Hydraulic Testing of the Lost Lake Aquifer Near Recovery Well RWM019

An aquifer pumping test was conducted on the Lost Lake Aquifer Zone (LLAZ) at the recently installed recovery well RWM019 in accordance with the approved test plan (Dixon, 2020). The objective of the testing was to determine baseline well performance parameters and aquifer hydraulic conductivity. This testing consisted of a step-drawdown test to determine well performance properties, a constant pumping rate aquifer test to determine aquifer hydraulic properties, and a post-test aquifer recovery monitoring period also used to estimate aquifer hydraulic properties. Well performance parameters determined included specific capacity, well efficiency, and head loss coefficients. The specific capacity of RWM019 was determined to be approximately 2.6 gpm/ft of drawdown based on the final step of the step-drawdown test. Well efficiency was inversely related to pumping rate and decreased from 87% to 81% over a pumping range of approximately 49 to 79 gpm. The aquifer head loss coefficient was determined to be 2.3 ft/ft 3 /min and the well loss coefficient was determined to be 0.05 min 2 /ft 5 .

42 ENGINEERING↗

Hydraulic Testing of the Lost Lake Aquifer Near Recovery Wells RWM 6 and RWM 7

Hydrologic tests were conducted on the Lost Lake Aquifer Zone (LLAZ) at recovery wells RWM 6 and RWM 7 in accordance with the approved test plan (Dixon, 2023). The objective of the testing was to determine well performance parameters of RWM 6 and aquifer hydraulic properties near RWM 6 and RWM 7. Tests at RWM 6 consisted of a step-drawdown test to determine well performance parameters, a constant rate pump test to determine aquifer hydraulic properties, and an aquifer recovery test also used to determine aquifer hydraulic properties. Well performance parameters determined included specific capacity, well efficiency, and head loss coefficients. Prior to testing at RWM 6, a constant rate pump test was conducted at RWM 7. Data from this testing was used to determine aquifer hydraulic properties near RWM 7.

42 ENGINEERING↗

Hydraulic Testing of the Lost Lake Aquifer Near Recovery Well RWM001R

An aquifer pumping test was conducted on the Lost Lake Aquifer Zone (LLAZ) at the recently installed recovery well RWM001R in accordance with the approved test plan (Dixon, 2024). The objective of the testing was to determine baseline well performance parameters and aquifer hydraulic conductivity. This testing consisted of two step-drawdown tests to determine well performance properties and two constant pumping rate aquifer tests with recovery periods to determine aquifer hydraulic properties. Well performance parameters determined included specific capacity, well efficiency, and head loss coefficients. The results of the step-drawdown testing are presented in Tables ES1 and ES2 whereas the results of the constant pumping rate testing are presented in Table ES3. The average specific capacity of RWM001R operating at pump capacity (~54 gpm) was 2.2 gpm/ft using data from the final step of both tests. The average well efficiency determined from both step-drawdown tests was 56% using data from the final step of both tests. For both step-drawdown tests, well efficiency was inversely related to the pumping rate with the average efficiency decreasing from approximately 79% to 56%. Aquifer head loss coefficients from both tests were comparable (Table ES2).

54 ENVIRONMENTAL SCIENCES↗

Industry Assessment and Initial Adaptive Protection System Design

This report presents the success merits, logic design details, and test plans for adaptive protection schemes for microgrids, secondary distribution networks, and radial distribution feeders. Success merits are presented in terms of challenges and issues which should be mitigated. The challenges and issues were identified during site-specific simulations and analysis presented in a prior report. The adaptive protection logic designs are presented in a vendor-neutral manner to make them readily adaptable to site--specific protection relays and controllers which support custom logic design. Vendor-specific implementations of the logic for the adaptive protection laboratory tests are also presented. The final section of the report presents details of the testing methodology, plans, and documentation for each of the three adaptive protection schemes.

