Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Distribution System State Estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Port Graham Community Building Biomass Heating Design Project

Native Village of Port Graham completed preconstruction activities to prepare for construction and operations of a cord wood biomass heating system to five or more community buildings in Port Graham, Alaska. Project Description Native Village of Port Graham (NVPG) completed preconstruction activities that pave the way towards reduced local energy costs through the construction and operations of a cord wood biomass heating system. NVPG plans include installation of a GARN WHS 3200 Boiler that uses cord wood as fuel source. Implementation of the 700,000 Btu per hour output biomass community building heat utility would heat 5-community buildings in Port Graham, Alaska. Heating system is estimated to displace 85% of the heating fuel oil or 5365 gallons of fuel on an annual basis with an estimated peak output of 600,000 Btu per hour. Estimated savings is $15,112.00 per year. The construction cost estimate made to install the new biomass boiler system is estimated $251,693.47 with an additional Boiler Building expansion cost estimated at $97,828.40. Total installed cost is estimated $349,521.87. The WHS 3200 Boiler would be placed inside a new structure at the old community Water Plant Building site that is controlled by NVPG. Design of the new biomass heat plant and hot water loop system was completed by Richmond Engineering, NVPG contractor for the project. A hot water heat loop system running off the boiler is designed to be placed underground on lands controlled by NVPG and stubbed to feed hot water to existing base board heating system in the following community buildings: 1. Anesia Anahonak Moonin Health and Dental Clinic 2. Native Village of Port Graham offices 3. Port Graham Public Safety Building/Fire Department 4. Port Graham Corporation Office Building which also houses the Port Graham Museum and Head Start Center 5. North Pacific Rim Housing Authority Workshop/Old Fire Hall Existing community buildings fuel oil heating systems are to be retro-fitted to accommodate hot water from the proposed wood-burning GARN Boiler, once installed, and rely on the existing fuel oil-fired hot water heating equipment for backup. The boiler would use an estimated 125 bone dry tons, equivalent to 100 cords, woody biomass feedstock obtained from local lands per year. Project would use local labor as described in the Port Graham Biomass Project, report completed by Chena Power, Inc. and Winters and Associates as part of the in-kind support to the U. S. Department of Energy (DOE) project for work on a project for State of Alaska’s Alaska Energy Authority (AEA). NVPG will likely initiate operations of the biomass boiler system even though several operational variations were studied. Obtaining the fuel source could be done by contractors, PGVC employees, or NVPG employees. Feeding the system would likely be done by NVPG employees. A majority of the buildings heated would be owned by NVPG. The PGVC office would be heated as well as the Old Fire Hall used as a workshop and storage area for North Pacific Rim Housing Authority. One methodology studied to charge for cost of utilizing the community building biomass system would use a percentage of use of hot water generated by the biomass hot water system based on past heating oil usage in relation to all buildings heated by biomass hot water. The method is better described in the Port Graham Biomass Project report. Fuel source agreements have been drafted to enter into agreements with area landowners. One Native allotment owner has asked Chugachmiut Forestry to begin a timber sale process to sell timber off her lands, specifically wind thrown timber that was determined to be of sufficient quantity to supply to the proposed biomass heating system for approximately 5-years. On NVPG’s behalf, Chugachmiut has presented to PGVC three different documents, attached, that could lead to a sale of woody biomass fuel for the project for up to 25-years, the expected life of the project. PGVC has signed a letter of intent to negotiate a sale of woody biomass material April 30, 2015. Chugachmiut Forestry has conducted two different field forest measurements of Native allotment lands and PGVC forest and timber lands. Lands deemed road accessible for biomass harvest were analyzed for this project. Forestry then conducted three different analyses and developed two reports to determine forest biomass on a tons per acre basis in addition to timber volume measurements taken for forest management purposes. Permits required were limited. For the biomass building, the Kenai Peninsula Borough did not require a permit. State of Alaska, Department of Public Safety, Division of Fire and Life Safety requires a plan review for fire and life safety requirements called an application for Fire and Life Safety Plan Review that would require a registered design professional to sign the document. State of Alaska State Forest Practices Act is required to be followed for any timber sale or harvest. This Act also requires consultation with Alaska Department of Fish and Game when operations are in close proximity or cross anadromous waters. Native allotment lands require following U. S. Bureau of Indian Affairs timber sale contracting process and approval.

09 BIOMASS FUELS↗

Catalytic Bio-crude Production in a Novel, Short-Contact Time Reactor

RTI has developed a catalytic fast pyrolysis (CFP) process to produce biomass-based hydrocarbon replacement fuels. From a technology perspective, this advanced biofuels process produces liquid transportation fuels that can leverage capital expenditures in the existing petroleum distribution infrastructure. From a business perspective, this technology does not face potential market limitations caused by oxygenate blend limitations for light duty vehicle applications. A promising catalyst has been developed with excellent potential for deoxygenation to produce a hydrocarbon-rich biocrude that is more suitable for upgrading with traditional hydroprocessing technology. The role of the catalyst is to control the chemistry during biomass pyrolysis to produce a biocrude in a single step that has lower oxygen content and is more thermally stable than conventional biomass fast pyrolysis oil. Catalyst properties are optimized to minimize gas and coke production and improve catalytic deoxygenation and biocrude yields. Results from this project have demonstrated that biocrudes from catalytic fast pyrolysis contain <20 wt% oxygen, with the organic fraction as low as 12% oxygen. These oxygen numbers are > 50% lower compared to traditional fast pyrolysis oils. The biocrude produced from our CFP process can be upgraded to gasoline range hydrocarbons. A very conservative approach for upgrading included a preliminary stabilization step followed by a hydroprocessing step. The oxygen content in the upgraded product was decreased by 97% (to less than 3wt %) from the oxygen content of the biocrude sample. Additionally, the acid content was reduced by 99% from the acid content of the biocrude sample. In an optimized integrated process, the CFP step and the hydroprocessing (upgrading) step need to be carefully balanced to maximize the input biomass energy that is recovered in the finished biofuels. Hydrogen utilization and carbon recovery during both catalytic biomass pyrolysis and biocrude upgrading need to be optimized to maximize energy recovery in the finished biofuel. A nominal 1 ton per day (TPD) catalytic biomass pyrolysis system was designed based on the laboratory experimental data. The system was designed to achieve the short residence times (0.5–2 sec) and high heat transfer rates required for maximum liquid biocrude yields while optimizing process integration to maintain catalyst activity by continuous regeneration. The catalytic biomass pyrolysis reactor is a continuously circulating single-loop transport reactor design that is flexible enough to allow sensitivity studies around temperature, residence time, biomass feed rate, and catalyst-to-biomass ratio (i.e., catalyst circulation rate) for process optimization. For a nominal 100 lb/hr feed rate of dry biomass, the products include ~25 lb/hr char and coke, ~20 lb/hr permanent gases, and ~55 lb/hr condensable vapors. Pyrolysis temperatures are 350–600°C, and the system is operated close to ambient pressure. Production of the catalyst developed within the project was scaled up to provide enough material (200kg) for bench-scale testing. The 1TPD bench-scale unit was fabricated, installed and commissioned with this project. Biocrude samples from wood were produced in this unit with the CFP catalyst with material balance > 90%. The intermediate biocrude yields and chemical composition compare well with previous laboratory results and a hydroprocessing strategy for upgrading the resulting biocrude was developed. The experimental results obtained within this project were used to develop a process model for a 2000 TPD commercial facility. Detailed flow sheets were developed for all major unit operations in the process and provided a basis for an economic analysis to develop capital and operating costs. Estimates of the biofuel production costs were used to develop internal rates of return for the yields and compositions measured for the current state of technology at the end of this project and for the yields anticipated for an optimized (nth plant) scenario as additional process improvements are made.

