Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “work”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Report of the Plasma Physics and Environmental Perturbation Laboratory (PPEPL) working groups. Volume 1: Plasma probes, wakes, and sheaths working group

It is shown in this report that comprehensive in-situ study of all aspects of the entire zone disturbance caused by a body in a flowing plasma resulted in a large number if requirements on the shuttle-PPEPL facility. A large amount of necessary in-situ observation can be obtained by adopting appropriate modes of performing the experiments. Requirements are indicated for worthwhile studies, of some aspects of the problems, which can be carried out effectively while imposing relatively few constraints on the early missions. Considerations for the desired growth and improvement of the PPEPL to facilitate more complete studies in later missions are also discussed. For Vol. 2, see N74-28170; for Vol# 3, see N74-28171.

Source record↗

Report of the Plasma Physics and Environmental Perturbation Laboratory (PPEPL) working groups. Volume 2: Wave experiments working group

The area of wave experiments for the PPEPL is considered in broad terms. It was found that most experiments in this area can be classified typically by a few generalized experiments. These experiment possibilities are discussed in terms of advantages, disadvantages, and probable areas for future investigation. It was concluded that the areas where wave experiments have the most promise are wave sources, wave propagation, and nonlinear interactions and should be implemented in that order. It was recommended that the PPEPL facility remain sufficiently flexible to handle new ideas as they appear, and a continuing effort should be made to solicit new ideas and approaches. It was also felt that detailed investigations should begin as soon as possible in the areas of antennas, both conventional and particle types, and wave-particle interaction experiments. For Vol. 1, see N74-28169; for Vol. 3, see N74-28171.

Source record↗

Report of the Plasma Physics and Environmental Perturbation Laboratory (PPEPL) working groups. Volume 3: Magnetospheric experiments working group

A number of general studies that were proposed for the PPEPL-SHUTTLE program are considered in qualitative detail from both the theoretical and practical points of view. The selection of experimental programs was restricted to those which may be considered active as opposed to refinements of the passive observational programs done previously. It is concluded that, while these new studies were scientifically worthwhile and could be performed in principle, in most cases insufficient attention was paid to the practical details of the experiments. Several specific areas of study, stressing in particular the practical feasibility of the proposed experiments, are recommended. In addition, recommendations are made for further theoretical study, where appropriate. For Vol. 1, see N74-28169; for Vol. 2, see N74-28170.

Source record↗

XTCE (XML Telemetric and Command Exchange) Standard Making It Work at NASA. Can It Work For You?

The XML Telemetric and Command Exchange (XTCE) standard is intended as a way to describe telemetry and command databases to be exchanged across centers and space agencies. XTCE usage has the potential to lead to consolidation of the Mission Operations Center (MOC) Monitor and Control displays for mission cross-support, reducing equipment and configuration costs, as well as a decrease in the turnaround time for telemetry and command modifications during all the mission phases. The adoption of XTCE will reduce software maintenance costs by reducing the variation between our existing mission dictionaries. The main objective of this poster is to show how powerful XTCE is in terms of interoperability across centers and missions. We will provide results for a use case where two centers can use their local tools to process and display the same mission telemetry in their MOC independently of one another. In our use case we have first quantified the ability for XTCE to capture the telemetry definitions of the mission by use of our suite of support tools (Conversion, Validation, and Compliance measurement). The next step was to show processing and monitoring of the same telemetry in two mission centers. Once the database was converted to XTCE using our tool, the XTCE file became our primary database and was shared among the various tool chains through their XTCE importers and ultimately configured to ingest the telemetry stream and display or capture the telemetered information in similar ways.Summary results include the ability to take a real mission database and real mission telemetry and display them on various tools from two centers, as well as using commercially free COTS.

CCSDS↗

Space: An Exciting Place to Work! Working in Space (without Ever Leaving Earth?)