14 SOLAR ENERGY↗

Preliminary Plan to Inform Testing of a Heat Exchanger Test Article

This report presents a preliminary plan to guide the qualification testing of advanced heat exchanger (HX) components for nuclear-to-industrial heat transfer applications. The objective is to establish a defensible, physics-based methodology that integrates computational modeling, targeted experimentation, and in-service inspection considerations to demonstrate component performance and reliability under representative reactor conditions. The analysis identifies Sodium-cooled Fast Reactor (SFR) and High-Temperature Gas-cooled Reactor (HTGR) systems as reference configurations in terms of temperature, pressure, and chemical environment. Within these operating envelopes, dominant degradation mechanisms— including creep–fatigue interaction, flow-induced vibration, corrosion, and diffusion-bond deterioration—were evaluated to define test requirements. A comprehensive computationalexperimental framework is proposed to support life prediction and qualification activities. The framework couples high-fidelity structural-mechanics, thermal-hydraulic, and fluid-structure interaction models with accelerated degradation testing to produce a traceable linkage between microstructural evolution, mechanical performance, and remaining useful life (RUL). The approach adheres to established Verification, Validation, and Uncertainty Quantification (VVUQ) standards (ASME V&V 10/20; NUREG-2152) and incorporates a digital-twin architecture for continuous model refinement through data assimilation. The plan further outlines testing methodologies, including pre-test analyses, test-loop design parameters, and sensor placement strategies that maximize information yield while maintaining mechanistic fidelity. Complementary sections describe in-service inspection (ISI), on-line monitoring (OLM), and structural-health-monitoring (SHM) techniques applicable to compact HX geometries typical of advanced reactors. Collectively, these activities establish the technical foundation for demonstrating 40-60-year equivalent service life of advanced heat exchangers in support of the U.S. Department of Energy’s Advanced Reactor and Integrated Energy Systems programs. The forthcoming phase will execute the defined pre-test analyses, initiate hardware fabrication, and implement the integrated testing campaign to validate the proposed qualification methodology.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

EVSE Characterization: V2G EVSE Comparison

As part of the U.S. Department of Energy EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization is conducted over a wide range of direct current (DC) current and DC voltage operation for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2024 study conducted on electric vehicle supply equipment (EVSE) characterization by the Idaho National Laboratory (INL) include two bi-directional vehicle-to-grid (V2G) capable EVSEs. These EVSE are referred to as V2G-EVSE9 and V2G-EVSE10. Laboratory testing is conducted at nominal test conditions to characterize the power transfer capabilities, efficiency, power factor, and other power quality metrics of the two DC EVSEs capable of V2G bi-directional power transfer. Results from testing show the performance is consistent for V2G-EVSE9 and V2G-EVSE10 when comparing charging to discharging performance, except for V2G-EVSE10 for power transfer when operating above 70% of the rated DC current. V2G-EVSE10 efficiency is >98% while charging and <91% while discharging at the same operating conditions, near maximum-rated current, at 300VDC. In contrast, V2G-EVSE9 results are consistent for charging and discharging. This EVSE is nearly 96% efficient while charging or discharging when operating over 50% of rated AC power. V2G EVSE performance is also characterized during off-nominal AC grid conditions involving AC voltage deviation (426 VAC to 518 VAC), AC frequency deviation of +2% (58.8 Hz to 61.2 Hz), and AC voltage harmonics injection. Many test conditions have little-to-no impact on performance characteristics of the two EVSEs; however, there are a few notable findings with significant power transfer capability impacts. AC voltage harmonics injection resulted in negative impacts on power quality attributes for both EVSEs, but with no impact on power transfer capability. Off-nominal AC voltage and frequency conditions resulted in unstable or lack of power transfer capability for both EVSEs. V2G-EVSE9 is unable to transfer power when AC voltage is >300V L-N. V2G-EVSE10 is unable to transfer power when AC frequency deviation exceeds +0.8%. V2G energy management system transient response and latency are quantified during laboratory testing. V2G-EVSE9 and V2G-EVSE10 utilize cloud-based V2G energy management systems that command the power transfer level between the EVSE and EV. The latency and response characteristics of the entire systems (web-based user interface, V2G energy management system, cellular communications, and EVSE response) are quantified through laboratory testing for V2G-EVSE9 and V2G-EVSE10. V2G-EVSE9 latency ranges from 0.8 to 1.8 seconds, whereas V2G-EVSE10 latency ranges from 3.4 to 8.8 seconds. The ramp rate to a change in power transfer request also differs between the two EVSEs. V2G-EVSE10 ramp rate ranges from 50% to -250% of rated AC power per second, whereas V2G-EVSE9 rate ranges from 95% to -95% of rated AC power per second. At the highest rate of change in power transfer, V2G-EVSE10 can change from full charge power to full discharge power in less than one second. The V2G EVSE characterization presented in this report provides valuable insights and results for use by numerous entities. This includes modeling and simulation organizations, decision makers, fleet planning, industry stakeholders, and many others involved with the development and deployment of electrified transportation technologies. Additional high-power DC chargers, bidirectional chargers, and inductive power transfer EVSE characterization results are anticipated from additional EVSE brands and models, which will be detailed in future publications in support of the U.S. Department of Energy EVs@Scale consortium Next-Gen Profiles project.

