Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “substations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Bus Clustering for Distribution Grid Topology Identification

Recovering the distribution grid topology is essential to perform several distribution system operator functions. Many algorithms that address the topology recovery problem have already been proposed in the literature. Most are based on a priori information regarding which buses are fed by which substation; however, this information might not be available because frequent grid reconfigurations change the distribution grid portion connected to each substation. This paper addresses the problem of assigning every substation the set of buses that it is feeding, given field data. First, the aforementioned task is cast as a nonconvex optimization problem. Second, a relaxed version of the optimization problem is solved via the alternating direction method of multipliers. Finally, the performance of our approach is validated through numerical simulations of realistic scenarios using a standard IEEE benchmark feeder.

bus clustering↗

Networked Microgrids Optimization

This project is mainly about the operation optimization of three networked microgrids (MG), including centralized optimization and distributed optimization. The alternating direction method of multipliers (ADMM) algorithm is used for distributed optimization. In the distribution network considered here, there is a Distribution Management system (DMS) as the system coordinator and several networked microgrids. In grid-connected mode, power could be imported or exported at the distribution substation bus according to the utility rate, and the exchanged power at point of common coupling (PCC) of any microgrid has a limitation. In islanded mode, the power imports/exports at the distribution substation are zero. In both grid-connected and islanded mode, the distribution substation is taken as a slack bus with fixed voltage magnitude.

Chen, Yang [Oak Ridge National Laboratory (ORNL), ↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CERF: IM3 Projected Western US Power Plant Locations

Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

CERF↗

Polarization and collision-induced coherence in the beam-foil light source

Monatomic systems were excited by the beam-foil method in order to re-examine the possibility that a particular magnetic substate was preferentially populated. O II, Ar II and He I levels were used. The results reveal that: (1) with a tilted foil substantial polarization (up to 15%) may be achieved, (2) the polarization is due to the foil, (3) the foil induces coherence among Zeeman substates with the appearance of quantum beats among these substates and that their coherence is due to the externally applied magnetic field perpendicular to the beam direction, and (4) the angular momentum of the emitted photon is perpendicular to the ion velocity. The possibility for detecting separate effects of alignment and polarization is noted.

Liu, C. H.↗

Two-way communication and analysis program on LANDSAT

Community workshops, field visits, telephone surveys, and other research reveals that professionals at the substate level are interested in and open to consideration of LANDSAT as a planning and resource management tool, but are at the same time skeptical about some of the inherent problems with LANDSAT such as cost, resolution, frequency of coverage, and data continuity. The principal requirements for increasing the utilization of LANDSAT by potential substate users were identified and documented. Without a committment from the Federal Government for increased substrate utilization and the availability of trained professionals to meet the needs of a largely new user community, substrate activity is likely to remain at a minimum. Well conceived and well executed demonstration projects could play a critical role is shaping the technology's ability to be more sensitive to substate user needs and interests as well as validating the effectiveness of this data to a skeptical audience.

Source record↗

ChatGPT and Other Large Language Models for Cybersecurity of Smart Grid Applications

Cybersecurity breaches targeting electrical substations constitute a significant threat to the integrity of the power grid, necessitating comprehensive defense and mitigation strategies. Any anomaly in information and communication technology (ICT) should be detected for secure communications between devices in digital substations. This paper proposes large language models (LLMs), e.g., ChatGPT, for the cybersecurity of IEC 61850-based communications. Multi-cast messages such as generic object oriented system events (GOOSE) and sampled values (SV) are used for case studies. The proposed LLM-based cybersecurity framework includes, for the first time, data pre-processing of communication systems and human-in-the-loop (HITL) training (considering the cybersecurity guidelines recommended by humans). The results show a comparative analysis of detected anomaly data carried out based on the performance evaluation metrics for different LLMs. A hardware-in-the-loop (HIL) testbed is used to generate and extract a dataset of IEC 61850 communications.