09 BIOMASS FUELS↗

Field Demonstration of The Krauklis Seismic Wave In A Novel Mva Method For Geologic CO 2 Storage

The Energy & Environmental Research Center (EERC) conducted a feasibility study of a new, low-impact geophysics monitoring method designed to incrementally track the saturation front of CO 2 injected into a reservoir. The method leverages a new way of transmitting energy from the surface to the reservoir and employs a new subsurface signal called the Krauklis wave (K-wave) and other guided waves for seismic monitoring. The EERC partnered with Seismos, Inc., the company that holds the exclusive technology license for this method, to advance development of K-wave technology, and Denbury Onshore, LLC, to field-test the system. The system was field-tested at Denbury’s Bell Creek oil field, currently undergoing CO 2 -based enhanced oil recovery (EOR) in southeastern Montana. The K-wave system uses a wellhead-mounted source to propagate energy down the wellbore in the form of a tube wave and through the well perforations into the reservoir. Part of the energy transmitted through the perforations into the reservoir converts to slow moving K-waves and/or other guided waves that are expected to propagate through the formation to neighboring wells. The propagated signal would induce tube waves in the neighboring wells that return to the surface to be recorded with a wellhead-mounted receiver. The propagation time of the signal is directly affected by the presence of CO 2 between the wells, so the difference in transit time of the returning signal between pre- and postinjection data sets could be used to help define the lateral extent of a CO 2 saturation front. Objectives of the study were to demonstrate, validate, and evaluate the K-wave method’s ability to monitor the morphology of injected CO 2 and estimate saturation distribution. Results from the demonstration were to be compared to conventional 4-D surface seismic methods, dynamic reservoir simulations, and CO 2 breakthrough data to validate the technology and provide useful information that may result in improvements. Prior to mobilizing for the full-scale K-wave baseline survey, a field test was conducted to better understand wellhead hardware configurations and test the response from the Bell Creek reservoir using three wells. Useful operational information resulted but signal from the first-generation gas release/gas injection source was not recorded in neighboring wells. After the initial field test, numerical modeling of the K-wave method was initiated using parameters specific to the Bell Creek Field. Modeling results indicated that the fundamental concepts behind the K-wave method exhibited problems and revealed a significantly greater attenuation of the signal at the wellbore perforations than expected, totaling on the order of 10-8 from source well to receiver well over a 400-m well spacing. Modeling also showed that greater source frequency bandwidth was needed to produce guided waves within a 30-foot-thick reservoir layer such as that at Bell Creek and that reservoir layer seismic velocity would need to be slower than the velocities of the bounding layers in order to act as a wave guide opposite to what exists at Bell Creek. Modeling results prompted a second field test with a stronger, second-generation displacement source developed in the interim. Concurrent with the second field test, a 3-D seismic survey was acquired to serve as a baseline for project validation and to serve as a monitor data set for the portion of the project area where CO 2 injection had already commenced. The new source was tested using a four-well geometry and failed to produce a detectable signal, which appeared to confirm modeling results and indicated that the Bell Creek Field is not an ideal site for the K-wave test. It was concluded that a source with sufficient strength and bandwidth could not be built to overcome the factors discovered by the modeling within a reasonable amount of time. Several other sites undergoing CO 2 -based EOR were also evaluated; however, none of these sites was amenable because of geology, limitations of source and receiver hardware, or the advanced state of the CO 2 flood. In addition, two other configurations of the source and receiver layout were considered; however, these design modifications either changed the scope of the project or did not meet the goals of the Carbon Storage Program. In consultation with the U.S. Department of Energy (DOE) Project Manager and Technology Manager, a no-go decision was invoked to forego additional expenditures as the technology would not meet current project objectives. Project activities to date have moved the technology forward by developing modeling equations that can be applied elsewhere, advanced the state of wellhead sensors and sources, and spurred improvements to field operations. The 3-D seismic survey in the project area and the dynamic reservoir simulations done as part of this study have provided value for ongoing and future synergistic activities at Bell Creek related to DOE carbon storage goals.

54 ENVIRONMENTAL SCIENCES↗

Analysis of Unit-Level Changes in Operations with Increased SPP Wind from EPRI/LCG Balancing Study

Wind power development in the United States is outpacing previous estimates for many regions, particularly those with good wind resources. The pace of wind power deployment may soon outstrip regional capabilities to provide transmission and integration services to achieve the most economic power system operation. Conversely, regions such as the Southeastern United States do not have good wind resources and will have difficulty meeting proposed federal Renewable Portfolio Standards with local supply. There is a growing need to explore innovative solutions for collaborating between regions to achieve the least cost solution for meeting such a renewable energy mandate. The Department of Energy funded the project 'Integrating Midwest Wind Energy into Southeast Electricity Markets' to be led by EPRI in coordination with the main authorities for the regions: SPP, Entergy, TVA, Southern Company and OPC. EPRI utilized several subcontractors for the project including LCG, the developers of the model UPLAN. The study aims to evaluate the operating cost benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of regional cooperation for integrating mid-western wind energy into southeast electricity markets. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the southern regions of the SERC. DOE funded Oak Ridge National Laboratory to provide additional support to the project, including a review of results and any side analysis that may provide additional insight. This report is a unit-by-unit analysis of changes in operations due to the different scenarios used in the overall study. It focuses on the change in capacity factors and the number of start-ups required for each unit since those criteria summarize key aspects of plant operations, how often are they called upon and how much do they operate. The primary analysis of the overall project is based on security-constrained unit commitment (SCUC) and economic dispatch (SCED) simulations of the SPP-SERC regions as modeled for the year 2022. The SCUC/SCED models utilized for the project were developed through extensive consultation with the project utility partners, to ensure the various regions and operational practices are represented as best as possible in the model. SPP, Entergy, Oglethorpe Power Company (OPC), Southern Company, and the Tennessee Valley Authority (TVA) actively participated in the project providing input data for the models and review of simulation results and conclusions. While other SERC utility systems are modeled, the listed SERC utilities were explicitly included as active participants in the project due to the size of their load and relative proximity to SPP for importing wind energy.

17 WIND ENERGY↗

Investigation of Microbunching Instabilities in Modern Recirculating Accelerators

