Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “traffic estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Network-Wide Traffic Signal Control Using Bilinear System Modeling and Adaptive Optimization

This study proposes a new multi-input multi-output optimal bilinear signal control method in which a bilinear dynamic model approximation is used to capture the nonlinear dynamics of the urban traffic networks. With signal green time splits as the control input and traffic delay changes as the output for each intersections in the network, a bilinear system model was developed, which, on the basis of linear system modeling, takes interactions among traffic delays and signal timing splits into consideration. Based on the bilinear system modeling framework, we conducted two steps in each time interval to derive traffic control strategies: (1) we used the normalized least-squared algorithm to estimate system parameters; and (2) we solved an online optimization problem to obtain the updated traffic control inputs for the signal timing that minimizes future traffic delays. We evaluated the proposed method in a microscopic traffic simulation environment (VISSIM) with a 35-intersection network of Bellevue city in Washington. Two different traffic demand patterns: (1) normal traffic demands; and (2) time-varying traffic demands were simulated to compare the performance of different control strategies. Experimental results show that (1) the proposed bilinear system model can better describe traffic system dynamics than linear-model based methods, such as our previously developed linear-quadratic regulator control; and (2) the proposed method outperforms the state-of-the-art signal control strategies, namely the max-pressure and the self-organizing traffic light control methods. We have also shown that the proposed method is applicable to all other possible network layouts and signal controller phasing structures.

42 ENGINEERING↗

Supersonic market and economic analyses

Advanced supersonic transport markets of the free world were projected for the period 1985 to 2004. Passenger traffic volume and airplane range and seat capacity requirements were estimated for Mach 2.2 service by international regional area market areas and by city pairs within and between these areas. Market factors and traffic factors examined include variable loads, growth rates, supersonic transport market shares, and schedule frequencies considering the different makeup of passenger traffic and individual city pairs. Direct, indirect, and total operating costs and yield levels were economically analyzed for first class and full fare economy class traffic.

Rochte, L. S.↗

RouteE API

This is the API endpoint for RouteE energy prediction, which can be used to get both single vehicle link or route energy estimates and transportation network-wide energy consumption estimates for a variety of vehicles. This enables external researchers and transportation engineers to access and utilize NREL's growing library of pre-trained vehicle models for prediction of transportation energy consumption. This API provides three endpoints: • /route: Energy estimation of a vehicle over a planning link or sequence of links (route). • /network: Network-wide estimation of energy consumption for all vehicle traffic in the desired area. • /compass: Energy-optimal “eco-routing” between input origin and destination coordinates (Currently in beta for Denver metro area only).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

RouteE API

This is the API endpoint for RouteE energy prediction, which can be used to get both single vehicle link or route energy estimates and transportation network-wide energy consumption estimates for a variety of vehicles. This enables external researchers and transportation engineers to access and utilize NREL's growing library of pre-trained vehicle models for prediction of transportation energy consumption. This API provides three endpoints: - /route: Energy estimation of a vehicle over a planning link or sequence of links (route). - /network: Network-wide estimation of energy consumption for all vehicle traffic in the desired area. - /compass: Energy-optimal “eco-routing” between input origin and destination coordinates (Currently in beta for Denver metro area only).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

RouteE API

This is the API endpoint for RouteE energy prediction, which can be used to get both single vehicle link or route energy estimates and transportation network-wide energy consumption estimates for a variety of vehicles. This enables external researchers and transportation engineers to access and utilize NLR's growing library of pre-trained vehicle models for prediction of transportation energy consumption. This API provides three endpoints: - /route: Energy estimation of a vehicle over a planning link or sequence of links (route). - /network: Network-wide estimation of energy consumption for all vehicle traffic in the desired area. - /compass: Energy-optimal “eco-routing” between input origin and destination coordinates (Currently in beta for Denver metro area only).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced space communications architecture study. Volume 2: Technical report

