Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Energy Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Smart Grid Integration Laboratory

The initial federal funding for the Colorado State University Smart Grid Integration Laboratory is through a Congressionally Directed Project (CDP), DE-OE0000070 Smart Grid Integration Laboratory. The original program requested in three one-year increments for staff acquisition, curriculum development, and instrumentation all which will benefit the Laboratory. This report focuses on the initial phase of staff acquisition which was directed and administered by DOE NETL/ West Virginia under Project Officer Tom George. Using this CDP funding, we have developed the leadership and intellectual capacity for the SGIC. This was accomplished by investing (hiring) a core team of Smart Grid Systems engineering faculty focused on education, research, and innovation of a secure and smart grid infrastructure. The Smart Grid Integration Laboratory will be housed with the separately funded Integrid Laboratory as part of CSU's overall Smart Grid Integration Center (SGIC). The period of performance of this grant was 10/1/2009 to 9/30/2011 which included one no cost extension due to time delays in faculty hiring. The Smart Grid Integration Laboratory's focus is to build foundations to help graduate and undergraduates acquire systems engineering knowledge; conduct innovative research; and team externally with grid smart organizations. Using the results of the separately funded Smart Grid Workforce Education Workshop (May 2009) sponsored by the City of Fort Collins, Northern Colorado Clean Energy Cluster, Colorado State University Continuing Education, Spirae, and Siemens has been used to guide the hiring of faculty, program curriculum and education plan. This project develops faculty leaders with the intellectual capacity to inspire its students to become leaders that substantially contribute to the development and maintenance of Smart Grid infrastructure through topics such as: (1) Distributed energy systems modeling and control; (2) Energy and power conversion; (3) Simulation of electrical power distribution system that integrates significant quantities of renewable and distributed energy resources; (4) System dynamic modeling that considers end-user behavior, economics, security and regulatory frameworks; (5) Best practices for energy management IT control solutions for effective distributed energy integration (including security with the underlying physical power systems); (6) Experimental verification of effects of various arrangements of renewable generation, distributed generation and user load types along with conventional generation and transmission. Understanding the core technologies for enabling them to be used in an integrated fashion within a distribution network remains is a benefit to the future energy paradigm and future and present energy engineers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Energy Retrofit Guide: Practical Ways to Improve Energy Performance, K-12 Schools (Book)

The U.S. Department of Energy developed the K-12 Advanced Energy Retrofit Guide to provide specific methodologies, information, and guidance to help energy managers and other stakeholders plan and execute energy efficiency improvements. We emphasize actionable information, practical methodologies, diverse case studies, and unbiased evaluation of the most promising retrofit measure for each building type. K-12 schools were selected as one of the highest priority building sectors, because schools affect the lives of most Americans. They also represent approximately 8% of the energy use and 10% of the floor area in commercial buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Energy Retrofit Guide: Practical Ways to Improve Energy Performance, K-12 Schools (Book)

The U.S. Department of Energy developed the Advanced Energy Retrofit Guides (AERGs) to provide specific methodologies, information, and guidance to help energy managers and other stakeholders plan and execute energy efficiency improvements. Detailed technical discussion is fairly limited. Instead, we emphasize actionable information, practical methodologies, diverse case studies, and unbiased evaluations of the most promising retrofit energy efficiency measures for each building type. A series of AERGs is under development, addressing key segments of the commercial building stock. K-12 schools were selected as one of the highest priority building sectors, because schools affect the lives of most Americans. They also represent approximately 8% of the energy use and 10% of the floor area in commercial buildings nationwide. U.S. K-12 school districts spend more than $8 billion each year on energy - more than they spend on computers and textbooks combined. Most occupy older buildings that often have poor operational performance - more than 30% of schools were built before 1960. The average age of a school is about 42 years - which is nearly the expected serviceable lifespan of the building. K-12 schools offer unique opportunities for deep, cost-effective energy efficiency improvements, and this guide provides convenient and practical guidance for exploiting these opportunities in the context of public, private, and parochial schools.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

El Paso County Geothermal Project at Fort Bliss. Final Project Report

The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator - Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.

