Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Multi-objective optimization of low-GWP mixture composition and heat exchanger circuitry configuration for improved system performance and reduced refrigerant flammability

The recently introduced hydrofluoroolefin (HFO) refrigerants, including R1234yf and R1234ze(E), have significantly lower global warming potentials (GWPs) than traditional hydrofluorocarbon (HFC) refrigerants like R410A. However, prior tests show that direct drop-in of pure R1234yf or R1234ze(E) into equipment designed for R410A results in a decrease in heat exchanger capacity and the system coefficient of performance. The primary reason is the lower in-tube heat transfer performance of R1234yf and R1234ze(E) compared with that of R410A. To address this issue, previous studies have mixed the mildly flammable HFC R32 with HFOs to improve system performance, with HFC R125 also added to suppress flammability. Previous studies selected compositions based on simple cycle analyses and did not consider modifications of the heat exchanger circuitry configuration to adapt to the new refrigerants. This study presents a novel multi-objective optimization approach to design a refrigerant composition that maximizes energy efficiency within flammability and GWP limits. The approach in this work simultaneously optimizes mixture composition and heat exchanger circuitry configuration. A case study on a rooftop unit indicates that, compared with mixture-only optimization, simultaneous optimization of mixture and heat exchanger circuitry yields a 5.9% improvement in cycle efficiency and a 48.6% reduction in refrigerant flammability with a GWP of 268. Circuitry optimization using refrigerants with different temperature glides shows that the larger the temperature glide is, the larger EER improvement is obtained. The results show that zeotropic blends with a large temperature glide are more sensitive to the refrigerant circuitry than pure refrigerants and may suffer significant performance degradation with subpar heat exchanger circuitry design. The proposed optimization approach is generally applicable to mixtures with any number of components. Using this approach to design a HVAC system can yield higher system efficiency within flammability and GWP constraints.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Benefits of digitalizing and employing simulation to increase plant system performance and ensure compliance with technical specifications - 109

The essential services water system in a BWR nuclear power plant was affected by corrosion, soiling and blockages due to ageing. Those episodes affected safety margins hindering the Technical Specifications compliance during periodic system testing. Tecnatom designed, implemented and tested a design modification for the on-line monitoring of this system by integrating it in the existing Digital Control System (DCS). Key system parameters were acquired in real time to be displayed in the Human System Interface, used in performing calculations and stored their historical evolution. The objective was to optimize monitoring and surveillance of the essential service water system. Furthermore, Tecnatom developed an engineering simulator ('What if' simulator) consisting of a hydraulic model of the system. This simulator takes as inputs each heat exchanger performance parameters from the plant DCS, allows the user to change the essential services water system configuration (valves position, UHS level...) and calculates theoretical process values predicting the system real behavior. In a second stage, more system instruments were wired to the DCS for Technical Specifications compliance automatic surveillance regarding opening and closing times of system valves. Operating experience shows important benefits after the digitalization. It enhances on-line information of system operation and automates calculation of load loss factor of each heat exchanger. It eases the evaluation of blockages and soiling in the system allowing optimization of cleaning proceedings. System Surveillance Requirements and Test Requirements reports have been automated optimizing the operation workload. The simulator use enables to identify optimal system configuration increasing safety margins of the system and ensuring Technical Specifications fulfillment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A 194nW Energy-Performance-Aware loT SoC Employing a 5.2nW 92.6% Peak Efficiency Power Management Unit for System Performance Scaling, Fast DVFS and Energy Minimization

