At least 91 records · Page 5

Multi-parametric analysis for mixed integer linear programming: An application to transmission upgrade and congestion management

Upgrading the capacity of existing transmission lines is essential for meeting the growing energy demands, facilitating the integration of renewable energy, and ensuring the security of the transmission system. This study focuses on the selection of lines whose capacities and by how much should be expanded from the perspective of the Independent System Operators (ISOs) to minimize the total system cost. We employ advanced multi-parametric programming and an enhanced branch-and-bound algorithm to address complex mixed-integer linear programming (MILP) problems, considering multi-period time constraints and physical limitations of generators and transmission lines. To characterize the various decisions in transmission expansion, we model the increased capacity of existing lines as parameters within a specified range. This study first relaxes the binary variables to continuous variables and applies the Lagrange method and Karush-Kuhn-Tucker (KKT) conditions to obtain optimal solutions and identify critical regions associated with active and inactive constraints. Moreover, we extend the traditional branch-and-bound (B&B) method by determining the problem’s upper and lower bounds at each node of the B&B decision tree, helping to manage computational challenges in large-scale MILP problems. Here, we compare the difference between the upper and lower bounds to obtain an approximate optimal solution within the decision-makers’ tolerable error range. In addition, the first derivative of the objective function on the parameters of each line is used to inform the selection of lines for easing congestion and maximizing social welfare. Finally, the capacity upgrades are selected by weighing the reductions in system costs against the expense of upgrading line capacities. The findings are supported by numerical simulations and provide transmission-line planners with decision-making guidance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hourly dynamic line ratings for existing transmission across the contiguous United States (preliminary results) [Slides]

The thermal rating of a transmission line depends on the rate at which heat generated by current flow through the line can be dissipated into the environment by convective and radiative cooling, keeping the conductor below a maximum operating temperature. Static or seasonal line ratings assume nearly-worst-case weather conditions (high ambient air temperature, high solar irradiance, and low wind speed), resulting in a low risk of "overrating" a line (i.e., allowing more current to flow than the line is designed for) but a high fraction of time when the line is "underrated" (i.e., able to flow more current while staying below the maximum temperature). Dynamic transmission line ratings (DLR) use real-time measurements of weather conditions, line sag, or line temperature to determine the thermal rating of transmission lines at hourly or higher time resolution, allowing for increased ratings during some (cold, windy, and/or dark) periods and correcting for overrating during other (hot, calm, and/or sunny) periods. Many studies have explored the benefits of DLR, but typically for small collections of transmission lines under a limited sample of weather conditions, leaving open the question of how widely applicable the benefits of DLR might be over diverse geographies and weather conditions. Here, we combine geospatial data on tens of thousands of transmission line routes across the contiguous United States with high-resolution hourly historical weather data for 2007-2013 to estimate the impact of DLR and other weather-adjusted rating systems. We compare static and dynamic line ratings to intermediate ratings adjusted by ambient temperature, day/night irradiance, clear-sky irradiance, and/or measured irradiance, illustrating the benefits of incorporating progressively more detailed weather data into the calculated line ratings. Moving from nighttime-adjusted ratings to clear-sky-adjusted ratings provides more benefit than moving from clear-sky-adjusted ratings to measured-irradiance-adjusted ratings. Depending on the assumed static windspeed for irradiance-adjusted-ratings, DLR either corrects for overrated hours or provides substantially increased ratings in the majority of hours on the majority of lines.

14 SOLAR ENERGY↗

The National Transmission Planning Study: Executive Summary

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 1: Introduction

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 5: Stress Analysis for 2035 Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 6: Conclusions

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 4: AC Power Flow Analysis for 2035 Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Impact assessment of geomagnetic induced current neutral blocking devices with power electronics sources on distance relay for 230 kV transmission lines

