Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test readiness review”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Seeing the Future of Spaceflight: Applications of Extended Reality (XR) Technologies

INTRODUCTION Advances in Earth Independent Medical Operations (EIMO) focused capabilities will be crucial for completing successful beyond low-earth-orbit (LEO) missions, where traditional Earth-based medical support and near real-time communication are limited, intermittent, or absent. In such restricted or limited communication environments, emerging extended reality (ER or XR) technologies may play a vital role in ensuring crew health and safety. Virtual Reality (VR), Augmented Reality (AR), and Mixed Reality (MR) are common terms used to describe technologies that "generate or modify" while “extended reality” (ER or XR) is often used as an umbrella term for these technologies. This review explores how such cutting-edge “extended reality” information delivery systems are currently applied across various disciplines within NASA. The review focuses on their capabilities, limitations, and prospective future applications as they pertain to Earth-Independent Medical Operations and its components of pre-mission planning, medical decision making, resource management, and task load management. METHODS/DESIGN The review began with a literature search to identify relevant disciplines (e.g., medical education, austere environments) where XR technologies have been studied to highlight areas where evidence is lacking. Previous and current NASA XR projects and applications, as well as commercial partnerships, such as those with Small Business Innovation Research (SBIR), were identified. Discussions with technical experts involved in the design, development, and application of these technologies allowed for classification based on their respective spaceflight applications. RESULTS AND CONCLUSION This review highlights current and emerging XR technologies that have been developed, tested, and implemented both terrestrially and in spaceflight by NASA, its international partners, the U.S. Armed Forces, and various relevant commercial entities. While these novel information delivery systems vary in their respective technology readiness levels (TRL), they have the potential to be implemented on Earth, in LEO, and during deep space exploration. These systems have the potential for impacting and optimizing many aspects of EIMO.

Yevgeniy Zhivotovskiy↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Needs Assessment Framework for Storage Complexes Contributed to EDX (Work Product 2.1.c)

On September 30, 2021, a Needs Assessment Framework for Storage Complexes was completed for the SECARB-USA region by the Southern States Energy Board (SSEB) and The University of Texas at Austin Bureau of Economic Geology (UT-BEG). The Needs Assessment Framework for Storage Complexes documented a region-wide assessment to identify data needed to advance storage projects at sites of relevance to industrial, academic, and government stakeholders. The region-wide assessment addresses the needs of CO2 source, storage, and utilization stakeholders, finance and insurance institutions, state and local government agencies, local stakeholders at prospective storage complexes, environmental non-governmental organizations (NGOs), and others as identified by the Partners. This assessment was tested against various potential storage sites and modified to include site-specific issues, such as surface or pore space rights. The framework was provided to stakeholders for review and then used in other tasks, such as the ML initiative (Subtask 3.4) and storage complex readiness evaluation (Subtask 4.2). In accordance with the SOPO, this assessment satisfied completion of Work Product 2.1.b. The OSTI ID is 3015803, and the DOI link is https://doi.org/10.2172/3015803. On February 28, 2022, SSEB uploaded Work Product 2.1.b to NETL’s Energy Data eXchange (EDX). As such, Work Product 2.1.c is completed as documented below.

42 ENGINEERING↗

Qualification of a Hybrid Propulsion System for the Mars Ascent Vehicle

Technology for a hybrid based propulsion system is being developed to support a potential Mars Sample Return campaign. A Mars Ascent Vehicle (MAV) concept for launching samples off of Mars, and delivering them to orbit for further transport to Earth may utilize hybrid propulsion due to the predicted favorable low temperature characteristics and high performance of this option. However, the hybrid option is still undergoing technology development to demonstrate these capabilities. Once development of a capable hybrid propulsion system is proven, further work will be required. This will include environmental testing relative to the mission, and integration with the vehicle reaction control systems and payload. Qualification of such a system will be a significant effort. It will require specialized procurements for the propellants and environments involved, and further testing of the more specialized designs. This paper details an estimate of the tasks required to complete development efforts from Technical Readiness Level 5 (TRL5) through qualification. A success based program was formulated to reach the required performance metrics sufficient for a standard Preliminary Design Review (PDR). Using task level inputs from team members cost and schedule were conceived for continued progress to Critical Design Review (CDR), then through Qualification.

