Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Cost Methodology for Biomass Feedstocks: Herbaceous Crops and Agricultural Residues

This report describes a set of procedures and assumptions used to estimate production and logistics costs of bioenergy feedstocks from herbaceous crops and agricultural residues. The engineering-economic analysis discussed here is based on methodologies developed by the American Society of Agricultural and Biological Engineers (ASABE) and the American Agricultural Economics Association (AAEA). An engineering-economic analysis approach was chosen due to lack of historical cost data for bioenergy feedstocks. Instead, costs are calculated using assumptions for equipment performance, input prices, and yield data derived from equipment manufacturers, research literature, and/or standards. Cost estimates account for fixed and variable costs. Several examples of this costing methodology used to estimate feedstock logistics costs are included at the end of this report.

09 BIOMASS FUELS↗

Cost Model for Pumped Storage Hydropower Geomembrane Lining Systems

The Cost Model for Pumped Storage Hydropower Geomembrane Lining Systems offers an approximation of geomembrane lining system costs for pumped storage hydropower (PSH) reservoirs. Geomembrane lining systems have been used around the world for over 60 years for the construction of dams and reservoirs. Although geomembrane lining systems have found widespread use in the construction of canals and waste containment systems, they have not been utilized in the construction of new PSH facilities in the United States since the Mount Elbert PSH powerplant in Colorado. For this reason, PSH developers in the United States expressed the need for a tool that would allow them to estimate the costs of geomembrane lining systems for their PSH projects. To meet this need, the Cost Model for Pumped Storage Hydropower Geomembrane Lining Systems was developed by Oak Ridge National Laboratory with support from Argonne National Laboratory and Stantec, Inc. This Cost Model will enable PSH developers to develop a preliminary estimate of the cost of geomembrane lining systems and to better understand different reservoir lining options and their cost and performance characteristics, thus enabling them to make informed decisions related to preferred reservoir lining systems for their PSH projects.

DeNeale, Scott [Oak Ridge National Laboratory (ORN↗

Transport Cost for Carbon Removal Projects With Biomass and CO2 Storage

Strategies to remove carbon from the atmosphere are needed to meet global climate goals. Promising strategies include the conversion of waste biomass to hydrogen, methane, liquid fuels, or electricity coupled with CO 2 capture and storage (CCS). A key challenge for these projects is the need to connect geographically dispersed biomass supplies with geologic storage sites by either transporting biomass or CO 2 . We assess the cost of transport for biomass conversion projects with CCS using publicly available cost data for trucking, rail, and CO 2 pipelines in the United States. We find that for large projects (order of 1 Mt/yr CO 2 or greater), CO 2 by pipeline is the lowest cost option. However, for projects that send most of the biomass carbon to storage, such as gasification to hydrogen or electricity production, biomass by rail is a competitive option. For smaller projects and lower fractions of carbon sent to storage, such as for pyrolysis to liquid fuels, CO 2 by rail is the lowest cost option. Assessing three plausible example projects in the United States, we estimate that total transport costs range from $24/t-CO 2 stored for a gasification to hydrogen project traversing 670 km to $\$ 36$/t for a gasification to renewable natural gas project traversing 530 km. In general, if developers have flexibility in choosing transport mode and project type, biomass sources and storage sites can be connected across hundreds of kilometers for transport costs in the range of $20-40/t-CO 2 stored. Truck and rail are often viable modes when pipelines cannot be constructed. Distances of 1,000 km or more can be connected in the same cost range when shared CO 2 pipelines are employed.

09 BIOMASS FUELS↗

Nationwide cost and capacity estimates for sedimentary basin geothermal power and implications for geologic CO 2 storage

