Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROTOTYPING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Residual Stress Measurements of Front Window Welds in a Prototypical Spallation Neutron Source Target Module

Spallation Neutron Source (SNS) target modules are fabricated from 316L stainless steel by welding together sections of machined components using electron beam welding. The failure of the tenth operational SNS target (Target 10) at an electron beam weld prompted an investigation into the residual stress remaining in the weld joint after joining to determine if welding procedures for SNS target fabrication produce detrimental residual stresses in or near the welds. Due to an issue with fabrication, the front section of an SNS target was removed from fabrication and made available for residual stress measurements. The residual stresses in an electron beam weld joining the front window and front body of the target prototype was measured at several locations near EBW2 weld between outer window and front body using the VUCLAN instrument. Different stress free d hkl 0 methods were used to calculated the residual strain and residual stress. Furthermore, the results show tensile residual stress up to 350MPa along the weld direction which peaked at weld location.

36 MATERIALS SCIENCE↗

Executive Summary: Prototype Design, Analysis, and Results for a Liquid Radiological Waste Control Room

Under the United States Department of Energy Light Water Sustainability Program (LWRS), Idaho National Laboratory (INL) is collaborating with Palo Verde Generating Station (PVGS) to support human factors engineering efforts in the modernization of PVNGS’ radiological waste system (LRS) control room. The studies proposed and/or conducted by INL are designed to address the inconsistency between different human factors standards, guidance, and conventions. Guidance such as NUREG-0700 leave much of the information open to interpretation. INL will identify whether maintaining a design that is consistent with population stereotypes actually enhances performance, or whether there are alternative designs that yield performance that is better than the designs that maintain those stereotypes. The overall design concept for the LRS workstation includes system overview displays for the Evaporator system and the Boric Acid Concentrator system. A third display contains overview information for the rest of the LRS. The forth display contains alarm information. Each display will be presented on one of four monitors in the control room. The system overview displays contain embedded controls for valves and pumps, mini-trends, and micro-trends. The mini-trends present data for the controllers and contain alarm set point information as well as trending. All other relevant system parameters are shown on micro-trends. The semi-dull screen approach utilized present dynamic data in green, active components are white (gray when closed or off). The product stream flow paths are indicated by different colors. Alarm states are presented in saturated red and selected components are indicated by bright blue. In addition to the micro task study described below, the INL researchers also conducted an evaluation of the semi-dull screen approach as well as an ergonomic evaluation of the suggested upgrades in the local control room. A detailed report of all INL’s activities related to the modernization of the LRS conducted between October 2016 and September 2017 are found in these two reports; • INL-EXT-17-43226, Prototype Design, Analysis, and Results for a Liquid Radiological Waste Control Room, and • INL-EXT-17-43250, Evaluation of Control Room Interface Designs to Support Modernization in Nuclear Power Plants.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vanguard Astra and ATSE – an ARM-based Advanced Architecture Prototype System and Software Environment (FY18 L2 Milestone #8759 Report)

The Vanguard program informally began in January 2017 with the submission of a white paper entitled "Sandia's Vision for a 2019 Arm Testbed" to NNSA headquarters. The program proceeded in earnest in May 2017 with an announcement by Doug Wade (Director, Office of Advanced Simulation and Computing and Institutional R&D at NNSA) that Sandia National Laboratories (Sandia) would host the first Advanced Architecture Prototype platform based on the Arm architecture. In August 2017, Sandia formed a Tri-lab team chartered to develop a robust HPC software stack for Astra to support the Vanguard program goal of demonstrating the viability of Arm in supporting ASC production computing workloads.

97 MATHEMATICS AND COMPUTING↗

Prototyping and Manufacturing of Magnetic Gearbox Components using Innovations in Castings

This project combines additive manufacturing with the broadly deployed practice of metal casting. Combining these methods will unlock new design possibilities while reducing the economic burden of early stage prototyping while leveraging well established high throughput sand casting. Two main approaches are evaluated: direct printing of single use sand molds and printing of reusable impression patterns used to create sand molds. Reusable impression molds typically can be used to produce hundreds to several thousands of casting thereby amplifying the function of the 3D printed replica mold. Emrgy’s newly developed and tested proprietary magnetic gearbox system for low head hydroelectricity generation was the subject part of this study. Leveraging ORNL’s additive manufacturing capability and expertise, a pattern impression was produced and used to create multiple sand molds of the gearbox during phase 1. Even before considering the cost savings possible once rigging and pattern mounting is optimized through repetition and improved design, final part costs using this combined method resulted in an 80% cost reduction over EMRGY’s previous method of subtractive manufacturing for gearbox production.

