Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CH”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 901 records · Page 50

Submillimeter observations of OH and CH in M42

The 2Pi(1/2) J = 3/2 to 1/2 transitions of OH at 163.12 and 163.40 microns have been detected, and upper limits have been obtained for the 2Pi(3/2) J = 3/2 to 1/2 transitions of CH at 149.09 and 149.39 microns, in observations of the Kleinmann-Low nebula of Orion. The results indicate emission from a gas cloud at a temperature of roughly 1000 K, having thickness of roughly 5 x 10 to the 14th cm with density about 7 million/cu cm and OH abundance of roughly 12 x 10 to the -6th. The OH column density is about 4 x 10 to the 16th/cu cm in the emitting regions. Optical depth effects play a major role in determining the relative strengths of the observed lines.

Viscuso, P. J.↗

Submillimeter observations of OH and CH in M42

The (sup 2) pi sub 1/2 (J = 3/2 to 1/2) transitions of OH at 163.12 and 163.40 micro m have been detected and upper limits have been obtained for the (sup 2) pi sub 3/2 (J = 3/2 to 1/2) transitions of CH at 149.09 and 149.39 micro m, in observations of the Kleinmann-Low Nebula of Orion. All four flux levels lie between 1 and 1.2 x 10 to the 17th power/sq.cm. The OH lines are bright when compared to the lower, (sup 2) pi sub 3/2 (J = 5/2 to 3/2) fluxes reported and imply that the 119 micro m emission observed is partially self-absorbed. The combined results provide strong constraints. Taken together with existing data on molecular hydrogen and CO and recent data on other OH transition, they suggest OH emission from post-shock regions at temperatures T approx 1000 k, densities approx. 7 x 10 to the 6th powr/cu cm N sub OH approx 80/cu cm optically thick for the (sup 2) pi sub 3/2 (J = 5/2 to 3/2), 119 micro m but only partially self-absorbing in the (J = 7/2 to 3/2), 84 micro m transitions over a Doppler velocity bandwidth of 30 km/sec. The OH column density is N sub OH approx 4 x 10 to the 16th powr/sq cm. in the emitting regions which occupy a fraction of approx 0.1 of a 1' x 1' field of view centered on the Becklin-Neugebauer source. The CO (J = 31 to 30), 84 micro m transition appears to lie sufficiently close to one of the 84 micro m OH line components to be partially absorbed as well, through a Bowen-type mechanism.

Viscuso, P. J.↗

The application of quadratic optimal cooperative control synthesis to a CH-47 helicopter

A control-system design method, Quadratic Optimal Cooperative Control Synthesis (CCS), is applied to the design of a Stability and Control Augmentation Systems (SCAS). The CCS design method is different from other design methods in that it does not require detailed a priori design criteria, but instead relies on an explicit optimal pilot-model to create desired performance. The design model, which was developed previously for fixed-wing aircraft, is simplified and modified for application to a Boeing Vertol CH-47 helicopter. Two SCAS designs are developed using the CCS design methodology. The resulting CCS designs are then compared with designs obtained using classical/frequency-domain methods and Linear Quadratic Regulator (LQR) theory in a piloted fixed-base simulation. Results indicate that the CCS method, with slight modifications, can be used to produce controller designs which compare favorably with the frequency-domain approach.

Townsend, Barbara K.↗

The application of quadratic optimal cooperative control synthesis to a CH-47 helicopter

A control-system design method, quadratic optimal cooperative control synthesis (CCS), is applied to the design of a stability and control augmentation system (SCAS). The CCS design method is different from other design methods in that it does not require detailed a priori design criteria, but instead relies on an explicit optimal pilot-model to create desired performance. The design method, which was developed previously for fixed-wing aircraft, is simplified and modified for application to a Boeing CH-47 helicopter. Two SCAS designs are developed using the CCS design methodology. The resulting CCS designs are then compared with designs obtained using classical/frequency-domain methods and linear quadratic regulator (LQR) theory in a piloted fixed-base simulation. Results indicate that the CCS method, with slight modifications, can be used to produce controller designs which compare favorably with the frequency-domain approach.

Townsend, Barbara K.↗

Research On The CH-47B Helicopter

Report describes equipment added to, and research capabilities of CH-47B helicopter. Programmable symbol generator provides display formats for variety of missions - those of vertical-takeoff-and-landing aircraft and helicopters. Powerful general-purpose flight computer in operation. Computer programmable in high-level languages and supports research more efficiently. Flight-control software developed to improve capability of helicopter to perform simulations in flight.

Hilbert, Kathryn B.↗

The rotational spectrum of the CH radical in its a 4Sigma(-) state, studied by far-infrared laser magnetic resonance

The CH radical has been detected in its a 4Sigma(-) state by the technique of laser magnetic resonance at far-infrared wavelengths. Spectra relating to different spin components of the first three rotational transitions have been recorded. The molecule was generated either by the reaction of F atoms with CH4, with a trace of added oxygen or by the reaction of O atoms with C2H2. The observed resonances have been analyzed and fitted to determine the parameters of an effective Hamiltonian for a molecule in a 4Sigma state. The principal quantities determined are the rotational constant B0 = 451 138.434(94) MHz and the spin-spin parameter lambda(0) = 2785.83(18) MHz. Proton hyperfine parameters have also been determined.