ChatGPT↗

Network-Cognizant Time-Coupled Aggregate Flexibility of Distribution Systems Under Uncertainties

Increasing integration of distributed energy resources (DERs) within distribution feeders provides unprecedented flexibility at the distribution-transmission interconnection. To exploit this flexibility and to use the capacity potential of aggregate DERs, feasible substation power injection trajectories need to be efficiently characterized. This paper provides an ellipsoidal inner approximation of the set of feasible power injection trajectories at the substation such that for any point in the set, there exists a feasible disaggregation strategy of DERs for any load uncertainty realization. The problem is formulated as one of finding the robust maximum volume ellipsoid inside the flexibility region under uncertainty. Though the problem is NP-hard even in the deterministic case, this paper derives novel approximations of the resulting adaptive robust optimization problem based on optimal second-stage policies. The proposed approach yields less conservative flexibility characterization than existing flexibility region approximation formulations. The efficacy of the proposed method is demonstrated on a realistic distribution feeder.

aggregates↗

Consumer safety-oriented scheduling of rotating power outages during heat waves

Extreme heat events have widespread effects on power systems, reducing available generation capacity, limiting transmission capabilities, and causing unusual demand patterns on the consumer side. As these combined effects expose bulk transmission systems to potential large-scale blackouts, utilities may be required to schedule and apply rotating outages, by temporarily and alternately disconnecting distribution substations to reduce overload. However, utilities lack mechanisms to inform these events, exacerbating the negative effects of heat waves on affected communities. This paper introduces a novel framework for scheduling rotating outages during heat waves while considering impacts on consumers’ safety. Instead of random sequential load shedding, we propose a methodology to rotate power outages considering a metric that quantifies the indoor overheating risk of groups of consumers during a power outage. The overheating risk is derived from a detailed building simulation using CityBES, where the buildings are modeled based on available data—use type, year built, floor area, number of stories, location—while presence of air conditioning and occupancy are calibrated from smart meter data. Based on the metric, an algorithm to schedule the rotating outages is applied to prioritize feeders for disconnection at each hour according to their overheating risk to meet a utility load reduction target. Applied to two substations and seven feeders in the Portland General Electric territory, the results show that this approach effectively leads to the lowest overheating risk during the resulting outage schedules, with an average 10.1% lower overheating compared to uninformed schedules.

Building thermal simulation↗

A cross-dimensional analysis of data-driven short-term load forecasting methods with large-scale smart meter data

Electricity load forecasting is essential to utility operation and power grid stability. A wide spectrum of data-driven methods, ranging from linear regression models to more recent deep learning models have been adopted to forecast electric load over the years. However, there still lacks a holistic evaluation of the applicability of conventional statistical and machine learning based algorithms with respect to different temporal and spatial scopes, computational requirements, and sensitivity of model-tuning. Enabled by a large-scale electricity load profile dataset of over 40,000 residential customers in a utility region, we conducted a cross-dimensional analysis of data-driven load forecasting methods. Three regression-based and seven deep learning algorithms with different model configurations were evaluated in terms of their overall and peak load prediction accuracy, and training burdens, across spatial aggregation levels ranging from the transformer, feeder, substation, to neighborhood. We found, first, the load forecasting accuracy is constrained by a predictability boundary, influenced by the forecasting horizon and spatial aggregation level. Specifically, RandomForest, XGBoost, TFT, TSMixer, and TiDE models achieved less than 10 % prediction error for up to 96-h ahead forecasting for district, substation, and feeder levels, while other models struggle at long-horizon predictions; Second, for winter and summer peak load dates, most models were able to predict the peak demand timing within ± 1 h, but the prediction percentage error varied by models, with TFT and TiDE models being the top performers; Third, models with similar prediction accuracy can differ in training burden by an order of magnitude. Therefore, choosing model configurations that balance prediction performance and computational resource is an important practical consideration for large-scale deployment of the machine learning based load forecasting. The outcome of this study can guide researchers and practitioners to choose the proper load forecasting algorithms based on their problem scope, required accuracy, and available resources. The predictability boundary can serve as a benchmark for electricity load forecasting problems with new algorithms and datasets.

