Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integration and test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

X-ray satellite

A mock-up for the development of the Engineering Model (EM) and Flight Model (FM) is introduced which shortens the delay of 7 weeks regarding the previous planned launch date of September 30, to about 3 weeks maintaining the 4 weeks reserve is discussed. As compared with the new assembly integration test (EM-AIT) schedule of March 11, 1985, the EM data handling system is on the critical path. For the attitude measurement and control subsystem, sufficiently flexibility is achieved through combination of dummies and EM hardware to catch up with the existing delays.

Source record↗

Space Missions for Automation and Robotics Technologies (SMART) Program

NASA is currently considering the establishment of a Space Mission for Automation and Robotics Technologies (SMART) Program to define, develop, integrate, test, and operate a spaceborne national research facility for the validation of advanced automation and robotics technologies. Initially, the concept is envisioned to be implemented through a series of shuttle based flight experiments which will utilize telepresence technologies and real time operation concepts. However, eventually the facility will be capable of a more autonomous role and will be supported by either the shuttle or the space station. To ensure incorporation of leading edge technology in the facility, performance capability will periodically and systematically be upgraded by the solicitation of recommendations from a user advisory group. The facility will be managed by NASA, but will be available to all potential investigators. Experiments for each flight will be selected by a peer review group. Detailed definition and design is proposed to take place during FY 86, with the first SMART flight projected for FY 89.

Cliffone, D. L.↗

Space station data system analysis/architecture study. Task 2: Options development, DR-5. Volume 3: Programmatic options

Task 2 in the Space Station Data System (SSDS) Analysis/Architecture Study is the development of an information base that will support the conduct of trade studies and provide sufficient data to make design/programmatic decisions. This volume identifies the preferred options in the programmatic category and characterizes these options with respect to performance attributes, constraints, costs, and risks. The programmatic category includes methods used to administrate/manage the development, operation and maintenance of the SSDS. The specific areas discussed include standardization/commonality; systems management; and systems development, including hardware procurement, software development and system integration, test and verification.

Source record↗

Integration of an expert system into a user interface language demonstration

The need for a User Interface Language (UIL) has been recognized by the Space Station Program Office as a necessary tool to aid in minimizing the cost of software generation by multiple users. Previous history in the Space Shuttle Program has shown that many different areas of software generation, such as operations, integration, testing, etc., have each used a different user command language although the types of operations being performed were similar in many respects. Since the Space Station represents a much more complex software task, a common user command language--a user interface language--is required to support the large spectrum of space station software developers and users. To assist in the selection of an appropriate set of definitions for a UIL, a series of demonstration programs was generated with which to test UIL concepts against specific Space Station scenarios using operators for the astronaut and scientific community. Because of the importance of expert system in the space station, it was decided that an expert system should be embedded in the UIL. This would not only provide insight into the UIL components required but would indicate the effectiveness with which an expert system could function in such an environment.

Stclair, D. C.↗

Historical data and analysis for the first five years of KSC STS payload processing

General and specific quantitative and qualitative results were identified from a study of actual operational experience while processing 186 science, applications, and commercial payloads for the first 5 years of Space Transportation System (STS) operations at the National Aeronautics and Space Administration's (NASA) John F. Kennedy Space Center (KSC). All non-Department of Defense payloads from STS-2 through STS-33 were part of the study. Historical data and cumulative program experiences from key personnel were used extensively. Emphasis was placed on various program planning and events that affected KSC processing, payload experiences and improvements, payload hardware condition after arrival, services to customers, and the impact of STS operations and delays. From these initial considerations, operational drivers were identified, data for selected processing parameters collected and analyzed, processing criteria and options determined, and STS payload results and conclusions reached. The study showed a significant reduction in time and effort needed by STS customers and KSC to process a wide variety of payload configurations. Also of significance is the fact that even the simplest payloads required more processing resources than were initially assumed. The success to date of payload integration, testing, and mission operations, however, indicates the soundness of the approach taken and the methods used.