Particle accelerators are machines to accelerate and store charged particles, such as electrons or protons, to the energy levels for various scientific applications. A collection of charged particles usually forms a particle beam. There are three basic types of particle accelerators: linear accelerators (linac), storage-ring (or circular) accelerators, and recirculating accelerators. In a linac, particles are accelerated and pass through once along a linear or straight beamline. Storage-ring accelerators propel particles around a circular track and repetitively append the energy to the stored beam. The third type, also the most recent one in chronology, the recirculating accelerator, is designed to accelerate the particle beam in a short section of linac, circulate the beam, and then either continue to accelerate for energy boost or decelerate it for energy recovery. The beam properties of a linac machine are set at best by the initial particle sources. For storage rings, the beam equilibria are instead determined by the overall machine design. The modern recirculating machines share with linacs the advantages to both accelerate and preserve the beam with high beam quality, as well as efficiently reuse the accelerating components. The beamline design in such a machine configuration can however be much more complicated than that of linacs. As modern accelerators push toward the high-brightness or high-intensity frontier by demanding particles in a highly charged bunch (about nano-Coulomb per bunch) to concentrate in an ever-decreasing beam phase space (transverse normalized emittance about 1 μm and relative energy spread of the order of 10^-5 in GeV beam energy), the interaction amongst particles via their self-generated electromagnetic fields can potentially lead to coherent instabilities of the beam and thus pose significant challenges to the machine design and operation. In the past decade and a half, microbunching instability (MBI) has been one of the most challenging issues for such high-brightness or high-intensity beam transport, as it would degrade lasing performance in the fourth-generation light sources, reduce cooling efficiency in electron cooling facilities, and compromise the luminosity of colliding beams in lepton or lepton-hadron colliders. The dissertation work will focus on the MBI in modern recirculating electron accelerators. It has been known that the collective interactions, the coherent synchrotron radiation (CSR) and the longitudinal space charge (LSC) forces, can drive MBI. The CSR effect is a collective phenomenon in which the electrons in a curved motion, e.g. a bending dipole, emit radiation at a scale comparable to the micro-bunched structure of the bunch distribution. The LSC effect stems from non-uniformity of the charge distribution, acts as plasma oscillation, and can eventually accumulate an amount of energy modulation when the beam traverses a long section of a beamline. MBI can be seeded by non-uniformity or shot noise of the beam, which originates from granularity of the elementary charge. Through the aforementioned collective effects, the modulation of the bunch sub-structure can be amplified and, once the beam-wave interaction formed a positive feedback, can result in MBI. The problem of MBI has been intensively studied for linac-based facilities and for storage-ring accelerators. However, systematic studies for recirculation machines are still very limited and form a knowledge gap. Because of the much more complicated machine configuration of the recirculating accelerators than that of linacs, the existing MBI analysis needs to be extended to accommodate the high-brightness particle beam transport in modern recirculating accelerators. This dissertation is focused on theoretical investigation of MBI in such machine configuration in the following seven themes: (1) Development and generalization of MBI theory The theoretical formulation has been extended so as to be applicable to a general linear beamline lattice including horizontal and vertical transport bending elements, and beam acceleration or deceleration. These featured generalizations are required for MBI analysis in recirculation accelerators. (2) Construction of CSR impedance models In addition to the steady-state CSR interaction, it has been found that the exit transient effect (or CSR drift) can even result in more serious MBI in high-brightness recirculation arcs. The onedimensional free-space CSR impedances, especially the exit transients, are derived. The steady-state CSR impedance is also extended to non-ultrarelativistic beam energy for MBI analysis of low-energy merger sections in recirculating accelerators. (3) Numerical implementation of the derived semi-analytical formulation This includes the development of a semi-analytical Vlasov solver for MBI analysis, and also benchmarking of the solver against massive particle tracking simulations. (4) Exploration of multistage amplification behavior of CSR microbunching development The CSR-induced MBI acts as an amplifier, which amplifies the sub-bunch modulation of a beam. The amplification is commonly quantified by the amplification gain. A beam transport system can be considered as a cascaded amplifier. Unlike the two-stage amplification of four-dipole bunch compressor chicanes employed in linacs, the recirculation arcs, which are usually constituted by several tens of bending magnets, show a distinguishing feature of up to six-stage microbunching amplification for our example arc lattices. That is, the maximal CSR amplification gain can be proportional to the peak bunch current up to sixth power. A method to compare lattice performance has been developed in terms of gain coefficients, which nearly depend on the lattice properties only. This method has also proven to be an effective way to quantify the current dependence of the maximal (5) Control of CSR MBI in multibend transport or recirculation arcs The existing mitigation schemes of MBI mostly aim to linac-based accelerators and may not be practical to the recirculating accelerator facilities. Thus a set of conditions for suppression of CSR MBI was proposed and examined for example lattices from low (~100 MeV) to high (~1 GeV) energies. (6) Study of more aspects of microbunched structures in beam phase spaces For a cascaded amplifier in circuit electronics, the total amplification gain can be estimated as the product of individual gains. In a beam transport line of an accelerator, the (scalar) gain multiplication was examined and found to under-estimate the overall microbunching amplification. The concept of gain matrix was developed, which includes the density, energy and transverse-longitudinal modulations in a beam phase space, and used to analyze MBI for a proposed recirculating machine. Throughout the gain matrix approach, it reasonably gives the upper limit of spectral MBI gain curves. This extended analysis can be employed to study multi-pass recirculation. (7) Study of MBI for magnetized beams Driven by a recent energy-recovery-linac based cooler design for electron cooling at Jefferson Lab Electron-Ion Collider Project, the generalized theoretical formulation for MBI to a transversely coupled beam has been developed and applied to this study. A magnetized beam in general features non-zero canonical angular momentum, thus considered to be a transversely coupled beam. A novel idea of utilizing magnetized beam transport was proposed for improvement of cooling efficiency and possible mitigation of collective effects. A concern of MBI regarding this design was studied and excluded. The large transverse beam size associated with the beam magnetization is found to help suppress MBI via the transverse-longitudinal correlation.

43 PARTICLE ACCELERATORS↗

A Stratigraphic Approach to Characterize the Deposition and Storage of Organic Matter in Reservoir Sediments.

The relationship between carbon burial and sedimentation in reservoirs is unknown, exposing gaps in our fundamental understanding of the transport, processing, and deposition of sediment and organic matter in fluvial and lacustrine systems and contributing to uncertainty in our understanding of the net impact of dams to the global carbon budget. The 2011-2014 removal of two large dams on the Elwha River, Washington State, the largest dam removal yet completed globally, created extensive cutbank exposures of reservoir sediments, allowing the first characterization of the facies architecture of sediments through direct observation in reservoirs worldwide and providing an unparalleled opportunity to 1) assess the relationship between environmental influences, such as and changes in sediment supply, and their expression in the stratigraphic record, 2) assess the relationship between sedimentation processes and detrital organic carbon deposition and storage, and the importance of coarse-grained organic matter and woody debris to the total carbon budget of a reservoir, and 3) apply the insight gained from these reservoirs to evaluate current global estimates of carbon storage in reservoirs and develop a conceptual model of carbon burial in reservoirs to guide further research, as defined by characteristic stratigraphic “types”. Former Lake Mills, the younger, upstream reservoir, was characterized by a tripartite, subaerial Gilbert-style delta which prograded >1 km into the main reservoir from 1927 to 2011. Sediments were composed of coarse-grained topset beds, steeply dipping foreset beds, and a fine-grained, gently dipping prodelta. While individual event horizons were discernible in fine-grained sediments of former Lake Mills, their number and spacing did not correspond to known drawdown or flood events. Former Lake Aldwell, impounded from 1913 to 2011, was initially defined by the rapid progradation of a Gilbert-style, subaerial delta prior to the upstream completion of Glines Canyon Dam. However, the 1927 closure of Glines Canyon Dam upstream caused the delta to evolve to a fine-grained, mouth-bar type delta indicative of low, finer-grained sediment. This evolution, combined with a previously-unrecognized landslide deposit into the upper delta plain, suggests that understanding the exogenic influences on reservoir sedimentation is critical to interpretation and prediction of the sedimentation within individual systems. Former Lake Mills accumulated ~330 Gg of, with depositional-zone average accumulation rates from 229 to 9262 gCm -2 yr -1 , while Former Lake Aldwell accumulated ~ 91 Gg (263 to 2414 gCm -2 yr -1 ). Carbon storage in both reservoirs was dominated by heterogeneous, coarse organic matter and woody debris in the coarse-grained delta slope and relatively coarse-grained prodelta regions of the reservoirs, with little storage in the gravel-dominated, subaerial delta plains. Carbon accumulation in fine-grained lacustrine and prodelta sediments was relatively homogeneous, but turbidity flows from the Gilbert-style delta slope in former Lake Mills delivered significantly more carbon to the prodelta than the mouth-bar style delta of former Lake Aldwell. C:N ratios support interpretation of most organic matter in both reservoirs as allochthonous. Sampling schemes based only on lacustrine and/or prodelta would underestimate of total carbon accumulation by up to 30% in former Lake Aldwell, but the overestimate by up to 47% in former Lake Mills. Global estimates of carbon sequestration rates in reservoir sediments vary by three orders of magnitude, while individual-reservoir estimates vary by four orders of magnitude and over only 37 reservoirs and a literature review of predictive variables suggests weak or contradictory relationships. A conceptual stratigraphic framework of four unique reservoir types suggests that organic matter deposition is intrinsically tied to sedimentation processes and that patterns of carbon storage vary systematically with the stratigraphy of reservoir sediments. Deltaically-dominated reservoirs (whether Gilbert style or shoalwater) appear to store most carbon in their deltaic and prodelta regions, while thalweg-style reservoirs exhibit a bimodal distribution, with allochthonous carbon preferentially routed along the former river thalweg and autochthonous deposited on the former floodplain. Lacustrine-style reservoirs are dominated by suspended sediment deposition and thus relatively homogeneous, but literature suggests these reservoirs are more variable than typically measured. Current methods of reservoir sampling fail to account for this systematic variation and tend to be biased toward fine sediment, suggesting that global reservoir carbon storage is underestimated.