Electrical grids increased the integration of power electronics sources onto transmission lines. In addition, recent reports show a significant rise in geomagnetic storms occurring in 2024. These geomagnetic storms can affect transmission lines by inducing electrical currents within them, potentially causing power outages due to overloaded power transformers. Geomagnetic induced current neutral blocking devices (GIC-NBDs) are capacitors on the ground of wye power transformers, to avoid damage caused by geomagnetic storms. The integration of distance relays and transmission lines with power electronics sources and GIC-NBDs needs to be studied to observe if GIC-NBDs and power electronics sources could adversely affect operation of the electrical grid. In this analysis, the effect of 2 MW power electronics sources and GIC-NBDs on distance relays is assessed for different 230 kV transmission line lengths in radial and nonradial power systems. The simulations measured the apparent impedances, with different electrical faults. Results for a typical 2,650 μF GIC-NBD application were presented on impedance plots, and the distance relay model operations were assessed. In conclusion, the tests for radial and nonradial power systems showed the behavior of the distance elements and source impedance ratios, assessing the effect of power electronics sources and GIC-NBDs on 230 kV transmission lines.

Distance relays↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impacts of Regional Coordination on Transmission Needs for Power System Resource Adequacy [Slides]

Resource adequacy (RA) is an important component of bulk power system reliability that addresses whether there are sufficient resources available to meet electricity demand at all times. RA analysis is used to assess whether the planned power system will provide reliable electricity to consumers while accounting for equipment outages, weather variability, and load uncertainty. Coordination between regions can enable resource sharing to meet RA needs if sufficient transmission capacity exists. Transmission's role in RA coordination can be particularly pronounced for large power systems like the U.S. electricity grid which contains geographically diverse demand and weather-dependent resources. Depending on the level of coordination desired, existing inter-regional transmission capacity may not be sufficient. This study is designed to assess optimal pathways for the development of inter-regional transmission in the U.S. under varying levels of RA coordination. Results can inform long-term grid infrastructure planning and provide insights into potential benefits of greater coordination for generation and transmission planning between regional U.S. power systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessing the Reliability Benefits of Energy Storage as a Transmission Asset

Utilizing energy storage solutions to reduce the need for traditional transmission investments has been recognized by system planners and supported by federal policies in recent years. This work demonstrates the need for detailed reliability assessment for quantitative comparison of the reliability benefits of energy storage and traditional transmission investments. First, a mixed-integer linear programming expansion planning model considering candidate transmission lines and storage technologies is solved to find the least-cost investment decisions. Next, operations under the resulting system configuration are simulated in a probabilistic reliability assessment which accounts for weather-dependent forced outages. The outcome of this work, when applied to TPPs, is to further equalize the consideration of energy storage compared to traditional transmission assets by capturing the value of storage for system reliability.

co-optimization↗

Barriers and Opportunities To Realize the System Value of Interregional Transmission

This report identifies barriers within existing rules and operational practices that may limit the system value interregional transmission can provide and identifies a suite of options that could enable greater utilization of and value from interregional transmission. To allow for the variety of power sector structures that exist across the United States, the report divides the evaluation of barriers and opportunities into three sections: common issues that are found in all regions, barriers between non-market or hybrid areas, and barriers between market areas. The report also identifies ambitious, transformative national actions that could unlock transmission value across both market and non-market areas. In the analysis of barriers and potential opportunities for improvement, we recognize these are complex issues that with a diverse set of power system stakeholders and considerations that must be taken into account. The aim of this report is not to make recommendations but to identify options to improve the use of interregional transmission that could be considered alongside other local, state, and regional objectives.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Measurements of the UV and VUV transmission of optical materials during high energy electron irradiation

An experimental program was conducted in which the optical transmission of several transparent materials was measured during high energy electron irradiation. These experiments were conducted using the Dynamitron electron accelerator as a continuous source of 1.5 MeV electrons and the LINAC electron accelerator as a pulsed source of 5-7 MeV electrons. The experimental program consisted of three major portions. The first portion, the optical transmission of fused silica, BeO, MgF2, and LiF was measured at vacuum ultraviolet wavelengths in the range 1550-2000 A during ambient temperature, 1.5 MeV electron irradiation at ionizing dose rates to 0.5 Mrad/sec. In the second portion of the program, the optical transmission of fused silica and BeO was measured in the range 2000-3000 A during high dose rate, elevated temperature 1.5 MeV electron irradiation. In particular, accurate measurements of the optical transmission were made at ionizing dose rates as high as 10 Mrad/sec. In the final portion of the program, the optical transmission of fused silica and BeO was measured in the wavelength range 2000-3000 A during pulsed 5 and 7 MeV electron irradiation from the LINAC accelerator. The maximum time averaged ionizing dose rate was limited to 0.75 Mrad/sec due to accelerator limitations.