In addition to the highly visible astronauts, NASA personnel include thousands of engineers, scientists, technicians and support staff. These vital employees develop technologies and solution to the many problems the Agency faces while undertaking space exploration. In this presentation to STEM students, the engineering that has been done to develop and maintain critical mechanism on the International Space Station will be reviewed and discussed. The overall goal of the presentation is to clearly show that many individuals can make meaningful contributions to space exploration without ever leaving the earth.

bearings↗

Medical Data Architecture Prototype Development - Summary of Recent Work and Proposed Ideas for Upcoming Work

The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions, and in ExMC Gap Med 10: We do not have the capability to provide computed medical decision support during exploration missions. These gaps recognize the need for a comprehensive medical data management system and the accompanying computational support to provide autonomous medical care during long duration exploration missions. As the MDA matures—including the capability to comprehensively process and discover medically-relevant information to support medical operations during exploration missions—project focus will shift to maturing and extending the MDA platform to enable clinical decision support and real-time guidance. To date, the MDA foundational architecture has recommended exploration medical system Level of Care IV requirements through a series of test bed prototype developments and analog demonstrations. The next stage in the development will focus on more autonomous clinical decision making necessary to address challenges in executing a self-contained medical system that enables health care both with and without assistance from ground support. A thorough understanding of current state of medical decision support systems, advanced machine learning algorithms and vast and varied data sources is required. The development of a clinical decision support for exploration missions (Level of Care V) roadmap is needed: one that assesses of current state of the art of clinical decision support systems (CDSS), interoperability issues, identification of challenges in health and performance monitoring, obtaining and processing information from biosensors, knowledge and data management, data integration and fusion, and advanced algorithm development. This roadmap must also include rapid prototype development in the areas of data processing, advanced analysis and prediction of medical events, and treatment based on medically relevant information processing and evidence-based best practices. In this presentation, an overview of the relevant issues and the beginning framework of a Level of Care V CDSS development roadmap will be provided.

Krihak, M.↗

NASA C3RS: Communication Works For Those Who Work At It!

The objective of the study is to learn about Communication Breakdown related to safety events reported to the Confidential Close Call Reporting System (C3RS). Studying the reported close calls can yield information about communication breakdowns that may be present in the railroad operations.

Confidential Close Call Reporting System↗

Performance Analysis: Work Control Events Identified January - August 2010

This performance analysis evaluated 24 events that occurred at LLNL from January through August 2010. The analysis identified areas of potential work control process and/or implementation weaknesses and several common underlying causes. Human performance improvement and safety culture factors were part of the causal analysis of each event and were analyzed. The collective significance of all events in 2010, as measured by the occurrence reporting significance category and by the proportion of events that have been reported to the DOE ORPS under the ''management concerns'' reporting criteria, does not appear to have increased in 2010. The frequency of reporting in each of the significance categories has not changed in 2010 compared to the previous four years. There is no change indicating a trend in the significance category and there has been no increase in the proportion of occurrences reported in the higher significance category. Also, the frequency of events, 42 events reported through August 2010, is not greater than in previous years and is below the average of 63 occurrences per year at LLNL since 2006. Over the previous four years, an average of 43% of the LLNL's reported occurrences have been reported as either ''management concerns'' or ''near misses.'' In 2010, 29% of the occurrences have been reported as ''management concerns'' or ''near misses.'' This rate indicates that LLNL is now reporting fewer ''management concern'' and ''near miss'' occurrences compared to the previous four years. From 2008 to the present, LLNL senior management has undertaken a series of initiatives to strengthen the work planning and control system with the primary objective to improve worker safety. In 2008, the LLNL Deputy Director established the Work Control Integrated Project Team to develop the core requirements and graded elements of an institutional work planning and control system. By the end of that year this system was documented and implementation had begun. In 2009, training of the workforce began and as of the time of this report more than 50% of authorized Integration Work Sheets (IWS) use the activity-based planning process. In 2010, LSO independently reviewed the work planning and control process and confirmed to the Laboratory that the Integrated Safety Management (ISM) System was implemented. LLNL conducted a cross-directorate management self-assessment of work planning and control and is developing actions to respond to the issues identified. Ongoing efforts to strengthen the work planning and control process and to improve the quality of LLNL work packages are in progress: completion of remaining actions in response to the 2009 DOE Office of Health, Safety, and Security (HSS) evaluation of LLNL's ISM System; scheduling more than 14 work planning and control self-assessments in FY11; continuing to align subcontractor work control with the Institutional work planning and control system; and continuing to maintain the electronic IWS application. The 24 events included in this analysis were caused by errors in the first four of the five ISMS functions. The most frequent cause was errors in analyzing the hazards (Function 2). The second most frequent cause was errors occurring when defining the work (Function 1), followed by errors during the performance of work (Function 4). Interestingly, very few errors in developing controls (Function 3) resulted in events. This leads one to conclude that if improvements are made to defining the scope of work and analyzing the potential hazards, LLNL may reduce the frequency or severity of events. Analysis of the 24 events resulted in the identification of ten common causes. Some events had multiple causes, resulting in the mention of 39 causes being identified for the 24 events. The most frequent cause was workers, supervisors, or experts believing they understood the work and the hazards but their understanding was incomplete. The second most frequent cause was unclear, incomplete or confusing documents directing the work. Together, these two causes were mentioned 17 times and contributed to 13 of the events. All of the events with the cause of ''workers, supervisors, or experts believing they understood the work and the hazards but their understanding was incomplete'' had this error in the first two ISMS functions: define the work and analyze the hazard. This means that these causes result in the scope of work being ill-defined or the hazard(s) improperly analyzed. Incomplete implementation of these functional steps leads to the hazards not being controlled. The causes are then manifested in events when the work is conducted. The process to operate safely relies on accurately defining the scope of work. This review has identified a number of examples of latent organizational weakness in the execution of work control processes.