Stratton, Laurel↗

WISP: Watching grid Infrastructure Stealthily through Proxies (Final Technical Report)

The complex interdependencies of cyber systems (sensors and communications), physical grids and associated electricity market operations make protecting electric power grids a significant challenge. The energy sector is constantly under new, targeted, advanced and dangerous cyber-attacks that have the potential to result in the loss of human life. These threats are further exacerbated by our need to modernize the grid. One focus of cyber security research in smart grids is the securing of the SCADA system through advanced intrusion detection systems (IDS) and bad data detection algorithms in state estimation. These methods either require full knowledge of the system topology and parameters or fail to understand the physical behaviors under attack. WISP (Watching grid Infrastructure Stealthily through Proxies) is designed to provide additional protection to the power grid using only publicly available data. In particular, WISP exploits the spatio-temporal nature of the real time locational marginal prices (LMPs), in conjunction with other information such as bids, weather, outages and load data to analyze anomalous power pricing behaviors and then correlate those observations to localize regions of interest and identify potential cyber events. WISP is non-intrusive as the tool is deployed as a service in the Cloud or on premise and provides reliable information to system operators for enhanced situational awareness, without impeding energy delivery functions. The WISP technology comprises three modules: the data-driven anomaly detection core, the vulnerability and risk analysis and the root cause analysis. The data-driven anomaly detection core performs the tasks of feature selection, anomaly detection and attack region localization. The vulnerability and risk analysis module provides system level information of the vulnerable variables and times, assisting the operators in selecting monitoring and protection nodes. The root cause analysis module takes the detection results and identifies potential operational conditions that contribute to the detected anomalies. In Phase I, we have demonstrated the feasibility and effectiveness of WISP. We developed a realistic electricity market simulator capable of generating normal and attack market data under various operational conditions. We developed a series of cyber-attack detection and analysis algorithms and evaluated them under multiple data sources. Finally, we integrated all modules into an end-to-end software, providing functions for data management, data analytics and visualization. Specifically, we have achieved: (i) real-time data acceptance from external utility interfaces with >99% acceptance rate; (ii) high performance anomaly detection algorithms with >98% detection accuracy and <0.1% false alarm rate; and (iii) ultra-low computing delay <50 milliseconds. Additionally, our team developed algorithms to identify the vulnerable variables in electricity market operations and root cause analysis functions to identify major contributors to the price spikes. These ancillary modules are necessary when deploying WISP in real world industry environment. In Phase II, we have demonstrated the effectiveness of WISP software on realistic largescale power systems. We performed red team testing for the Phase I WISP software and identified software vulnerabilities and implemented corresponding mitigation solutions. We adapted the electricity market simulator for the Texas synthetic 2000-bus system and generated datasets for the false data injection attacks. We created database and visualization interfaces for the Texas system and the ISO New England system. We performed software optimization in terms of operation efficiency, computing speed and detection accuracy. Finally, we tested the software on the Texas system and the ISO New England system and evaluated the detection performance. Overall, we achieved above 89% detection rate, below 3% false alarm rate and below 37 seconds of end-to-end detection delay.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multimodal Nondestructive Dry Cask Basket Structure and Spent Fuel Evaluation

This NEUP-IRP assembled a team from diverse institutions and a diverse set of expertise to examine the problem of assessing the structural health of dry nuclear fuel storage casks, specifically the TN-32 design. With no physical access designed into these storage casks and the high cost and risk associated with opening casks for direct inspection, the technical difficulty of structural assessment of the basket structure and fuel assemblies is high. In response to this challenge, this IRP brought together experts in both traditional and novel NDE methodologies: active acoustics (University of Mississippi), emissions tomography (University of Florida), muon tomography (Oregon State University), and passive-active ultrasonics (University of South Carolina). Further, our industry partners in the Electric Power Research Institute (EPRI) and AREVA provided invaluable insight into technical design details for the cask, practical knowledge of operating parameters at a storage facility, and key relationships that enabled activities unforeseen at the time of the proposed work but were critical in guiding the path of the research. The team decided early in the project that we had a collective goal of laying the technical ground work for practical solutions that could be implemented in the field with reasonable cost, time, and reliability. A fortunate opportunity arose early in this IRP project to obtain access to a new TN-32 cask at Columbiana High Tech. Both acoustics teams were given access for testing concepts in the first year of the project. This ended up providing critical guidance in the design of subsequent laboratory experiments. Specifically, it became clear that the only reliable acoustic pathways to the interior were through the trunnions, base plate, and top ring of the cask. Based on these field tests and discussions about what would be of practical interest, the team as a whole decided a realistic goal was to detect catastrophic failure of a single fuel assembly, or one that was missing. It is clear from this work that the active acoustics / resonance and muon tomography methodologies would be capable of detecting interior structural integrity problems at this level. The other two areas of investigation (emissions tomography and passive/active ultrasonics) would need more testing to determine a successful implementation, but each may also have other applications such as long term monitoring and monitoring during transportation. This IRP project resulted in technical advances with applications that extend beyond the problem at hand, supported the training of 10 graduate students + 1 post doc, 21 publications, and 13 conference presentations. The remainder of this summary highlights significant activities and achievements in each of the methodologies and a brief discussion on how they can be combined to leverage strengths. Active Acoustics The active acoustics team at UM used both linear and non-linear structural resonance methods to infer information about the internal structure of a cask. Significant activities were a set of four field test measurements on a full scale TN-32 cask at the Columbiana Hi Tech facility in Greensboro, NC and the design and fabrication of a 1/6th scale model TN-32 cask for laboratory measurements. A significant set of acoustic data has been acquired on both the full scale and laboratory scale casks. It was determined early in the project that mechanical resonance techniques were not going to be sensitive to small scale (centimeter) cracks and structural defects in the basket structure or fuel assemblies. We were able to ascertain that both the energy and complexity of the resonance spectra were sensitive to “bulk state” of the fuel assemblies – an intact assembly versus a severely degraded assembly. By developing a novel combination of metrics, we are able to measure a statistically significant shift due to one out of the 32 fuel assemblies being either missing or degraded to a point of complete loss of structural coherence (i.e. “rubble”). We believe this combination of resonance metrics is new to the field and will have applications beyond the fuel storage problem. Emissions Tomography The Emissions Tomography team at the University of Florida explored the concept of using scattering of radiation emissions from the stored fuel as method of evaluating the internal structural health of the cask. Due to the need for emissive fuel assemblies and the difficulties of gaining access to storage facilities, this team primarily relied on simulations to inform feasibility. A key question was the flux estimates of neutrons with a small enough number of scattering events to retain spatial information. Some key conclusions from the transmission component of this work are that the number of scattering events falls rapidly with energy – setting a 11MeV threshold, the average number of scattering events is 8∓4. Rough estimates of scanning times using an ideal detector array would be 1 week. The team also explored the case of significant structural failure resulting in a shift of the source material (fuel). The result is that a +/- 2% mass shift results in a detectable (5.13%) shift in the correlated 2 neutron emission counts and thus may be a candidate as an initial survey. Finally, simulations for predicting the azimuthal dependence of the flux based on specific loading patterns were conducted. Due to self-shielding effects of the assemblies, a periodic pattern results and could potentially be used to identify missing or severely degraded assemblies. This work forms a basis for proper detector placement with the goal of optimizing sensitivity. Muon Tomography Muon tomography (MT) is a relatively novel method of interrogating interior structure on a large scale. One of the advantages of this technique is that the exciting energy source (cosmic muons) is ubiquitous and relatively stable in time. Challenging aspects are relatively low flux rates and appropriate detector technologies. The efforts of the muon group at Oregon State University focused on two areas: (1) simulation of various combinations of muon scattering events and detection schemes to assess sensitivities and time scales for image construction and (2) building a prototype muon detection system applicable to the dry storage cask problem as well as many other similar systems. Significant accomplishments in this area are: (1) demonstration that MT is a viable method for detecting missing or severely degraded rod assemblies, (2) a scintillation based detector with 4 panels and 32 channels of position data each were constructed, tested, and calibrated. Testing of the panels using natural muon background and no scattering objects yielded largely expected results – a straight line path for the muon through the four panels. However some anomalies (paths deviating from a line) were also detected. A redesign of the board improved the signal which greatly improved the muon tracking through the panels. Testing with lead bricks as scattering bodies showed a reduction in the coincidence rate with increasing bricks indicating increased scattering events. A refinement of the scintillator detector design resulted in a spatial image resolution of around 2 cm based on lead brick spacing tests lasting 24 hours. Passive/Active Ultrasonics This team at the University of South Carolina investigated the feasibility of combining passive ultrasonics, in which an elastic pulse is generated by a degradation process (such as a crack extending), and active ultrasonics, in which a known excitation is introduced into the structure and detected by an array of transducers. Significant accomplishments in this area include the development of elastic wave propagation simulation in relevant materials, development of diagnostic algorithms, and laboratory testing and validation using laser doppler vibrometry. This group demonstrated the applicability of various non-contact vibration detection methodologies such as air-coupled ultrasonic transducers and scanning laser doppler vibrometry. While passive acoustic emissions monitoring will likely have a role during the transportation of a fuel storage cask, the level of detailed information about the defect generating the event which can be ascertained from the detections in a complex structure remains for future work. Thermography The EPRI team contributed early in the project a series of thermography measurements in which various levels of water pooled in a mock-up canister were analyzed using commercially available infrared imaging technologies. While large levels of water (100 L, ~10 cm deep) were observable in the thermograms, more realistic levels of pooled water (1 L) were not detectable whether localized or distributed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Technical Report: Moving ASR Cloud Microphysical Retrievals Beyond the Vertical Column