The technical feasibility and economic viability of satellite system architectures that are suitable for customer premise service (CPS) communications are investigated. System evaluation is performed at 30/20 GHz (Ka-band); however, the system architectures examined are equally applicable to 14/11 GHz (Ku-band). Emphasis is placed on systems that permit low-cost user terminals. Frequency division multiple access (FDMA) is used on the uplink, with typically 10,000 simultaneous accesses per satellite, each of 64 kbps. Bulk demodulators onboard the satellite, in combination with a baseband multiplexer, convert the many narrowband uplink signals into a small number of wideband data streams for downlink transmission. Single-hop network interconnectivity is accomplished via downlink scanning beams. Each satellite is estimated to weigh 5600 lb and consume 6850W of power; the corresponding payload totals are 1000 lb and 5000 W. Nonrecurring satellite cost is estimated at $110 million, with the first-unit cost at $113 million. In large quantities, the user terminal cost estimate is $25,000. For an assumed traffic profile, the required system revenue has been computed as a function of the internal rate of return (IRR) on invested capital. The equivalent user charge per-minute of 64-kbps channel service has also been determined.

Horstein, Michael↗

High-Speed Civil Transport Forecast: Simulated Airlines Scenarios for Mach 1.6, Mach 2.0, and Mach 2.4 Configurations for Year 2015

The report describes the development of a database of fuel burn and emissions from projected High Speed Civil Transport (HSCT) fleets that reflect actual airlines' networks, operational requirement, and traffic flow as operated by simulated world wide airlines for Mach 1.6, 2.0, and 2.4 HSCT configurations. For the year 2015, McDonnell Douglas Corporation created two supersonic commercial air traffic networks consisting of origin-destination city pair routes and associated traffic levels. The first scenario represented a manufacturing upper limit producible HSCT fleet availability by year 2015. The fleet projection of the Mach 2.4 configuration for this scenario was 1059 units with a traffic capture of 70 percent. The second scenario focused on the number of units that can minimally be produced by the year 2015. Using realistic production rates, the HSCT fleet projection amounts to 565 units. The traffic capture associated with this fleet was estimated at 40 percent. The airlines network was extracted from the actual networks of 21 major world airlines. All the routes were screened for suitability for HSCT operations. The route selection criteria included great circle distance, difference between flight path distance and great circle distance to avoid overland operations, and potential flight frequency.

Metwally, Munir↗

Comparison of Selected Weather Translation Products

Weather is a primary contributor to the air traffic delays within the National Airspace System (NAS). At present, it is the individual decision makers who use weather information and assess its operational impact in creating effective air traffic management solutions. As a result, the estimation of the impact of forecast weather and the quality of ATM response relies on the skill and experience level of the decision maker. FAA Weather-ATM working groups have developed a Weather-ATM integration framework that consists of weather collection, weather translation, ATM impact conversion and ATM decision support. Some weather translation measures have been developed for hypothetical operations such as decentralized free flight, whereas others are meant to be relevant in current operations. This paper does comparative study of two different weather translation products relevant in current operations and finds that these products have strong correlation with each other. Given inaccuracies in prediction of weather, these differences would not be expected to be of significance in statistical study of a large number of decisions made with a look-ahead time of two hours or more.

Kulkarni, Deepak↗

The Effects of Very Light Jet Air Taxi Operations on Commercial Air Traffic

This study investigates the potential effects of Very Light Jet (VLJ) air taxi operations adding to delays experienced by commercial passenger air transportation in the year 2025. The affordable cost relative to existing business jets and ability to use many of the existing small, minimally equipped, but conveniently located airports is projected to stimulate a large demand for the aircraft. The resulting increase in air traffic operations will mainly be at smaller airports, but this study indicates that VLJs have the potential to increase further the pressure of demand at some medium and large airports, some of which are already operating at or near capacity at peak times. The additional delays to commercial passenger air transportation due to VLJ air taxi operations are obtained from simulation results using the Airspace Concepts Evaluation System (ACES) simulator. The direct increase in operating cost due to additional delays is estimated. VLJs will also cause an increase in traffic density, and this study shows increased potential for conflicts due to VLJ operations.