Ragusa, J. M.↗

STS retrieval of satellites

The Space Transportation System (STS) provides the capability to retrieve satellites from space. This capability was demonstrated on flights STS 41-C and STS 51-A, and will be demonstrated again on a future flight with the retrieval of the Long Duration Exposure Facility (LDEF). This paper describes the activity required to ensure a successful retrieval from initial flight planning to actual flight operations. Attention is given to retrieval hardware necessary for success and manifest. Discussion of flight design to meet all constraints placed on the manifested cargo is included. Flightcrew and flight control team training are addressed. Flight rules, techniques, and procedures development are described and examples given. Mission Control Center (MCC) and Payload Operations Control Center (POCC) operations for integrated testing and actual flight support will be presented.

Bruce, T. N.↗

Design and demonstrate the performance of cryogenic components representative of space vehicles: Start basket liquid acquisition device performance analysis

The objective was to design, fabricate and test an integrated cryogenic test article incorporating both fluid and thermal propellant management subsystems. A 2.2 m (87 in) diameter aluminum test tank was outfitted with multilayer insulation, helium purge system, low-conductive tank supports, thermodynamic vent system, liquid acquisition device and immersed outflow pump. Tests and analysis performed on the start basket liquid acquisition device and studies of the liquid retention characteristics of fine mesh screens are discussed.

Source record↗

The influence of the launch site operational environment on Space Shuttle scientific payloads

The effects of prelaunch assembly, testing, and integration activities on the scientific payload at the KSC are examined. The functions of the Shuttle and payload organizations of the KSC are discussed. The processing of the various types of pyaloads, and the amount of access to the payload during processing and after landing are described. The KSC facility contains: an Operations and Checkout Building, a Vertical Processing Facility, Cargo Integration and Test Equipment, an Orbiter Processing Facility, a Payload Changeout Room, payload transportation equipment, and Shuttle launch pads.

Schuiling, Roelof L.↗

Satellite ground-terminal user simulation

Realistic simulation of satellite communication systems and evaluation of satellite networking schemes require emulation of the systems's users. A laboratory model of a Ka-band satellite-switched time-division multiple-access (SS-TDMA) communication network, referred to as the System Integration, Test, and Evaluation (SITE) project, uses special bit-error-rate (BER) test sets to simulate the transmitting and receiving users of a communication network. The bit-error-rate test sets contain circuit boards that can be modified to create a variety of interfaces to satellite system ground terminals.

Shalkhauser, Mary Jo W.↗

Langley Symposium on Aerodynamics, volume 1

The purpose of this work was to present current work and results of the Langley Aeronautics Directorate covering the areas of computational fluid dynamics, viscous flows, airfoil aerodynamics, propulsion integration, test techniques, and low-speed, high-speed, and transonic aerodynamics. The following sessions are included in this volume: theoretical aerodynamics, test techniques, fluid physics, and viscous drag reduction.

Stack, Sharon H.↗

Spacelab Life Sciences 1 - The stepping stone

The Spacelab Life Sciences (SLS-1) mission scheduled for launch in March 1990 will study the effects of microgravity on physiological parameters of humans and animals. The data obtained will guide equipment design, performance of activities involving the use of animals, and prediction of human physiological responses during long-term microgravity exposure. The experiments planned for the SLS-1 mission include a particulate-containment demonstration test, integrated rodent experiments, jellyfish experiments, and validation of the small-mass measuring instrument. The design and operation of the Research Animal Holding Facility, General-Purpose Work Station, General-Purpose Transfer Unit, and Animal Enclosure Module are discussed and illustrated with drawings and diagrams.

Dalton, B. P.↗

Space Station launch site processing

Planning which is underway at NASA-Kennedy toward launch site processing of Space Station elements is described. The goal is to develop cost-effective processing for each of the Program elements. Launch site receiving is discussed as well as post delivery verification, prelaunch assembly, prelaunch testing, experiment integration, and testing and servicing.

Oertel, John G.↗

Satellite range delay simulator for a matrix-switched time division multiple-access network simulator