15 GEOTHERMAL ENERGY↗

Budget Period 2 Summary Report Part 1: Hywind Maine Project

This project was performed under the Work for Others—Funds in Agreement FIA-14-1793 between Statoil and the Alliance for Sustainable Energy, manager and operator of the National Renewable Energy Laboratory (NREL). To support the development of a 6-MW spar-mounted offshore wind turbine, Statoil funded NREL to perform tasks in the following three categories: 1. Design and analysis 2. Wake modeling 3. Concept resource assessment. This summarizes the document reports on the design and analysis work package, which built a FAST [Jonkman & Buhl, 2005] computer model of the Hywind 6-MW floating wind turbine system and uses this tool to evaluate the performance of a set of design load cases (DLCs). The FAST model was also used in Work Package 2: Wake Modeling .

17 WIND ENERGY↗

Budget Period 2 Summary Report Part 2: Hywind Maine Project

This project was performed under the Work for Others—Funds in Agreement FIA-14-1793 between Statoil and the Alliance for Sustainable Energy, manager and operator of the National Renewable Energy Laboratory (NREL). To support the development of a 6-MW spar-mounted offshore wind turbine, Statoil funded NREL to perform tasks in the following three categories: 1. Design and analysis 2. Wake modeling 3. Concept resource assessment. This study expands upon the work conducted in Budget Period 1 (BP1) to investigate the influence of the wake generated from an upstream turbine on a downstream turbine using Computational Fluid Dynamics (CFD) high-fidelity modeling tool. Simulator fOr Wind Farms Application (SOWFA) is an NREL high fidelity modeling tool that couples OpenFOAM CFD and NREL’s Aero-Elastic code Fatigue, Aerodynamics, Structures, and Turbulence (FAST). In BP1 the configuration was based on Hywind-3MW at 140 m water depth in the Gulf of Maine; however this study for Budget Period 2 (BP2) the configuration investigated is based on Hywind-6MW at 220 m water depth off the coast of Boston. The objectives were to perform two-turbines One-Way Coupling (OWC), three-turbines Two-Way Coupling (TWC), and to investigate wind power plant optimization.

99 GENERAL AND MISCELLANEOUS↗

Budget Period 2 Summary Report Part 3: Hywind Maine Project

This project was performed under the Work for Others—Funds in Agreement FIA-14-1793 between Statoil and the Alliance for Sustainable Energy, manager and operator of the National Renewable Energy Laboratory (NREL). To support the development of a 6-MW spar-mounted offshore wind turbine, NREL performed tasks on behalf of Statoil in the following three categories: 1. Design and analysis 2. Wake modeling 3. Concept resource assessment. This document summarizes the work performed in Work Package (WP) 3, where the spatial variability and influence that relevant parameters have on levelized cost of energy (LCOE) were analyzed. The study allows Statoil to identify areas of interest for floating wind technology and the Hywind concept in particular. This report describes the results of a study that NREL conducted to provide targeted insight into the United States (U.S.) offshore wind resource area that Statoil can use for taking strategic decisions about how to commercialize and market the company’s Hywind technology. The report centers on a new spatio-economic methodology that NREL has developed to assess how variability in spatial parameters can influence levelized cost of energy (LCOE) for different technologies. The method combines wind plant performance modeling, economic modeling, and national geospatial data layers to estimate the cost of potential projects using Hywind technology, considering the following parameters: • Water depth • Possible inshore assembly areas • Wind resource • Existing grid features and potential connection points • Wave regime • Environmentally sensitive areas • Seabed conditions • Competitive use areas • Prospective staging ports The scope of the study covers the major offshore regions within the contiguous United States, including the Atlantic Ocean, Gulf of Mexico, Pacific Ocean, and the Great Lakes. The spatio-economic assessment extends to 92 km (50 nm) off of the nearest land mass, consistent with the available data on wind characteristics. The study is restricted to those locations that meet the depth criteria for Hywind technology—defined as water depths between 100 m to 1,000 m—and only considered sites with net capacity factors that exceed 30%.