Smith, Jeremy C.↗

Trajectory-Based Takeoff Time Predictions Applied to Tactical Departure Scheduling: Concept Description, System Design, and Initial Observations

Current aircraft departure release times are based on manual estimates of aircraft takeoff times. Uncertainty in takeoff time estimates may result in missed opportunities to merge into constrained en route streams and lead to lost throughput. However, technology exists to improve takeoff time estimates by using the aircraft surface trajectory predictions that enable air traffic control tower (ATCT) decision support tools. NASA s Precision Departure Release Capability (PDRC) is designed to use automated surface trajectory-based takeoff time estimates to improve en route tactical departure scheduling. This is accomplished by integrating an ATCT decision support tool with an en route tactical departure scheduling decision support tool. The PDRC concept and prototype software have been developed, and an initial test was completed at air traffic control facilities in Dallas/Fort Worth. This paper describes the PDRC operational concept, system design, and initial observations.

Engelland, Shawn A.↗

Wake Vortex Advisory System (WakeVAS) Evaluation of Impacts on the National Airspace System

This report is one of a series that describes an ongoing effort in high-fidelity modeling/simulation, evaluation and analysis of the benefits and performance metrics of the Wake Vortex Advisory System (WakeVAS) Concept of Operations being developed as part of the Virtual Airspace Modeling and Simulation (VAMS) project. A previous study, determined the overall increases in runway arrival rates that could be achieved at 12 selected airports due to WakeVAS reduced aircraft spacing under Instrument Meteorological Conditions. This study builds on the previous work to evaluate the NAS wide impacts of equipping various numbers of airports with WakeVAS. A queuing network model of the National Airspace System, built by the Logistics Management Institute, Mclean, VA, for NASA (LMINET) was used to estimate the reduction in delay that could be achieved by using WakeVAS under non-visual meteorological conditions for the projected air traffic demand in 2010. The results from LMINET were used to estimate the total annual delay reduction that could be achieved and from this, an estimate of the air carrier variable operating cost saving was made.

Smith, Jeremy C.↗

Military, Charter, Unreported Domestic Traffic and General Aviation 1976, 1984, 1992, and 2015 Emission Scenarios

The report describes development of databases estimating aircraft engine exhaust emissions for the years 1976 and 1984 from global operations of Military, Charter, historic Soviet and Chinese, Unreported Domestic traffic, and General Aviation (GA). These databases were developed under the National Aeronautics and Space Administration's (NASA) Advanced Subsonic Assessment (AST). McDonnell Douglas Corporation's (MDC), now part of the Boeing Company has previously estimated engine exhaust emissions' databases for the baseline year of 1992 and a 2015 forecast year scenario. Since their original creation, (Ward, 1994 and Metwally, 1995) revised technology algorithms have been developed. Additionally, GA databases have been created and all past NIDC emission inventories have been updated to reflect the new technology algorithms. Revised data (Baughcum, 1996 and Baughcum, 1997) for the scheduled inventories have been used in this report to provide a comparison of the total aviation emission forecasts from various components. Global results of two historic years (1976 and 1984), a baseline year (1992) and a forecast year (2015) are presented. Since engine emissions are directly related to fuel usage, an overview of individual aviation annual global fuel use for each inventory component is also given in this report.

Mortlock, Alan↗

A 30/20 GHz FSS feasibility study

The near term feasibility of direct-to-subscriber services were determined using the 30/20 GHz Fixed Satellite Service (FSS) frequency bands. Those technologies which need to be further developed before such a system can be implemented, were identified. To determine this feasibility, dozens of potential applications were examined for their near-term viability, and the subscriber base of three promising applications were estimated. The system requirements, terminal design, and satellite architecture were all investigated to determine whether a 30/20 GHz FSS system is technically and economically feasible by mid-1990s. It was concluded that such a system is feasible, although maturation of some technologies is needed. This system would likely consist of one or two multibeam satellites serving hub/spoke networks of simple user terminals and more complex, mutli-channel terminals of the service providers. Rain compensation would be accomplished non-adaptively through the use of coding, nonuniform satellite TWT power that is a function of a beam's anticipated downlink fading, and signal regeneration of traffic to the wettest climate regions. It was estimated that a potential market of almost two million users could exist in in the mid-1990s time frame for home banking and financial services via Ka-band satellites.