The Systems Integration, Test, and Evaluation (SITE) facility at NASA Lewis Research Center is presently configured as a satellite-switched time division multiple access (SS-TDMA) network simulator. The purpose of SITE is to demonstrate and evaluate advanced communication satellite technologies, presently embodied by POC components developed under NASA contracts in addition to other hardware, such as ground terminals, designed and built in-house at NASA Lewis. Each ground terminal in a satellite communications system will experience a different aspect of the satellite's motion due mainly to daily tidal effects and station keeping, hence a different duration and rate of variation in the range delay. As a result of this and other effects such as local oscillator instability, each ground terminal must constantly adjust its transmit burst timing so that data bursts from separate ground terminals arrive at the satellite in their assigned time slots, preventing overlap and keeping the system in synchronism. On the receiving end, ground terminals must synchronize their local clocks using reference transmissions received through the satellite link. A feature of the SITE facility is its capability to simulate the varying propagation delays and associated Doppler frequency shifts that the ground terminals in the network have to cope with. Delay is achieved by means of two NASA Lewis designed and built range delay simulator (RDS) systems, each independently controlled locally with front panel switches or remotely by an experiment control and monitor (EC/M) computer.

Nagy, Lawrence A.↗

A burst compression and expansion technique for variable-rate users in satellite-switched TDMA networks

A burst compression and expansion technique is described for asynchronously interconnecting variable-data-rate users with cost-efficient ground terminals in a satellite-switched, time-division-multiple-access (SS/TDMA) network. Compression and expansion buffers in each ground terminal convert between lower rate, asynchronous, continuous-user data streams and higher-rate TDMA bursts synchronized with the satellite-switched timing. The technique described uses a first-in, first-out (FIFO) memory approach which enables the use of inexpensive clock sources by both the users and the ground terminals and obviates the need for elaborate user clock synchronization processes. A continous range of data rates from kilobits per second to that approaching the modulator burst rate (hundreds of megabits per second) can be accommodated. The technique was developed for use in the NASA Lewis Research Center System Integration, Test, and Evaluation (SITE) facility. Some key features of the technique have also been implemented in the gound terminals developed at NASA Lewis for use in on-orbit evaluation of the Advanced Communications Technology Satellite (ACTS) high burst rate (HBR) system.

Budinger, James M.↗

Magellan/Galileo solder joint failure analysis and recommendations

On or about November 10, 1988 an open circuit solder joint was discovered in the Magellan Radar digital unit (DFU) during integration testing at Kennedy Space Center (KSC). A detailed analysis of the cause of the failure was conducted at the Jet Propulsion Laboratory leading to the successful repair of many pieces of affected electronic hardware on both the Magellan and Galileo spacecraft. The problem was caused by the presence of high thermal coefficient of expansion heat sink and conformal coating materials located in the large (0.055 inch) gap between Dual Inline Packages (DIPS) and the printed wiring board. The details of the observed problems are described and recommendations are made for improved design and testing activities in the future.

Ross, Ronald G., Jr.↗

NASA/DOD Controls-Structures Interaction Technology 1989

The purpose of this conference was to report to industry, academia, and government agencies on the current status of controls-structures interaction technology. The agenda covered ground testing, integrated design, analysis, flight experiments, and concepts.

Newsom, Jerry R.↗

Robotic space simulation integration of vision algorithms into an orbital operations simulation

In order to successfully plan and analyze future space activities, computer-based simulations of activities in low earth orbit will be required to model and integrate vision and robotic operations with vehicle dynamics and proximity operations procedures. The orbital operations simulation (OOS) is configured and enhanced as a testbed for robotic space operations. Vision integration algorithms are being developed in three areas: preprocessing, recognition, and attitude/attitude rates. The vision program (Rice University) was modified for use in the OOS. Systems integration testing is now in progress.

Bochsler, Daniel C.↗

A knowledge-based system design/information tool

The objective of this effort was to develop a Knowledge Capture System (KCS) for the Integrated Test Facility (ITF) at the Dryden Flight Research Facility (DFRF). The DFRF is a NASA Ames Research Center (ARC) facility. This system was used to capture the design and implementation information for NASA's high angle-of-attack research vehicle (HARV), a modified F/A-18A. In particular, the KCS was used to capture specific characteristics of the design of the HARV fly-by-wire (FBW) flight control system (FCS). The KCS utilizes artificial intelligence (AI) knowledge-based system (KBS) technology. The KCS enables the user to capture the following characteristics of automated systems: the system design; the hardware (H/W) design and implementation; the software (S/W) design and implementation; and the utilities (electrical and hydraulic) design and implementation. A generic version of the KCS was developed which can be used to capture the design information for any automated system. The deliverable items for this project consist of the prototype generic KCS and an application, which captures selected design characteristics of the HARV FCS.

Allen, James G.↗