Sedimentary basins are naturally porous and permeable subsurface formations that underlie approximately half of the United States. In addition to being targets for geologic CO 2 storage, these resources could supply geothermal power: sedimentary basin geothermal heat can be extracted with water or CO 2 and used to generate electricity. The geothermal power potential of these basins and the accompanying implication for geologic CO 2 storage are, however, understudied. Here, we use the Sequestration of CO 2 Tool (SCO2T PRO ) and the generalizable GEOthermal techno-economic simulator (genGEO) to address this gap by a) estimating the cost and capacity of sedimentary basin geothermal power plants across the United States and b) comparing those results to nationwide CO 2 sequestration cost and storage potential estimates. We find that across the United States, using CO 2 as a geothermal heat extraction fluid reduces the cost of sedimentary basin power compared to using water, and some of the lowest cost capacity occurs in locations not typically considered for their geothermal resources (e.g., Louisiana, South Dakota). Additionally, using CO 2 effectively doubles the sedimentary basin geothermal resource base, equating to hundreds of gigawatts of new capacity, by enabling electricity generation in geologies that are otherwise (with water) too impermeable, too thin, too cold, or not deep enough. We find there is competition for the best sedimentary basin resources between water- and CO 2 -based power, but no overlap between the lowest-cost resources for CO 2 storage and CO 2 -based power. In this way, our results suggest that deploying CO 2 -based power may increase the cost of water based systems (by using the best resources) and the cost of CO 2 storage (by storing CO 2 in locations that otherwise may not be targeted). As such, our findings demonstrate that determining the best role for sedimentary basins within the energy transition may require balancing tradeoffs between competing priorities.

CPG↗

Learning from Arctic Microgrids: Cost and Resiliency Projections for Renewable Energy Expansion with Hydrogen and Battery Storage

Electricity in rural Alaska is provided by more than 200 standalone microgrid systems powered predominantly by diesel generators. Incorporating renewable energy generation and storage to these systems can reduce their reliance on costly imported fuel and improve sustainability; however, uncertainty remains about optimal grid architectures to minimize cost, including how and when to incorporate long-duration energy storage. This study implements a novel, multi-pronged approach to assess the techno-economic feasibility of future energy pathways in the community of Kotzebue, which has already successfully deployed solar photovoltaics, wind turbines, and battery storage systems. Using real community load, resource, and generation data, we develop a series of comparison models using the HOMER Pro software tool to evaluate microgrid architectures to meet over 90% of the annual community electricity demand with renewable generation, considering both battery and hydrogen energy storage. We find that near-term planned capacity expansions in the community could enable over 50% renewable generation and reduce the total cost of energy. Additional build-outs to reach 75% renewable generation are shown to be competitive with current costs, but further capacity expansion is not currently economical. We additionally include a cost sensitivity analysis and a storage capacity sizing assessment that suggest hydrogen storage may be economically viable if battery costs increase, but large-scale seasonal storage via hydrogen is currently unlikely to be cost-effective nor practical for the region considered. While these findings are based on data and community priorities in Kotzebue, we expect this approach to be relevant to many communities in the Arctic and Sub-Arctic regions working to improve energy reliability, sustainability, and security.

25 ENERGY STORAGE↗

Cost estimation for unmanned lunar and planetary programs

A basic model is presented for estimating the cost of unmanned lunar and planetary programs. Cost data were collected and analyzed for eight lunar and planetary programs. Total cost was separated into the following components: labor, overhead, materials, and technical support. The study determined that direct labor cost of unmanned lunar and planetary programs comprises 30 percent of the total program cost. Twelve program categories were defined for modeling: six spacecraft subsystem categories (science, structure, propulsion, electrical power, communications, and guidance and integration, test and quality assurance, launch and flight operations, ground equipment, systems analysis and engineering, and program management). An analysis showed that on a percentage basis, direct labor cost and direct labor manhours compare on a one-to-one ratio. Therefore, direct labor hours is used as the parameter for predicting cost, with the advantage of eliminating the effect of inflation on the analysis.

Dunkin, J. H.↗

Cost analysis of water recovery systems

A methodology was developed to predict the relevant contributions of the more intangible cost elements encountered in the development of flight-qualified hardware based on an extrapolation of past hardware development experience. Major items of costs within water recovery systems were identified and related to physical and/or performance criteria. Cost and performance data from Gemini, Skylab, and other aerospace and biotechnology programs were analyzed to identify major cost elements required to establish cost estimating relationships for advanced water recovery systems. The results of the study are expected to assist NASA in long-range planning and allocation of resources in a cost effective manner in support of earth orbital programs. This report deals with the cost analysis of the five leading water reclamation systems, namely: (1) RITE waste management-water system, (2) reverse osmosis system, (3) multifiltration system, (4) vapor compression system, and (5) closed air evaporation system with electrolytic pretreatment.