Source record↗

Probabilistic Data Association for Orbital-Element Estimation Using Multistage Expectation–Maximization

Tracking space objects is important for managing space traffic and predicting collisions, but is difficult in part due to data association and orbit model uncertainty. Expectation–maximization (EM) is a commonly used tracking method that has not been widely considered for tracking space objects. The technique consists of iteratively computing data association probabilities with a set of current element estimates, and updating estimates of the elements by solving a nonlinear weighted least-squares regression problem where the weights are the data association probabilities. In this paper, we demonstrate the use of EM for probabilistic data association and orbital-element estimation by applying the technique to simulated data from two angles-only tracking scenarios. In both scenarios, EM provides correct data associations and accurate maximum likelihood estimates of orbital elements. One scenario considers tracking a single object in clutter and quantifies the improvement of the orbital-element estimates and data associations as the detection probability increases. However, standard application of EM requires knowing the number of objects or may fail when a large number of objects are present. To address these issues, this paper employs a multistage version of EM that is applicable when there are a large and possibly unknown number of objects.

97 MATHEMATICS AND COMPUTING↗

Simulation Evaluation of a Large-Scale Implementation of Virtual-Phase Link-Based Model Predictive Control

Traffic congestion is a serious problem in the US, and traffic signal control is one of the effective solutions to congestion. Previous research on model predictive control (MPC)-based traffic signal control showed substantial benefits over conventional methods. This study focused on implementing MPC over a large-scale network with complex intersections and the impact of cycle length, network size, and imperfect state estimation on performances. This study implemented a virtual phase link (VPL)-based model predictive control method which used the number of vehicles in each VPL as input state variables and was suitable for National Electrical Manufacturing Association (NEMA) ring-barrier control. To test the impact of network size, the performance of distributed MPC (36 intersections in the network are divided into five subnetworks) was compared with that of MPC over the full network for a set of cycle lengths. To test the impact of imperfect state estimation, we synthetically infused estimation error and developed two scenarios, MPC-error and MPC-error narrow, which had higher and lower estimation errors, respectively. The performance of these MPC methods was compared with that of the existing time-of-day (TOD) method and an offline method that used Webster's method for split and MULTIBAND for cycle length and offset optimization. Trajectory and linkwise signal performance measures were collected from the simulation to evaluate performance. The distributed MPC method with perfect state estimation had the lowest delay and highest energy efficiency of all the methods. The performance of MPC decreased as the prediction inaccuracy increased. MPC-error had 7% and 11% more delay than MPC-error narrow in the morning and evening peaks, respectively. Overall, simulation results suggest that even with imperfect state estimation, MPC methods will outperform offline methods significantly.

large-scale simulation↗

An investigation of TNAV equipped aircraft in a simulated en route metering environment

This document presents the results of an effort to estimate how often a TNAV (Time Navigation) equipped aircraft could be given a TNAV clearance in the En Route Metering (ERM) system as a function of the percentage of arriving traffic which is TNAV equipped. A fast-time simulation of Denver Stapleton international arrival traffic in the Denver Air Route Traffic Control Center route structure, including en route metering operations, was used to develop data on estimated conflicts, clearance communications and fuel usage for traffic mixes of 25, 50, 75 and 100% TNAV equipped. This study supports an overall effort by NASA to assess the benefits and required technology for using TNAV-equipped aircraft in the ERM environment.

