Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integrated Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Predicting Crew Time Allocations for Lunar Orbital Missions Based on Historical ISS Operational Activities

As the National Aeronautics and Space Administration continues to define candidate architectures for the planned lunar “Gateway”, it will be necessary to have a detailed understanding of how the crew will inhabit, operate, and maintain the spacecraft. The nature of the Gateway vehicle systems configuration and operations will have a direct impact on the scope of work activities required of the crew. Crew work schedules are sensitive to variations in spacecraft architecture, visiting vehicle activities, and logistics operations – particularly within short duration missions as initially planned for the lunar Gateway. These system and operational configurations must be taken into account when planning for crew time availability to conduct science activities on Gateway missions. This paper presents a methodology that is used to predict crew time distributions for lunar Gateway missions, as applied in NASA’s Exploration Crew Time Model (ECTM). The process utilized for evaluating crew time distributions is based on the categorization of all crew activities into a standardized ontology. Historical ISS daily crew timeline data from July 20, 2011 (post STS retirement) to present day was captured via the Operational Planning Timeline Integration System (OPTimIS) database and characterized according to the standardized ontology. This process enabled correlation and statistical analysis of the ISS data according to common mission parameters such as crew size, ECLSS system design, vehicle traffic operations, and logistics delivery operations. The results of the statistical analysis are a set of crew time distributions for each activity category. These distributions are then utilized within the ECTM to examine crew time allocations based on mission parameter inputs, which serve to characterize the Gateway mission configurations. Results for predicted crew time allocations for representative short duration Gateway missions are presented. These results can be used to evaluate crew schedule availability for science and utilization activities. Variations in expected mission architectures and mission operations are accounted for to correct crew time predictions. The analysis is being leveraged to plan utilization capability objectives that are achievable on the Gateway missions, as well as inform the viability of various mission architecture options.

Stromgren, Chel↗

Apollo Program Management, Kennedy Space Center, Florida

The evolution of the Kennedy Space Center as the launch organization for Apollo/ Saturn V involved the concurrent solution of numerous complex problems. A significant increase in manpower was involved. Large and complex checkout and launch facilities were to be designed and constructed. Expansion of operational capabilities required the establishment and integration of a Government-Contractor operational team. From an initial cadre of approximately 200 civil service personnel of the Army Ballistic Missile Agency, transferred to NASA in 1960 following its establishment, expansion to the present civil service level of 2,900 occurred in the last seven years. Established within NASA as a directorate of the Marshall Space Flight Center, KSC achieved center status in 1962. With its designation as a Center, KSC accomplished the development and staffing of an organization that could perform procurement, resources, financial, and other management requirements formerly provided by the parent organization. In addition to continuing launch operations for established programs, KSC undertook the design and construction of large, new, and unique launch facilities for Apollo/Saturn V. With the expansion of the civil service work force, KSC integrated contractor organizations employing 23,000 personnel at the Center to perform specific operational and support missions under the technical supervision and observation of the Government team. The management techniques, organizational concepts, and continuing efforts utilized to meet the Apollo goals and challenges are discussed in this document.

Source record↗

A Predictive GNSS Performance Monitor for Autonomous Air Vehicles in Urban Environments

The emergence and development of advanced technologies and vehicle types has created a growing demand for the introduction of new forms of flight operations. These new and increasingly complex operational paradigms such as Advanced and Urban Air Mobility (AAM/UAM) present regulatory authorities and the aviation community with several design and implementation challenges – particularly for highly autonomous vehicles. An overarching and daunting task is finding methods to integrate these emerging operations without compromising safety or disrupting traditional airspace operations. A shift toward a more predictive risk mitigation capability becomes critical to meet this challenge. This paper focus on the development and testing of a prognostic service aimed at estimating the quality of Global Navigation Satellite System (GNSS) performance for an autonomous aircraft in complex environments. The intent of this function is to proactively reduce a flight operations risk of exposure to states that may induce poor or unacceptable navigation system performance by factoring in estimates of GNSS quality into pre-flight and/or in-flight route planning. Methodologies for producing quality estimates are specified and results are provided for selected simulation and flight test cases.

