. Phase 1 included a baseline field study with inspections and performance testing to assess construction practices with respect to the energy code. PNNL used the data to perform EUI and savings potential analyses. Phase 2 consisted of training, education, and outreach to building industry professionals with content based on the findings from Phase 1. Phase 3 was a post-program field study using the same methodology as Phase 1 and was intended to measure the impact of Phase 2. During Phase 1 of the project, PSD collected data from 171 job sites across eastern Pennsylvania, a territory bounded by PECO, PPL, and Met-Ed electric distribution territories, to reach the required 63 “home equivalents” deemed necessary by PNNL for a representative sample. Based on subsequent analysis, four key items were identified as having significant savings potential from improvement in compliance, including duct leakage, above-grade wall insulation (specifically insulation installation quality), foundation insulation, and high-efficacy lighting. About half the total savings potential is from duct leakage, so that was the primary focus. The goal of Phase 2 was to improve upon these key compliance weaknesses through an intensive training, education, and outreach program. PSD dubbed this effort the Penn Energy Codes Program. For Phase 3, PSD obtained a new sample plan from PNNL, obtained permit data from sample municipalities, and made substitutions where necessary. PSD field staff visited 165 job sites to collect the required 504 key observations. PSD submitted all data collection sheets to PNNL for their analysis to determine if there was a measurable change due to Phase 2 activities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Fort Yukon wood Energy Program Wood Boiler Deployment (Final Report)

The Fort Yukon Gwitchyaa Zhee Corporation (GZ) worked with partners on the development of an Integrated Biomass Energy Program for Fort Yukon. This integrated approach linked sustainable forest management with an in- village for -profit wood harvest and delivery business to displace diesel energy with wood energy for heat and power. The program was based on the concept of ecological, economic and social sustainability with a goal of displacing as much diesel and fuel oil as is technically feasible and sustainable; essentially systematically converting a village to significant amounts of wood use. Additionally, GZ worked with the Alaska Energy Authority (AEA) on the development of a rural power system upgrade (RPSU) project that replaced GZ’s existing antiquated diesel power plant and provided upgrades to the existing electrical distribution system. Due to the synergy of the two projects, the Biomass and RPSU projects were combined to provide improved operating efficiency, economy of scale and increased benefits to GZ, the Council of Athabascan Tribal Governments (CATG) and the community of Fort Yukon. The combined project is referred to as the Fort Yukon Combined heat and power (CHP) project. The purpose of the DOE Tribal Energy Program award was to support the preconstruction tasks and installation of wood boilers at the CATG clinic, and at the new GZ diesel power plant as part of an overall program to create a for- profit wood energy utility in Native Village of Fort Yukon. The CHP project provides biomass and diesel generation recovered heat via a new district heating system to the major commercial buildings in Fort Yukon. The CATG clinic will receive heat from a separate biomass boiler to their heating needs. The award from the Department of Energy (DOE) Tribal Energy Program was divided into two phases: Design/Permitting (phase 1) and Construction (phase 2). Phase 1 (Design & Permitting) is cost shared using State of Alaska Renewable Energy Funding (REF) funds through the Alaska Energy Authority (AEA). Phase 2 (Construction) was funded by DOE, AEA and US Department of Agriculture Rural Utility Service (USDA-RUS). Phase 1 of this grant, along with a separate grant from the Denali Commission provided funding for development of the wood delivery infrastructure necessary to support the CHP project. Under phase 2, This DOE grant supported final design of the boiler, bidding, purchase and transport of boilers, installation, technical support and engineering. The AEA and RUS grants supported permitting, final design, material and equipment purchase, and construction and installation of the new diesel power plant and district heating distribution system.

09 BIOMASS FUELS↗

Airspace Technology Demonstration 2 (ATD-2) Phase 2 Technology Description Document (TDD)

