Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “utility distribution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

The Impact of Behind-the-Meter Heterogeneous Distributed Energy Resources on Distribution Grids: Preprint

The increasing integration of distributed energy resources (DERs) on the electric grid brings new challenges and opportunities for utility grid operations. With the rapid deployment of DERs, there is emerging interest in integrating these controllable devices with utility operations at all levels for monitoring and management. Different types of DERs such as Photovoltaics (PV), energy storage, electric vehicles (EVs), etc. have varying effects on the grid based on how and where they are deployed. Again, the DER deployment and its impact are network-dependent, while the traditional electric grids were not designed to host DERs. To understand the challenges with increasing behind-the-meter (BTM) DERs and to identify the needs in deploying advanced controls, a comprehensive grid impact study is indispensable. This paper investigates the impacts of integrating a mix of DERs in the utility distribution network in Colorado, U.S. Firstly, BTM DERs at the residential scale including distributed PV; battery energy storage systems (BESS); heating, ventilation, and air-conditioning (HVAC) load; electric water heater (EWH) load; and EVs are modeled. The impacts of integrating these resources on the distribution network are evaluated by conducting time-series simulations for different scenarios considering different days to capture the worst-case conditions. Monte Carlo simulations are conducted to generate the realistic EV charging profile. The voltage issues, substation transformer loadings, and critical nodes in the network are identified with the incorporation of uncoordinated EV charging loads and other DER in the network. This analysis helps visualize the DER impact on the grid, identify the challenges, and provides an insight into the new distribution management and control needs to enable reliable and resilient distribution grid operations. Additionally, further analysis is performed to estimate the daily residential electricity cost with the inclusion of DERs under time-of-use tariffs. The result shows the daily residential electricity cost reduced by 20:7% on average with DERs compared to the case without DERs.

27 ARPA - Advanced Research Projects Agency-Energy↗

Equity-driven Planning of Distributed Solar PV using Optimal Transport

Typically, distribution system planning processes do not explicitly incorporate energy equity considerations, such as identifying consumers most affected by energy costs and determining how investments in the distribution system can address existing energy burden imbalances. This paper proposes a novel optimal transport (OT)-based method to improve the energy burden distribution of consumers. The approach involves the strategic siting and sizing of solar PV in order to assist customers with high energy burden and improve the overall energy burden distribution of the community. The desired energy burden distribution is defined using the equal distribution equivalent (EDE) concept. The OT-based method is then used to estimate the distributed solar PV capacity to be installed at various locations and the tariffs to be adjusted, all while improving the energy burden distribution and providing valuable insights into distributed generation (DG) planning. The results on IEEE 37 bus test system demonstrate how DG planning, considering EDE and OT, can help reduce the energy burden of low-income consumers. Additionally, the approach also reveals optimal tariff adjustments needed to ensure revenue neutrality for distribution utilities.

Optimal transport, equal distribution equivalent, ↗

Functional Assessment of Shell Recharge Solutions' SKY™ Platform OpenADR Capability

The project’s overall objective is to research, develop, and conduct a wide-scale demonstration of a utility smart charge management (SCM) system to develop optimal managed charging structures for grid value, evaluate the impact of EV charging on local distribution utility operations, and evaluate the utilities’ ability to control electronic vehicle (EV) charging load based on grid conditions. This report covers Argonne’s validation testing in the first period of the project, the objective of which was to determine the current managed charging functionality of the EVSE hardware, the network and the vehicle telematics software solution and understand gaps that need to be addressed prior to a large-scale demonstration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pathways for Tamil Nadu’s Electric Power Sector: 2020 - 2030

This report is part one of a two-part series that represents a year-long collaboration with the Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) and Tamil Nadu Transmission Corporation Limited (TANTRANSCO) on power sector planning. This Pathways for Tamil Nadu’s Electric Power Sector 2020-2030 report outlines NREL’s work with TANGEDCO's electricity sector planning department to develop a model of the State power system and evaluate multiple scenarios of system evolution given resource constraints, costs of technologies, and power sector policies. A broad stakeholder group comprised of TANGEDCO leadership, developers, regulators, and researchers from within the power sector community in Tamil Nadu helped to guide the main objectives of the study and provided technical feedback to the research team. The outcomes of this effort include multiple pathways for power sector growth to 2030 and a robust model of Tamil Nadu's power system that can be used to continually analyze the impact of new policies, regulations, or system changes. The second report in this series will build on the bulk system analysis by focusing on the rapidly transforming distribution network in the State. The report will outline a framework developed by NREL and TANGEDCO's distribution utility to quickly and accurately analyze the impacts of integrating renewable energy onto Tamil Nadu's distribution system. Together these studies help to prepare Tamil Nadu for a rapidly transforming power system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Distributed Antenna-Coupled Transition Edge Sensors