GNSS↗

A simple, effective media access protocol system for integrated, high data rate networks

The operation and performance of a dual media access protocol for integrated, gigabit networks are described. Unlike other dual protocols, each protocol supports a different class of traffic. The Carrier Sensed Multiple Access-Ring Network (CSMA/RN) protocol and the Circulating Reservation Packet (CRP) protocol support asynchronous and synchronous traffic, respectively. The two protocols operate with minimal impact upon each other. Performance information demonstrates that they support a complete range of integrated traffic loads, do not require call setup/termination or a special node for synchronous traffic control, and provide effective pre-use and recovery. The CRP also provides guaranteed access and fairness control for the asynchronous system. The paper demonstrates that the CSMA-CRP system fulfills many of the requirements for gigabit LAN-MAN networks most effectively and simply. To accomplish this, CSMA-CRP features are compared against similar ring and bus systems, such as Cambridge Fast Ring, Metaring, Cyclic Reservation Multiple Access, and Distributed Dual Queue Data Bus (DQDB).

Foudriat, E. C.↗

Agent independent task planning

Agent-Independent Planning is a technique that allows the construction of activity plans without regard to the agent that will perform them. Once generated, a plan is then validated and translated into instructions for a particular agent, whether a robot, crewmember, or software-based control system. Because Space Station Freedom (SSF) is planned for orbital operations for approximately thirty years, it will almost certainly experience numerous enhancements and upgrades, including upgrades in robotic manipulators. Agent-Independent Planning provides the capability to construct plans for SSF operations, independent of specific robotic systems, by combining techniques of object oriented modeling, nonlinear planning and temporal logic. Since a plan is validated using the physical and functional models of a particular agent, new robotic systems can be developed and integrated with existing operations in a robust manner. This technique also provides the capability to generate plans for crewmembers with varying skill levels, and later apply these same plans to more sophisticated robotic manipulators made available by evolutions in technology.

Davis, William S.↗

Tailoring of NASA-STD-3001 to Lunar Gateway Program Requirements

The Gateway Program must meet NASA's Agency-level human rating requirements, which are intended to accommodate human capabilities and limitations while protecting the safety of the crew, and providing to the maximum extent practical, the capability to safely recover the crew from hazardous situations. Human systems integration represents a key human rating component of Moon to Mars systems to support the execution of Artemis missions, including compliance with mandatory standards for Health and Medical, Safety and Mission Assurance, and Engineering. The human system requirements, together with the human systems integration plan, medical operations requirements, and Gateway sub-system specifications, represent the flow-down of NASA Health and Medical Standards (NASA-STD-3001, Volumes 1 and 2) into the Gateway system. This paper discusses how these documents and other human systems integration activities provide full consideration of human capabilities and limitations as part of the total system design trade space, serving as an example on how the human must be effectively integrated as part of the system in order to achieve mission success. At a bigger scale, the paper con-tributes to the application of systems engineering standards to cutting-edge space exploration initiatives and to the dialogue on how systems engineering can continue to evolve to meet the needs of such ambitious projects.

Systems engineering↗

Urban Air Mobility Airspace Dynamic Density

Airspace safety must be assured for Urban Air Mobility (UAM) to become reality. Emerging operations need to safely integrate with existing and future air traffic. UAM is anticipated to evolve in stages. Early stages, characterized by low-density operations, may be accommodated by traditional air traffic management approaches. However, to enable the scale of UAM operations necessary to reach ubiquitous integration into daily life, new paradigms that utilize collaborative and automated systems are being considered. Correspondingly, traditional approaches for determining a safe number of simultaneous operations in an airspace must be adapted to suit evolving traffic management paradigms. In this paper, we examine dynamic density as an approach to determine when an airspace is excessively populated, and safety may become compromised. We review previous work on dynamic density as it relates to air traffic controller workload and propose factors that may be more fitting for UAMs. Rather than considering controller workload, we propose factors that suggest increased likelihood of loss of separation and may lead to conflicts that require tactical avoidance maneuvers. In addition to monitoring dynamic density for tactical decision making, we endeavor to predict airspace dynamic density with adequate look-ahead to allow for strategic route selection.

