Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technology plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

The Habitable Worlds Observatory Technology Development Plan

The Habitable Worlds Observatory (HWO) is NASA’s next large space telescope, selected by the 2020 Decadal Survey in Astronomy and Astrophysics to search for and characterize habitable exoplanets while enabling a broad range of transformative astrophysics. In August 2024, the HWO Technology Maturation Project Office (TMPO) was formed to begin exploring the HWO science, technology, and mission architectures toward a Mission Concept Review (MCR) at the end of the decade. A primary deliverable of this effort is a technology development plan that identifies critical technologies that enable the mission, defines a process for assessing the readiness of those technologies, and outlines a strategy for developing those technologies to a Technology Readiness Level (TRL) of 5 before the MCR. In this paper we summarize the HWO technology development plan which comprises three “tracks”: Coronagraph System technologies, Ultra-stable Telescope System technologies, and High-sensitivity Ultraviolet and Visible Instrumentation technologies. Each track has completed an initial assessment of technology gaps, prioritized the gaps for investment, and laid out development roadmaps to mature candidate technologies to close those gaps.

Matthew R Bolcar↗

Technology for the future - Long range planning for space technology development

NASA's Office of Aeronautics and Space Technology (OAST) has begun the definition of an Integrated Technology Plan for the civilian space program which guides long-term technology development for space platforms, in light of continuing marker research and other planning data. OAST has conferred particular responsibility for future candidate space mission evaluations and platform performance requirement projections to NASA-Langley. An implementation plan is devised which is amenable to periodic space-platform technology updates.

Collier, Lisa D.↗

The NASA Cryogenic Fluid Management Technology Program Plan

The status of the NASA Cryogenic Fluid Management Technology Program Plan is discussed along with specific needs for near future missions. Using the Space Exploration Initiative mission set, cost/benefit projections are then made for development of advanced cryogenic fluid management techniques. Space based and earth based test programs are discussed relative to the technology requirements for liquid storage, supply and transfer and for fluid transfer and advanced instrumentation.

Faddoul, James R.↗

Titan probe technology assessment and technology development plan study

The need for technology advances to accomplish the Titan probe mission was determined by defining mission conditions and requirements and evaluating the technology impact on the baseline probe configuration. Mission characteristics found to be technology drivers include (1) ten years dormant life in space vacuum; (2) unknown surface conditions, various sample materials, and a surface temperature; and (3) mission constraints of the Saturn Orbiter Dual Probe mission regarding weight allocation. The following areas were identified for further development: surface sample acquisition system; battery powered system; nonmetallic materials; magnetic bubble memory devices, and the landing system. Preentry science, reliability, and weight reduction and redundancy must also be considered.

Castro, A. J.↗

Technology Transfer and the Civil Space Program. Volume 2: Workshop proceedings

The objectives were to (1) provide a top-level review of the Integrated Technology Plan (ITP) and current civil space technology plans, including planning processes and technologies; (2) discuss and assess technology transfer (TT) experiences across a wide range of participants; (3) identify alternate categories/strategies for TT and define the objectives of transfer processes in each case; (4) identify the roles of various government 'stakeholders', aerospace industry, industries at large, and universities in civil space technology research, development, demonstration, and transfer; (5) identify potential barriers and/or opportunities to successful civil space TT; (6) identify specific needs for innovations in policy, programs, and/or procedures to facilitate TT; and (7) develop a plan of attack for the development of a workshop report. Papers from the workshop are presented.