A self-powered IoT system-on-chip (SoC) reduces power to sub-μw and employs multiple power-management techniques to trade-off ultra-low power (ULP), higher performance, smaller energy harvester footprint, and longer operating lifetime. Minimum Energy Point Tracking (MEPT) [1]–[4] keeps an SoC operating at the minimum energy point (MEP) to enhance system lifetime. Previous sample-and-hold MEPT schemes need frequent voltage comparisons and a high-frequency clock that increases power [2]. Current-ratio-based MEPT relies on specialized CMOS technology for body-bias tuning [3]. A switched-capacitor-based MEPT can achieve energy minimization at a targeted performance [4], but it uses a 30MHz clock witμW power consumption and low power efficiency. For ULP IoT applications, SoCs need to have ultra-low quiescent power, high efficiency for energy delivery, performance scaling based on available energy, and energy minimization to increase system lifetime. In this work, we propose an ULP IoT SoC with a triple-mode power management unit (PMU) that integrates energy-performance scaling, event-driven fast DVFS, and MEPT features to improve the system energy efficiency, as shown in Fig. 13.8.1. This work achieves a minimum 194nW power consumption for the SoC and 5.2nW quiescent power for the PMU with a 92.6% peak efficiency and >10 4 dynamic range. The timing waveform in Fig. 13.8.1 (bottom), demonstrates the transition of the three modes including energy aware (EA), performance aware (PA), and MEPT based on event priority and input voltage level which reflects the energy availability. As such, the system energy consumption and performance could be well-balanced based on both the input and output conditions.

self-powered IoT system-on-chip (SoC)↗

A simple model of PV system performance and its use in fault detection

Results are presented from a monitoring study of the performance of a sample of UK domestic PV systems. Five-minute average climatic and performance data was recorded for 27 PV systems at two sites for up to 2 years of operation. On average, the annual energy losses due to faults were 3.6% (Site A, first year of operation), 6.6% (Site A, second year of operation) and 18.9% (Site B, first year of operation). Simple empirical models are constructed to describe the performance of the PV systems under 'normal operation' (when no faults occur). New analysis techniques are developed which estimate the energy losses of four different fault categories: sustained zero efficiency faults; brief zero efficiency faults; shading; and non-zero efficiency non-shading faults. The results demonstrate that faults have the potential to cause significant energy losses in domestic PV systems. The benefits of applying the data analysis techniques described in this work to PV system clusters and other urban micro-generation technologies are discussed. (author)

14 SOLAR ENERGY↗

Best Practices at the End of Photovoltaic System Performance Period

Responsible and cost-effective dissolution of photovoltaic (PV) system hardware at the end of the performance period has emerged as an important business and environmental consideration. Alternatives include extending the performance period and existing contracts for power purchase, lease, and utility interconnect; refurbishing the plant by correcting any deficiencies; repowering the plant with new PV modules and inverters; or decommissioning the plant and removing all the hardware from the site. Often key decisions are made very early in the project development and might require decommissioning by some certain date after the end of a power purchase agreement. To “abandon in place” is not an alternative acceptable to landowners and regulators, so any financial prospectus should include costs associated with decommissioning, even if those costs are deferred by extending operations, refurbishment, or repowering. Decommissioning costs are driven by regulations regarding the handling and disposal of waste, with reuse and recycling of PV modules and other components preferred as a way to reduce both costs and environmental impact. Each alternative is discussed with order-of-magnitude costs, and recommendations are provided considering site-specific details of that situation, such as estimated costs to refurbish or repower, projected revenue from continued operations, and tax considerations.

14 SOLAR ENERGY↗

Heating, Ventilating, and Air-Conditioning: Recent Advances in Diagnostics and Controls to Improve Air-Handling System Performance

The performance of air-handling systems in buildings needs to be improved. Many of the deficiencies result from myths and lore and a lack of understanding about the non-linear physical principles embedded in the associated technologies. By incorporating these principles, a few important efforts related to diagnostics and controls have already begun to solve some of the problems. This paper illustrates three novel solutions: one rapidly assesses duct leakage, the second configures ad hoc duct-static-pressure reset strategies, and the third identifies useful intermittent ventilation strategies. By highlighting these efforts, this paper seeks to stimulate new research and technology developments that could further improve air-handling systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Washington Clean Energy Fund: Energy Storage System Performance Test Plans and Data Requirements