Prince, Andrew↗

Main propulsion system test requirements for the two-engine Shuttle-C

The Shuttle-C is an unmanned cargo carrying derivative of the space shuttle with optional two or three space shuttle main engines (SSME's), whereas the shuttle has three SSME's. Design and operational differences between the Shuttle-C and shuttle were assessed to determine requirements for additional main propulsion system (MPS) verification testing. Also, reviews were made of the shuttle main propulsion test program objectives and test results and shuttle flight experience. It was concluded that, if significant MPS modifications are not made beyond those currently planned, then main propulsion system verification can be concluded with an on-pad flight readiness firing.

Lynn, E. E.↗

Galileo and Ulysses missions safety analysis and launch readiness status

The Galileo spacecraft, which will release probes to explore the Jupiter system, was launched in October, 1989 as the payload on STS-34, and the Ulysses spacecraft, which will fly by Jupiter en route to a polar orbit of the sun, is presently entering system-test activity in preparation for an October, 1990 launch. This paper reviews the Galileo and Ulysses mission objectives and design approaches and presents details of the missions' safety analysis. The processes used to develop the safety analysis are described and the results of safety tests are presented.

Cork, M. Joseph↗

Technological Readiness of Ceramic Matrix Composites: A Review

This review intends to provide a snapshot of the state of industry of ceramic matrix composites (CMC). It is therefore organized in terms of design needs, composite properties, system capabilities, and technological availability. This publication will cover CMCs in use and development, with technological readiness levels (TRL) from laboratory testing of coupons to flight proven hardware.

Neergaard, Lynn↗

Interval Management: Development and Implementation of an Airborne Spacing Concept

Interval Management is a suite of ADS-B-enabled applications that allows the air traffic controller to instruct a flight crew to achieve and maintain a desired spacing relative to another aircraft. The flight crew, assisted by automation, manages the speed of their aircraft to deliver more precise inter-aircraft spacing than is otherwise possible, which increases traffic throughput at the same or higher levels of safety. Interval Management has evolved from a long history of research and is now seen as a core NextGen capability. With avionics standards recently published, completion of an Investment Analysis Readiness Decision by the FAA, and multiple flight tests planned, Interval Management will soon be part of everyday use in the National Airspace System. Second generation, Advanced Interval Management capabilities are being planned to provide a wider range of operations and improved performance and benefits. This paper briefly reviews the evolution of Interval Management and describes current development and deployment plans. It also reviews concepts under development as the next generation of applications.

Barmore, Bryan E.↗

High Speed Interferometry for James Webb Space Telescope Testing

High speed interferometry (HSI) was one of the enabling technologies to the successful development and testing of the James Webb Space Telescope (JWST) optical system that consists of a 6.5 meter diameter, segmented, lightweight primary mirror and lightweight carbon fiber composite structure. This paper reviews the interferometry that was used first to demonstrate that the lightweight mirror and lightweight composite structure technologies were ready for JWST and later to verify performance of the fully assembled primary mirror and the telescope at cryogenic temperature. The tools and techniques developed for JWST are being advanced to benefit future missions that require stable mirrors, precision metering structures, active controls and diagnostic metrology.

B Saif↗

Strength Analysis Report Flight Readiness Review (FRR) for SXI Stepper Motor/Encoder

The strength analysis report for FRR shall include only revisions to update the strength analysis reports for the flight design configuration. Since there have been no revisions to the design configuration since the PDR and the CDR this report shall consist of re-submitting the analysis previously performed. In addition the motors have been subjected to Sine vibration, Random vibration, and shock per the SM specification. Both motor/encoders have passed all three tests. There was no evidence of damage to the motor/encoder and the motor/encoder performed as required by the Acceptance test procedure. No degradation was seen between the before and after performance tests. The testing verified the analysis that there were adequate safety margins with regard to structural integrity. Separate reports are available from the test facility and are apart of the FRR submittal.