We describe progress toward realizing a new architecture for focal plane arrays for the Submillimeter and Far- Infrared (FIR) bands. This architecture is based on a detector design utilizing distributed hot{electron transition edge sensors (TES) coupled to slot antenna elements. Arrays utilizing this type of detector can be considerably easier to manufacture than membrane-isolated TES arrays, because the need for micro-machining is eliminated. We present background and rationale for this new array architecture and details of a new antenna design for an imaging polarimeter, which yields greater bandwidth than past designs. In addition, we describe a cryogenic facility for testing these arrays.

bolometer↗

From Modular ADMS to Plug-and-Play Ops: Distribution Grid Operations with Platform-Level Orchestration to Enable Ambitious App Hosting

The core function of the distribution grid is to provide electricity to consumers affordably, reliably, and securely. In pursuing these core objectives, distribution utilities are accountable to customers, regulators, and in some cases, shareholders. Other third parties such as aggregators and microgrids can also have a stake in the smooth operation of the grid. Each of these stakeholders has economic, business, and/or governance objectives that inform their expectations of the distribution grid. This multi-objective, multi-stakeholder environment creates tension that must be reconciled to successfully design and operate the distribution grid. Innovative companies are competing to bring high-tech solutions to electric utilities and their customers that address each of these objectives. Many developers of advanced distribution management systems (ADMS) and distributed energy resource management systems (DERMS) have adopted a modular architecture that allows grid operators to select functions and features according to their individual system needs. A modular platform also allows the solution provider to develop and integrate specific new product modules; however, the need to pursue multiple objectives with a fixed set of controllable devices makes integration expensive whether it is done at the product development stage or the deployment stage. This cost creates a significant barrier to adoption and can lengthen the product to market time of new solutions. To fundamentally address the complexity of system integration for distribution grid operations, the U.S. Department of Energy Office of Electricity has funded the GridAPPS-D project at PNNL, which streamlines integration by contributing to standards development, defining system architecture, applying advanced mathematics, and developing open-source software to demonstrate the concept of an open data-integration platform for distribution operations. The open data-integration platform concept enables system operators and solution providers to deploy ambitious, best-of-breed applications (or apps) without continually reengineering for integration. Ambitious apps developed by different solution providers will inevitably attempt to achieve different control objectives with the same set of controllable devices. If the open platform itself can resolve these conflicts in a way that achieves the best available outcomes for all apps, doesn’t restrict the ambitious design of apps, and ensures safe and secure operations, apps will be able to plug-and-play with the platform at the same time as other ambitious apps. In this paper, we describe a framework called App Deconfliction that empowers a platform to assign setpoints to controllable devices based on the values preferred by different apps (and even external stakeholder entities like customers or aggregators). The App Deconfliction framework is compatible with several methods for determining setpoint values. We present two methods based on game theory that provide a subtle built-in incentive structure for developers to adapt their apps to the fact that they will be operating in a moderated multi-app environment and to favor device setpoints that have the most effect on their objectives over those that have the least effect. Our simulation-based demonstrations have shown that game-theory-based deconfliction can lead to a 7% improvement in control space utilization compared to design-based methods.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-State Transportation Electrification Impact Study: Preparing the Grid for Light-, Medium-, and Heavy-Duty Electric Vehicles

Recent U.S. Environmental Protection Agency (EPA) notices of proposed rulemakings for GHG emissions standards for light-, medium-, and heavy-duty on-road vehicles would accelerate ongoing advancements already happening in the industry because of private investment, consumer demand, state-level policies, and federal incentives. As the EPA finalizes these regulations, questions persist regarding the cost of the requisite charging infrastructure and associated upgrades to the nation's electric grid. With support from the U.S. Department of Energy, U.S. Joint Office of Energy and Transportation, and the EPA, a multidisciplinary team conducted a Multi-State Transportation Electrification Impact Study that quantitatively assesses the incremental investment necessary to enable the levels of vehicle electrification expected to be induced by pending EPA regulations and to estimate the potential value of deferred investments in electric distribution infrastructure stemming from proactive vehicle-grid integration planning and deployment. This study finds the simulated incremental capital cost of charging infrastructure (including grid upgrades) to be at least 2.5 times smaller than the lifetime net benefits of vehicle electrification (including fuel savings but excluding the value of avoided emissions). Additionally, the incremental distribution grid upgrade cost of the EPA Action-Unmanaged scenario was found to be approximately 3% of existing utility distribution system investments (on an annual basis). Finally, the potential for managed charging to defer distribution grid upgrades was found to be significant with costs found to decrease from $2.3 billion to an incremental cost of $1 billion across five states in the Action-Managed scenario (relative to the No Action-Unmanaged scenario).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Transportation Electrification Impact Study (TEIS)