99 GENERAL AND MISCELLANEOUS↗

Floating Offshore Wind in California: Gross Potential for Jobs and Economic Impacts from Two Future Scenarios

Construction of the first offshore wind farm in the United States began in 2015, using fixed platform structures that are appropriate for shallow seafloors, like those located off of the East Coast and mid-Atlantic. However, floating platforms, which have yet to be deployed commercially, will likely need to anchor to the deeper seafloor if deployed off of the West Coast. To analyze the employment and economic potential for floating offshore wind along the West Coast, the Bureau of Ocean Energy Management (BOEM) has commissioned the National Renewable Energy Laboratory (NREL) to analyze two hypothetical, large-scale deployment scenarios for California: 16 GW of offshore wind by 2050 (Scenario A) and 10 GW of offshore wind by 2050 (Scenario B). The results of this analysis can be used to better understand the general scales of economic opportunities that could result from offshore wind development. Results show total state gross domestic product (GDP) impacts of $16.2 billion in Scenario B or $39.7 billion in Scenario A for construction; and $3.5 billion in Scenario B or $7.9 billion in Scenario A for the operations phases.

2050↗

Review of Life Cycle Cost Analysis Tools

Life cycle costing (LCC) is a vital aspect of decision-making in building retrofitting. It allows stakeholders to thoroughly assess all expenses involved throughout the lifespan of these retrofits, covering initial costs; ongoing operation, maintenance, and repair costs; and disposal costs of the system. The Federal Energy Management Program of the US Department of Energy has established clear guidelines for conducting LCC analysis, particularly for investments aimed at energy and water conservation, as well as renewable energy projects. These guidelines are detailed in the Code of Federal Regulations, 10 CFR 436, Subpart A, which outlines the methodology and procedure for LCC analysis (Department of Energy 1990). The National Institute of Standards and Technology (NIST) has developed the NIST Handbook 135 (Joshua Kneifel 2022) to standardize the process of LCC analysis within the building industry. Whereas the handbook is tailored to the needs of federal agencies, its principles and methodologies can be valuable for other organizations and industries interested in conducting life cycle costing analyses for their building projects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Interplay Between Climate and Urban Expansion on Building Energy Demand in Morocco

Understanding building energy demand is critical for addressing climate uncertainty challenges and ensuring sustainable urban growth. This study develops a building energy demand (BED) model to explore how climate variation and urban expansion affect residential and commercial space heating and cooling demands in Morocco for three scenarios, namely, 2005, 2018, and 2018 + 1.5 °C. The results show that coastal cities have lower heating and cooling needs due to the oceanic influence, while interior cities require significantly higher heating demand per-unit-floorspace. Between 2005 and 2018, urban growth increased total heating and cooling demand by 218.8 GWh, particularly in northern and coastal regions, despite per-unit-floorspace reductions in milder climates and improved building efficiency in 2018. Residential heating remains the dominant energy use, though commercial demand is significant in urban centers. Under the 2018 + 1.5 °C hypothetical scenario, heating demand across Morocco declines by 335.8 GWh compared to 2018, with urban areas amplifying this trend. Meanwhile, cooling demand increases slightly by 44.4 GWh, with major cities experiencing relative increases of up to 50%. These findings highlight a trade-off where reduced winter heating needs are partly offset by increased summer cooling demands in densely urbanized areas. In conclusion, the study identifies key urban hotspots for targeted interventions, emphasizing the need for energy-efficient building designs, climate-adaptive urban planning, and resilient energy management strategies to sustainably address shifting seasonal energy patterns.

Morocco↗

Real Time Predictive and Adaptive Hybrid Powertrain Control Development via Neuroevolution

The real-time application of powertrain-based predictive energy management (PrEM) brings the prospect of additional energy savings for hybrid powertrains. Torque split optimal control methodologies have been a focus in the automotive industry and academia for many years. Their real-time application in modern vehicles is, however, still lagging behind. While conventional exact and non-exact optimal control techniques such as Dynamic Programming and Model Predictive Control have been demonstrated, they suffer from the curse of dimensionality and quickly display limitations with high system complexity and highly stochastic environment operation. This paper demonstrates that Neuroevolution associated drive cycle classification algorithms can infer optimal control strategies for any system complexity and environment, hence streamlining and speeding up the control development process. Neuroevolution also circumvents the integration of low fidelity online plant models, further avoiding prohibitive embedded computing requirements and fidelity loss. This brings the prospect of optimal control to complex multi-physics system applications. The methodology presented here covers the development of the drive cycles used to train and validate the neurocontrollers and classifiers, as well as the application of the Neuroevolution process.