Source record↗

Brayton Power Conversion System Study to Advance Technology Readiness for Nuclear Electric Propulsion

Recently, there has been significant interest within the aerospace community to develop space based nuclear power conversion technologies especially for exploring the outer planets of our solar system where the solar energy density is very low. To investigate these technologies NASA awarded several contracts under Project Prometheus, the Nuclear Systems Program. The studies described in this paper were performed under one of those contracts, which was to investigate the use of a nuclear power conversion system based on the closed Brayton cycle (CBC).The investigation performed included BPCS (Brayton Power Conversion System) trade studies to minimize system weight and radiator area and advance the state of the art of BPCS technology. The primary requirements for studies were a power level of 100 kWe (to the PPU), a low overall power system mass and a lifetime of 15 years (10 years full power). For the radiation environment, the system was to be capable of operation in the generic space environment and withstand the extreme environments surrounding Jupiter. The studies defined a BPCS design traceable to NEP (Nuclear Electric Propulsion) requirements and suitable for future missions with a sound technology plan for technology readiness level (TRL) advancement identified. The studies assumed a turbine inlet temperature approx. 100 C above the current the state of the art capabilities with materials issues and related development tasks identified. Analyses and evaluations of six different HRS (heat rejection system) designs and three primary power management and distribution (PMAD) configurations will be discussed in the paper.

Patrick E. Frye↗

NASA Technology Maturation Plan for In-space Manufacturing of Metals

As the International Space Station’s (ISS) life approaches its end, NASA intends to travel back to the Moon and establish a sustainable presence, paving a pathway towards Mars. A fundamental shift in the current logistics strategy is required to support extended missions. On-demand manufacturing enables reduced operational cost and increased long term sustainability providing a pathway towards reducing NASA’s logistics burden. The In-Space Manufacturing (ISM) portfolio at Marshall Space Flight Center is developing additive polymers, metals, and electronics manufacturing technologies to enable a sustainable presence on the Moon and enable long-duration transit missions. Manufacturing systems for in-space applications must meet a unique set of constraints requiring a maturation path independent from processes targeted for terrestrial use. In May 2023, the On Demand Manufacturing of Metals (ODMM) project, part of the ISM portfolio funded through the Game Changing Development (GCD) program office, was canceled; however, prior to cancelation, the engineering team developed a technology maturation plan for in-space manufacturing of metallic components. The status of ODMM at closeout and an overview of the technology maturation plan for ODMM are discussed.

In Space Manufacturing↗

On space deployable antennas and electronics: Plans and programs

Technology plans are presented for developing deployable reflectors having diameters of 30 to 300 meters and surface accuracies of several millimeters for L and X band applications, as well as for the electronic subsystems required for such large structures. An electromagnetic analysis method for predicting the radio frequency performance of large reflectors involves projecting field points onto an aperture plane. The data points in the aperture plane are quantized to produce contours of constant phase and amplitude. Far field patterns are then calculated using reduced computer storage.

Campbell, T. G.↗

The Habitable Worlds Observatory Technology Development Plan

The Habitable Worlds Observatory (HWO) is NASA’s next large space telescope, selected by the 2020 Decadal Survey in Astronomy and Astrophysics to search for and characterize habitable exoplanets while enabling a broad range of transformative astrophysics. In August 2024, the HWO Technology Maturation Project Office (TMPO) was formed to begin exploring the HWO science, technology, and mission architectures toward a Mission Concept Review (MCR) at the end of the decade. A primary deliverable of this effort is this technology development plan that identifies critical technologies that enable the mission, defines a process for assessing the readiness of those technologies, and outlines a strategy for developing those technologies to a Technology Readiness Level (TRL) of 5 before the MCR. This document covers technologies organized along three “tracks”: Coronagraph System technologies, Ultra-stable Telescope System technologies, and High-sensitivity Ultraviolet and Visible Instrumentation technologies. Additional emerging and enhancing technologies are also discussed.