Yakut, M. M.↗

Low cost payload studies

Low cost payload studies aimed at the reduction of Space Shuttle cost, with the emphasis on mission support subsystem equipment, are reviewed. Spacecraft design, manufacturing and operational approaches are specified and quantified to demonstrate the feasibility of reductions of cost from present-day estimates. Space Shuttle design capabilities for retrieval, repair, and reuse of future payloads are indicated as cost reduction possibilities. It is also pointed out that an increased volume and weight carrying capability of the Space Shuttle can alter the design approach to future payloads to reduce cost. Details are given on some specific subsystem component design alterations integrated in an overall low-cost payload design. Refurbishment is discussed as the final area of interest for low cost payload design. Total program savings of up to 50% are found to be possible in the studies.

Moore, W. F.↗

Space Tug Docking Study. Volume 5: Cost Analysis

The cost methodology, summary cost data, resulting cost estimates by Work Breakdown Structure (WBS), technical characteristics data, program funding schedules and the WBS for the costing are discussed. Cost estimates for two tasks of the study are reported. The first, developed cost estimates for design, development, test and evaluation (DDT&E) and theoretical first unit (TFU) at the component level (Level 7) for all items reported in the data base. Task B developed total subsystem DDT&E costs and funding schedules for the three candidate Rendezvous and Docking Systems: manual, autonomous, and hybrid.

Source record↗

Estimating airline operating costs

A review was made of the factors affecting commercial aircraft operating and delay costs. From this work, an airline operating cost model was developed which includes a method for estimating the labor and material costs of individual airframe maintenance systems. The model, similar in some respects to the standard Air Transport Association of America (ATA) Direct Operating Cost Model, permits estimates of aircraft-related costs not now included in the standard ATA model (e.g., aircraft service, landing fees, flight attendants, and control fees). A study of the cost of aircraft delay was also made and a method for estimating the cost of certain types of airline delay is described.

Maddalon, D. V.↗

Low cost Ku-band earth terminals for voice/data/facsimile

A Ku-band satellite earth terminal capable of providing two way voice/facsimile teleconferencing, 128 Kbps data, telephone, and high-speed imagery services is proposed. Optimized terminal cost and configuration are presented as a function of FDMA and TDMA approaches to multiple access. The entire terminal from the antenna to microphones, speakers and facsimile equipment is considered. Component cost versus performance has been projected as a function of size of the procurement and predicted hardware innovations and production techniques through 1985. The lowest cost combinations of components has been determined in a computer optimization algorithm. The system requirements including terminal EIRP and G/T, satellite size, power per spacecraft transponder, satellite antenna characteristics, and link propagation outage were selected using a computerized system cost/performance optimization algorithm. System cost and terminal cost and performance requirements are presented as a function of the size of a nationwide U.S. network. Service costs are compared with typical conference travel costs to show the viability of the proposed terminal.

Kelley, R. L.↗

Life cycle costing with a discount rate

This article studies life cycle costing for a capability needed for the indefinite future, and specifically investigates the dependence of optimal policies on the discount rate chosen. The two costs considered are reprocurement cost and maintenance and operations (M and O) cost. The procurement price is assumed known, and the M and O costs are assumed to be a known function, in fact, a non-decreasing function, of the time since last reprocurement. The problem is to choose the optimum reprocurement time so as to minimize the quotient of the total cost over a reprocurement period divided by the period. Or one could assume a discount rate and try to minimize the total discounted costs into the indefinite future. It is shown that the optimum policy in the presence of a small discount rate hardly depends on the discount rate at all, and leads to essentially the same policy as in the case in which discounting is not considered.

Posner, E. C.↗

Assessment of economic factors affecting the satellite power system. Volume 1: System cost factors

The factors relevant to SPS costing and selection of preferred SPS satellite configurations were studied. The issues discussed are: (1) consideration of economic factors in the SPS system that relate to selection of SPS satellite configuration; (2) analysis of the proper rate of interest for use in SPS system definition studies; and (3) the impacts of differential inflation on SPS system definition costing procedures. A cost-risk comparison of the SPS satellite configurations showed a significant difference in the levelized cost of power from them. It is concluded, that this difference is the result more of differences in the procedures for assessing costs rather than in the satellite technologies required or of any advantages of one satellite configuration over the other. Analysis of the proper rate of interest for use in SPS system is 4 percent. The major item of differential inflation to be expected over this period of time is the real cost of labor. This cost is likely to double between today and the period of SPS construction.

