Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “supply chains”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Development of Two High-Energy Bus ‘Cores’

For several years the TechEdSat flight series (TES-n), developed by the Nano Orbital Workshop (NOW) group at NASA Ames, has relied upon an in-house developed unit to serve both EPS (Electrical Power System) and C&DH (Command and Data Handling) roles along with low data-rate telemetry functions, i.e., serving as the ‘core’ of the spacecraft bus. This ‘core’ has a considerable task given the rapid cadence of the TES program and the typically low-TRL of payloads; configurability and compatibility are key to prevent mission-specific hardware. However, at only 15 watts the current core has become insufficient to support the program’s growing missions and increasingly demanding payloads. To this end, the NOW program is developing new cores to support two TES mission classes: a single-PCB ‘MiniCore’ designed to support 80-watt missions 6U or smaller in LEO, and a three-PCB, radiation-tolerant ‘StackCore’ designed to support 6U and larger missions over 500 watts in LEO and beyond. The ‘MiniCore’ design consists of three main segments: a processor-agnostic C&DH, a software-configured EPS, and a backup low data-rate radio. The design philosophy was to enable rapid-manufacture in a turbulent supply chain, hence the design consists of COTS parts with a focus on those able to be drop-in replaced with radiation-tolerant versions when demanded by the mission. As a single PC-104 sized circuit board, power density and ease of integration also dominated design, demanding the use of modern features such as single-point USB-C for easy charging and monitoring of the spacecraft on the ground. The ‘MiniCore’ can support 80 watts of load, 140 watt-hours of storage, and over 20 watts of optimized solar generation with extensive power monitoring throughout. The ‘MiniCore’ supports one battery pack, six solar-panels, six loads, five actuators, Iridium SBD, and an internal 802.15.4 network. Additionally, the processor-agnostic design can accept any PJRC Teensy 3.x or Adafruit Feather microcontroller unit to enable processor scaling with mission requirements or environment. It is expected a development unit of this design will be completed before conference. The ‘StackCore’ design consists of three stacked PC-104 sized circuit boards: one dedicated to power generation and storage, one dedicated to power distribution, and one dedicated to C&DH tasks. This delineation is necessary to support the transition from highly integrated ICs to discrete analog circuitry, enabling a primarily analog control power system able to operate without software in a radiation environment with finer monitoring compared to the ‘MiniCore’ design. The planned base architecture supports over 500 watts of load, 250 watt-hours of storage, and over 80 watts of optimized solar generation. The power distribution board allows for the use of daughter cards hosting custom converters or interfaces for payloads, in addition to the software-configured supplies used on the ‘MiniCore’. This core stack will be managed by a Vorago ARM M4 microcontroller and support the same wireless communications as the ‘MiniCore’, with optional integration of a NOW S-band radio and attitude determination sensors for ‘black box’ functionality. It is expected the prototype will still be in development during conference.

Avery Brock↗

Collaborative Engineering for Research and Development

Research and development (R&D) organizations are being required to be relevant, to be more application-oriented, and to be partners in the strategic management of the business while meeting the same challenges as the rest of the organization, namely: (1) reduced time to market; (2) reduced cost; (3) improved quality; (4) increased reliability; and (5) increased focus on customer needs. Recent advances in computer technology and the Internet have created a new paradigm of collaborative engineering or collaborative product development (CPD), from which new types of relationships among researchers and their partners have emerged. Research into the applicability and benefits of CPD in a low/no production, R&D, and/or government environment is limited. In addition, the supply chain management (SCM) aspects of these relationships have not been studied. This paper presents research conducted at the NASA Glenn Research Center (GRC) investigating the applicability of CPD and SCM in an R&D organization. The study concentrates on the management and implementation of space research activities at GRC. Results indicate that although the organization is engaged in collaborative relationships that incorporate aspects of SCM, a number of areas, such as development of trust and information sharing merit special attention.

Davis, Jose M.↗

Collaborative Product Development in an R&D Environment

Research and development (R&D) organizations are being required to be relevant, to be more application-oriented, and to be partners in the strategic management of the business while meeting the same challenges as the rest of the organization, namely: (1) reduced time to market; (2) reduced cost; (3) improved quality; (4) increased reliability; and (5) increased focus on customer needs. Recent advances in computer technology and the Internet have created a new paradigm of collaborative engineering or collaborative product development (CPD), from which new types of relationships among researchers and their partners have emerged. Research into the applicability and benefits of CPD in a low/no production, R&D, and/or government environment is limited. In addition, the supply chain management (SCM) aspects of these relationships have not been studied. This paper presents research conducted at the NASA Glenn Research Center (GRC) investigating the applicability of CPD and SCM in an R&D organization. The study concentrates on the management and implementation of space research activities at GRC. Results indicate that although the organization is engaged in collaborative relationships that incorporate aspects of SCM, a number of areas, such as development of trust and information sharing merit special attention.