Clouds of all types play important roles in atmospheric heating, surface heating and emission of radiation, hence energy, to space. Clouds not only affect atmospheric heating via their impacts on solar and terrestrial radiation, they also release kinetic energy to the atmosphere when they form and they extract kinetic energy from the atmosphere when they evaporate. To understand the impacts of clouds on weather and climate, one must be able to make accurate observations of the amount of water associated with them and the impact of this water on atmospheric and surface heating rates. One important cloud type is liquid water clouds. Liquid clouds are often found in the boundary layers of Earth at altitudes from just above the surface to approximately 2000 m above it, at a variety of temperatures, including temperatures below the freezing point of liquid water (0 °C). As a result, they are important constituents over the world’s oceans as well as over cold, ice-covered surfaces such as in the Arctic. Observationally estimating the total amount of liquid contained in a column through a liquid water cloud can now be accomplished to acceptable accuracies (except for the thinnest, lowest liquid containing clouds) using instruments called passive microwave radiometers. However, observationally determining the spatial distribution of liquid within these columns has proven to be difficult. The focus of this project was on the application of two radars operating at two different frequencies to retrieve the distribution of liquid water within columns passing through liquid water clouds. Motivation in this project for using two different radars operating at different frequencies is that as overlapping (in space) beams from the two radars pass through the same column of liquid water cloud absorption of power from one beam (the 94-GHz beam) is greater than absorption of power from the other beam (the 35-GHz beam). Therefore, the difference in returned powers between the two radar beams with distance from the radars is proportional to the amount of liquid water that the two beams have passed through. Therefore, one can use the differences in power between the two beams with distance through a liquid water cloud to determine the distribution of liquid water throughout the cloud. The two radars used in this study are the Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Program Ka-band Scanning ARM Cloud Radar (Ka-SACR) and the W-band Scanning ARM Cloud Radar (W-SACR). When this projected started in 2013, the Ka- and W-band SACRs were new technology, state-of-the-art sensors. To put together a sufficiently diverse and big set of test cases for the study, data from the SACRs deployed to NSA, SGP, TCAP and MAGIC were used, leading to a test set composed of 65 hours of suitable data spread over approximately 17 case study days. Using the Ka- and W-band SACR data from the case study periods, vertical distributions of liquid water content through liquid water clouds were retrieved. Because there are no other data sets with which to compare the retrievals, distributions of liquid water through a column were summed and compared to the total amounts of liquid water obtained by retrievals applied to passive microwave radiometer observations. The total amounts of liquid water (in units of millimeters, or the thickness in millimeters of the total liquid water in a vertical column if allowed to pool at the bottom of the column) between the two retrievals agreed to within 0.060 mm with a standard deviation of 0.31 mm, or to within 0.016 mm with a standard deviation of 0.12 mm once outliers were removed. The standard deviation of 0.12 mm was fairly independent of the total amount of liquid water in the clouds, indicating that retrieval errors were larger for clouds with smaller amounts of liquid in them. Errors in the retrieved total amounts of liquid were also found to be sensitive to the a priori information that was fed into the retrieval approach. Overall, standard deviations of 0.12 mm are sufficient for some cloud studies but for radiation studies standard deviations on the order of 0.02 mm need to be achieved for clouds with the lowest amounts of liquid water. Many modifications to the retrieval approach were tested subsequently in an attempt to reduce the standard deviations relative to the radiometer retrievals below 0.12 mm but none of them worked reliably. We decided to wait until the DOE ARM Program deployed its second generation SACR2s to its NSA and ENA sites for further retrieval evaluation. The SACR2s were engineered to better synchronize data between the Ka- and W-band radars, reducing potential sources of noise for radar retrieval of liquid water distributions within clouds. The SACR2s have improved in reliability recently and the system deployed to ENA is best positioned to provide the data to advance research on this path. This will be an ongoing research activity beyond the project because of the promise in SACR2 data from the DOE ARM ENA Facility.

58 GEOSCIENCES↗

VersiCharge-SG - Smart Grid Capable Electric Vehicle Supply Equipment (EVSE) for Residential Applications

In his 2011 State of the Union address, President Obama called for one million electric vehicles on the road by 2015 [1]. With large-scale Electric Vehicle (EV) or Plug-in Electric Vehicle (PEV or EV for short) or Plug-in Hybrid Electric Vehicle (PHEV) penetration into the US market, there will be drastic reduction in fossil fuel consumption, thus significantly reducing our dependency on foreign oil [2-6]. There will also be significant reduction on Green House Gas (GHG) emissions and smog in the major US cities [3, 7, 8]. Similar studies have also been done other industrial counties [9]. For the fuel cost, with the home electricity rate around $0.13 per kWh, it would cost about $0.05 per mile for DC operation and $0.03 cents per mile for AC operation. But, assuming 25 miles per gallon for a typical vehicle and $4 per gallon, fossil fuel will cost $0.16 per mile [10]. The overall lifecycle cost of PEVs will be several folds lower than the existing fossil fueled vehicles. Despite the above advantages of the EVs, the current cost of EVSE is not affordable for the average consumer. Presently, the cost of installing state-of-the-art residential EVSE ranges from $1500 to $2500 [11]. Low priced EVSE technology, which is easy to install, and affordable to operate and maintain by an average consumer, is essential for the large-scale market penetration of EVs. In addition, the long-term success of this technology is contingent on the PEVs having minimal excessive load and shift impact on the grid, especially at peak times. In a report [2] published by the Pacific Northwest National Laboratory (PNNL), the exiting electric power generation infrastructure, if used at its full capacity 24 hours a day, would support up to 84% of the nation’s cars, pickup trucks and SUVs for an average daily drive of 33 miles. This mileage estimate is certainly much below what an average driver would drive his/her vehicle per day. Another report [3] by the National Renewable Energy Laboratory (NREL) shows that an increased PEV penetration would significantly increase pressure on the peak generation, if no controlled charging strategy was put in place. Investigations from Oak Ridge National Laboratory (ORNL) show that in many regions, additional power generation facilities must be put in place and operate in evening times to recharge the EVs [12]. By all accounts, large PEV penetration will bring to the power grid enormous challenges due to the excessive and stochastic demand, and can entirely change the peak time distribution and behavior, perhaps, into a bi-modal distribution capable of exhausting primary, secondary and even reserves (spinning or non-spinning). To minimize the infrastructure upgrade costs and risks to the grid, and to ensure that power quality and reliability remain within the set standards, the demand for EV plug-ins must then be controlled and coordinated locally and at regional levels. Novel control techniques must be devised to allow for close collaboration between neighboring plug-in requestors, between neighboring communities, and between these and more central power authorities. The concept of electric drive vehicle is not new. The development of electric vehicle has been around since 19th century [13]. But due to a number of reasons and practical limitations at the time, including lower cost of gasoline compared to electricity, excessive refueling times, and abundance of gasoline, the automobile industry embraced gasoline-powered vehicles worldwide [13]. With the global warming, ever reducing reservoirs of fossil oil around the world and increasing political pressure to reduce the national dependency on foreign oil, the last decade of the 20th century witnessed major technological breakthroughs in Alternative Fueled Vehicle (AFV) technologies, including electric vehicles. With GHG emissions and carbon footprint in the minds of many more consumers and politicians, the first decade of the 21stCentury witnessed more breakthroughs with some real life experimentation and sporadic deployment of these technologies [14]. By many accounts, the second decade of the 21st Century is expected to be the time when mass volume production and popular usage of these AFV technologies, especially EV, will materialize. The current DOE request for proposals recognizes the need for major technological changes to ensure that the above national goal is realizable. Two major challenges have been identified: (1) major reduction in the cost of ownership of EVSEs, and (2) managing additional EV loads in the power grid while maintaining power quality, reliability, and affordability. We note that the two challenges are closely linked – A holistic approach to true lifecycle cost of EVSE ownership will certainly include any taxes and surcharges that can be put in place for major potential investments in the grid, and higher electricity charges in case of more frequent and longer peak periods. From a societal perspective, this cost could also include the lost GDP (computed on a local basis) and revenue for businesses at local and regional levels when the grid is no longer capable of meeting the demand and unexpected outages occur. A typical end-point electrical distribution system delivers power to a residential EVSE from the neighborhood distribution pole, as shown in Fig.1. This pole has a transformer (neighboring step-down transformer) that steps down the utility medium voltage to dual 120VAC single phase (also called 240VAC split phase). This voltage is fed through a meter into the residential load control center. The load control center consists of branch circuit breakers and distributes the power supply within various areas of the residential unit. One of the branch circuits from the load control center feeds EV charging station for the unit. An electric vehicle charger is plugged into the socket of the EV charging station and other end of this charger is connected to the vehicle during charging. Figure 1 illustrates a typical configuration of the power grid. The left side of the figure shows the power grid from the power generation to the neighboring step-down transformer, while the right side of the figure shows multiple EVs with the respective charging stations. The typical step-down transformer has an upper limit representing the maximum load that can be requested from these neighboring houses altogether (typically 24 kW). In case the total load increases beyond the supported limit, the protection system (e.g. a circuit breaker) attached to the step-down transformer gets activated automatically.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final DOE-ASR Report for the Project “Advancing our Understanding and the Remote Sensing of Ice Clouds”

