ERCOT Event on February 26, 2008: Lessons Learned
The event analyzed in this paper is of special interest, and was widely reported on in the press, because wind generation played a partial role in the event.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
The event analyzed in this paper is of special interest, and was widely reported on in the press, because wind generation played a partial role in the event.
Offshore wind is a key player in the transition to a decarbonized electric gird, and the United States has set ambitious goals of integrating 30 GW of offshore wind capacity by 2030 and 110 GW by 2050. To facilitate this integration, the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory are conducting the Atlantic Offshore Wind Transmission Study to assess transmission solutions. To achieve the 110-GW target by 2050, meticulous planning for network expansion and resource allocation is essential; however, meeting the 2030 goals requires integrating offshore wind power with minimal system upgrades, thus necessitating a careful study of grid strength and stability. The study team developed the Grid Strength Analysis Tool (GSAT) to assess system strength under various operating conditions and contingencies, focusing on the proposed integration of 30 GW of offshore wind power by 2030. In this paper, we provide a summary of key features of the GSAT software and results of the grid strength analysis for integrating 30 GW of offshore wind generation by 2030 in the U.S. Eastern Interconnection.
Many states are deploying renewable generation sources at a significant rate to meet renewable portfolio standards. As part of this drive to meet renewable generation levels, significant additions of wind generation are planned. Due to the highly variable nature of wind generation, significant energy imbalances on the power system can be created and need to be handled. This report examines the impact on the Northwest Power Pool (NWPP) region for a 2019 expected wind scenario. One method for mitigating these imbalances is to utilize plug-in hybrid electric vehicles (PHEVs) or battery electric vehicles (BEVs) as assets to the grid. PHEVs and BEVs have the potential to meet this demand through both charging and discharging strategies. This report explores the usage of two different charging schemes: V2GHalf and V2GFull. In V2GHalf, PHEV/BEV charging is varied to absorb the additional imbalance from the wind generation, but never feeds power back into the grid. This scenario is highly desirable to automotive manufacturers, who harbor great concerns about battery warranty if vehicle-to-grid discharging is allowed. The second strategy, V2GFull, varies not only the charging of the vehicle battery, but also can vary the discharging of the battery back into the power grid. This scenario is currently less desirable to automotive manufacturers, but provides an additional resource benefit to PHEV/BEVs in meeting the additional imbalance imposed by wind. Key findings in the report relate to the PHEV/BEV population required to meet the additional imbalance when comparing V2GHalf to V2GFull populations, and when comparing home-only-charging and work-and-home-charging scenarios. Utilizing V2GFull strategies over V2GHalf resulted in a nearly 33% reduction in the number of vehicles required. This reduction indicates fewer vehicles are needed to meet the unhandled energy, but they would utilize discharging of the vehicle battery into the grid. This practice currently results in the voiding of automotive manufacturer's battery warranty, and is not feasible for many customers. The second key finding is the change in the required population when PHEV/BEV charging is available at both home and work. Allowing 10% of the vehicle population access to work charging resulted in nearly 80% of the grid benefit. Home-only charging requires, at best, 94% of the current NWPP light duty vehicle fleet to be a PHEV or BEV. With the introduction of full work charging availability, only 8% of the NWPP light duty vehicle fleet is required. Work charging has primarily been associated with mitigating range anxiety in new electric vehicle owners, but these studies indicate they have significant potential for improving grid reliability. The V2GHalf and V2GFull charging strategies of the report utilize grid frequency as an indication of the imbalance requirements. The introduction of public charging stations, as well as the potential for PHEV/BEVs to be used as a resource for renewable generation integration, creates conditions for additional products into the ancillary services market. In the United Kingdom, such a capability would be bid as a frequency product in the ancillary services market. Such a market could create the need for larger, third-party aggregators or services to manage the use of electric vehicles as a grid resource. Ultimately, customer adoption, usage patterns and habits, and feedback from the power and automotive industries will drive the need.
Offshore wind is a key player in the transition to a decarbonized electric gird, and the United States has set ambitious goals of integrating 30 GW of offshore wind capacity by 2030 and 110 GW by 2050. To facilitate this integration, the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory are conducting the Atlantic Offshore Wind Transmission Study to assess transmission solutions. To achieve the 110-GW target by 2050, meticulous planning for network expansion and resource allocation is essential; however, meeting the 2030 goals requires integrating offshore wind power with minimal system upgrades, thus necessitating a careful study of grid strength and stability. The study team developed the Automated System-wide Strength Evaluation Tool (ASSET) to assess system strength under various operating conditions and contingencies, focusing on the proposed integration of 30 GW of offshore wind power by 2030. In this paper, we provide a summary of key features of the ASSET software and results of the grid strength analysis for integrating 30 GW of offshore wind generation by 2030 in the U.S. Eastern Interconnection.
Abstract not provided
Supports examination of implications of national 20% wind vision, and provides input to integration and transmission studies for operational impact of large penetrations of wind on the grid.