25 ENERGY STORAGE↗

Predeployment progress of the Canister Deposition Field Demonstration

This report updates the high-level test plan for evaluating surface deposition on three commercial 32PTH2 spent nuclear fuel (SNF) canisters inside NUTECH Horizontal Modular Storage (NUHOMS) Advanced Horizontal Storage Modules (AHSMs) from Orano (formerly Transnuclear Inc.) and provides a summary of the surface sampling activities that have been conducted to date. The details contained in this report represent the best designs and approaches explored for testing as of this publication. Given the rapidly developing nature of this test program, some of these plans may change to accommodate new objectives or requirements. One goal of this testing is to collect defensible and detailed dust deposition measurements from the surface of dry storage canisters in a marine coastal environment to guide chloride-induced stress corrosion cracking (CISCC) research. Another goal is to provide data for the validation of computational fluid dynamics (CFD) based deposition modeling. To facilitate surface sampling, the otherwise highly prototypic dry storage systems will not contain SNF but rather will be electrically heated to mimic the decay heat and thermal hydraulic environment. Test and heater design is supported by detailed CFD modeling. Instrumentation throughout the canister, storage module, and environment will provide extensive information about the thermal-hydraulic behavior of horizontal dry cask storage systems. Manual sampling over a comprehensive portion of the canister surface at regular time intervals will offer detailed quantification and composition of the deposited particulates from a realistic storage environment. Discussions of a potential host site for the Canister Deposition Field Demonstration (CDFD) are ongoing. Until a host site is chosen, testing of key CDFD hardware components including the heater assemblies, power skid, and remote data acquisition system will continue. Functional testing of the finalized heater assemblies and test apparatus started this fiscal year. These initial heater tests have shown the assemblies are performing within design specifications. Staged surface sampling of a mockup of a canister outside the AHSM on a transfer skid was also performed. Refinements to the sampling procedures and techniques were captured from observation of these activities and lessons-learned debriefs. These updated sampling procedures and techniques are planned to be tested again in the field using the mockup in order to assure personnel are using the most accurate and repeatable methods possible prior to deployment for actual CDFD testing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

First ITER CS module test results

The ITER Central Solenoid (CS) is under fabrication by the US ITER organization and its subcontractors. US ITER will supply seven modules to ITER IO, six of which will be assembled in a stack that forms the ITER Central Solenoid, with one as a spare. The first module fabrication has been completed by General Atomics (GA) at their facility and has begun testing including high voltage testing, Paschen testing in the vacuum and then testing at 4.5 K and up to 40 kA in order to demonstrate compliance of the coil to ITER requirements. In the paper we present the Test Plan and results of the CS Module performance tests, especially at 40 kA current. Herein, AC losses, joint resistances and hydraulic characteristics of the coil are all measured. Displacements of the coil height and hoop strain of the CS Module are also measured to verify structural and mechanical characteristics of the coil along with cooldown shrinkage of the coil. This information is used for verification of the stack behavior of CS in ITER operation. The test results and preliminary analyses results are presented, compared to expectations, and discussed. All measured parameters suggest that the CS module will perform well in ITER machine.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

EVSE Characterization, A Next-Gen Profiles Project Report

As part of the U.S. DOE EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization was conducted over a wide range of DC output current and DC voltage charging for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2023 study conducted on electric vehicle supply equipment (EVSE) characterization by Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) include one 350 kW capable EVSE using a liquid-cooled combined charging system-1 (CCS-1, North American version) cable and connector and an ORNL-developed 100-kW polyphase wireless charger. Characterization results during nominal operation show the AC-to-DC power transfer efficiency for the 350kW conductive EVSE is 95.1% peak and is >92% when the AC power is at least 50 kW. The power quality of the 350 kW conductive EVSE is also measured during nominal conditions. The power factor is >0.91 for power transfer above 50 kW AC input during nominal conditions with a maximum power factor of 0.975. The AC current harmonics produced by the EVSE as measured at the AC input connection to the EVSE is <25% harmonics for power transfer greater than 50 kW and <10% harmonics for power transfer greater than 180 kW.

