Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

MCC/shuttle test plan. Volume 1: Philosophy and guidelines

The Mission Control Center/Shuttle Test Plan is defined from development through operations to a level of detail which will support the National Aeronautics and Space Administration and contractor management in the following areas: test management, test tool development, and resource and schedule planning.

Source record↗

Test Plan for the Bearing Dust Cycle Test

The overall objective of these experiments is to test the dust-resistant seal on the high performance glove disconnect system (HPGD), to analyze the response of the bearing to lunar regolith simulant effects.

Gunderson, Katelyn↗

General test plan redundant sensor strapdown IMU evaluation program

The general test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The inertial unit contains six gyros and three orthogonal accelerometers. The software incorporates failure detection and correction logic and a land vehicle navigation program. The principal objective of the test is a demonstration of the practicability, reliability, and performance of the inertial measuring unit with failure detection and correction in operational environments.

Hartwell, T.↗

Improved Test Planning and Analysis Through the Use of Advanced Statistical Methods

The goal of this work is, through computational simulations, to provide statistically-based evidence to convince the testing community that a distributed testing approach is superior to a clustered testing approach for most situations. For clustered testing, numerous, repeated test points are acquired at a limited number of test conditions. For distributed testing, only one or a few test points are requested at many different conditions. The statistical techniques of Analysis of Variance (ANOVA), Design of Experiments (DOE) and Response Surface Methods (RSM) are applied to enable distributed test planning, data analysis and test augmentation. The D-Optimal class of DOE is used to plan an optimally efficient single- and multi-factor test. The resulting simulated test data are analyzed via ANOVA and a parametric model is constructed using RSM. Finally, ANOVA can be used to plan a second round of testing to augment the existing data set with new data points. The use of these techniques is demonstrated through several illustrative examples. To date, many thousands of comparisons have been performed and the results strongly support the conclusion that the distributed testing approach outperforms the clustered testing approach.

Green, Lawrence L.↗

Test Planning Approach and Lessons

As NASA began technology risk reduction activities and planning for the next generation launch vehicle under the Space Launch Initiative (SLI), now the Next Generation Launch Technology (NGLT) Program, a review of past large liquid rocket engine development programs was performed. The intent of the review was to identify any significant lessons from the development testing programs that could be applied to current and future engine development programs. Because the primary prototype engine in design at the time of this study was the Boeing-Rocketdyne RS-84, the study was slightly biased towards LOX/RP-1 liquid propellant engines. However, the significant lessons identified are universal. It is anticipated that these lessons will serve as a reference for test planning in the Engine Systems Group at Marshall Space Flight Center (MSFC). Towards the end of F-1 and J-2 engine development testing, NASA/MSFC asked Rocketdyne to review those test programs. The result was a document titled, Study to Accelerate Development by Test of a Rocket Engine (R-8099). The "intent (of this study) is to apply this thinking and learning to more efficiently develop rocket engines to high reliability with improved cost effectivenes" Additionally, several other engine programs were reviewed - such as SSME, NSTS, STME, MC-1, and RS-83- to support or refute the R-8099. R-8099 revealed two primary lessons for test planning, which were supported by the other engine development programs. First, engine development programs can benefit from arranging the test program for engine system testing as early as feasible. The best test for determining environments is at the system level, the closest to the operational flight environment. Secondly, the component testing, which tends to be elaborate, should instead be geared towards reducing risk to enable system test. Technical risk can be reduced at the component level, but the design can only be truly verified and validated after engine system testing.