Recent U.S. Environmental Protection Agency (EPA) notices of proposed rulemakings for GHG emissions standards for light-, medium-, and heavy-duty on-road vehicles would accelerate ongoing advancements already happening in the industry because of private investment, consumer demand, state-level policies, and federal incentives. As the EPA finalizes these regulations, questions persist regarding the cost of the requisite charging infrastructure and associated upgrades to the nation's electric grid. With support from the U.S. Department of Energy, U.S. Joint Office of Energy and Transportation, and the EPA, a multidisciplinary team conducted a Multi-State Transportation Electrification Impact Study that quantitatively assesses the incremental investment necessary to enable the levels of vehicle electrification expected to be induced by pending EPA regulations and to estimate the potential value of deferred investments in electric distribution infrastructure stemming from proactive vehicle-grid integration planning and deployment. This study finds the simulated incremental capital cost of charging infrastructure (including grid upgrades) to be at least 2.5 times smaller than the lifetime net benefits of vehicle electrification (including fuel savings but excluding the value of avoided emissions). Additionally, the incremental distribution grid upgrade cost of the EPA Action-Unmanaged scenario was found to be approximately 3% of existing utility distribution system investments (on an annual basis). Finally, the potential for managed charging to defer distribution grid upgrades was found to be significant with costs found to decrease from $2.3 billion to an incremental cost of $1 billion across five states in the Action-Managed scenario (relative to the No Action-Unmanaged scenario).

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

An Analysis Framework for Distribution Network DER Integration Analysis in India: Distributed Solar in Tamil Nadu

This report is part of a two-part series that represents a year-long collaboration with the Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) on power sector planning. The first report in this series, the Pathways for Tamil Nadu’s Electric Power Sector 2017-2030 report outlines NREL’s work with TANGEDCO's electricity sector planning department to develop a model of the State’s power system and evaluate multiple scenarios of system growth given resource constraints, costs of technologies, and power sector policies. This second report in this series focuses on the rapidly transforming distribution network in the State. The report outlines a framework developed by NREL with TANGEDCO's distribution utility to quickly and accurately analyze the impacts of integrating renewable energy, specifically rooftop solar PV onto Tamil Nadu's distribution system. Together these studies help to prepare Tamil Nadu for a rapidly transforming power system.

14 SOLAR ENERGY↗

Distributed Fiber Optic Sensing for in-well hydraulic fracture monitoring

This study presents the results from in-well hydraulic fracture monitoring within a horizontal well in an unconventional reservoir utilizing Distributed Fiber Optic Sensing (DFOS). An in-house-developed Brillouin-based Distributed Strain Sensing (DSS) interrogator was deployed to obtain strain measurements, complemented by a commercial Raman-based Distributed Temperature Sensing (DTS) interrogator for temperature measurements and a commercial Rayleigh-based Low-Frequency Distributed Acoustic Sensing (LF-DAS) interrogator for strain-rate measurements. Examined over a ten-day period, the spatio-temporal distribution of temperature-compensated strain obtained from DSS and DTS revealed distinct signatures of the multi-stage hydraulic fracturing process. These signatures were analyzed with respect to fracture width growth and closure, residual strain effects, and fracture conductivity near the wellbore. Fracture widths within the fracture zone were estimated for individual stages. The findings were assessed with LF-DAS measurements for further evaluation. This work integrates DFOS-measured strain, temperature, and strain-rate data for monitoring in-well hydraulic fracturing, with the goal of supporting future studies in interpreting DFOS measurements for improved understanding of hydraulic fracturing in unconventional reservoirs.

58 GEOSCIENCES↗

Interpretation of cosmic ray composition - The path length distribution

The chemical composition of cosmic ray nuclei, the value of Z varying between 3 and 28, and being between a few hundred MeV/nucleon and a few hundred GeV/nucleon, is compared with a consistent set of propagation calculations. These include the effects of spallation (energy-dependent cross sections are used), escape, ionization loss in the interstellar medium, and deceleration in the solar cavity. The amount of matter traversed by cosmic rays is found to be approximately 7 g/sq cm, independent of energy between 100 MeV/nucleon and 2 GeV/nucleon. Above 2 GeV/nucleon, the escape length varies as the -0.4 + or 0.1 power of the energy. In addition, a procedure has been developed to measure the shape of the cosmic ray path length distribution. Utilizing the ratio of Fe secondaries to Fe in the cosmic rays, presently available data are found to be consistent with an exponential distribution and they eliminate models in which the path length distribution is severely truncated. To tie down the shape of the distribution more precisely, new measurements of the cosmic ray composition, presently becoming available from experiments on the HEAO 3 satellite, will have to be coupled with improved measurements of the energy dependence of partial and total cross sections.