Groce, J. L.↗

Recommendations for an Applicant to Calculate Activity Data for Greenhouse Gases Estimates

In 2009, the U.S. Nuclear Regulatory Commission (NRC) directed the NRC staff to address climate change issues and consider the impacts of the emissions of carbon dioxide (CO 2 ) and other greenhouse gases (GHGs) in its environmental reviews for major licensing actions (NRC 2009b). To implement this direction from the Commission, the staff issued guidance in 2011 and updated guidance in 2014 in Attachment 1 to Interim Staff Guidance COL/ESP-ISG-026 (NRC 2011; NRC 2014). This guidance provides a simpler method than the method described in RG 4.2 Rev. 3, that an applicant can use to meet the plant parameter envelope (PPE) value from the Generic Environmental Impact Statement for Licensing of New Nuclear Reactors (NR GEIS). NRC staff estimated the 97-year lifecycle GHG emissions from a reference 1000 megawatt electrical (MWe) light-water reactor (LWR) for various activities associated with construction, operation (including uranium fuel cycle), and decommissioning of nuclear power plants and presented the results in Appendix H of the NR GEIS. Appendix H of the NR GEIS includes estimates of direct emissions from construction equipment and emergency diesel engines in a nuclear facility and indirect emissions from workforce vehicular traffic, fuel transportation and the uranium fuel cycle. The NR GEIS Section 3.3 extended the estimates in Appendix H for the installation of two 1000 MWe nuclear reactors on the same site. Scaling factors were used to extrapolate the GHG emissions of a reference 1000 MWe reactor to a two-unit nuclear reactor plant (each reactor unit generating 1000 MWe). GHG emission estimates for building, operation, decommissioning and safe storage (SAFSTOR) for a two-unit nuclear reactor plant would be based on the plant’s physical size, and therefore estimates for these source categories were assumed to be twice the value of the reference 1000 MWe reactor. However, GHG emissions from the fuel cycle (including fuel transportation) were scaled upward by a factor of 3, based on plant efficiencies greater than the 80 percent assumption in Appendix H. Table 1 below shows the PPE emissions for two 1000 MWe nuclear reactors as provided in NR GEIS. The total GHG emissions for two 1000 MWe reactors were calculated as 2,534,000 metric tons (MT) of CO 2 equivalent (CO 2 (e)) based on a 97 year GHG life cycle period. The GHG emissions lifetime of 97 years for a reference nuclear reactor includes a 7-year building phase, 40 years of operation, 10 years of active decommissioning, and 40 years of SAFSTOR operations (NRC 2024). Construction equipment and vehicular traffic from workers commute would contribute to the GHG emissions during a 7-year building phase. Uranium fuel cycle, vehicular traffic, fuel and waste transportation, and testing of standby diesel generators would contribute to GHG emissions during the 40-year operations phase. While NRC’s regulations allow up to 60 years of reactor facility decommissioning, Appendix H estimated that most of the GHGs would occur over an estimated 10-year period during which to the licensee would engage in significant demolition and earth-moving activities, as discussed in Supplement 1 to NUREG-0586 (NRC 2002). Vehicular traffic by the workforce during a 40-year SAFSTOR period would additionally contribute GHG emissions. The carbon footprint for a 40-year SAFSTOR period was separately analyzed from the decommissioning activities as provided in Table YYYY-2 of the staff issued guidance in 2011 (NRC 2011).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cost of a potential hydrogen-refueling network for heavy-duty vehicles with long-haul application in Germany 2050

Long-distance road-freight transport emits a large share of Germany's greenhouse gas (GHG) emissions. A potential solution for reducing GHG emissions in this sector is to use green hydrogen in fuel cell electric vehicles (FC-HDV) and establish an accompanying hydrogen refueling station (HRS) network. In this paper, we apply an existing refueling network design model to a HDV-HRS network for Germany until 2050 based on German traffic data for heavy-duty trucks and estimate its costs. Comparing different fuel supply scenarios (pipeline vs. on-site), the on-site scenario results show a network consisting of 137 stations at a cost of 8.38 billion € per year in 2050 (0.40 € per vehicle km), while the centralized scenario with the same amount of stations shows a cheaper cost with 7.25 billion euros per year (0.35 € per vehicle km). Finally, the hydrogen cost (LCOH) varies from 5.59 €/kg (pipeline) to 6.47 €/kg (on-site) in 2050.

08 HYDROGEN↗