UAM↗

Low Frequency 1/f Noise on QWIPs, nBn, and Superlattice Focal Plane Array

Noise Equivalent Difference Temperature (NE△T) is a standard performance metric for most infrared focal plane array (FPA) systems. The frequency bandwidth and range associated with NE△T is at high frequency and it does not describe the long time noise behavior or the very low frequency noise of the FPA. Very low frequency noise measurement requires data capture that takes longer time duration and sampling interval. This study investigates low frequency noise in QWIP, nBn and LWIR n-type Complementary Barrier Infrared Detector (CBIRD) FPAs. The corner frequencies are extracted from the power spectral density (PSD) as function of frequency. The peak wavelength, quantum efficiency of QWIP detector are 6.2 µm and 2 %, respectively. QWIP FPA has a mean NE△T ~ 25 mK at an operating temperature of 65 K and an integration time of 16 msec. The mean QWIP PSD plot shows a corner frequency of < 0.5 mHz. The nBn FPA with 4 µm cut off and quantum efficiency of 67 % has NE△T ~ 15.6 mK at an integration time ~ 7.52 msec and an operating temperature of 120 K. The nBn has corner frequency of > 50 mHz. Lastly the n-type CBIRD FPA with a 50% cutoff at 8.8 µm and quantum efficiency of ~ 50 % has an NE△T ~ 18.6 mK at an integration time of 1.86 msec and operating temperature 120 K. The superlattice FPA has a corner frequency ~ 10 mHz. The investigation of the tail on the NE△T histogram reveals that its origin is not accounted for entirely by the high noise current, but also it needs the inclusion of lower responsivity for some pixels.

Pepper, B.↗

Generic Airspace Research Phase 5 Report

Human-in-the-loop testing was completed to assess the subjective preferences, usage, and operational benefits of Integrated and Separated Controller Information Tools (CITs) in support of Generic Airspace Research. Participants controlled traffic in in a busy, high altitude sector with the aid of the CITs. When the participants were asked which CIT that they preferred to use, they overwhelmingly chose the integrated version of the CIT. The primary reason for this seemed to be that it allowed participants to remain focused on the traffic situation, whereas the Standalone CIT required them to focus their attention for short periods away from the radar presentation. In contrast to their preference, there were little or no differences in the CIT usage and the operational differences. There were similar numbers of losses of separation and participants accessed each CIT equally. Although the information accessed was the similar for the two conditions, participants actively turned off the data on the Integrated CIT, presumably to reduce the clutter on the radar scope. Further work is needed to isolate which information can and should be available to controllers in the Integrated vs. Standalone format.

controller information tool↗

An Integrated, Evidence-Based Approach to Transitioning to Operations: Specifications for Future Replacement Lights on ISS

The International Space Station (ISS) currently uses General Luminaire Assemblies (GLAs) as its primary light source. These GLAs are composed of fluorescent lighting and are integrated into the electrical system on Station. Seventy seven of these units are distributed throughout the vehicle, and many of the lights, having reached their lifespan, are no longer functional; while backup panels are available on orbit, it is anticipated that the supplies of fluorescents on the station will be exhausted by 2015. The ISS vehicle office is therefore preparing to replace all of the GLAs, with Solid State Light Assemblies (SSLAs) composed of white Light Emitting Diodes (LEDs). In the Spring of 2010, an announcement for the replacement lights was released. The announcement specified that proposed lighting systems should use LED technology, given certain power draw restrictions and no changes to how the lights are currently controlled (a central on/off switch per node, and a dial to turn on/off and increase brightness on each lighting unit). The replacement lights are to follow current specifications for brightness levels (lux) and color temperature (degrees Kelvin, or K). Reportedly, the lighting on orbit is dim and suboptimal. The average brightness of the lights (given all lights within a node are operational) is 291 lux; by comparison, recommended office lighting ranges from 200 to 500 lux, and daylight ranges on a typical overcast day, consists of 10,000 to 25,000 lux. Representatives from NASA Behavioral Health and Performance Element (BHP) and Human Factors and Habitability identified that maintaining current brightness levels limits visual acuity, work space, and the use of light as a countermeasure for improving circadian entrainment, hastening phase shifting, evoking acute alertness and enhancing performance. Revised lighting specifications are therefore needed to optimize the replacement lights for the ISS.

Leveton, Lauren↗

Virtual reality applications in robotic simulations

Virtual reality (VR) provides a means to practice integrated extravehicular activities (EVA)/remote manipulator system (RMS) operations in the on-orbit configuration with no discomfort or risk to crewmembers. VR afforded the STS-61 crew the luxury of practicing the integrated EVA/RMS operations in an on-orbit configuration prior to the actual flight. The VR simulation was developed by the Automation and Robotics Division's Telepresence/Virtual Reality Lab and Integrated Graphics, Operations, and Analysis Lab (IGOAL) at JSC. The RMS Part Task Trainer (PTT) was developed by the IGOAL for RMS training in 1988 as a fully functional, kinematic simulation of the shuttle RMS and served as the RMS portion of the integrated VR simulation. Because the EVA crewmember could get a realistic view of the shuttle and payload bay in the VR simulation, he/she could explore different positions and views to determine the best method for performing a specific task, thus greatly increasing the efficiency of use of the neutral buoyancy facilities.