This report documents the test plans, including detailed duty cycles, used in evaluating the technical performance of five energy storage systems (ESSs) sponsored by the Washington State Clean Energy Fund (CEF). These ESSs were installed at three participating utilities’ (Avista, Snohomish Public Utility District or SnoPUD, and Puget Sound Energy or PSE) designated sites. Under each test plan, a number of baseline and use case tests are defined. This report documents the test plan for each utility, including duty cycles, data and performance reporting requirements. Baseline tests defined in this report mainly focus on determining an initial or reference performance for each ESS, which may be compared with the performance at any later time to assess the state of health of the ESS. Parameter values of a given ESS obtained from baseline tests are applied for different modeling purposes and use case tests. The stored energy capacity test is the first test conducted in the baseline test program, which generates data to calculate round trip efficiency (RTE). The response time and ramp rate tests provide the time required for an ESS to change from zero to full charging/discharging rate and hence the ramp rate, which is important in understanding ESS performance for applications calling for fast response. Internal resistance testing of ESS cells is also conducted in conjunction with the response time and ramp rate tests. Finally, the baseline tests include frequency regulation (FR) and peak shaving (PS) tests based on real-world duty cycles. Upon completion of the baseline tests, use case tests are conducted at each of the storage sites with duty cycles developed to meet the site-specific criteria and conditions. The use cases are grouped according to their intended target benefits within the electric infrastructure topology (e.g., transmission versus distribution). Although an ESS may be located on the low-voltage side of a substation that provides power to a distribution feeder, a use case that addresses bulk power services could still be provided and would be grouped under the transmission or bulk-power benefits. Use cases for ESS applications deep into the distribution circuit would be categorized under the distribution system cases.

25 ENERGY STORAGE↗

Retrofit device to improve vapor compression cooling system performance by dynamic blower speed modulation

A device and method are provided to improve performance of a vapor compression system using a retrofittable control board to start up the vapor compression system with the evaporator blower initially set to a high speed. A baseline evaporator operating temperature with the evaporator blower operating at the high speed is recorded, and then the device detects if a predetermined acceptable change in evaporator temperature has occurred. The evaporator blower speed is reduced from the initially set high speed as long as there is only a negligible change in the measured evaporator temperature and therefore a negligible difference in the compressor's power consumption so as to obtain a net increase in the Coefficient of Performance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reassessment of PHDS Fulcrum40h High Purity Germanium (HPGe) Detector System Performance

This report presents a comprehensive evaluation of the updated PHDS Fulcrum40h High Purity Germanium (HPGe) detector system, benchmarking its performance, usability, and software capabilities against the current National Nuclear Security Administration (NNSA) Nuclear Emergency Support Team (NEST) HPGe Detector System Requirements Document. Systematic measurements were conducted using a single Fulcrum40h detector to assess key parameters including gamma efficiency and resolution, neutron detection efficiency, gamma pulse-pileup response, and gamma-to-neutron crosstalk. The Fulcrum40h system, acquired in August 2022, has undergone recent updates by PHDS to address deficiencies identified following the initial NEST requirements release. The results provide critical insights into the detector’s operational capabilities and compliance with NNSA NEST standards.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Fukushima Daiichi—A Case Study for BWR Instrumentation and Control Systems Performance During a Severe Accident, Rev 1