technology development↗

A Technology Maturation Plan for the Development of Nuclear Electric Propulsion

Over the last two years NASA’s Space Nuclear Propulsion (SNP) Project formulated a Technology Maturation Plan (TMP) for development of the sub-systems needed for a MW-class Nuclear Electric Propulsion (NEP) system which, combined with a high thrust chemical propulsion stage, would be suitable for human missions to Mars. Two recent assessments, independently conducted by the National Academies for Science, Engineering, and Medicine and the NASA Engineering & Safety Center, concluded that the technologies required for a high-power NEP system are immature and the attendant risks insufficiently quantified to justify initiating a flight project. For NEP to be available as a viable option to meet flight opportunities in the late 2030s / 2040s time frame, development of the key sub-systems must begin now. SNP has subdivided the NEP system into five Critical Technology Elements (CTE): the nuclear reactor, power conversion, power management and distribution, electric propulsion sub-system, and the primary heat rejection system. Development plans for each of these CTEs have been drafted which will serve as the template for a focused milestone-driven research and development campaign intended to advance each CTE to Technology Readiness Level (TRL) 5. This will be accomplished by building and testing hardware at relevant power levels (~ 1 MW) and for relevant durations (2,500 hours, ~10% of the required operational lifetime) and conducting numerical modeling of the CTEs anchored by the accumulated test data to predict system performance and reliability. Concurrent with this work, high-level coupled system/mission modeling will be carried out to refine the key performance parameters that the various CTEs must achieve. Non-advocate reviews will be held at milestone points to assess progress and inform down-select decisions. The strategy for formulating the TMP was described previously; this paper describes ongoing progress on the drafting and baselining of the plan, including key specific details.

Space Nuclear Propulsion↗

Variable Cycle Engine Technology Program Planning and Definition Study

The variable stream control engine, VSCE-502B, was selected as the base engine, with the inverted flow engine concept selected as a backup. Critical component technologies were identified, and technology programs were formulated. Several engine configurations were defined on a preliminary basis to serve as demonstration vehicles for the various technologies. The different configurations present compromises in cost, technical risk, and technology return. Plans for possible variably cycle engine technology programs were formulated by synthesizing the technology requirements with the different demonstrator configurations.

Westmoreland, J. S.↗

A Technology Maturation Plan for the Development of Nuclear Electric Propulsion

Over the last two years NASA’s Space Nuclear Propulsion (SNP) Project formulated a Technology Maturation Plan (TMP) for development of the sub-systems needed for a MW-class Nuclear Electric Propulsion (NEP) system which, combined with a high thrust chemical propulsion stage, would be suitable for human missions to Mars. Two recent assessments, independently conducted by the National Academies for Science, Engineering, and Medicine and the NASA Engineering & Safety Center, concluded that the technologies required for a high-power NEP system are immature and the attendant risks insufficiently quantified to justify initiating a flight project. For NEP to be available as a viable option to meet flight opportunities in the late 2030s / 2040s time frame, development of the key sub-systems must begin now. SNP has subdivided the NEP system into five Critical Technology Elements (CTE): the nuclear reactor, power conversion, power management and distribution, electric propulsion sub-system, and the primary heat rejection system. Development plans for each of these CTEs have been drafted which will serve as the template for a focused milestone-driven research and development campaign intended to advance each CTE to Technology Readiness Level (TRL) 5. This will be accomplished by building and testing hardware at relevant power levels (~ 1 MW) and for relevant durations (2,500 hours, ~10% of the required operational lifetime) and conducting numerical modeling of the CTEs anchored by the accumulated test data to predict system performance and reliability. Concurrent with this work, high-level coupled system/mission modeling will be carried out to refine the key performance parameters that the various CTEs must achieve. Non-advocate reviews will be held at milestone points to assess progress and inform down-select decisions. The strategy for formulating the TMP was described previously*; this paper describes ongoing progress on the drafting and baselining of the plan, including key specific details. * “Strategy for Developing Technologies for Megawatt-class Nuclear Electric Propulsion Systems”, K.A. Polzin, et. al., International Electric Propulsion Conference IEPC 2022, IEPC-2022-155

Nuclear Electric Propulsion↗

Fly-by-light flight control system technology development plan

The results of a four-month, phased effort to develop a Fly-by-Light Technology Development Plan are documented. The technical shortfalls for each phase were identified and a development plan to bridge the technical gap was developed. The production configuration was defined for a 757-type airplane, but it is suggested that the demonstration flight be conducted on the NASA Transport Systems Research Vehicle. The modifications required and verification and validation issues are delineated in this report. A detailed schedule for the phased introduction of fly-by-light system components has been generated. It is concluded that a fiber-optics program would contribute significantly toward developing the required state of readiness that will make a fly-by-light control system not only cost effective but reliable without mitigating the weight and high-energy radio frequency related benefits.