The proposed Aero-MINE technology will extract energy from wind without any exterior moving parts. Aero-MINEs can be integrated into buildings or function stand-alone, and are scalable. This gives them advantages similar to solar panels, but with the added benefit of operation in cloudy or dark conditions. Furthermore, compared to solar panels, Aero-MINEs can be manufactured at lower cost and with less environmental impact. Power generation is isolated internally by the pneumatic transmission of air and the outlet air-jet nozzles amplify the effectiveness. Multiple units can be connected to one centrally located electric generator. Aero-MINEs are ideal for the built-environment, with numerous possible configurations ranging from architectural integration to modular bolt-on products. Traditional wind turbines suffer from many fundamental challenges. The fast-moving blades produce significant aero-acoustic noise, visual disturbances, light-induced flickering and impose wildlife mortality risks. The conversion of massive mechanical torque to electricity is a challenge for gears, generators and power conversion electronics. In addition, the installation, operation and maintenance of wind turbines is required at significant height. Furthermore, wind farms are often in remote locations far from dense regions of electricity customers. These technical and logistical challenges add significantly to the cost of the electricity produced by utility-scale wind farms. In contrast, distributed wind energy eliminates many of the logistical challenges. However, solutions such as micro-turbines produce relatively small amounts of energy due to the reduction in swept area and still suffer from the motion-related disadvantages of utility-scale turbines. Aero-MINEs combine the best features of distributed generation, while eliminating the disadvantages.
This paper discusses the process of wind model validation against field measurements
This report summarizes the event which occured on February 26, 2008, in which the Electric Reliability Council of Texas (ERCOT) called for an Emergency Electric Curtailment Plan (EECP) at 18:41 due to a worsening imbalance between generation and load which led to a decline in system frequency. The event is of special interest, and was widely reported on in the press, because wind generation played a partial role in the event. Other load-response events, which did not involve wind generation, have not received similar attention.
This peer-reviewed analysis is one of a series of Technology Assessments of power production and evaluates the role of wind power in the future energy portfolio of the U.S. Wind power is evaluated with respect to resource base, growth potential, environmental profile, costs, barriers, risks, and expert opinions. Wind can be an important energy resource for the U.S., but as its contribution to total U.S. electricity generation increases, it will require a significant amount of fossil resources for backup power to maintain grid reliability. Wind power has exhibited significant growth over the last decade, but most of this growth was made possible through financial incentives such as temporary renewable energy tax credits. Technology advances that result in lower project costs and energy storage devices that enable better power reliability remain crucial research and development areas for the long-term integration of wind power.
This paper presents a first-order autoregressive algorithm to generate real-time (RT), hour-ahead (HA), and day-ahead (DA) wind and load forecast errors. The methodology aims at producing random wind and load forecast time series reflecting the autocorrelation and cross-correlation of historical forecast data sets. Five statistical characteristics are considered: the means, standard deviations, autocorrelations, and cross-correlations. A stochastic optimization routine is developed to minimize the differences between the statistical characteristics of the generated time series and the targeted ones. An optimal set of parameters are obtained and used to produce the RT, HA, and DA forecasts in due order of succession. This method, although implemented as the first-order regressive random forecast error generator, can be extended to higher-order. Results show that the methodology produces random series with desired statistics derived from real data sets provided by the California Independent System Operator (CAISO). The wind and load forecast error generator is currently used in wind integration studies to generate wind and load inputs for stochastic planning processes. Our future studies will focus on reflecting the diurnal and seasonal differences of the wind and load statistics and implementing them in the random forecast generator.
Paper examines the capacity requirements that arise as wind generation is integrated into the power system and how those requirements change depending on where the wind energy is delivered.
This analysis indicates the extent to which pooled regional dispatch for matching generation to load mitigates the costs and improves associated reliability, particularly in scenarios with high penetration of variable output resources, such as wind
Grid-forming (GFM) control of Type-3 and Type-4 wind turbine generators has attracted substantial attention in power systems research; however, the limited over-current capability of power electronics converters continues to deteriorate the grid strength of the evolving power systems. This paper develops the generic model of synchronous wind power generators, also known as Type-5 wind turbines, for power system integration studies. The Type-5 wind turbine interfaces with the electric grid through a synchronous generator; hence, its operation and consequent grid impacts are similar to a conventional power plant. Based on the developed model, a Type-5 wind power plant is integrated into the IEEE 14-bus test bed to evaluate its control and operation with a bulk power system. Finally, the stability properties of Type-5 wind turbine generators are compared with Type-3 wind turbines in GFM control mode through impedance characterization.
WindPower 2008 conference sponsored by AWEA held in Houston, TX on June 1-4, 2008. This poster illustrates the content in NREL/SR-500-43146, State Transmission Infrastructure.
Probabilistic wind power forecasts that quantify the uncertainty in wind output have the potential to aid in the economic grid integration of wind power at large penetration levels. In this paper, a novel probabilistic wind forecasting approach based on pinball loss optimization is proposed, in conjunction with a multi-model machine learning based ensemble deterministic forecasting framework. By assuming the point-forecasted value as the mean at each point, one unknown parameter (i.e., standard deviation) of a predictive distribution at each forecasting point is determined by minimizing the pinball loss. A surrogate model is developed to represent the unknown distribution parameter as a function of deterministic forecasts. This surrogate model can be used together with deterministic forecasts to predict the unknown distribution parameter and thereby generate probabilistic forecasts. Numerical results of case studies show that the proposed method has improved the pinball loss by up to 35% compared to a baseline quantile regression forecasting model.
Probabilistic wind power forecasts that quantify the uncertainty in wind output have the potential to aid in the economic grid integration of wind power at large penetration levels. In this paper, a novel probabilistic wind forecasting approach based on pinball loss optimization is proposed, in conjunction with a multi-model machine learning based ensemble deterministic forecasting framework. By assuming the pointforecasted value as the mean at each point, one unknown parameter (i.e., standard deviation) of a predictive distribution at each forecasting point is determined by minimizing the pinball loss. A surrogate model is developed to represent the unknown distribution parameter as a function of deterministic forecasts. This surrogate model can be used together with deterministic forecasts to predict the unknown distribution parameter and thereby generate probabilistic forecasts. Numerical results of case studies show that the proposed method has improved the pinball loss by up to 35% compared to a baseline quantile regression forecasting model.