Source record↗

Solid state remote power controllers for 120 VDC power systems

Remote Power controllers (RPCs) are devices that combine in one unit the capability to perform all the needed functions of load switching and provide total system protection of equipment and wires. The unique developments of solid-state RPCs for 120 Vdc power distribution systems are reviewed. The discussion covers design guidelines, power switch design concepts, and performance effectiveness. An NPN transistor is used as the the basic switch element. Since the ultimate goal of the 120 Vdc RPC program is to demonstrate technology readiness, the final phase is directed to the design, fabrication, and testing of multi-chip hybrid prototypes in hermetically sealed packages. RPCs have potential application in spacecraft and aircraft electrical systems, in transportation systems, and various industrial applications. The upper voltage limitation on the RPC design is related to the capability and availability of suitable high-voltage power transistors. The merits of solid-state RPCs are noted.

Sundberg, G. R.↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture to where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publicatoin5, in 2006 development was started to baseline Extra- Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

Van Cise, E. A.↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publication, in 2006 development was started to baseline Extra-Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

Van Cise, E. A.↗

Re-Engineering the Mission Operations System (MOS) for the Prime and Extended Mission

One of the most challenging tasks in a space science mission is designing the Mission Operations System (MOS). Whereas the focus of the project is getting the spacecraft built and tested for launch, the mission operations engineers must build a system to carry out the science objectives. The completed MOS design is then formally assessed in the many reviews. Once a mission has completed the reviews, the Mission Operation System (MOS) design has been validated to the Functional Requirements and is ready for operations. The design was built based on heritage processes, new technology, and lessons learned from past experience. Furthermore, our operational concepts must be properly mapped to the mission design and science objectives. However, during the course of implementing the science objective in the operations phase after launch, the MOS experiences an evolutional change to adapt for actual performance characteristics. This drives the re-engineering of the MOS, because the MOS includes the flight and ground segments. Using the Spitzer mission as an example we demonstrate how the MOS design evolved for both the prime and extended mission to enhance the overall efficiency for science return. In our re-engineering process, we ensured that no requirements were violated or mission objectives compromised. In most cases, optimized performance across the MOS, including gains in science return as well as savings in the budget profile was achieved. Finally, we suggest a need to better categorize the Operations Phase (Phase E) in the NASA Life-Cycle Phases of Formulation and Implementation

Extended Mission↗

Improving tide-estuary representation in MPAS-Ocean (Final Report)

The overarching goal of this research is to produce a skill-assessed tide-estuary representation, including BGC (biogeochemistry) components of the ecosystem, into the MPAS-O global climate modeling system. Specifically, in the original proposal we proposed one-way nesting, into global MPAS-O, of a high-resolution model for TES (tidal and estuary systems) including the coupling of the BGC components. We have completed the proposed tasks during the past 4 years. Specifically, after extensive consultation with the MPAS-O group during the first year, we have decided to go beyond the original proposal and to two-way nest SCHISM into MPAS-O. As a result, SCHISM-CoSiNE (with CoSiNE being the BGC model) is now fully integrated into MPAS-O as a subroutine (more precisely, an analysis member) and can be invoked as MPAS-O is running with two-way exchange of information between the TES and global models (with proper spatial interpolation done on the fly). As originally proposed, we have also developed the new finite-volume (FV) model MPAS-OI (aka ELCIRC-sub) for TES. We have conducted several tests using the coupled MPAS-SCHISM- CoSiNE model and also MPAS-OI for Columbia River, San Francisco Bay and Chesapeake Bay. Four journal publications have been produced so far as the result of the project and 1 is under review (cf. Publication section). With these achievements, we will be ready to conduct fully coupled simulations of TES and global ocean anywhere, as soon as some missing capabilities in MPAS-O (e.g. tides, improved ability to handle the boundary conditions, and streamlining of the global BGC model) are worked out. The significance of the outcome of this project cannot be overstated. It marks the first time, as far as we know, that a global climate model is tightly coupled to a bona fide nearshore and terrestrial model (SCHISM system); in fact SCHISM is the first bona fide compound flooding model that seamlessly covers the coastal ocean, estuaries, rivers and watersheds (Ye et al. 2020; Zhang et al. 2020). The coupled model will reduce the errors and uncertainties of the MPAS-O global climate model system. It also complements and extends on-going E3SM project, as the latter seeks in the long-term to include components required to simulate impacts of sea-level change and storm surge on coastal regions, including wave models and focusing resolution in coastal and storm-track regions, as an important component of the Cryosphere-ocean system. Note that a spectral wave model (the unstructured-grid version of Wave Watch III, aka Wind Wave Model) is already incorporated inside the SCHISM system and is therefore directly accessible in the coupled system.