This report provides an assessment of the performance of various instrumentation and control (I&C) and monitoring systems, with a focus on the first few days of the Fukushima Daiichi accident starting on March 11, 2011. Similar to what occurred at the Three Mile Island Unit 2 (TMI-2) accident in 1979, operator responses were challenged when information on key parameters was lost, erroneous, or misleading. While numerous improvements in instrumentation capabilities have been made since the TMI-2 event, the accident at Fukushima Daiichi suggests the potential for further improvement. The objective of this research is to review the performance of the Fukushima Daiichi Units 1–3 instrumentation systems that could have helped ensure that plant operators and emergency responders had relevant, accurate, and timely knowledge of plant conditions as they managed the accident response. As was the case with TMI-2, forensic analyses of plant instrumentation failures will be a long-term effort. As an introduction to this long-term research, this report focuses on the information available in the control room during the accident and illustrates the challenges to operators in their understanding of plant conditions during the progression of the accident. I&C systems monitor the success or failure of achievement of light water reactor safety principles in which the protection of the reactor fuel, reactor coolant system, and reactor containment is accomplished. This report (1) provides an overview of the safety principles; (2) notes parameters associated with the boiling water reactor (BWR)/3 and BWR/4 protection, actuation, and monitoring systems as they relate to the achievement of these principles; (3) presents data from past research on predicted instrumentation performance during severe accidents, and (4) assesses performance of the key I&C and monitoring systems associated with BWR/3 and BWR/4 reactors like those at Fukushima Daiichi. Lessons learned or potential improvements associated with the performance of these systems in the context of severe accidents are delineated. As background information, an overview of key BWR/3- and BWR/4-Mark I reactor designs (BWR/3 and BWR/4 with a Mark I containment) reactor protection, engineered safety features actuation, and accident monitoring systems is provided. A brief description of plant safety systems used to prevent or mitigate reactor accidents is also provided. This background information provides context for the brief discussion of previous research that has been conducted on BWR severe accidents and for the discussion of the accident sequences, which led to core damage at Fukushima Daiichi Units 1–3. The progression of the accident sequences at Fukushima Daiichi Units 1–3 occurred very much as predicted in prior severe accident research conducted in the United States and internationally, given the complete station blackout that occurred when the tsunami generated by one of the most powerful earthquakes ever recorded rolled onshore.

Accident Tolerant Equipment↗

Masking of photovoltaic system performance problems by inverter clipping and other design and operational practices

We describe how performance problems can be “masked,” or not readily evident by several causes: by photovoltaic (PV) system configuration (such as the size of the PV array capacity relative to the size of the inverter and the resultant clipped operating mode); by instrumentation design, installation, and maintenance (such as a misaligned or dirty pyranometer); by contract clauses (when operational availability is transformed to contractual availability, which excludes many factors); and by identified management and operational practices (such as reporting on a portfolio of plants rather than individually). A simple method based on a duration curve is introduced to overcome shortcomings of Performance Ratio based on nameplate capacity and Performance Index based on hourly simulation when quantifying masking effects, and inverter clipping and pyranometer soiling are presented as two examples of the new method. With a better understanding of the non-transparency of masking issues, stakeholders can better interpret performance data and deliver improved AC and DC plant conditions through PV system operation and maintenance (O&M) for improved performance, reduced O&M costs, and a more consistently delivered, and reduced, levelized cost of energy (LCOE).

14 SOLAR ENERGY↗

Industry Application ECCS / LOCA Integrated Cladding/Emergency Core Cooling System Performance: Demonstration of LOTUS-Baseline Coupled Analysis of the South Texas Plant Model

Under the auspices of the DOE LWRS Program RISMC Industry Application ECCS/LOCA, INL has engaged staff from both South Texas Project (STP) and the Texas A&M University (TAMU) to produce a generic pressurized water reactor (PWR) model including reactor core, clad/fuel design and systems thermal hydraulics based on the South Texas Project (STP) nuclear power plant, a 4-Loop Westinghouse PWR. A RISMC toolkit, named LOCA Toolkit for the U.S. (LOTUS), has been developed for use in this generic PWR plant model to assess safety margins for the proposed NRC 10 CFR 50.46c rule, Emergency Core Cooling System (ECCS) performance during LOCA. This demonstration includes coupled analysis of core design, fuel design, thermalhydraulics and systems analysis, using advanced risk analysis tools and methods to investigate a wide range of results. Within this context, a multi-physics best estimate plus uncertainty (MPBEPU) methodology framework is proposed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of the microangiographic fluoroscope (MAF) using generalized system performance metrics