Li, Han↗

Wildfire-Power Grid Interactions: Feedback, Impacts, Monitoring, Modeling, and Mitigation Strategies

Wildfires are increasingly interacting with electric power systems through a two-way hazard chain: fires damage grid assets and trigger cascading outages, while grid faults can ignite new fires under hot, dry, and windy conditions. This review synthesizes the state of knowledge across five domains: (i) physical impacts of flames, heat, and smoke on lines, towers, insulators, and substations; (ii) power-infrastructure-initiated ignitions via conductor clash, high-impedance faults, and corona discharge; (iii) widespread blackouts and disproportionate societal impacts; (iv) multi-scale monitoring spanning laboratory tests, in-situ and grid-integrated sensors, and Earth observation; (v) coupled modeling that links fire behavior with grid operations; and (vi) technological and strategic mitigation pathways spanning prevention, response, and recovery. We integrate these domains into a novel 'feedback-aware' socio-technical framework. Through a longitudinal analysis (2005-2025) of global incidents, we identify that while vegetation contact remains the most frequent ignition source, aging infrastructure failure has emerged as a critical driver of catastrophic 'mega-fires'. We further identify persistent gaps, including limited interoperability of high-frequency grid and environmental data, scarce real-time data assimilation, and under-developed equity metrics for outage management. We conclude by outlining a research agenda to (1) deploy interoperable sensing architectures, (2) advance feedback-coupled fire-grid simulations, and (3) evaluate mitigation portfolios through techno-economic and fairness lenses. Recognizing wildfire-grid interactions as coupled socio-technical systems is essential for protecting infrastructure and communities and for ensuring reliable, sustainable electricity in a changing world.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Network Topology for Node-Breaker Representations With AC Power Flow Constraints

It has been demonstrated that network topology optimization (NTO) may change the topology of power system networks, and consequently, provide additional flexibility to reduce network congestion and violations. Most NTO problems are formulated based on the bus-branch model in which it is challenging to represent a realistic picture of all substation configurations. In this paper, we explore advantages of substation reconfiguration modeling based on node-breaker representations for NTO problem with full nonlinear alternating current power flow. It also proposes a tailored solution algorithm to solve this nonconvex mixed-integer nonlinear programming through the outer approximation method. The proposed solution approach iterates between a mixed-integer linear programming and a nonlinear subproblem. Additional enhancements to further accelerate the iteration process are illustrated. Numerical case studies demonstrate the relative economic and operational impact of optimal network topology with node-breaker representations.

42 ENGINEERING↗

Machine Learning-Assisted Distribution System Network Reconfiguration Problem

High penetration from volatile renewable energy resources in the grid and the varying nature of loads raise the need for frequent line switching to ensure the efficient operation of electrical distribution networks. Operators must ensure maximum load delivery, reduced losses, and the operation between voltage limits. However, computations to decide the optimal feeder configuration are often computationally expensive and intractable, making it unfavorable for real-time operations. This is mainly due to the existence of binary variables in the network reconfiguration optimization problem. To tackle this issue, we have devised an approach that leverages machine learning techniques to reshape distribution networks featuring multiple substations. This involves predicting the substation responsible for serving each part of the network. Hence, it leaves simple and more tractable Optimal Power Flow problems to be solved. This method can produce accurate results in a significantly faster time, as demonstrated using the IEEE 37-bus distribution feeder. Compared to the traditional optimization-based approaches, a feasible solution is achieved approximately ten times faster for all the tested scenarios.

deep neural networks↗

Network-Cognizant Time-Coupled Aggregate Flexibility of Distribution Systems Under Uncertainties

Increasing integration of distributed energy resources (DERs) within distribution feeders provides unprecedented flexibility at the distribution-transmission interconnection. To exploit this flexibility and to use the capacity potential of aggregate DERs, feasible substation power injection trajectories need to be efficiently characterized. This paper provides an ellipsoidal inner approximation of the set of feasible power injection trajectories at the substation such that for any point in the set, there exists a feasible disaggregation strategy of DERs for any load uncertainty realization. The problem is formulated as one of finding the robust maximum volume ellipsoid inside the flexibility region under uncertainty. Though the problem is NP-hard even in the deterministic case, this paper derives novel approximations of the resulting adaptive robust optimization problem based on optimal second-stage policies. The proposed approach yields less conservative flexibility characterization than existing flexibility region approximation formulations. The efficacy of the proposed method is demonstrated on a realistic distribution feeder.