33 ADVANCED PROPULSION SYSTEMS↗

Concurrent development of fault management hardware and software in the SSM/PMAD

Space Station issues in fault management are discussed. The system background is described with attention given to design guidelines and power hardware. A contractually developed fault management system, FRAMES, is integrated with the energy management functions, the control switchgear, and the scheduling and operations management functions. The constraints that shaped the FRAMES system and its implementation are considered.

Freeman, Kenneth A.↗

California Energy Incentive Programs: An Annual Update on Key Energy Issues and Financial Opportunities for Federal Sites in California

A spate of recently enacted energy legislation and associated program changes is providing numerous opportunities to help California federal energy managers cut costs and meet their renewables, energy efficiency and GHG emissions goals. In April 2011, Governor Jerry Brown approved the nation’s most ambitious renewable portfolio standard (RPS), which requires 33% of the state’s electricity to come from renewable energy sources by 2020. Policy changes that will support the RPS include expanded eligibility rules that fill previous gaps in incentives for certain sizes of on-site renewable energy systems. Program updates described in this document include: $200 million more in funding for California Solar Initiative rebates to commercial and industrial customers; an increase in the eligible system size for the Feed-In-Tariff (FIT) from 1.5MW to 3MW; and pending changes that may allow customer-side systems to sell tradable renewable energy credits (TRECs) to entities with RPS compliance obligations in California.

California, Incentive, Energy, Financial, Federal↗

Federal Utility Partnerships & Clean Production of Natural Gas

Karen Thomas from NREL will discuss utility partnership programs with the federal government under the Federal Energy Management Program (FEMP) of the Department of Energy (DOE). These programs offer a way for a utility to partner with federal agencies. She will describe the federal government's ability to work directly with their serving natural gas utility to implement successful energy efficiency projects. Also, Jill Engel-Cox from NREL's Joint Institute for Strategic Energy Analysis will briefly share their analysis to identify opportunities to reduce emissions and increase efficiency of the production and delivery of natural gas.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

High-resolution Seismic Imaging of Depositional Characteristics at Gas Hydrate Research Sites in the Gulf of Mexico

High-resolution seismic data acquired by the U.S. Geological Survey (USGS), with support from the U.S. Bureau of Ocean Energy Management (BOEM) and the U.S. Department of Energy (DOE), in 2013 at two geologically distinct study sites in the offshore Gulf of Mexico basin provide an opportunity for detailed characterization and for comparison of the depositional settings of sediments that host high concentrations of gas hydrate at each site. Gas hydrate exists at Green Canyon Block 955 (GC955) within sand layers deposited in a proximal marine channel-levee setting, whereas at Walker Ridge Block 313 (WR313) gas hydrate deposits occur within thin distal levees and sheet sands deposited in a mini-basin environment. A refined understanding of the depositional environment at these sites in turn provides valuable insights regarding reservoir characteristics and controls on gas hydrate occurrence.

Haines, Seth↗

Massive Contingency Analysis with High Performance Computing

Contingency analysis is a key function in the Energy Management System (EMS) to assess the impact of various combinations of power system component failures based on state estimates. Contingency analysis is also extensively used in power market operation for feasibility test of market solutions. Faster analysis of more cases is required to safely and reliably operate today’s power grids with less marginal and more intermittent renewable energy sources. Enabled by the latest development in the computer industry, high performance computing holds the promise of meet the need in the power industry. This paper investigates the potential of high performance computing for massive contingency analysis. The framework of "N-x" contingency analysis is established and computational load balancing schemes are studied and implemented with high performance computers. Case studies of massive 300,000-contingency-case analysis using the Western Electricity Coordinating Council power grid model are presented to illustrate the application of high performance computing and demonstrate the performance of the framework and computational load balancing schemes.