Chakravarty, A.↗

Large Deployable Reflector (LDR) system concept and technology definition study. Volume 2: Technology assessment and technology development plan

A study was conducted to define reasonable and representative LDR system concepts for the purpose of defining a technology development program aimed at providing the requisite technological capability necessary to start LDR development by the end of 1991. This volume presents thirteen technology assessments and technology development plans, as well as an overview and summary of the LDR concepts. Twenty-two proposed augmentation projects are described (selected from more than 30 candidates). The five LDR technology areas most in need of supplementary support are: cryogenic cooling; astronaut assembly of the optically precise LDR in space; active segmented primary mirror; dynamic structural control; and primary mirror contamination control. Three broad, time-phased, five-year programs were synthesized from the 22 projects, scheduled, and funding requirements estimated.

Agnew, Donald L.↗

Technology Development Plan for the Baseline Detector System of the X-Ray Microcalorimeter Spectrometer (XMS) of the International X-Ray Observatory (IXO)

The primary purpose of this document is to present the technology development plan for the XMS detector system. It covers the current status (including assessment of the Technology Readiness Level, TRL, and a justification of the level assigned), the roadmap to progress to a level between TRL 5 and TRL 6 by the middle of 2012, and an assessment of the associated cost. A secondary purpose of this document is to address the Action Items raised at the XMS Phase-A Study Mid-Term Review that pertain to the detector system (AI #4, #8, and #9).

Kilbourne, C. A.↗

Overview of the PLEXIL Plan Execution Technology and its Applications in Autonomous Piloting Projects at NASA

Automated planning is a key Artificial Intelligence technology enabling Unmanned Aerial Systems (UAS) and the eminent reality of Urban Air Mobility (UAM). It produces plans, which formalize procedures often performed by humans. Plans differ from other kinds of computer programs in their ability to react and interact with a dynamically changing environment. Aviation plans must encode the procedural knowledge, reasoning capability, and capacity for multi-tasking held by competent human pilots. Correct execution of these plans (performed by software called an executive) in the dynamic airspace environment is vital to the success of each automated flight, and the safety of the vehicle and all things in its path. In the early 2000s NASA developed a plan representation language and executive called PLEXIL (Plan Execution Interchange Language) that has successfully been applied in several NASA aviation and UAS projects. Autonomy Operating System (AOS), Cockpit Hierarchical Automated Planning and Execution (CHAP-E), and ICAROUS are all projects that have used PLEXIL to help encode and automatically execute flight procedures, some normally performed by human pilots. AOS also automates a subset of pilot/Air Traffic Control communication towards enabling UAS entry into the National Airspace. PLEXIL has been open-source software since 2008 and has seen usage in a wide range of prototypical autonomy applications in academia, government, and industry. In this presentation, we describe PLEXIL and highlight its significant accomplishments in the aviation domain.

Dalal, Michael↗

Shuttle and Spacelab - The promise for advanced technology

Plans are being developed at NASA's Langley Research Center to use the United States Shuttle and European Spacelab to routinely extend ground-based research programs into space. Operational modes and design features of systems capitalizing on the advantages of a laboratory environment in space flight will be highlighted through examples of proposed experiments.

Hook, W. R.↗

Payload software technology: Software technology development plan

Programmatic requirements for the advancement of software technology are identified for meeting the space flight requirements in the 1980 to 1990 time period. The development items are described, and software technology item derivation worksheets are presented along with the cost/time/priority assessments.

Source record↗