Hazelrigg, G. A., Jr.↗

Structural cost optimization of photovoltaic central power station modules and support structure

The results of a comprehensive study of photovoltaic module structural support concepts for photovoltaic central power stations and their associated costs are presented. The objective of the study has been the identification of structural cost drivers. Parametric structural design and cost analyses of complete array systems consisting of modules, primary support structures, and foundations were performed. Area related module cost was found to be constant with design, size, and loading. A curved glass module concept was evaluated and found to have the potential to significantly reduce panel structural costs. Conclusions of the study are: array costs do not vary greatly among the designs evaluated; panel and array costs are strongly dependent on design loading; and the best support configuration is load dependent

Sutton, P. D.↗

Effects of design on cost of flat-plate solar photovoltaic arrays for terrestrial central station power applications

The paper examines the impact of module and array designs on the balance-of-plant costs for flat-plate terrestrial central station power applications. Consideration is given to the following types of arrays: horizontal, tandem, augmented, tilt adjusted, and E-W tracking. The life-cycle cost of a 20-year plant life serves as the costing criteria for making design and cost tradeoffs. A tailored code of accounts is developed for determining consistent photovoltaic power plant costs and providing credible photovoltaic system cost baselines for flat-plate module and array designs by costing several varying array design approaches.

Tsou, P.↗

Study of turboprop systems reliability and maintenance costs

The overall reliability and maintenance costs (R&MC's) of past and current turboprop systems were examined. Maintenance cost drivers were found to be scheduled overhaul (40%), lack of modularity particularly in the propeller and reduction gearbox, and lack of inherent durability (reliability) of some parts. Comparisons were made between the 501-D13/54H60 turboprop system and the widely used JT8D turbofan. It was found that the total maintenance cost per flight hour of the turboprop was 75% higher than that of the JT8D turbofan. Part of this difference was due to propeller and gearbox costs being higher than those of the fan and reverser, but most of the difference was in the engine core where the older technology turboprop core maintenance costs were nearly 70 percent higher than for the turbofan. The estimated maintenance cost of both the advanced turboprop and advanced turbofan were less than the JT8D. The conclusion was that an advanced turboprop and an advanced turbofan, using similar cores, will have very competitive maintenance costs per flight hour.

Source record↗

Cost analysis of composite fan blade manufacturing processes

The relative manufacturing costs were estimated for large high technology fan blades prepared by advanced composite fabrication methods using seven candidate materials/process systems. These systems were identified as laminated resin matrix composite, filament wound resin matrix composite, superhybrid solid laminate, superhybrid spar/shell, metal matrix composite, metal matrix composite with a spar and shell, and hollow titanium. The costs were calculated utilizing analytical process models and all cost data are presented as normalized relative values where 100 was the cost of a conventionally forged solid titanium fan blade whose geometry corresponded to a size typical of 42 blades per disc. Four costs were calculated for each of the seven candidate systems to relate the variation of cost on blade size. Geometries typical of blade designs at 24, 30, 36 and 42 blades per disc were used. The impact of individual process yield factors on costs was also assessed as well as effects of process parameters, raw materials, labor rates and consumable items.

Stelson, T. S.↗

An algorithm for minimum-cost set-point ordering in a cryogenic wind tunnel

An algorithm for minimum cost ordering of set points in a cryogenic wind tunnel is developed. The procedure generates a matrix of dynamic state transition costs, which is evaluated by means of a single-volume lumped model of the cryogenic wind tunnel and the use of some idealized minimum-costs, which is evaluated by means of a single-volume lumped model of the cryogenic wind tunnel and the use of some idealized minimum-cost state-transition control strategies. A branch and bound algorithm is employed to determine the least costly sequence of state transitions from the transition-cost matrix. Some numerical results based on data for the National Transonic Facility are presented which show a strong preference for state transitions that consume to coolant. Results also show that the choice of the terminal set point in an open odering can produce a wide variation in total cost.

Tripp, J. S.↗