Computational Load Balancing↗

Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions

The aim of commissioning new buildings is to ensure that they deliver, if not exceed, the performance and energy savings promised by their design. When applied to existing buildings, commissioning identifies the almost inevitable 'drift' from where things should be and puts the building back on course. In both contexts, commissioning is a systematic, forensic approach to quality assurance, rather than a technology per se. Although commissioning has earned increased recognition in recent years - even a toehold in Wikipedia - it remains an enigmatic practice whose visibility severely lags its potential. Over the past decade, Lawrence Berkeley National Laboratory has built the world's largest compilation and meta-analysis of commissioning experience in commercial buildings. Since our last report (Mills et al. 2004) the database has grown from 224 to 643 buildings (all located in the United States, and spanning 26 states), from 30 to 100 million square feet of floorspace, and from $17 million to $43 million in commissioning expenditures. The recorded cases of new-construction commissioning took place in buildings representing $2.2 billion in total construction costs (up from 1.5 billion). The work of many more commissioning providers (18 versus 37) is represented in this study, as is more evidence of energy and peak-power savings as well as cost-effectiveness. We now translate these impacts into avoided greenhouse gases and provide new indicators of cost-effectiveness. We also draw attention to the specific challenges and opportunities for high-tech facilities such as labs, cleanrooms, data centers, and healthcare facilities. The results are compelling. We developed an array of benchmarks for characterizing project performance and cost-effectiveness. The median normalized cost to deliver commissioning was $0.30/ft2 for existing buildings and $1.16/ft2 for new construction (or 0.4% of the overall construction cost). The commissioning projects for which data are available revealed over 10,000 energy-related problems, resulting in 16% median whole-building energy savings in existing buildings and 13% in new construction, with payback time of 1.1 years and 4.2 years, respectively. In terms of other cost-benefit indicators, median benefit-cost ratios of 4.5 and 1.1, and cash-on-cash returns of 91% and 23% were attained for existing and new buildings, respectively. High-tech buildings were particularly cost-effective, and saved higher amounts of energy due to their energy-intensiveness. Projects with a comprehensive approach to commissioning attained nearly twice the overall median level of savings and five-times the savings of the least-thorough projects. It is noteworthy that virtually all existing building projects were cost-effective by each metric (0.4 years for the upper quartile and 2.4 years for the lower quartile), as were the majority of new-construction projects (1.5 years and 10.8 years, respectively). We also found high cost-effectiveness for each specific measure for which we have data. Contrary to a common perception, cost-effectiveness is often achieved even in smaller buildings. Thanks to energy savings valued more than the cost of the commissioning process, associated reductions in greenhouse gas emissions come at 'negative' cost. In fact, the median cost of conserved carbon is negative - -$110 per tonne for existing buildings and -$25/tonne for new construction - as compared with market prices for carbon trading and offsets in the +$10 to +$30/tonne range. Further enhancing the value of commissioning, its non-energy benefits surpass those of most other energy-management practices. Significant first-cost savings (e.g., through right-sizing of heating and cooling equipment) routinely offset at least a portion of commissioning costs - fully in some cases. When accounting for these benefits, the net median commissioning project cost was reduced by 49% on average, while in many cases they exceeded the direct value of the energy savings. Commissioning also improves worker comfort, mitigates indoor air quality problems, increases the competence of in-house staff, plus a host of other non-energy benefits. These findings demonstrate that commissioning is arguably the single-most cost-effective strategy for reducing energy, costs, and greenhouse gas emissions in buildings today. Energy savings tend to persist well over at least a 3- to 5-year timeframe, but data over longer time horizons are not available. It is thus important to 'Trust but Verify,' and indeed the field is moving towards a monitoring-based paradigm in which instrumentation is used not only to confirm savings, but to identify opportunities that would otherwise go undetected. On balance, we view the findings here as conservative, in the sense that they underestimate the actual performance of projects when all costs and benefits are considered. They underestimate the technical potential for a scenario in which best practices are applied.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