36 MATERIALS SCIENCE↗

1,000+ cycles of a 350 bar prototype cryo-compressed pressure vessel

A type 3 pressure vessel similar to the vessel used in their prototype cryo-compressed vehicle was leased by BMW AG (Munich, Germany) to Lawrence Livermore National Laboratory (Live rmore, CA) in order to conduct multiple cryo-compressed fills at the testing facility, using the Linde 900 bar LH 2 pump.

47 OTHER INSTRUMENTATION↗

Monitoring the Prototype Hanford Barrier – Fiscal Year 2018 Report

After a decade of development activities from 1983 to 1993, the 2.5-ha (6.2-acre) Prototype Hanford Barrier (PHB) was constructed between late 1993 and 1994 over the 216-B-57 Crib in the 200 East Area (46°34’01.23”N, 119°32’28.43”W) at the Hanford Site in southeastern Washington State. The PHB construction was part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200-BP-1 Operable Unit. The CERCLA treatability test was an enhanced precipitation stress test from water year 1995 (WY95) to WY97 to determine barrier response to extreme precipitation events. A controlled fire test was conducted in 2008 to examine the recovery of vegetation under the natural condition and the performance of the barrier with limited vegetation

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prototype System for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions. This report describes a prototype tool designed to support plant personnel in controlling work during NPP outages to prevent unintended interactions. A software application was created to manage and display important configuration information and utilize natural language processing to access the impacts of upcoming procedures and work orders. Initial industry feedback is also presented.

99 GENERAL AND MISCELLANEOUS↗

Monitoring the Prototype Hanford Barrier – Fiscal Year 2017 Report

After a decade of development activities from 1983 to 1993, the 2.5-ha (6.2-acre) Prototype Hanford Barrier (PHB) was constructed between late 1993 and 1994 over the 216-B-57 Crib in the 200 East Area (46°34’01.23”N, 119°32’28.43”W) at the Hanford Site in southeastern Washington State. The PHB construction was part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200-BP-1 Operable Unit. The CERCLA treatability test was an enhanced precipitation stress test during water year 1995 (WY95) to WY97 to determine barrier response to extreme precipitation events. A controlled fire test was conducted in 2008 to examine the recovery of vegetation under the natural condition and the performance of the barrier with limited vegetation.

54 ENVIRONMENTAL SCIENCES↗

FY18 L2 Milestone #6360 Report: Initial Capability of an Arm-based Advanced Architecture Prototype System and Software Environment

The Vanguard program informally began in January 2017 with the submission of a white paper entitled "Sandia's Vision for a 2019 Arm Testbed" to NNSA headquarters. The program proceeded in earnest in May 2017 with an announcement by Doug Wade (Director, Office of Advanced Simulation and Computing and Institutional R&D at NNSA) that Sandia National Laboratories (Sandia) would host the first Advanced Architecture Prototype platform based on the Arm architecture. In August 2017, Sandia formed a Tri-lab team chartered to develop a robust HPC software stack for Astra to support the Vanguard program goal of demonstrating the viability of Arm in supporting ASC production computing workloads. This document describes the high-level Vanguard program goals, the Vanguard-Astra project acquisition plan and procurement up to contract placement, the initial software stack environment planned for the Vanguard-Astra platform (Astra), a description of how the communities of users will utilize the platform during the transition from the open network to the classified network, and initial performance results.

97 MATHEMATICS AND COMPUTING↗

Monitoring the Prototype Hanford Barrier – Fiscal Year 2017 Report

After a decade of development activities from 1983 to 1993, the 2.5-ha (6.2 acres) Prototype Hanford Barrier (PHB) was constructed between late 1993 and 1994 over the 216-B-57 Crib in the 200 East Area (46°34’01.23”N, 119°32’28.43”W) at the Hanford Site in southeastern Washington State as part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200-BP-1 Operable Unit. The CERCLA treatability test included an enhanced precipitation stress test during the water years 1995 to 1997 to determine barrier response to extreme precipitation events and a controlled fire test in 2008 to examine the recovery of vegetation under the natural condition and the performance of the barrier with limited vegetation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Adaptive Gap Prototype IVU from the X9 MGU Mechanics