adaptive robust optimization↗

Performance Evaluation of Peer-to-Peer Distributed Microgrids Coordination for Voltage Regulation

This paper presents the performance evaluation of a peer-to-peer microgrids coordination algorithm for sub-transmission systems. As distributed energy resources (DERs) in distribution system start to show negative impact to the bulk power system, a paradigm shift is needed for transmission planning and operation. Because distribution substations are located far from the sub-transmission system, and it is hard to use traditional centralized control for real-time control and coordination. Thus, distributed control is a natural choice because it requires less communication and central computation. In this paper, each distribution substation is treated as a microgrid, and the peer-to-peer distributed microgrids control is formulated as a real-time optimal power flow problem to reduce the negative impact in sub-transmission systems. A distributed primal-dual optimization algorithm is adopted to solve the problem. Validation of the peer-to-peer algorithm is performed through the simulation of a real-world sub-transmission system composing of many distribution systems with high renewable penetration. Simulation results show that the peer-to-peer algorithm can achieve satisfactory performance (e.g., voltage regulation) in sub-transmission system by coordinating and controlling DERs in distribution systems.

distributed control↗

The Impact of Behind-the-Meter Heterogeneous Distributed Energy Resources on Distribution Grids

The increasing integration of distributed energy resources (DERs) on the electric grid brings new challenges and opportunities for utility grid operations. With the rapid deployment of DERs, there is emerging interest in integrating these controllable devices with utility operations at all levels for monitoring and management. To understand the challenges with increasing behind-the-meter (BTM) DERs and to identify the needs in deploying advanced controls, a comprehensive grid impact study is indispensable. This paper presents the analysis which help visualize the DER impact on the grid, identify the challenges and provides an insight into the new distribution management and control needs to enable reliable and resilient grid operations.

behind-the-meter↗

Effect of GPS Manipulation to Traditional and Next Generation Relay Protection

This project’s objective is to test the effect of GPS timing variations on relay protection algorithms to determine vulnerabilities and the associated hazards to the electric grid. This will focus on differential protection which utilizes peer to peer communication between substations to determine if the current is not equivalent. This requires the use of GPS to sync the two substations and can be vulnerable to GPS manipulation. However, the effects of GPS manipulation are not a commonly known risk. Therefore, this LDRD will address the risks of GPS manipulation for such a widely implemented technology. For differential protection a GPS resilient architecture was implemented and tested for differential protective relays through a direct serial fiber connection between the two relays. This allows for one relay to be the master and provide synchronization outside of timestamp for differential protection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Broadband Characterization and Circuit Model Development of Transmission-Scale Transformers

This report describes broadband measurements of transmission-scale transformers typical in the electric power grid. This work was performed as part of the EMP Resilient Grid LDRD project at Sandia National Laboratories to generate circuit models that can be used for high-altitude electromagnetic pulse (HEMP) coupling simulations and response predictions. The objective of the work was to obtain characterization data of substation yard equipment across a frequency range relevant to HEMP. Vector network analyzer measurements up to 100 MHz were performed on two power transformers at ABB-Hitachi and a single ITEC potential transformer. Custom cable breakouts were designed to interface with the transformer terminals and provide ground connections to the chassis at the base of the transformer bushings. The three-phase terminals of the power transformers were measured as a common mode impedance using a parallel resistive splitter, and the single-phase terminals of the potential transformer were measured directly. A vector fitting algorithm was used to empirically fit circuit models to the resulting two-port networks and input impedances of the measured objects. Simplified circuit representations of the input impedances were also generated to assess the degree of precision needed for high-altitude electromagnetic pulse response predictions, which were performed in Sandia's XYCE circuit simulator platform. HEMP coupling simulations using the transformer models showed significant reduction in the voltage peak and broadening in the pulse width seen at the power transformer compared to the traveling wave voltage. This indicated the importance of the load condition when defining the coupled insult in an electric power substation. Simplified circuit models showed a similar voltage at the transformer with a smoothed waveform. The presence of potential transformers in the simulation did not significantly change the simulated voltage at the power transformer. Single-port input impedance models were also developed to define load conditions when transfer characteristics were not necessary.

24 POWER TRANSMISSION AND DISTRIBUTION↗