Davis, Jose M.↗

NASA Space Exploration Logistics Workshop Proceedings

As NASA has embarked on a new Vision for Space Exploration, there is new energy and focus around the area of manned space exploration. These activities encompass the design of new vehicles such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV) and the identification of commercial opportunities for space transportation services, as well as continued operations of the Space Shuttle and the International Space Station. Reaching the Moon and eventually Mars with a mix of both robotic and human explorers for short term missions is a formidable challenge in itself. How to achieve this in a safe, efficient and long-term sustainable way is yet another question. The challenge is not only one of vehicle design, launch, and operations but also one of space logistics. Oftentimes, logistical issues are not given enough consideration upfront, in relation to the large share of operating budgets they consume. In this context, a group of 54 experts in space logistics met for a two-day workshop to discuss the following key questions: 1. What is the current state-of the art in space logistics, in terms of architectures, concepts, technologies as well as enabling processes? 2. What are the main challenges for space logistics for future human exploration of the Moon and Mars, at the intersection of engineering and space operations? 3. What lessons can be drawn from past successes and failures in human space flight logistics? 4. What lessons and connections do we see from terrestrial analogies as well as activities in other areas, such as U.S. military logistics? 5. What key advances are required to enable long-term success in the context of a future interplanetary supply chain? These proceedings summarize the outcomes of the workshop, reference particular presentations, panels and breakout sessions, and record specific observations that should help guide future efforts.

deWeek, Oliver↗

Precision Cleaning - Path to Premier

ITT Space Systems Division s new Precision Cleaning facility provides critical cleaning and packaging of aerospace flight hardware and optical payloads to meet customer performance requirements. The Precision Cleaning Path to Premier Project was a 2007 capital project and is a key element in the approved Premier Resource Management - Integrated Supply Chain Footprint Optimization Project. Formerly precision cleaning was located offsite in a leased building. A new facility equipped with modern precision cleaning equipment including advanced process analytical technology and improved capabilities was designed and built after outsourcing solutions were investigated and found lacking in ability to meet quality specifications and schedule needs. SSD cleans parts that can range in size from a single threaded fastener all the way up to large composite structures. Materials that can be processed include optics, composites, metals and various high performance coatings. We are required to provide verification to our customers that we have met their particulate and molecular cleanliness requirements and we have that analytical capability in this new facility. The new facility footprint is approximately half the size of the former leased operation and provides double the amount of throughput. Process improvements and new cleaning equipment are projected to increase 1st pass yield from 78% to 98% avoiding $300K+/yr in rework costs. Cost avoidance of $350K/yr will result from elimination of rent, IT services, transportation, and decreased utility costs. Savings due to reduced staff expected to net $4-500K/yr.

Mackler, Scott E.↗

Commercial Product Activation Using RFID

Radio-frequency identification (RFID) would be used for commercial product activation, according to a proposal. What is new here is the concept of combining RFID with activation - more specifically, using RFID for activating commercial products (principally, electronic ones) and for performing such ancillary functions as tracking individual product units on production lines, tracking shipments, and updating inventories. According to the proposal, an RFID chip would be embedded in each product. The information encoded in the chip would include a unique number for identifying the product. An RFID reader at the point of sale would record the number of the product and would write digital information to the RFID chip for either immediate activation of the product or for later interrogation and processing. To be practical, an RFID product-activation system should satisfy a number of key requirements: the system should be designed to be integrable into the inventory-tracking and the data-processing and -communication infrastructures of businesses along the entire supply chain from manufacture to retail; the system should be resistant to sophisticated hacking; activation codes should be made sufficiently complexity to minimize the probability of activating stolen products; RFID activation equipment at points of sale must be capable to two-way RF communication for the purposes of reading information from, and writing information to, embedded RFID chips; the equipment at points of sale should be easily operable by sales clerks with little or no training; the point-of-sale equipment should verify activation and provide visible and/or audible signals indicating verification or lack thereof; and, the system should be able to handle millions of products per year with minimal human intervention, among other requirements.