58 GEOSCIENCES↗

Space Shuttle Orbiter - Countdown

The status of Orbiter launch planning is reviewed, with consideration given to major structure elements, subsystem and component development, readiness for launch, and follow-on Orbiters. It is noted that timelines in the completion of each increment of development of the first Orbital Flight Vehicle become increasingly crucial as the scheduled launch date approaches. Concurrent with the testing and finalization of this vehicle's software and hardware construction are the preliminary developmental stages of future Shuttle Orbiters.

Cohen, A.↗

Magnetic suspension systems for space applications

An overview of techniques is presented used in the described magnetic suspension systems. Also a review is presented of the systems already developed, which demonstrate the usefulness, applicability, and flight readiness of magnetic suspension to a broad range of payloads and environments. The following subject areas are covered: programs overview; key concepts; magnetic suspension as an isolator and as a pointer; pointing and isolation systems; magnetic actuator control techniques; and test data.

Havenhill, Douglas G.↗

STS-1: Columbia Briefings

A video presentation on an update of the STS-1 Columbia Shuttle is shown. Hugh Harris is the moderator. He introduces Don Phillips, Chief STS Test OPS, who presents the status of the vehicle. Terry William, Chief of Mechanical Systems, discusses the debonding of the panels. A question and answer period from the news media is shown. The various topics of discussion from the news media include: 1) Repair of thermal tiles; 2) Launch dates; and 3) Landing and launch sites and 4) Low pressure/high pressure tanking tests. An audio presentation is given of questions from NASA Marshall Space Flight Center and NASA Washington. On March 12, 1981, another STS-1 Columbia update is shown. Bob Schick, Shuttle Test Director, and Bob Sieck, Flight Project Engineer answers questions about the actual repair time of the panels and a very detailed description of the three areas of debonding is presented. A brief launch date statement from Dr. Allen Lovelace, Acting NASA Administrator is given and John Lardley, Shuttle Associate Director, discusses the flight readiness review.

Source record↗

Toroidal Variable-Line-Space Gratings: The Good, the Bad and The Ugly

Toroidal variable-line-space (VLS) gratings are an important factor in the design of an efficient VUV solar telescope that will measure the CIV (155nm) and MgII (280nm) emissions lines in the Sun's transition region. In 1983 Kita and Harada described spherical VLS gratings but the technology to commercially fabricate these devices is a recent development, especially for toroidal surfaces. This paper will describe why this technology is important in the development of the Solar Ultraviolet Magnetograph Investigation (SUMI) sounding rocket program (the good), the delays due to the conversion between the TVLS grating design and the optical fabrication (the bad), and finally the optical testing, alignment and tolerancing of the gratings (the ugly). The Solar Ultraviolet Magnetograph Investigation, SUMI, has been reported in several papers since this program began in 2000. The emphasis of this paper is to describe SUMI's Toroidal Variable-Line-Space (TVLS) gratings. These gratings help SUMI meet its scientific goals which require both high spectral resolution and high optical efficiency for magnetic field measurements in the vacuum ultraviolet wavelength band of the solar spectrum (the good). Unfortunately, the technology readiness level of these gratings has made their implementation difficult, especially for a sounding rocket payload (the bad). Therefore, this paper emphasizes the problems and solutions that were developed to use these gratings in SUMI (the ugly). Section 2 contains a short review of the scientific goals of SUMI and why this mission is important in the understanding of the 3D structure of the magnetic field on the Sun. The flight hardware that makes up the SUMI payload is described in Section 3 with emphasis on those components that affect the TVLS gratings. Section 4 emphasizes the alignment, testing and optical modeling that were developed to optimize the performance of these gratings.

West, Edward A.↗