This project has evolved during its execution, and what follows are the key project findings. This project has arguably provided the first global view of how cirrus cloud (defined as having cloud base temperature T < 235 K) nucleation physics (evaluated through satellite retrievals of ice particle number concentration Ni, effective diameter De and ice water content IWC) evolves with the seasons for a given temperature, latitude zone and surface type (e.g. ocean vs. land), based on a new satellite remote sensing method developed for this project. The retrieval method is unique in that it is very sensitive to the small ice crystals that govern the number concentration Ni, allowing Ni to be retrieved. The method currently samples single-layer cirrus clouds having visible optical depth ranging from about 0.3 to 3.0, using co-located observations from the Infrared Imaging Radiometer (IIR) and from the CALIOP (Cloud and Aerosol Lidar with Orthogonal Polarization) lidar aboard the CALIPSO (Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observation) polar orbiting satellite, employing IIR channels at 10.6 μm and 12.05 μm. Retrievals of Ni are primarily used to estimate the cirrus cloud formation mechanism; that is, either homo- or heterogeneous ice nucleation (henceforth hom and het). This is possible since, in general, hom produces more than an order of magnitude more ice crystals than does het. Thus the retrievals provide insight on how these mechanisms change with the seasons for a given latitude zone or region, based on the years 2008 and 2013. Using a conservative criterion for hom cirrus, on average, the sampled cirrus clouds formed through hom occur about 43% of the time in the Arctic and 50% of the time in the Antarctic, and during winter at mid-latitudes in the Northern Hemisphere, hom cirrus occur 37% of the time. Elsewhere (and during other seasons in the Northern Hemisphere mid-latitudes), this hom cirrus fraction is lower, and it is lowest in the tropics. Thus, the microphysical properties of cirrus clouds in the Polar Regions are much different than they are in the tropics; something unknown prior to this study. Moreover, the frequency of cirrus cloud occurrence in the Polar Regions varies strongly with season, peaking during winter in the Arctic and during spring in the Antarctic. Considering these seasonal changes in microphysics and inferred cloud coverage, this leads us to speculate that the buildup of Arctic cirrus during winter may significantly contribute to tropospheric heating in that region, possibly affecting winter jet-stream dynamics and mid-latitude weather patterns through the thermal-wind balance relationship. This cirrus cloud research provides essential guidance for realistically representing cirrus clouds in climate models; guidance previously unavailable. For example, mid-latitude hom cirrus were widespread during winter over or nearby mountainous terrain, evidently due to mountain-induced waves that produce strong updrafts at cirrus cloud levels. The treatment of turbulent mountain stress and gravity waves will likely need to be improved in climate models in order to adequately represent cirrus clouds outside the tropics. Another goal of this project was to develop a ground-based 94-GHz radar retrieval for winter snowstorms, based on (1) an improved analytical framework describing the interaction of radiation from radar with snowfall and (2) the development of a steady-state snow growth model that predicts the height-evolution of the ice particle size distribution through ice particle growth by vapor diffusion, aggregation and riming (i.e. the growth of snow through collisions with supercooled cloud droplets). Although activities (1) and (2) were completed, there was insufficient time to test and finalize the radar retrieval scheme. However, activity (2) provided a new method for relating ice particle mass “m” and projected area “A” to the ice particle maximum dimension “D”. The ice cloud microphysical processes (which determine ice cloud radiative properties) in climate models are parameterized in terms of these m-D and A-D relationships. By improving these relationships, the ice cloud radiative properties in Community Atmosphere Model version 5, or CAM5 (an atmosphere global climate model, or GCM) were improved. Student funding from the University of Nevada, Reno, was combined with funds from this project to conduct some basic research on the mechanism of the North American monsoon, or NAM. Federal research on the NAM has dwindled since 2006, but atmospheric soundings taken during research vessel cruises in the Gulf of California (GC) during the North American Monsoon Experiment (NAME) were used to reveal a likely mechanism that explains the relationship between an intrusion of tropical warm water into the GC during late spring-early summer and the onset of relatively heavy NAM rainfall in northwest Mexico and the southwestern United States. These soundings, combined with reanalysis data, satellite sea surface temperatures and satellite measurements of outgoing longwave radiation were used to develop and provide evidence for a planetary-scale NAM mechanism. As far as we know, no other physical explanation has been offered for the spring-summer evolution of the NAM system.

54 ENVIRONMENTAL SCIENCES↗

Distribution Development for Residual Inventory at the New York West Valley Site - 20400