Homan, David J.↗

Description of a dual fail operational redundant strapdown inertial measurement unit for integrated avionics systems research

An experimental redundant strapdown inertial measurement unit (RSDIMU) is developed as a link to satisfy safety and reliability considerations in the integrated avionics concept. The unit includes four two degree-of-freedom tuned rotor gyros, and four accelerometers in a skewed and separable semioctahedral array. These sensors are coupled to four microprocessors which compensate sensor errors. These microprocessors are interfaced with two flight computers which process failure detection, isolation, redundancy management, and general flight control/navigation algorithms. Since the RSDIMU is a developmental unit, it is imperative that the flight computers provide special visibility and facility in algorithm modification.

Bryant, W. H.↗

International Cooperation of Payload Operations on the International Space Station

One of the primary goals of the International Space Station (ISS) is to provide an orbiting laboratory to be used to conduct scientific research and commercial products utilizing the unique environment of space. The ISS Program has united multiple nations into a coalition with the objective of developing and outfitting this orbiting laboratory and sharing in the utilization of the resources available. The primary objectives of the real- time integration of ISS payload operations are to ensure safe operations of payloads, to avoid mutual interference between payloads and onboard systems, to monitor the use of integrated station resources and to increase the total effectiveness of ISS. The ISS organizational architecture has provided for the distribution of operations planning and execution functions to the organizations with expertise to perform each function. Each IPP is responsible for the integration and operations of their payloads within their resource allocations and the safety requirements defined by the joint program. Another area of international cooperation is the sharing in the development and on- orbit utilization of unique payload facilities. An example of this cooperation is the Microgravity Science Glovebox. The hardware was developed by ESA and provided to NASA as part of a barter arrangement.

Melton, Tina↗

Communications Transceivers for Venus Surface Missions

The high temperature of the surface of Venus poses many difficulties. Previous Venus landers have only operated for short durations before succumbing to the heat. NASA Glenn Research Center conducted a study on communications for long duration Venus surface missions. I report the findings in this presentation. Current technology allows production of communications transceivers that can operate on the surface of Venus, at temperatures above 450 C and pressures of over 90 atmospheres. While these transceivers would have to be relatively simple, without much of the advanced signal processing often used in modern transceivers, since current and near future integrated circuits cannot operate at such high temperatures, the transceivers will be able to meet the requirements of proposed Venus Surface mission. The communication bands of interest are High Frequency or Very High Frequency (HFNHF) for communication between Venus surface and airborne probes (including surface to surface and air to air), and Ultra High Frequency (UHF) to Microwave bands for communication to orbiters. For HFNHF, transceivers could use existing vacuum tube technology. The packaging of the vacuum tubes may need modification, but the internal operating structure already operates at high temperatures. Using metal vacuum structures instead of glass, allows operation at high pressure. Wide bandgap transistors and diodes may be able to replace some of the thermionic components. VHF communications would be useful for line-of- sight operations, while HF would be useful for short-wave type communications using the Venusian ionosphere. UHF and microwave communications use magnetically focused thermionic devices, such as traveling wave tubes (TWTs), magnetron (M-type) amplifiers, and klystrons for high power amplifiers, and backward wave oscillators (BWOs) and reflex klystrons for oscillators. Permanent magnets are already in use in industry that can operate at 500 C. These magnets could focus electron beam tubes on the surface of Venus. While microwave windows will need to be designed for the high pressure, diamond windows have already been demonstrated, so high-pressure microwave windows can be designed and built. Thus, all of these devices could be useful for Venus surface missions. Current electronic power conditioners to supply the high voltages used in these microwave devices cannot operate at high temperatures, but earlier electronic power conditioners that used vacuum tubes can be modified to work at high temperature. Evaluating the various devices in this study, the M-type traveling wave tube (where a traveling wave structure is used in a crossed-field device, similar to the Amplitron used on the Apollo missions) stood out for the high power amplifier since it requires a single high voltage, simplifying the power supply design. Since the receiver amplifier is a low power amplifier, the loss of efficiency in linear beam devices without a depressed collector (and thus needing a single high voltage) is not important; a low noise TWT is a possible solution. Before solid-state microwave amplifiers were available, such TWTs were built with a 1-2 dB noise figure. A microwave triode or transistor made from a wide bandgap material may be preferable, if available. Much of the development work needed for Venusian communication devices will need to focus on the packaging of the devices, and their connections, but the technology is available to build transceivers that can operate on the surface of Venus indefinitely.