Parkinson, Douglas A.↗

Test Plan. GCPS Task 4, subtask 4.2 thrust structure development

The Single Stage To Orbit (SSTO) vehicle is designed to lift off from a vertical position, go into orbit, return to earth for a horizontal landing, and be reusable for the next mission. (NASA baseline only) In order to meet its performance goals, the SSTO relies on light weight structure and the use of 8 tri-propellant engines. These engines are mounted to the thrust structure. This test plan addresses selection of the material for this structure, and the integrity of the design through testing of elements and a full-scale subcomponent. This test plan supports the development of the design for an advanced composite thrust structure for a Single Stage to Orbit manned, heavy launch vehicle. The thrust structure is designed to transmit very high thrust loads from the engines to the rest of the vehicle (see Figure 1 ). The thrust structure will also be used for primary attachment of the twin vertical tails and possibly act as the aft attach point for the wing. The combination of high loading, high vibration, long service life and high acoustic environments will need to be evaluated by tests. To minimize design risk, a building block approach will be used. We will first screen materials to determine which materials show the most promise for this application. Factors in this screening will be the suitability of these materials for chosen design concepts, particularly concerning specific strength, environmental compatibility and applicability to fabrication processes. Next we will characterize two material systems that will be used in the design; the characterization will allow us to generate preliminary design data that will be used for the analysis. Element testing will be performed to evaluate critical structural locations under load. Final testing on the full scale test article will be performed to verify the design and to demonstrate predictability of the analysis. Additionally, risks associated with fabricating full scale thrust structures will be reduced through testing activities. One of the major concerns that stems from full scale fabrication is the realities of size and the associated complexities of handling, manufacturing, and assembly. The need exists to fabricate, assemble and test_representative joint specimens to achieve_confidence in the design and manufacturing technologies being proposed.

Greenberg, H. S.↗

Pyrotechnic hazards classification and evaluation program. Phase 2, segment 3: Test plan for determining hazards associated with pyrotechnic manufacturing processes

A comprehensive test plan for determining the hazards associated with pyrotechnic manufacturing processes is presented. The rationale for each test is based on a systematic analysis of historical accounts of accidents and a detailed study of the characteristics of each manufacturing process. The most hazardous manufacturing operations have been determined to be pressing, mixing, reaming, and filling. The hazard potential of a given situation is evaluated in terms of the probabilities of initiation, communication, and transition to detonation (ICT). The characteristics which affect the ICT probabilities include the ignition mechanisms which are present either in normal or abnormal operation, the condition and properties of the pyrotechnic material, and the configuration of the processing equipment. Analytic expressions are derived which describe the physical conditions of the system, thus permitting a variety of processes to be evaluated in terms of a small number of experiments.

Source record↗

Utility Microgrid Controller Test Plan

The functional requirements of many microgrid controllers (MGCs) are expanding and evolving to meet growing utility and community needs. At a high level, the utility microgrid controller serves resilience and reliability use cases by coordinating transitions between grid-connected and islanded states and by managing the system during island operations. This includes control scenarios that require the microgrid controller to use flexible microgrid boundaries, maintain energy balance, coordinate with peer systems, and manage grid-forming (GFM) and grid-following (GFL) DER. In order to evaluate these functional enhancements, microgrid controller test plans must also be developed to ensure that the implemented controllers provide adequate performance. This report provides MGC test plans for both island operation and transition functions. The functions covered in this first edition report include feeder level energy management, island constraint management, secondary voltage and frequency control, black start, and synchronized reconnection. These test cases can be applied to utility-managed microgrid controllers that exclusively manage utility-owned equipment; the tests also apply to third-party managed microgrid controllers that coordinate with utility- and customer-owned equipment. The report can also be used by technology developers and project developers in industry to evaluate control strategies and performance characteristics for community microgrid controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Definition study of a Variable Cycle Experimental Engine (VCEE) and associated test program and test plan

The Definition Study of a Variable Cycle Experimental Engine (VCEE) and Associated Test Program and Test Plan, was initiated to identify the most cost effective program for a follow-on to the AST Test Bed Program. The VCEE Study defined various subscale VCE's based on different available core engine components, and a full scale VCEE utilizing current technology. The cycles were selected, preliminary design accomplished and program plans and engineering costs developed for several program options. In addition to the VCEE program plans and options, a limited effort was applied to identifying programs that could logically be accomplished on the AST Test Bed Program VCE to extend the usefulness of this test hardware. Component programs were provided that could be accomplished prior to the start of a VCEE program.

Allan, R. D.↗

Test Plan for a Calibration Demonstration System for the Reflected Solar Instrument for the Climate Absolute Radiance and Refractivity Observatory