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351 ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into Agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States. NFS, a private company, built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations ended in 1972 and never reopened, leaving behind radioactive and chemical wastes. Operations led to contamination in a number of facilities and locations. Some of that contamination has migrated from waste disposal zones to other layers, formations, and features on and off the WNYNSC. Phase I decommissioning activities are ongoing and involve the removal of a number of areas and structures that have been associated with contamination. The purpose of this work is to outline the approach for characterizing contamination not associated with disposed wastes, contaminated structures, or specific releases. In this work, the term, residual radiological activity, is used to describe environmental contamination that exists subsequent to the completion of Phase I decommissioning activities, that is not associated with disposed wastes, contaminated structures, or specific releases. Contamination from the Site was quantified relative to data that characterize the concentrations of radionuclides that exist in background. Background concentrations are those present in the area but having no influence from Site related activities. The existence of residual radiological activity that is elevated relative to background has the potential to contribute to future risks to human health and the environment. As a consequence, the residual inventory information is used to inform the West Valley Probabilistic Performance Assessment (PPA) model to characterize potential future risks to human health and the environment. The centralized West Valley Data Management System (DMS) was the source of information for the data assembled in this analysis. The DMS is a fairly large compilation consisting of thousands of records from investigation studies, with sample dates ranging from 1990 to present. Samples from monitoring wells, boreholes, geoprobe studies, surface water, surface soils, storm water outfalls, ventilation stack filters, plant and animal tissues, and more are included in the DMS. Results are typically reported in units of activity per unit volume. For the purpose of the analyses presented here, all results were converted into consistent units of pCi per unit volume. Since 1990, data have been collected from various locations across the WNYNSC at different times with varying frequency over the course of several decades. As a consequence, a number of potential issues can arise with respect to the assembly of a dataset that is deemed adequate for the characterization of residual radiological activity. These issues were assessed and resolved to the extent possible through careful consideration of the properties of the distributions. The intent was to use data which characterize the current state of the Site. Radionuclides can be designated to one of several groups depending on their origin. In this work the groups considered were 1) Naturally Occurring Radioactive Material (NORM), 2) fallout, and 3) Other (including power plant, medical research, etc). This grouping is a useful construct with respect to the interpretation of fixed laboratory results. For example, NORM radionuclides that exist within a decay chain should have approximately equivalent distributions of concentrations if they are representative of background conditions. Insights such as these can be used as a check to identify sample results that need to be further investigated or omitted due to issues associated with reported results from fixed laboratory analyses. This type of analysis provided a foundation for the assessment of the adequacy of sample results for use in subsequent components of an assessment. The general process for the assessment of residual radiological contamination at the Site consists of a sequence of several steps. First, for each analyte, several statistical tests were performed to assess the weight of evidence against the null hypothesis that the mean of the distribution of concentrations was equal to zero. If the mean of the distribution of concentrations for a given radionuclide was not found to be greater than zero, then it was removed from consideration as a component of the residual radiological contamination. If there was significant evidence to reject the hypothesis of the mean being equal to zero, the second step was to compare the distribution of the data from the Site to that of the corresponding background. A suite of tests was used to compare the distributions of the site and background data. The results of these tests were collectively used to determine if site data are elevated relative to background. The third step was to develop distributions using a Bayesian framework to characterize the distribution of mean of the increment present above background for each of the radionuclides. The Bayesian model implemented allowed for the comparison of site-specific records to background concentrations to better approximate contamination attributed to the Site. A final screening step was employed for radionuclides that exceed background. This screening step compared 95% upper confidence limits (UCLs) from the increment distribution developed in the previous step to the risk screening levels. This approach yields a list of analytes that were determined to be elevated relative to background.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Well-to-wheels analysis of energy use and greenhouse gas emissions of plug-in hybrid electric vehicles.

Plug-in hybrid electric vehicles (PHEVs) are being developed for mass production by the automotive industry. PHEVs have been touted for their potential to reduce the US transportation sector's dependence on petroleum and cut greenhouse gas (GHG) emissions by (1) using off-peak excess electric generation capacity and (2) increasing vehicles energy efficiency. A well-to-wheels (WTW) analysis - which examines energy use and emissions from primary energy source through vehicle operation - can help researchers better understand the impact of the upstream mix of electricity generation technologies for PHEV recharging, as well as the powertrain technology and fuel sources for PHEVs. For the WTW analysis, Argonne National Laboratory researchers used the Greenhouse gases, Regulated Emissions, and Energy use in Transportation (GREET) model developed by Argonne to compare the WTW energy use and GHG emissions associated with various transportation technologies to those associated with PHEVs. Argonne researchers estimated the fuel economy and electricity use of PHEVs and alternative fuel/vehicle systems by using the Powertrain System Analysis Toolkit (PSAT) model. They examined two PHEV designs: the power-split configuration and the series configuration. The first is a parallel hybrid configuration in which the engine and the electric motor are connected to a single mechanical transmission that incorporates a power-split device that allows for parallel power paths - mechanical and electrical - from the engine to the wheels, allowing the engine and the electric motor to share the power during acceleration. In the second configuration, the engine powers a generator, which charges a battery that is used by the electric motor to propel the vehicle; thus, the engine never directly powers the vehicle's transmission. The power-split configuration was adopted for PHEVs with a 10- and 20-mile electric range because they require frequent use of the engine for acceleration and to provide energy when the battery is depleted, while the series configuration was adopted for PHEVs with a 30- and 40-mile electric range because they rely mostly on electrical power for propulsion. Argonne researchers calculated the equivalent on-road (real-world) fuel economy on the basis of U.S. Environmental Protection Agency miles per gallon (mpg)-based formulas. The reduction in fuel economy attributable to the on-road adjustment formula was capped at 30% for advanced vehicle systems (e.g., PHEVs, fuel cell vehicles [FCVs], hybrid electric vehicles [HEVs], and battery-powered electric vehicles [BEVs]). Simulations for calendar year 2020 with model year 2015 mid-size vehicles were chosen for this analysis to address the implications of PHEVs within a reasonable timeframe after their likely introduction over the next few years. For the WTW analysis, Argonne assumed a PHEV market penetration of 10% by 2020 in order to examine the impact of significant PHEV loading on the utility power sector. Technological improvement with medium uncertainty for each vehicle was also assumed for the analysis. Argonne employed detailed dispatch models to simulate the electric power systems in four major regions of the US: the New England Independent System Operator, the New York Independent System Operator, the State of Illinois, and the Western Electric Coordinating Council. Argonne also evaluated the US average generation mix and renewable generation of electricity for PHEV and BEV recharging scenarios to show the effects of these generation mixes on PHEV WTW results. Argonne's GREET model was designed to examine the WTW energy use and GHG emissions for PHEVs and BEVs, as well as FCVs, regular HEVs, and conventional gasoline internal combustion engine vehicles (ICEVs). WTW results are reported for charge-depleting (CD) operation of PHEVs under different recharging scenarios. The combined WTW results of CD and charge-sustaining (CS) PHEV operations (using the utility factor method) were also examined and reported. According to the utility factor method, the share of vehicle miles traveled during CD operation is 25% for PHEV10 and 51% for PHEV40. Argonne's WTW analysis of PHEVs revealed that the following factors significantly impact the energy use and GHG emissions results for PHEVs and BEVs compared with baseline gasoline vehicle technologies: (1) the regional electricity generation mix for battery recharging and (2) the adjustment of fuel economy and electricity consumption to reflect real-world driving conditions. Although the analysis predicted the marginal electricity generation mixes for major regions in the United States, these mixes should be evaluated as possible scenarios for recharging PHEVs because significant uncertainties are associated with the assumed market penetration for these vehicles. Thus, the reported WTW results for PHEVs should be directly correlated with the underlying generation mix, rather than with the region linked to that mix.

02 PETROLEUM↗

DOE: Integrating Southwest Power Pool Wind Energy into Southeast Electricity Markets

Wind power development in the United States is outpacing previous estimates for many regions, particularly those with good wind resources. The pace of wind power deployment may soon outstrip regional capabilities to provide transmission and integration services to achieve the most economic power system operation. Conversely, regions such as the Southeastern United States do not have good wind resources and will have difficulty meeting proposed federal Renewable Portfolio Standards with local supply. There is a growing need to explore innovative solutions for collaborating between regions to achieve the least cost solution for meeting such a renewable energy mandate. The DOE-funded project 'Integrating Southwest Power Pool Wind Energy into Southeast Electricity Markets' aims to evaluate the benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of different balancing approaches with increasing levels of inter-regional cooperation. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the southern regions of the SERC. The primary analysis of the project is based on unit commitment (UC) and economic dispatch (ED) simulations of the SPP-SERC regions as modeled for the year 2022. The UC/ED models utilized for the project were developed through extensive consultation with the project utility partners, to ensure the various regions and operational practices are represented as accurately as possible realizing that all such future scenario models are quite uncertain. SPP, Entergy, Oglethorpe Power Company (OPC), Southern Company, and the Tennessee Valley Authority (TVA) actively participated in the project providing input data for the models and review of simulation results and conclusions. While other SERC utility systems are modeled, the listed SERC utilities were explicitly included as active participants in the project due to the size of their load and relative proximity to SPP for importing wind energy. The analysis aspects of the project comprised 4 primary tasks: (1) Development of SCUC/SCED model of the SPP-SERC footprint for the year 2022 with only 7 GW of installed wind capacity in SPP for internal SPP consumption with no intended wind exports to SERC. This model is referred to as the 'Non-RES' model as it does not reflect the need for the SPP or SERC BAs to meet a federal Renewable Energy Standard (RES). (2) Analysis of hourly-resolution simulation results of the Non-RES model for the year 2022 to provide project stakeholders with confidence in the model and analytical framework for a scenario that is similar to the existing system and more easily evaluated than the high-wind transfer scenarios that are analyzed subsequently. (3) Development of SCUC/SCED model of the SPP-SERC footprint for the year 2022 with sufficient installed wind capacity in SPP (approximately 48 GW) for both SPP and the participating SERC BAs to meet an RES of 20% energy. This model is referred to as the 'High-Wind Transfer' model with several different scenarios represented. The development of the High-Wind Transfer model not only included identification and allocation of SPP wind to individual SERC BAs, but also included the evaluation of various methods to allow the model to export the SPP wind to SERC without developing an actual transmission plan to support the transfers. (4) Analysis of hourly-resolution simulation results of several different High-Wind Transfer model scenarios for the year 2022 to determine balancing costs and potential benefits of collaboration among SPP and SERC BAs to provide the required balancing.