Purpose: The performance of a newly developed, high resolution, microangiographic fluoroscope (MAF) (35 {mu}m pixel pitch and 300 {mu}m thick CsI phosphor) was evaluated using a generalized linear system analysis and compared with that of a standard amorphous Si thin film transistor flat panel detector (FPD) (194 {mu}m pixel pitch and 600 {mu}m thick CsI phosphor). The linear system metrics such as modulation transfer function (MTF), noise power spectrum, and detection quantum efficiency (DQE) are commonly used to gauge the intrinsic detector performance in the detector plane. However, these linear system metrics do not provide information about the image receptor performance in a real system since they do not include the effects of other parameters such as focal spot distribution, scatter radiation, and geometric unsharpness, which may compromise detector performance characteristics. Use of generalized linear system metrics [generalized modulation transfer function (GMTF), generalized normalized noise power spectrum (GNNPS), and generalized detection quantum efficiency (GDQE)] that include these effects gives a more meaningful, complete, and appropriate evaluation of detector performance as part of the imaging system. Methods: A uniform head equivalent phantom was used to simulate realistic clinical parameters and x-ray spectra. The detector MTFs were measured using the slanted edge method and the focal spot MTFs were measured using a pinhole assembly. The scatter MTF was simulated and the scatter fraction was measured for a head-equivalent phantom. The generalized system metrics were calculated for different combinations of three choices of focal spots and three different magnifications with two different air-gaps. The performance of the MAF was also illustrated using stent images obtained with different focal spots under similar conditions. Results: Results for the generalized metrics provide a quantitative description of the performance of the imaging system for both detectors. This generalized analysis demonstrated that both detectors have similar imaging capabilities at lower spatial frequencies, but that the MAF has superior performance over the FPD at higher frequencies even when considering focal spot blurring and scatter. Conclusions: This generalized performance analysis demonstrates the significance of focal spot size, magnification, and scatter on the system performance metrics (GMTF, GNNPS, and GDQE). Although the ideal detector performance characteristics of the MAF are not fully realized due to these other system factors, it still retains an advantage in DQE at high spatial frequencies over the FPD. Similar studies based on the generalized linear system metrics can serve as an efficient tool to evaluate total system capabilities under different realistic conditions to enable optimal design for specific imaging tasks.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A standardized approach to PV system performance model validation.

PV performance models are used to predict how much energy a PV system will produce at a given location and subject to prescribed weather conditions. These models are commonly used by project developers to choose between module technologies and array designs (e.g., fixed tilt vs. tracking) for a given site or to choose between different geographic locations, and are used by the financial community to establish project viability. Available models can differ significantly in their underlying mathematical formulations and assumptions and in the options available to the analyst for setting up a simulation. Some models lack complete documentation and transparency, which can result in confusion on how to properly set up, run, and document a simulation. Furthermore, the quality and associated uncertainty of the available data upon which these models rely (e.g., irradiance, module parameters, etc.) is often quite variable and frequently undefined. For these reasons, many project developers and other industry users of these simulation tools have expressed concerns related to the confidence they place in PV performance model results. To address this problem, we propose a standardized method for the validation of PV system-level performance models and a set of guidelines for setting up these models and reporting results. This paper describes the basic elements for a standardized model validation process adapted especially for PV performance models, suggests a framework to implement the process, and presents an example of its application to a number of available PV performance models.

14 SOLAR ENERGY↗

Flow battery cleansing cycle to maintain electrolyte health and system performance

A method of cleansing a redox flow battery system may include operating the redox flow battery system in a charge, discharge, or idle mode, and responsive to a redox flow battery capacity being less than a threshold battery capacity, mixing the positive electrolyte with the negative electrolyte. In this way, battery capacity degradation following cyclic charging and discharging of the redox flow battery system can be substantially reduced.

Song, Yang↗