In consideration of affordable options to construct a prototype of an Adaptive-Gap Undulator (AGU), in which different segments along the structure may have different gaps and periods, we investigate the possible use of an existing undulator structure and mechanics from former NSLSI. An AGU is intended to allow for conforming gap clearance to the vertical "envelope" within a straight section of the NSLS-II accelerator, allowing precise tuning of its magnet array segments to the same fundamental photon energy while still satisfying impedance constraints. Placing together undulator segments with different periods and gaps portends possible undesirable effects, such as "kicks" to electron trajectories and perturbations to undulator radiation phase at the segment junctions, as well as increased impedance.

36 MATERIALS SCIENCE↗

Production Facility Prototype Blower 1000 Hour Test Results IV

Long duration operations tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks was not included in these tests. Twelve long duration 500 to 1000 hour tests have been completed since the first test was performed in January of 2016. All twelve long duration tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for the end of the ninth test to the twelfth test is included in this report. Complete details for the previous tests are shown in the reports, Production Facility Prototype Blower 1000 Hour Test Results, II, and III.

42 ENGINEERING↗

HB650 Prototype Cryomodule

The HB650 prototype cryomodule is 9.92m long and contains 6 elliptical cavities. As SSR1 cryomodule The design is based on a strong-back at room temperature supporting the coldmass including an heat exchanger and a JT valve to produce helium at 2K.

43 PARTICLE ACCELERATORS↗

3D Printing Prototypes for a Reflector-Based Broadband Axion Search

This work sought to begin research and development on a horn antenna which can be used to transfer the energy of microwave photons produced by axions in a strong magnetic field to a coaxial cable for measurement. 3D prototypes of pyramidal horn antennas and a parabolic reflector were printed and then coated with conductive spray paint. The S 11 parameter was measured and simulated for both 3D printed horn antenna and the conical horn antenna both with and without the reflector present to determine how much of the radiated power was reflected back. Ultimately, for both the conical and pyramidal antennas, less than one percent of the energy emitted by the antennas was reflected back. When the pyramidal antenna was tilted by about 45 degrees, however, around 30-40 percent of the microwaves emitted by the antennas was reflected back.

43 PARTICLE ACCELERATORS↗

CONFIDANTE Demonstration Prototype Report

This report summarizes design optimization and performance evaluation studies for a new prototype CONFIDANTE (CONfirmation using a Fast-neutron Imaging Detector with Anti-image Null-positive Time Encoding) warhead confirmation system. It was found that a spherical mask geometry and a 2” diameter cylindrical central detector is expected to best discriminate between the parametrically varied source distributions that were evaluated. The optimized design as fabricated and its performance was evaluated in a series of laboratory measurements. The performance was in good agreement with the design studies, with demonstrated discrimination between objects with differences in scale on the order of 5 centimeters or better at 1 meter stand-off

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Prototype Distributed Ledger Technology of UF 6 Cylinder Tracking in Ethereum

We have created a demonstration permissioned Distributed Ledger Technology (DLT) datastore for the UF 6 cylinder tracking safeguards use-case utilizing the Ethereum DLT framework and using Solidity for smart contract code. Our demonstration creates a simulated dataset representing tracking of 75,000 UF 6 cylinders across 11 example nuclear facilities worldwide. Our DLT system allows for easy input and reading of shipping and receiving data, including a Graphical User Interface (GUI). Sandia’s Emulytics capability was leveraged to help create the DLT node network and assess performance. We find that our DLT prototype can easily handle to ~150,000 UF 6 cylinder shipments per year worldwide, without any excessive computational or storage burden on the IAEA or Member States. Next steps could include a demonstration to the IAEA and potentially demonstrating integration with TradeLens, a DLT in use by a consortium of international shipping companies representing over half of world shipping trade.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Production Facility Prototype Blower 1000 Hour Test Results V

Long duration operations tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks was not included in these tests. Thirteen long duration 500 to 1000 hour tests have been completed since the first test was performed in January of 2016. All thirteen long duration tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for the end of the thirteenth test is included in this report. Complete details for the previous tests are shown in the reports, Production Facility Prototype Blower 1000 Hour Test Results, II, III, and IV.

36 MATERIALS SCIENCE↗