Palma, G. E.↗

On sound transmission into a thin cylindrical shell under 'flight conditions'

A mathematical model for sound transmission into a thin cylindrical shell is used to study sound transmission under flight conditions, i.e., under conditions of external air flow past a pressurized cylinder at flight altitude. Numerical results for different incidence angles are presented for a typical narrow-bodied jet in cruising flight at 10,660 m with interior pressure at 2440 m. A comparison is made between no-flow sound transmission at standard conditions on the ground to sound transmission under flight conditions. It is shown that at M = 0, the cylinder transmission loss (TL) has dips at the cylinder ring frequency (fR) and the critical frequency (fc) for a flat panel of same material and thickness as shell. Between fR and fc, cylinder TL follows a mass-law behavior. Flow provides a modest increase in TL in the mass-law region, and strongly interacts with the cylinder resonances below fR.

Koval, L. R.↗

Effect of longitudinal stringers on sound transmission into a thin cylindrical shell

In the context of the transmission of airborne noise into an aircraft fuselage, a mathematical model is presented for the transmission of airborne noise into a stiffened cylindrical shell. The stiffeners are longitudinal stringers and are modeled as discrete structural elements. The numerical cases examined were typical of a narrow-bodied jet transport fuselage. The stringers appeared to raise the cylinder transmission loss in the mass-controlled region, although they produced dips at the stringer resonances. The ring-frequency dip in transmission loss, which is characteristic of monocoque shells, was found to still be present. There appeared to be a small increase in transmission loss as the number of stringers was increased. The effect of high damping was also investigated.

Koval, L. R.↗

On sound transmission into an orthotropic shell

A mathematical model is presented for the transmission of airborne noise through the walls of an orthotropic cylindrical shell. Parameters were varied to see how orthotropicity affected noise transmission. When compared to that for an isotropic shell, the cylinder transmission loss was found to be quite sensitive to the ratio of circumferential to axial modulus of elasticity. A modulus ratio greater than unity appears to enhance transmission loss in the mass-controlled region, while a ratio less than unity degrades it. Below the ring frequency, the trends appear to be reversed. The cylinder transmission loss appears to be relatively insensitive to changes in the shear modulus

Koval, L. R.↗

On sound transmission into a stiffened cylindrical shell with rings and stringers treated as discrete elements

In the context of the transmission of airborne noise into an aircraft fuselage, a mathematical model is presented for the transmission of an oblique plane sound wave into a finite cylindrical shell stiffened by stringers and ring frames. The rings and stringers are modeled as discrete structural elements. The numerical case studied was typical of a narrow-bodied jet transport fuselage. The numerical results show that the ring-frequency dip in the transmission loss curve that is present for a monocoque shell is still present in the case of a stiffened shell. The ring frequency effect is a result of the cylindrical geometry of the shell. Below the ring frequency, stiffening does not appear to have any significant effect on transmission loss, but above the ring frequency, stiffeners can enhance the transmission loss of a cylindrical shell.

Koval, L. R.↗

Power availability at terrestrial receptor sites for laser-power transmission from the satellite power system

A statistical model was developed for relating the temporal transmission parameters of a laser beam from a solar power satellite to observable meteorological data to determine the influence of weather on power reception at the earth-based receiver. Sites within 100 miles of existing high voltage transmission lines were examined and the model was developed for clear-sky and clouded conditions. The cases of total transmission through clouds at certain wavelengths, no transmission, and partial transmission were calculated for the cloud portion of the model. The study covered cirriform, stratiform, cumiliform, and mixed type clouds and the possibility of boring holes through the clouds with the beam. Utilization of weapons-quality beams for hole boring, was found to yield power availability increases of 9-33%, although no beneficial effects could be predicted in regions of persistent cloud cover. An efficiency of 80% was determined as possible if several receptor sites were available within 200-300 miles of each other, thereby allowing changes of reception point in cases of unacceptable meteorological conditions.

Beverly, R. E., III↗