The Climate Absolute Radiance and Refractivity Observatory (CLARREO) mission addresses the need to observe high-accuracy, long-term climate change trends and to use decadal change observations as the most critical method to determine the accuracy of climate change. One of the major objectives of CLARREO is to advance the accuracy of SI traceable absolute calibration at infrared and reflected solar wavelengths. This advance is required to reach the on-orbit absolute accuracy required to allow climate change observations to survive data gaps while remaining sufficiently accurate to observe climate change to within the uncertainty of the limit of natural variability. While these capabilities exist at NIST in the laboratory, there is a need to demonstrate that it can move successfully from NIST to NASA and/or instrument vendor capabilities for future spaceborne instruments. The current work describes the test plan for the Solar, Lunar for Absolute Reflectance Imaging Spectroradiometer (SOLARIS) which is the calibration demonstration system (CDS) for the reflected solar portion of CLARREO. The goal of the CDS is to allow the testing and evaluation of calibration approaches , alternate design and/or implementation approaches and components for the CLARREO mission. SOLARIS also provides a test-bed for detector technologies, non-linearity determination and uncertainties, and application of future technology developments and suggested spacecraft instrument design modifications. The end result of efforts with the SOLARIS CDS will be an SI-traceable error budget for reflectance retrieval using solar irradiance as a reference and methods for laboratory-based, absolute calibration suitable for climate-quality data collections. The CLARREO mission addresses the need to observe high-accuracy, long-term climate change trends and advance the accuracy of SI traceable absolute calibration. The current work describes the test plan for the SOLARIS which is the calibration demonstration system for the reflected solar portion of CLARREO. SOLARIS provides a test-bed for detector technologies, non-linearity determination and uncertainties, and application of future technology developments and suggested spacecraft instrument design modifications. The end result will be an SI-traceable error budget for reflectance retrieval using solar irradiance as a reference and methods for laboratory-based, absolute calibration suitable for climate-quality data collections.

Thome, Kurtis↗

Advanced communications technology satellite high burst rate link evaluation terminal power control and rain fade software test plan, version 1.0

The Power Control and Rain Fade Software was developed at the NASA Lewis Research Center to support the Advanced Communications Technology Satellite High Burst Rate Link Evaluation Terminal (ACTS HBR-LET). The HBR-LET is an experimenters terminal to communicate with the ACTS for various experiments by government, university, and industry agencies. The Power Control and Rain Fade Software is one segment of the Control and Performance Monitor (C&PM) Software system of the HBR-LET. The Power Control and Rain Fade Software automatically controls the LET uplink power to compensate for signal fades. Besides power augmentation, the C&PM Software system is also responsible for instrument control during HBR-LET experiments, control of the Intermediate Frequency Switch Matrix on board the ACTS to yield a desired path through the spacecraft payload, and data display. The Power Control and Rain Fade Software User's Guide, Version 1.0 outlines the commands and procedures to install and operate the Power Control and Rain Fade Software. The Power Control and Rain Fade Software Maintenance Manual, Version 1.0 is a programmer's guide to the Power Control and Rain Fade Software. This manual details the current implementation of the software from a technical perspective. Included is an overview of the Power Control and Rain Fade Software, computer algorithms, format representations, and computer hardware configuration. The Power Control and Rain Fade Test Plan provides a step-by-step procedure to verify the operation of the software using a predetermined signal fade event. The Test Plan also provides a means to demonstrate the capability of the software.

Reinhart, Richard C.↗

Multiple IMU system test plan, volume 4

Operating procedures for this redundant system are described. A test plan is developed with two objectives. First, performance of the hardware and software delivered is demonstrated. Second, applicability of multiple IMU systems to the space shuttle mission is shown through detailed experiments with FDI algorithms and other multiple IMU software: gyrocompassing, calibration, and navigation. Gimbal flip is examined in light of its possible detrimental effects on FDI and navigation. For Vol. 3, see N74-10296.

Landey, M.↗

AMSD Test Plan

The overall government plan to verify compliance of AMSD mirror systems to the specifications as given in the contract Statement of Work will be presented. The plan will address test requirements, test hardware, AMSD-XRCF interfacing, government vs contractor responsibilities, tests to be carried out, test conduction, and test data reduction & reporting. Issues regarding input to the plan and schedule of plan milestones will also be addressed.

Hadaway, James↗

Test plan and preliminary report of airborne electromagentic environment survey over USA urban areas 0.4 to 18.0 GHz

An airborne electromagnetic environment survey is described of five urban areas where terrestrially-generated radio-frequency interference was measured over the frequency range from 0.4 to 18.0 GHz. A chartered Cessna 402 aircraft contained necessary measurement test equipment, including the receiving antennas mounted beneath the fuselage. Urban areas including Washington, D.C.; Baltimore, MD; Philadelphia, PA; New York, NY; Chicago, ILL; and Palestine, TX were surveyed. A flight test plan and preliminary test results for the 0.4 to 1.4 GHz frequency range, are included; a final test report describes more detailed results.

Taylor, R. E.↗