25 ENERGY STORAGE↗

MARVEL 90% Final Design Report

This document provides documentation of the Microreactor Applications Research Validation and Evaluation Project’s (MARVEL) 90% Final Design, as required by U.S. Department of Energy (DOE) Standard-1189, “Integration of Safety into the Design Process." Per DOE-STD-1189-2016, the 90% Final Design documentation focuses on design completion, at a level capable of supporting procurement, construction, testing, and operation. At this phase, the design organization finalizes the hazards and accident analyses, Fire Hazard Analysis (FHA), security vulnerability assessments, and other supporting analyses for design completion. The objective of this report is to provide a high-level summary of the design thus far and provide references including, but not limited to, the following design deliverables: • Complete final drawings, specifications and commercial grade dedications that may be released for bid and/or construction. • Clearly defined testing plans for the safety and functionality of all subsystems. • Quality Assurance Program for Design, Testing and Procurement. • Software Quality Assurance Plan. • Code of Record (COR), applicable design requirements including codes and standards. • Final design that meets all the requirements stipulated in the COR. • Final design review, consisting of final validation of comment resolution from previous reviews, and a review of any additional developments since the last review. • Updated Safety Design Strategy. • Hazard Analysis. • Fire Hazard Analysis. • Accident analysis. • Security vulnerability assessment. • Current and detailed cost estimate. • Current construction schedule, and • Risk & Opportunities Assessment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SCO#1197 Addendum #4 OSR Characterization Database (Test Report)

A test plan was developed and approved in June of 2022. Testing was successfully performed to verify the functions of Version 2.0 of the OSR Characterization database. Checks verified that data remains consistent to tests previously performed using Microsoft Access® 2003, 2010 and 2016.

97 MATHEMATICS AND COMPUTING↗

Data From Experiments on Bubbling Fluidization of Zeolite in a Rectangular Bubbling Fluidized Bed

Fluidization experiments were conducted in a lab-scale rectangular bubbling fluidized bed with the objective of generating a high-quality dataset for model validation and artificial intelligence/machine learning (AI/ML) training. Zeolite was chosen as the bed material, and the fluidizing medium was air as supplied by a compressor. Three different flow rates at the inlet were chosen such that the particles were fluidized but not elutriated from the system. The test matrix involved randomization and replicates to provide uncertainty estimates as well as four different batches of zeolite as the bed material. The quantities of interest obtained from this study were statistics of differential pressures, interface heights, and particle velocities. Considering all the components of the elaborate test plan, the results obtained were consistent and reproducible. Characterization tests were performed to estimate particle properties including size, density, coefficient of friction, coefficient of restitution, and minimum fluidization velocity. In addition, the angle of repose from granular discharge experiments has been reported to account for rolling friction, though its effect on the overall process is expected to be negligible.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Melter Tests to Define LAW Halide Concentrations, Phase 2

The present work represents the second of two phases to address the formation of secondary sulfate phases while processing high waste loading LAW formulations with elevated halide, chromium, and phosphate feed concentrations over a wide range of LAW waste types, including those with high potassium concentrations. The Test Plan for the present work outlines a series of tests designed to assess the formation of secondary phases over a range of sulfur and halide concentrations for two LAW streams and associated glass formulations as well as crucible testing to identify additives that have the potential to suppress the formation of secondary phases for wastes with high chlorine contents. The combined results from both phases of testing and from previous tests with these LAW waste streams will be used as inputs to future work to develop concentration limits for these components in the LAW glass property composition models and to support the modification and updating of the current WTP LAW glass formulation algorithm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY24 progress report on A709 mechanical properties data development and A709 thermal aging status

The report provides the status of the creep, fatigue, and creep-fatigue testing to date conducted at Idaho National Laboratory to generate the data package. This data package evaluates the material performance from three commercial heats to support the Alloy 709 qualification in American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section III, Division 5. First procured heat was manufactured by G.O. Carlson with heat number 58776. Second and third heats were fabricated by ATI Specialty Rolled Products with heat numbers 529900 and 530843, respectively. A series of creep and cyclic specimens were fabricated from these three heats and tests were performed. A list of finished, ongoing, and planned test are presented for creep, fatigue, and creep-fatigue tests. Cyclic properties of three commercial heats are compared.