Protheroe, R. J.↗

Applying Utility's Advanced Grid Technologies to Improve Resiliency of a Critical Load

The US DOE Office of Electricity's Energy Storage Program's joint R&D work with the Cordova Electric Cooperative (CEC) has deployed several advanced grid technologies that are providing benefits today to Cordova Alaska's electricity users. Advanced grid technologies deployed through DoE co-funded R&D include a 1MW Battery Energy Storage System (BESS), and enhanced monitoring including Phasor Measurement Units (PMU's) to help better understand the operational impacts of the added BESS. This paper will highlight key accomplishments to-date in deploying and using advanced grid technologies, and then outline the next phase of work that will use these technologies to implement an operating scheme to reconfigure the utility's distribution system and utility resources including BESS to provide emergency back-up power to a critical load: the Cordova Community Medical Center (CCMC). This paper will include additional insights on the use of utility resources to support critical loads via case study examples by the National Rural Electric Cooperative Assoc. (NRECA).

BESS↗

Using Dark Fiber and Distributed Acoustic Sensing to Characterize a Geothermal System in the Imperial Valley, Southern California

The Imperial Valley, CA, is a tectonically active transtensional basin located south of the Salton Sea; the area hosts numerous geothermal fields, including significant hidden hydrothermal resources without surface manifestations. Development of inexpensive, rugged, and highly sensitive exploration techniques for undiscovered geothermal systems is critical for accelerating geothermal power deployment as well as unlocking a low-carbon energy future. We present a case study utilizing distributed acoustic sensing (DAS) and ambient noise interferometry for geothermal reservoir imaging, utilizing unlit fiber-optic telecommunication infrastructure (dark fiber). The study exploits two days of passive DAS data acquired in early November 2020 over a ~28-km section of fiber from Calipatria, CA to Imperial, CA. We apply ambient noise interferometry to retrieve coherent signals from DAS records and develop a bin stacking technique to attenuate the effects from persistent localized noise sources and to enhance retrieval of coherent surface waves. As a result, we are able to obtain high-resolution two-dimensional (2D) S wave velocity ($V_s$) structure to 3 km depth, based on joint inversion of both the fundamental and higher overtones. We observe a previously unmapped high $V_s$ and low $V_p$/$V_s$ ratio feature beneath the Brawley geothermal system, which we interpret to be a zone of hydrothermal mineralization and lower porosity. This interpretation is consistent with a host of other measurements including surface heat flow, gravity anomalies, and available borehole wireline data. These results demonstrate the potential utility of DAS deployed on dark fiber for geothermal system exploration and characterization in the appropriate geological settings.

Vp/Vs imaging↗

Virtual Power Plants: Pilots, Challenges, and Innovations Shaping Future Development

Virtual Power Plants (VPPs) aggregate distributed energy resources (DERs) to provide grid services traditionally delivered by centralized power plants. This article reviews the current state of VPP deployment, highlighting business models, compensation mechanisms, and global pilot projects. While VPPs offer benefits such as grid flexibility, resilience, and cost savings, challenges remain in communication infrastructure, regulatory frameworks, market access, and customer engagement. To address these, we propose a scalable, privacy-preserving hierarchical VPP architecture that coordinates with distribution utilities and preserves customer data. We also present the Integrated T&D Control Room of the Future as a key test bed for validating and accelerating VPP adoption. These innovations can help transition VPPs from pilot programs to integral components of a modern, reliable power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Fast and Scalable Genetic Algorithm-Based Approach for Planning of Microgrids in Distribution Networks: Preprint

As a result of climate change, extreme weather events are occurring more frequently and with increasing impact. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks; thus, the level of proactive preparation of the distribution system to be able to handle severe impacts of extreme weather events represents the system's resilience. One method that distribution systems use to prepare for extreme events is to form multiple microgrids and thereby isolate themselves from the grid supply by using local generation as much as possible to supply critical loads. But partitioning an existing system into multiple feasible islands capable of supporting critical loads is still challenging for distribution systems - first, because of the size of the graph partitioning problem and, second, because of the difficulty in properly formulating the desired attributes of such islands or microgrids. Therefore, this paper presents a genetic algorithmbased approach that facilitates incorporating multiple objectives for grid partitioning by formulating two types of problems - node allocation and edge elimination - and it considers multiple topological and resilience-enhancing objectives. The performance of the proposed genetic algorithm-based approach is numerically evaluated on multiple test systems as well as on a real distribution feeder in Colorado, USA.

edge elimination↗

Logarithmic Resilience Risk Metrics That Address the Huge Variations in Blackout Cost

Resilience risk metrics must address the customer cost of the largest blackouts of greatest impact. However, there are huge variations in blackout cost in observed distribution utility data that make it impractical to properly estimate the mean large blackout cost and the corresponding risk. These problems are caused by the heavy tail observed in the distribution of customer costs. To solve these problems, we propose resilience metrics that describe large blackout risk using the mean of the logarithm of the cost of large-cost blackouts, the slope index of the heavy tail, and the frequency of large-cost blackouts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