This Technology Description Document (TDD) provides an overview of the technology for the Phase 1 Baseline and Phase 2 Fused demonstrations of the Integrated Arrival, Departure, and Surface (IADS) prototype system of the National Aeronautics and Space Administration’s (NASA) Airspace Technology Demonstration 2 (ATD-2) project, which has been demonstrated since October of 2017 at Charlotte Douglas International Airport (CLT). Development, integration, and field demonstration of relevant technologies of the IADS system directly address recommendations made by the Next Generation Air Transportation System (NextGen) Integration Working Group (NIWG) on Surface and Data Sharing and the Surface Collaborative Decision Making (Surface CDM) concept of operations developed jointly by the Federal Aviation Administration (FAA) and aviation industry partners. NASA has been developing the IADS traffic management system under the ATD-2 project in coordination with the FAA, flight operators, CLT airport operators, and the National Air Traffic Controllers Association (NATCA). The primary goal of ATD-2 is to improve the predictability and operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation’s most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 project is a 5-year research activity beginning in 2015 and extending through 2020. The Phase 1 Baseline IADS capability resulting from the ATD-2 research has been demonstrated at the CLT airport since the beginning of October 2017. Phase 1 provided data exchange and integration with the initial demonstration of the integrated system of strategic and tactical scheduling, collaborative tactical surface metering, tactical departure scheduling to an en route meter point and overhead stream insertion, initial integration of a TFDM SWIM prototype feed, and an early implementation prototype of a Terminal Flight Data Manager (TFDM) Electronic Flight Data (EFD) system. The strategic surface scheduling element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 The Phase 2 Fused IADS system provided substantial updates to baseline IADS Demonstration capability. Improvements were made to the IADS modeler; tactical surface scheduling, and metering; tactical departure scheduling for overhead stream insertion; Electronic Flight Data (EFD) and the integration with the FAA Advanced Electronic Flight Strip (AEFS); RTC/RMTC, and departure trajectories. New capabilities included a TFDM SWIM prototype feed and delivery of IADS data via the TFDM Terminal Publication (TTP) service of the FAA’s SWIM system; strategic surface scheduling and metering as well as fusion with tactical surface metering; integration and ingestion of data from TTP-connected Mobile App and texting industry for General Aviation (GA) flights; and expansion of airspace deployments to include adjacent Center automation, in particular interface with the Atlanta Center (ZTL) arrival metering TBFM system to evaluate pre-scheduling of flights. Improvements in Data Analysis and System Health (DASH) monitoring and updates were completed as well.

Talebi, Ehsan↗

Game Based Learning For Earth Science Applications Training

Current NASA Earth capacity development programs employ mechanisms ranging from online resource sharing, and virtual and in-person trainings to share knowledge. While these programs are highly successful at engaging individuals around the world – in 2018, over 8000 individuals and over 2000 institutions from all 50 US states and over 140 countries were engaged through over 150 projects and trainings – user feedback has highlighted the desire for expanded hands-on, practical experiences in incorporating NASA EO insights with localized data and actions. We aim to address this gap by leveraging the benefits of game-based learning to build user skills in integrating NASA and local EO data to guide decisions for climate resiliency and hazard planning. This project is being executed as a two-phase crowdsourced challenge: 1) Phase 1 will require a well-researched product concept that reflects an understanding of NASA’s Earth data and tools and user needs, and proposes an innovative and interactive game or extended reality experience to train users in identifying relevant NASA data and applying insights to their climate resiliency decisions; 2) Winners of Phase 1 will be provided seed funding to develop a working prototype of the product. We aim to award 1-3 final winners to support the development of more than one game, thereby ensuring that NASA's diverse audiences around the world can access training games that best suit their needs and capabilities. This EO training game project fits in the NASA Earth Science Applied Sciences Program’s Capacity Development Program, contributing to the program mission of “helping people around the world better understand [NASA’s Earth] data and find ways to use them” (https://appliedsciences.nasa.gov/what-we-do/capacity-building). The final training game will complement existing programmatic activities of workforce development, trainings, and collaborative projects, while providing the unique value of providing interactive experiences to users and collecting real-time data and feedback to improve NASA’s Earth applications’ products and services related to climate resilience.

Human centered design↗

Space transfer vehicle concepts and requirements study, phase 2

This final report is a compilation of the Phase 1 and Phase 2 study findings and is intended as a Space Transfer Vehicle (STV) 'users guide' rather than an exhaustive explanation of STV design details. It provides a database for design choices in the general areas of basing, reusability, propulsion, and staging; with selection criteria based on cost, performance, available infrastructure, risk, and technology. The report is organized into the following three parts: (1) design guide; (2) STV Phase 1 Concepts and Requirements Study Summary; and (3) STV Phase 2 Concepts and Requirements Study Summary. The overall objectives of the STV study were to: (1) define preferred STV concepts capable of accommodating future exploration missions in a cost-effective manner; (2) determine the level of technology development required to perform these missions in the most cost effective manner; and (3) develop a decision database of programmatic approaches for the development of an STV concept.

Cannon, Jeffrey H.↗