Jedrey, Thomas↗

Launch and Landing Effects Ground Operations (LLEGO) Model

LLEGO is a model for understanding recurring launch and landing operations costs at Kennedy Space Center for human space flight. Launch and landing operations are often referred to as ground processing, or ground operations. Currently, this function is specific to the ground operations for the Space Shuttle Space Transportation System within the Space Shuttle Program. The Constellation system to follow the Space Shuttle consists of the crewed Orion spacecraft atop an Ares I launch vehicle and the uncrewed Ares V cargo launch vehicle. The Constellation flight and ground systems build upon many elements of the existing Shuttle flight and ground hardware, as well as upon existing organizations and processes. In turn, the LLEGO model builds upon past ground operations research, modeling, data, and experience in estimating for future programs. Rather than to simply provide estimates, the LLEGO model s main purpose is to improve expenses by relating complex relationships among functions (ground operations contractor, subcontractors, civil service technical, center management, operations, etc.) to tangible drivers. Drivers include flight system complexity and reliability, as well as operations and supply chain management processes and technology. Together these factors define the operability and potential improvements for any future system, from the most direct to the least direct expenses.

Source record↗

Developing Ultra Reliable Life Support for the Moon and Mars

Recycling life support systems can achieve ultra reliability by using spares to replace failed components. The added mass for spares is approximately equal to the original system mass, provided the original system reliability is not very low. Acceptable reliability can be achieved for the space shuttle and space station by preventive maintenance and by replacing failed units, However, this maintenance and repair depends on a logistics supply chain that provides the needed spares. The Mars mission must take all the needed spares at launch. The Mars mission also must achieve ultra reliability, a very low failure rate per hour, since it requires years rather than weeks and cannot be cut short if a failure occurs. Also, the Mars mission has a much higher mass launch cost per kilogram than shuttle or station. Achieving ultra reliable space life support with acceptable mass will require a well-planned and extensive development effort. Analysis must define the reliability requirement and allocate it to subsystems and components. Technologies, components, and materials must be designed and selected for high reliability. Extensive testing is needed to ascertain very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The systems must be designed, produced, integrated, and tested without impairing system reliability. Maintenance and failed unit replacement should not introduce any additional probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass must start soon if it is to produce timely results for the moon and Mars.

Jones, Harry W.↗

NASA Tech Briefs, December 2009

Topics include: A Deep Space Network Portable Radio Science Receiver; Detecting Phase Boundaries in Hard-Sphere Suspensions; Low-Complexity Lossless and Near-Lossless Data Compression Technique for Multispectral Imagery; Very-Long-Distance Remote Hearing and Vibrometry; Using GPS to Detect Imminent Tsunamis; Stream Flow Prediction by Remote Sensing and Genetic Programming; Pilotless Frame Synchronization Using LDPC Code Constraints; Radiometer on a Chip; Measuring Luminescence Lifetime With Help of a DSP; Modulation Based on Probability Density Functions; Ku Telemetry Modulator for Suborbital Vehicles; Photonic Links for High-Performance Arraying of Antennas; Reconfigurable, Bi-Directional Flexfet Level Shifter for Low-Power, Rad-Hard Integration; Hardware-Efficient Monitoring of I/O Signals; Video System for Viewing From a Remote or Windowless Cockpit; Spacesuit Data Display and Management System; IEEE 1394 Hub With Fault Containment; Compact, Miniature MMIC Receiver Modules for an MMIC Array Spectrograph; Waveguide Transition for Submillimeter-Wave MMICs; Magnetic-Field-Tunable Superconducting Rectifier; Bonded Invar Clip Removal Using Foil Heaters; Fabricating Radial Groove Gratings Using Projection Photolithography; Gratings Fabricated on Flat Surfaces and Reproduced on Non-Flat Substrates; Method for Measuring the Volume-Scattering Function of Water; Method of Heating a Foam-Based Catalyst Bed; Small Deflection Energy Analyzer for Energy and Angular Distributions; Polymeric Bladder for Storing Liquid Oxygen; Pyrotechnic Simulator/Stray-Voltage Detector; Inventions Utilizing Microfluidics and Colloidal Particles; RuO2 Thermometer for Ultra-Low Temperatures; Ultra-Compact, High-Resolution LADAR System for 3D Imaging; Dual-Channel Multi-Purpose Telescope; Objective Lens Optimized for Wavefront Delivery, Pupil Imaging, and Pupil Ghosting; CMOS Camera Array With Onboard Memory; Quickly Approximating the Distance Between Two Objects; Processing Images of Craters for Spacecraft Navigation; Adaptive Morphological Feature-Based Object Classifier for a Color Imaging System; Rover Slip Validation and Prediction Algorithm; Safety and Quality Training Simulator; Supply-Chain Optimization Template; Algorithm for Computing Particle/Surface Interactions; Cryogenic Pupil Alignment Test Architecture for Aberrated Pupil Images; and Thermal Transport Model for Heat Sink Design.