99 GENERAL AND MISCELLANEOUS↗

Work Coordination Engine

The Work Coordination Engine (WCE) is a Java application integrated into the Service Management Database (SMDB), which coordinates the dispatching and monitoring of a work order system. WCE de-queues work orders from SMDB and orchestrates the dispatching of work to a registered set of software worker applications distributed over a set of local, or remote, heterogeneous computing systems. WCE monitors the execution of work orders once dispatched, and accepts the results of the work order by storing to the SMDB persistent store. The software leverages the use of a relational database, Java Messaging System (JMS), and Web Services using Simple Object Access Protocol (SOAP) technologies to implement an efficient work-order dispatching mechanism capable of coordinating the work of multiple computer servers on various platforms working concurrently on different, or similar, types of data or algorithmic processing. Existing (legacy) applications can be wrapped with a proxy object so that no changes to the application are needed to make them available for integration into the work order system as "workers." WCE automatically reschedules work orders that fail to be executed by one server to a different server if available. From initiation to completion, the system manages the execution state of work orders and workers via a well-defined set of events, states, and actions. It allows for configurable work-order execution timeouts by work-order type. This innovation eliminates a current processing bottleneck by providing a highly scalable, distributed work-order system used to quickly generate products needed by the Deep Space Network (DSN) to support space flight operations. WCE is driven by asynchronous messages delivered via JMS indicating the availability of new work or workers. It runs completely unattended in support of the lights-out operations concept in the DSN.

Zendejas, Silvino↗

Paperless Work Package Application

Paperless Work Package (PWP) System is a computer program process that takes information from Asset Suite, provides a platform for other electronic inputs, Processes the inputs into an electronic package that can be downloaded onto an electronic work tablet or laptop computer, provides a platform for electronic inputs into the work tablet, and then transposes those inputs back into Asset Suite and to permanent SRS records. The PWP System will basically eliminate paper requirements from the maintenance work control system. The program electronically relays the instructions given by the planner to work on a piece of equipment which is currently relayed via a printed work package. The program does not control/approve what is done. The planner will continue to plan the work package, the package will continue to be routed, approved, and scheduled. The supervisor reviews and approves the work to be performed and assigns work to individuals or to a work group. (The supervisor conducts pre job briefings with the workers involved in the job) The Operations Manager (Work Controlling Entity) approves the work package electronically for the work that will be done in his facility prior to work starting. The PWP System will provide the package in an electronic form. All the reviews, approvals, and safety measures taken by people outside the electronic package does not change from the paper driven work packages.

Kilgore, Jr., William R.↗