Force, Dale A.↗

Integration of Dynamic Weather Routes Automation with Air/Ground Data Communications

The Dynamic Weather Routes (DWR) toolcontinuously and automatically analyzes airborne flights in en route airspace to identify flights where a route correction could save significant flight time and still avoid weather. A partnership between NASA, American Airlines (AA), and the FAA has enabled testing of DWR in real-world air traffic operations. En route Data Communications (Data Comm) could significantly reduce the controller and pilot workload needed to communicate DWR route changes under today’s voice-based operations and thereby enable more timely and frequent high-value corrections to weather avoidance routes. Sample data from the DWR trial at AA illustrate how Data Comm could improve DWR operations. Two operating concepts that integrate DWR with Data Comm are described:(1) route corrections are initiated by air traffic control and implemented using Airborne Reroutes and Data Comm, and (2) route corrections are initiated by the dispatcher and pilot and implemented via Data Comm. Both concepts align with Federal Aviation Administration (FAA) plans for implementation ofData Comm in en route airspace.

weather avoidance↗

Operational Characteristics Identification and Simulation Model Verification for Incheon International Airport

Incheon International Airport (ICN) is one of the hub airports in East Asia. Airport operations at ICN have been growing more than 5% per year in the past five years. According to the current airport expansion plan, a new passenger terminal will be added and the current cargo ramp will be expanded in 2018. This expansion project will bring 77 new stands without adding a new runway to the airport. Due to such continuous growth in airport operations and future expansion of the ramps, it will be highly likely that airport surface traffic will experience more congestion, and therefore, suffer from efficiency degradation. There is a growing awareness in aviation research community of need for strategic and tactical surface scheduling capabilities for efficient airport surface operations. Specific to ICN airport operations, a need for A-CDM (Airport - Collaborative Decision Making) or S-CDM(Surface - Collaborative Decision Making), and controller decision support tools for efficient air traffic management has arisen since several years ago. In the United States, there has been independent research efforts made by academia, industry, and government research organizations to enhance efficiency and predictability of surface operations at busy airports. Among these research activities, the Spot and Runway Departure Advisor (SARDA) developed and tested by National Aeronautics and Space Administration (NASA) is a decision support tool to provide tactical advisories to the controllers for efficient surface operations. The effectiveness of SARDA concept, was successfully verified through the human-in-the-loop (HITL) simulations for both spot release and runway operations advisories for ATC Tower controllers of Dallas/Fort Worth International Airport (DFW) in 2010 and 2012, and gate pushback advisories for the ramp controller of Charlotte/Douglas International Airport (CLT) in 2014. The SARDA concept for tactical surface scheduling is further enhanced and is being integrated into NASA's Airspace Technology Demonstration - 2 (ATD-2) project for technology demonstration of Integrated Arrival/Departure/Surface (ADS) operations at CLT. This study is a part of the international research collaboration between KAIA (Korea Agency for Infrastructure Technology Advancement)/KARI (Korea Aerospace Research Institute) and NASA, which is being conducted to validate the effectiveness of SARDA concept as a controller decision support tool for departure and surface management of ICN. This paper presents the preliminary results of the collaboration effort. It includes investigation of the operational environment of ICN, data analysis for identification of the operational characteristics of the airport, construction and verification of airport simulation model using Surface Operations Simulator and Scheduler (SOSS), NASA's fast-time simulation tool.

scheduling↗

Modis-N airborne simulator

All required work associated with the above referenced contract has been successfully completed at this time. The Modis-N Airborne Simulator has been developed from existing AB184 Wildfire spectrometer parts as well as new detector arrays, optical components, and associated mechanical and electrical hardware. The various instrument components have been integrated into an operational system which has undergone extensive laboratory calibration and testing. The instrument has been delivered to NASA Ames where it will be installed on the NASA ER-2. The following paragraphs detail the specific tasks performed during the contract effort, the results obtained during the integration and testing of the instrument, and the conclusions which can be drawn from this effort.

Cech, Steven D.↗