Source record↗

Effective Materials Property Information Management for the 21st Century

This paper discusses key principles for the development of materials property information management software systems. There are growing needs for automated materials information management in various organizations. In part these are fueled by the demands for higher efficiency in material testing, product design and engineering analysis. But equally important, organizations are being driven by the need for consistency, quality and traceability of data, as well as control of access to sensitive information such as proprietary data. Further, the use of increasingly sophisticated nonlinear, anisotropic and multi-scale engineering analyses requires both processing of large volumes of test data for development of constitutive models and complex materials data input for Computer-Aided Engineering (CAE) software. And finally, the globalization of economy often generates great needs for sharing a single "gold source" of materials information between members of global engineering teams in extended supply chains. Fortunately, material property management systems have kept pace with the growing user demands and evolved to versatile data management systems that can be customized to specific user needs. The more sophisticated of these provide facilities for: (i) data management functions such as access, version, and quality controls; (ii) a wide range of data import, export and analysis capabilities; (iii) data "pedigree" traceability mechanisms; (iv) data searching, reporting and viewing tools; and (v) access to the information via a wide range of interfaces. In this paper the important requirements for advanced material data management systems, future challenges and opportunities such as automated error checking, data quality characterization, identification of gaps in datasets, as well as functionalities and business models to fuel database growth and maintenance are discussed.

Ren, Weiju↗

An Optimization Model for Scheduling Problems with Two-Dimensional Spatial Resource Constraint

Traditional scheduling problems involve determining temporal assignments for a set of jobs in order to optimize some objective. Some scheduling problems also require the use of limited resources, which adds another dimension of complexity. In this paper we introduce a spatial resource-constrained scheduling problem that can arise in assembly, warehousing, cross-docking, inventory management, and other areas of logistics and supply chain management. This scheduling problem involves a twodimensional rectangular area as a limited resource. Each job, in addition to having temporal requirements, has a width and a height and utilizes a certain amount of space inside the area. We propose an optimization model for scheduling the jobs while respecting all temporal and spatial constraints.

Garcia, Christopher↗

GSFC Safety and Mission Assurance Organization

This viewgraph presentation reviews NASA Goddard Space Flight Center's approach to safety and mission assurance. The contents include: 1) NASA GSFC Background; 2) Safety and Mission Assurance Directorate; 3) The Role of SMA-D and the Technical Authority; 4) GSFC Mission assurance Requirements; 5) GSFC Systems Review Office (SRO); 6) GSFC Supply Chain Management Program; and 7) GSFC ISO9001/AS9100 Status Brief.

Kelly, Michael P.↗

Lead-Free Electronics: Impact for Space Electronics

Pb is used as a constituent in solder alloys used to connect and attach electronic parts to printed wiring boards (PWBs). Similar Pbbearing alloys are electroplated or hot dipped onto the terminations of electronic parts to protect the terminations and make them solderable. Changing to Pb-free solders and termination finishes has introduced significant technical challenges into the supply chain. Tin/lead (Sn/Pb) alloys have been the solders of choice for electronics for more than 50 years. Pb-free solder alloys are available but there is not a plug-in replacement for 60/40 or 63/37 (Sn/Pb) alloys, which have been the industry workhorses.