17 WIND ENERGY↗

Quantifying the Solar Energy Resource for Puerto Rico

After Hurricane Maria, multiple U.S. Department of Energy laboratories studied the state of the electric grid in Puerto Rico and analyzed grid resilience and grid integration of renewable energy. As part of the work done at the National Renewable Energy Laboratory, researchers created new solar resource data, conducted a technical potential and supply curve analysis, and studied the interannual variability of the solar resource. A new methodology was developed to downscale solar resource data from the National Solar Radiation Data Base (NSRDB) from a 4-km x 4-km spatial and 30-minute temporal resolution to a 2 km x 2 km and 5-minute resolution. This methodology primarily used simple physical principles to develop high-resolution cloud properties which were then used to compute solar radiation. The high-resolution datasets were validated against ground measurements and the error metrics were found to be similar to the original lower resolution dataset. Using 20 years of downscaled data from the NSRDB multi-year capacity factors for photovoltaics (PV) were developed for both single-axis tracking and fixed latitude-tilt configurations. Use of the multi-year data provides the ability to understand variability in capacity factors due to variability in weather over a long period of time. For Puerto Rico the coastal regions were found to have significant higher capacity factors than inland. Using land-use and terrain information a technical potential analysis was conducted for Puerto Rico. This analysis restricted single PV plant development to a maximum of 100 MW nameplate capacity. The nameplate capacity for each municipality were then determined. Based on our assumptions, 56 of the 78 total municipalities of Puerto Rico contain some level of solar capacity. Most of the interior municipalities did not have any capacity because of the geographic exclusions used in this study. The lowest capacity for a PV plant observed in a municipality was 10 MW. The maximum capacity within a county was 2,000 MW. Further a supply curve analysis was conducted by taking the results of the technical potential and quantifying system and transmission costs. The levelized cost of energy (LCOE) was calculated for each theoretical PV plant site, and the levelized cost of transmission was added to the LCOE to produce a total cost estimate for each site. The results of the supply curve analysis allow for a relative comparison of the cost for integrating new PV capacity into the grid. This analysis indicates that cheaper total LCOE sites tend to be larger in capacity. The total capacity in this study was found to be far beyond the maximum peak load for the island. However, this study does not consider the economic and market potential for development. The cumulative capacity presented in this study assumes that the best locations are developed first and ignores the complex decision paths for new power plant development. Therefore, this analysis can only be treated as illustrative. Finally this study investigates the impact of inter-annual variability of resource using a variety of metrices including probability of exceedance and variation in capacity factor and LCOE. This study demonstrates that the capacity factor or LCOE could vary by over 10% year to year. This clearly indicates the risks involved in using any particular year of data and clearly points to the use of multi-year data to reduce some of the risks related to variability in weather.

14 SOLAR ENERGY↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Scientific/Technical Report: Characterizing the Response of the Cascadia Margin Gas Hydrate Reservoir to Bottom Water Warming Along the Upper Continental Slope

The objective of this project is to understand the response of the WA margin gas hydrate system to contemporary warming of bottom water along the upper continental slope. Through pre-cruise analysis and modeling of archive and recent geophysical and oceanographic data, we (1) inventoried bottom simulating reflectors along the WA margin and defined the upper limit of gas hydrate stability, (2) refined margin-wide estimates of heat flow and geothermal gradients, (3) characterized decadal scale temporal variations of bottom water temperatures at the upper continental slope of the Washington margin, and (4) used numerical simulations to provide quantitative estimates of how the shallow boundary of methane hydrate stability responds to modern environmental change. These pre-cruise results provided the context for a systematic geophysical and geochemical survey of methane seepage along the upper continental slope from 48° to 46°N during a 10-day field program on the R/V Thompson from October 10-19, 2014. This systematic inventory of methane emissions along this climate-sensitive margin corridor and comprehensive sediment and water column sampling program provided data and samples for Phase 3 of this project that focused on determining fluid and methane sources (deep-source vs. shallow; microbial, thermogenic, gas hydrate dissociation) within the sediment, and how they relate to contemporary intermediate water warming. During the 2014 research expedition, we sampled nine seep sites between ~470 and 520 m water depth, within the zone of predicted methane hydrate retreat over the past 40 years. We imaged 22 bubble plumes with heights commonly rising to ~300 meters below sea level with one reaching near the sea surface. We collected 22 gravity cores and 20 CTD/hydrocasts from the 9 seeps and at background locations (no acoustic evidence of seepage) within the depth interval of predicted downslope retreat of the methane hydrate stability zone. Approximately 300 pore water samples were extracted from the gravity cores, and the pore water was analyzed for a comprehensive suite of solutes, gases, and stable isotope ratios. This comprehensive geochemical dataset was used to characterize the fluid and gas source(s) at each of the seep sites surveyed. The primary results of this project are: 1) Bottom simulating reflector-derived heat flow values decrease from 95 mW/m2 10 km east of the deformation front to ~60 mW/m2 60 km landward of the deformation front, with anomalously low values of ~25 mW/m2 on a prominent mid-margin terrace off central Washington. 2) The temperature of the incoming sediment/ocean crust interface at the deformation front ranges between 164-179 oC off central Washington, and the 350 oC isotherm at the top of the subducting ocean crust occurs 95 km landward of the deformation front. Differences between BSR-derived heat flow and modeled conductive heat flow suggest mean upward fluid flow rates of 0.4 cm/yr across the margin, with local regions (e.g. fault zones) exhibiting fluid flow rates up to 3.5 cm/yr. 3) A compilation of 2122 high-resolution CTD, glider, and Argo float temperature profiles spanning the upper continental slope of the Washington margin from the years 1968 to 2013 show a long-term warming trend that ranges from 0.006-0.008 oC/yr. Based on this long-term bottom water warming, we developed a 2-D thermal model to simulate the change in sediment temperature distribution over this period, along with the downslope retreat of the methane hydrate stability field. Over the 43 years of the simulation, the thermal disturbance propagated 30 m into the sediment column, causing the base of the methane hydrate stability field to shoal ~13 m and to move ~1 km downslope. 4) A preliminary analysis of seafloor observations and mid-water column acoustic data to detect bubble plumes was used to characterize the depth distribution of seeps along the Cascadia margin. These results indicate high bubble plume densities along the continental shelf at water depths <180 m and at the upper limit of methane hydrate stability along the Washington margin. 5) The majority of the seeps cored during the 2014 research expedition on the R/V Thompson contained abundant authigenic carbonate indicating that they are locations of long-lived seepage rather than emergent seep systems related to methane hydrate dissociation. Despite the evidence for enhanced methane seepage at the upper limit of methane hydrate stability along the Washington margin, we found no unequivocal evidence for active methane hydrate dissociation as a source of fluid and gas at the seeps surveyed. The pore fluid and bottom water chemistry shows that the seeps are fed by a variety of fluid and methane sources, but that methane hydrate dissociation, if occurring, is not widespread and is only a minor source (below the detection limit of our methods). Collectively, these results provide a significant advance in our understanding of the thermal structure of the Cascadia subduction zone and the fluid and methane sources feeding seeps along the upper continental slope of the Washington-sector of the Cascadia margin. Though we did not find unequivocal evidence for methane hydrate dissociation as a source of water and methane at the upper pressure-temperature limit of methane hydrate stability at present, continued warming of North Pacific Intermediate Water in the future has the potential to impact the methane hydrate reservoir in sediments at greater depths along the slope. Thus, this study provides a strong foundation and the necessary characterization of the background state of seepage at the upper limit of methane hydrate stability for future investigations of this important process.

54 ENVIRONMENTAL SCIENCES↗