Nelis, Thomas↗

Vibration-rotation bands of CH in the solar infrared spectrum and the solar carbon abundance

High resolution solar spectra obtained from the ATMOS Fourier Transform Spectrometer (Spacelab 3 flight on April 29-May 6, 1985) have made it possible to identify and measure a large number of lines of the vibration-rotation fundamental bands of the X2 Pi state of CH. From about 100 lines of the 1-0, 2-1, and 3-2 bands and adopting theoretical transition probabilities, a solar carbon abundance of 8.60 + or - 0.05 is derived. This value is compared with new results inferred from other carbon abundance indicators. The final recommended solar abundance of carbon is 8.60 + or - 0.05.

Grevesse, N.↗

Identification of CH(+) emission in the Red Rectangle

Waelkens et al. (1992) have recently reported high-resolution spectroscopic observations of the exciting star (HD 44179) of the Red Rectangle nebula. During this study a new set of sharp, optical emission features in the spectrum of the Red Rectangle was discovered. Here, these new features, which occur in the blue region of the spectrum between 4215 and 4245 A are analyzed and assigned to emission from low-lying rotational transitions in the (0,0) band of the A1Pi-Sigma(+) electronic system of the methylidyne ion, CH(+).

Balm, S. P.↗

Signal Processing and Fault Detection with Application to CH-46 Helicopter Data

Central to Qualtech Systems' mission is its testability and maintenance software (TEAMS) and derivatives. Many systems comprise components equipped with self-testing capability; but, if the system is complex (and involves feedback and if the self-testing itself may occasionally be faulty) tracing faults to a single or multiple causes is difficult. However, even for systems involving many thousands of components the PC-based TEAMS provides essentially real-time system-state diagnosis. Until recently TEAMS operation was passive: its diagnoses were based on whatever data sensors could provide. Now, however, a signal-processing (SP) "frontend" matched to inference needs is available. Many standard signal processing primitives, such as filtering, spectrum analysis and multi-resolution decomposition are available; the SP toolbox is also equipped with a (supervised) classification capability based on a number of decision-making paradigms. This paper is about the SP toolbox. We show its capabilities, and demonstrate its performance on the CH-46 "Westland" data set.

Wen, Fang↗

Microstructure and Thermal History of Metal Particles in CH Chondrites

Fe-Ni metal particles with smooth Ni, Co, and Cr zoning patterns, 8-13 wt.% Ni in the center of the particle to 3-5 wt% Ni at the rim, have been identified in several CR-clan (CH, Bencubbinlike, and CR) chondrites. These zoning patterns are broadly consistent with an origin by gas-solid condensation in the solar nebula at temperatures between approximately 1500 to 1300 K and fast cooling rates, 2 to 25 K/day. Apparently, this condensate metal was not melted during chondrule formation or affected significantly in the solid-state by alteration during parent body processing. Consideration of diffusional redistribution of Ni, Co, Cr and siderophile elements have further constrained the calculated condensation temperatures and cooling rates of the zoned condensates. These condensate metals have irregular shapes and vary in size from 50 to 350 m as revealed in some detail by optical and SEM techniques. In addition to zoned condensate particles, other types of metal particles have been observed. These include zoned condensates with exsolution-precipitates, unzoned homogeneous metal with no exsolution precipitates, unzoned metal exhibiting exsolution precipitates and high Ni metal grains.

Goldstein, J. I.↗

From CMS to the U.S. Greenhouse Gas Center – Improved Tracking of Recent Changes in Co 2 and Ch 4 From NASA’s Quasi-Operational Modeling Systems

Reliable, low latency delivery of high quality global flux and concentration information is a growing but still unmet need to advance expanding measurement, monitoring, reporting, and verification efforts that underpin federal climate mitigation strategies. Here we present on progress toward developing space-based greenhouse gas (GHG) monitoring systems that can provide comprehensive information trailing real time by a matter of weeks to a few months. Through support from its Carbon Monitoring System (CMS) program, NASA has developed the capability to assimilate XCO 2 retrievals from the Orbiting Carbon Observatory, 2 (OCO 2 ) into the Goddard Earth Observing System (GEOS) Constituent Data Assimilation System (CoDAS) to create gap-filled, three-dimensional (3D) estimates of CO 2 mixing ratio. When observations are unavailable, concentration fields are further informed by observationally-informed bottom-up flux packages that incorporate remotely sensed fire, nighttime lights, and vegetation observations combined with estimates of atmospheric growth rate based on surface in situ data. The 3D nature of these datasets supports evaluation with independent aircraft data to improve confidence in satellite data, development of new regional modeling approaches, and quantification of the climate impacts of GHGs. The system has recently been expanded to assimilate XCH 4 from ESA’s TROPOspheric Monitoring Instrument (TROPOMI) instrument and is supported by companion efforts to improve delivery of estimates of bottom-up land and ocean fluxes. The quasi-operational GEOS-GHG system is contributing to the recently announced U.S. Greenhouse Gas Center (GHG Center) by delivering information on recent changes in CO 2 and CH 4 emissions and concentrations to support stakeholder and research communities. In this presentation, we provide an overview of the current system configured to support the GHG Center. We highlight examples of how this data contributes to broader NASA initiatives including the Earth Information Center, an innovative virtual and physical exhibit designed to show how NASA data helps the nation combat climate change. We conclude by discussing how innovations in CMS research can address remaining data gaps and modeling challenges to advance operational GHG monitoring in the future.

Lesley Ott↗

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing SWB Payload Assembly; and 1.7, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10.1)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