Sampson, Michael J.↗

Ultra Reliable Closed Loop Life Support for Long Space Missions

Spacecraft human life support systems can achieve ultra reliability by providing sufficient spares to replace all failed components. The additional mass of spares for ultra reliability is approximately equal to the original system mass, provided that the original system reliability is not too low. Acceptable reliability can be achieved for the Space Shuttle and Space Station by preventive maintenance and by replacing failed units. However, on-demand maintenance and repair requires a logistics supply chain in place to provide the needed spares. In contrast, a Mars or other long space mission must take along all the needed spares, since resupply is not possible. Long missions must achieve ultra reliability, a very low failure rate per hour, since they will take years rather than weeks and cannot be cut short if a failure occurs. Also, distant missions have a much higher mass launch cost per kilogram than near-Earth missions. Achieving ultra reliable spacecraft life support systems with acceptable mass will require a well-planned and extensive development effort. Analysis must determine the reliability requirement and allocate it to subsystems and components. Ultra reliability requires reducing the intrinsic failure causes, providing spares to replace failed components and having "graceful" failure modes. Technologies, components, and materials must be selected and designed for high reliability. Long duration testing is needed to confirm very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The system must be designed, developed, integrated, and tested with system reliability in mind. Maintenance and reparability of failed units must not add to the probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass should start soon since it must be a long term effort.

Jones, Harry W.↗

NASA-DoD Lead-Free Electronics Project

Original Equipment Manufacturers (OEMs), depots, and support contract ors have to be prepared to deal with an electronics supply chain that increasingly provides parts with lead-free finishes, some labeled no differently and intermingled with their SnPb counterparts. Allowance of lead-free components presents one of the greatest risks to the r eliability of military and aerospace electronics. The introduction of components with lead-free terminations, termination finishes, or cir cuit boards presents a host of concerns to customers, suppliers, and maintainers of aerospace and military electronic systems such as: 1. Electrical shorting due to tin whiskers 2. Incompatibility of lead-f ree processes and parameters (including higher melting points of lead -free alloys) with other materials in the system 3. Unknown material properties and incompatibilities that could reduce solder joint reli ability As the transition to lead-free becomes a certain reality for military and aerospace applications, it will be critical to fully un derstand the implications of reworking lead-free assemblies.

Kessel, Kurt↗

Current and Future Parts Management at NASA

This presentation provides a high level view of current and future electronic parts management at NASA. It describes a current perspective of the new human space flight direction that NASA is beginning to take and how that could influence parts management in the future. It provides an overview of current NASA electronic parts policy and how that is implemented at the NASA flight Centers. It also describes some of the technical challenges that lie ahead and suggests approaches for their mitigation. These challenges include: advanced packaging, obsolescence and counterfeits, the global supply chain and Commercial Crew, a new direction by which NASA will utilize commercial launch vehicles to get astronauts to the International Space Station.

Sampson, Michael J.↗

NASA Space Technology Draft Roadmap Area 13: Ground and Launch Systems Processing

This slide presentation reviews the technology development roadmap for the area of ground and launch systems processing. The scope of this technology area includes: (1) Assembly, integration, and processing of the launch vehicle, spacecraft, and payload hardware (2) Supply chain management (3) Transportation of hardware to the launch site (4) Transportation to and operations at the launch pad (5) Launch processing infrastructure and its ability to support future operations (6) Range, personnel, and facility safety capabilities (7) Launch and landing weather (8) Environmental impact mitigations for ground and launch operations (9) Launch control center operations and infrastructure (10) Mission integration and planning (11) Mission training for both ground and flight crew personnel (12) Mission control center operations and infrastructure (13) Telemetry and command processing and archiving (14) Recovery operations for flight crews, flight hardware, and returned samples. This technology roadmap also identifies ground, launch and mission technologies that will: (1) Dramatically transform future space operations, with significant improvement in life-cycle costs (2) Improve the quality of life on earth, while exploring in co-existence with the environment (3) Increase reliability and mission availability using low/zero maintenance materials and systems, comprehensive capabilities to ascertain and forecast system health/configuration, data integration, and the use of advanced/expert software systems (4) Enhance methods to assess safety and mission risk posture, which would allow for timely and better decision making. Several key technologies are identified, with a couple of slides devoted to one of these technologies (i.e., corrosion detection and prevention). Development of these technologies can enhance life on earth and have a major impact on how we can access space, eventually making routine commercial space access and improve building and manufacturing, and weather forecasting for example for the effect of these process improvements on our daily lives.

Clements, Greg↗

ASPEN Version 3.0

The Automated Scheduling and Planning Environment (ASPEN) computer program has been updated to version 3.0. ASPEN is a modular, reconfigurable, application software framework for solving batch problems that involve reasoning about time, activities, states, and resources. Applications of ASPEN can include planning spacecraft missions, scheduling of personnel, and managing supply chains, inventories, and production lines. ASPEN 3.0 can be customized for a wide range of applications and for a variety of computing environments that include various central processing units and random access memories.

Rabideau, Gregg↗