36 MATERIALS SCIENCE↗

FY24 progress report on A709 mechanical properties data development and A709 thermal aging status

The report provides the status of the creep, fatigue, and creep-fatigue testing to date conducted at Idaho National Laboratory to generate the data package. This data package evaluates the material performance from three commercial heats to support the Alloy 709 qualification in American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section III, Division 5. First procured heat was manufactured by G.O. Carlson with heat number 58776. Second and third heats were fabricated by ATI Specialty Rolled Products with heat numbers 529900 and 530843, respectively. A series of creep and cyclic specimens were fabricated from these three heats and tests were performed. A list of finished, ongoing, and planned test are presented for creep, fatigue, and creep-fatigue tests. Cyclic properties of three commercial heats are compared.

36 - MATERIALS SCIENCE↗

Gamma Spectrometry Code Rodeo for Uranium Enrichment—FY 2022 Report

In the first two quarters of FY22, data acquisition continued at ORNL and LLNL using uranium sources of known enrichments. This was an FY21 task which could not be completed in FY21 because of problems encountered with the ORNL M400 CZT in Q4 of FY21, and the subsequent repairs. The detector was received back from H3D in the first of September 2021 , and the measurements resumed . Measurements using the repaired detector were completed in Q1 of FY22. The spectra were distributed by ORNL to the analyzing labs. Analysis results were received in Q2 of FY2022. The results from the various codes were intercompared and an ANOVA analysis was performed. Random and systematic uncertainties were established for each code. The ANOVA results and discussions were included in a revised version of FY21Annual Report issued in March 2022. A paper was presented at the INMM 2022Annual Conference, with the analysis results from the various isotopic codes, and the ANOVA table with random and systematic uncertainties. The Project Work Plan (PWP) for FY22 included a task to perform field testing of the M400 CZT and the analysis codes using UF 6 cylinder measurements at the Framatome Fuel Fabrication Facility in Richland, WA. PNNL was the lead for the field testing task. PNNL drafted a Field Test Plan, and refined it based on comments received from the team. PNNL coordinated with Framatome facility, the logistics of carrying out the field testing . A collimator and shield made out of TFlex (tungsten impregnated polymer) was designed and professionally manufactured. The collimators were used in the field test measurements. The measurements at Framatome were completed on April 21, 2022. A total of 34 Type 30B cylinders were measured using three M400 detectors (PNNL, LLNL, and ORNL detectors). Measurements using M400 were taken at two locations on the side of each cylinder and from the end-on bottom location. Additionally, HPGe measurements were taken at the end-on location to establish ground truth. Cylinder wall thickness measurements were also made at all three locations. To gain a better understanding of the effect of background from surrounding cylinders, the same five cylinders measured individually in low background locations were measured again in the cylinder storage yards. Due to inclement weather, manufacturer delays, shipping delays, and equipment failure, the measurement campaign spanned twice as long compared to the original timeline. Gamma-ray spectra from M400 and HPGe detectors, along with the cylinder data and photographs were organized and shared with the collaborators for further analysis. Spectra were analyzed by the participating laboratories. FY22 PWP also consists of tasks related to plutonium source measurements, adapting the codes to analyze plutonium spectra, and inter-comparison of the results from various codes. Plutonium spectra are being acquired at LANL, ORNL, and LLNL. LANL, SNL and LLNL are in the process of modifying FRAM, GADRAS, and CZTU, respectively. The plutonium related tasks will be completed in Q2 of FY23.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

EVs@Scale NextGen Profiles: EVSE Characterization 2024

As part of the U.S. Department of Energy's EVs@Scale consortium, the Next-Generation Profiles (NextGen Profiles) project presents analysis and results from the characterization of high-power conductive and wireless charging infrastructure. High power charging equipment is capable of recharging electric vehicle traction batteries at power levels of 200KW and above. EVSE characterization was conducted over a wide range of DC output current and DC voltage charging for nominal and off-nominal test conditions. Test plans and procedures were developed and refined to define the test configurations and requirements, measurement parameters, and test procedures used throughout NextGen Profiles testing.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