Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “software reliability engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

DuraMAT FY24 Annual Report: Five Results to Help America's Photovoltaic Industry

The Durable Module Materials Consortium's overarching goal is to understand photovoltaic (PV) module degradation and enable high-energy-yield modules with a 50-year lifespan. One of DuraMAT's milestones this year was to identify cases where the whole of DuraMAT really mattered and made an impact that was greater than the sum of the project results. We identified five key results that demonstrate progress toward enabling 50-year modules for a resilient PV industry: 1) Resilient PV Systems; 2) Proactive Materials Screening; 3) Understanding Wear-Out; 4) Identifying Which Cracks Matter; and 5) Software Tools and Data Resources This annual report summarizes these key results, as well as reviewing our other ongoing work in fiscal year 2024.

14 SOLAR ENERGY↗

Near-fault earthquake ground motion prediction by a high-performance spectral element numerical code

Near-fault effects have been widely recognised to produce specific features of earthquake ground motion, that cannot be reliably predicted by 1D seismic wave propagation modelling, used as a standard in engineering applications. These features may have a relevant impact on the structural response, especially in the nonlinear range, that is hard to predict and to be put in a design format, due to the scarcity of significant earthquake records and of reliable numerical simulations. In this contribution a pilot study is presented for the evaluation of seismic ground-motions in the near-fault region, based on a high-performance numerical code for 3D seismic wave propagation analyses, including the seismic fault, the wave propagation path and the near-surface geological or topographical irregularity. For this purpose, the software package GeoELSE is adopted, based on the spectral element method. The set-up of the numerical benchmark of 3D ground motion simulation in the valley of Grenoble (French Alps) is chosen to study the effect of the complex interaction between basin geometry and radiation mechanism on the variability of earthquake ground motion.

58 GEOSCIENCES↗

Methodology for Building Granular Testing in Multicomponent Scientific Software

Computational science and engineering communities develop complex application software with multiple mathematical models that need to interact with one another. Partly due to complexity of verifying scientific software, and partly because of the way incentives work in science, there has been insufficient testing of these codes. With a spotlight on the results produced with scientific software, and increasing awareness of software testing and verification as a critical contributor to the reliability of these results, testing is gaining more attention by the developing teams. However, many science teams struggle to find a good solution for themselves due either to lack of training or lack of resources within the team. In this experience paper, we describe test development methodologies utilized in two different scenarios: one explains a methodology for building granular tests where none existed before, while the second demonstrates a methodology for selecting test cases that build confidence in the software through a process similar to scaffolding. The common insight from both the experiences is that testing should be a part of software design from the beginning for better software and scientific productivity.

test building, granular testing, Earth system mode↗

Southwest Wind Power R&D Test Site Development at the National Wind Technology Center (CRADA CRD-12-00472 Final Report)

Southwest Windpower, Inc. (SWWP) has been designing and distributing small wind turbines for more than 22 years and is the recognized global leader in the design, manufacturing and distribution of small wind systems (400-3000 watts). The company has been a pioneer in the development of wind technology and has built and shipped more than 170,000 wind turbines to over 120 countries worldwide. Headquartered in Flagstaff AZ, SWWP has sales representatives in over 88 countries. Applications for SWWP systems include residential homes, commercial properties, micro grids, remote cabins, telecom transmitters, offshore platforms, water pumping and sailboats. In addition, U.S. Department of Defense uses SWWP’s products in Forward Operating Bases (FOB’s), USGS uses them for remote monitoring of glacier movements and the CIA uses them to provide power seismic monitoring. Today, SWWP plans development of new technologies to address distributed energy market needs and become even more aggressive in international markets. This strategy includes extensive Research, Development, Demonstration & Deployment (RDD&D) activities to improve existing production line into more simple, reliable, and cost-effective wind turbine systems. Important part of such activities is the field testing of the new systems, which should provide: (i) validation of the reliable operation of hardware and software; (ii) validation of numerical models of the system and its components; (iii) field comparison of various control and optimization strategies; (iv) customized reliability testing; (v) customized monitoring and analysis testing; and (vi) IEC certification testing (vii) filed demonstration of system performance and reliability. Such field testing facility should encompass multiple towers and appropriate data acquisition systems. SWWP is exploring to move part of the engineering department to Colorado, and execute its RDD&D strategies in this new location. Partnership with NREL will provide great insights into SWWP’s RDD&D processes and more efficient commercialization by utilizing NWTC as the field testing site, and working close with NREL personnel. NWTC is ideally suited to strain the design. NREL is very experienced with customized and IEC testing. During this project, Southwest Windpower aims to improve the value proposition of distributed renewable energy, and make it a competitive choice in the energy markets. As of today, more then 170,000 small wind turbines, manufactured in the U.S., are installed in more then 180 countries. With the improved value proposition, Southwest Windpower wants to create and address new market needs, substantially increase its sales domestically and internationally, which should have positive impact on the creation of American jobs, competitiveness of U.S. economy, export or U.S. products, and the use of renewable energy.

17 WIND ENERGY↗

Evolution of Programmatic Asset Lifecycle Planning at MESA

Early on in 2018 Sandia recognized the Microsystems Engineering, Science and Applications (MESA) Programmatic Asset Lifecycle Planning capability to be unpredictable, inconsistent, reactive, and unable to provide strong linkage to the sponsor's needs. The impetus for this report is to share learnings from MESA's journey towards maturing this capability. This report describes re-building the foundational elements of MESA's Programmatic Asset Lifecycle Planning capability using a risk-based, Multi-Criteria Decision Analysis (MCDA) approach. To begin, MESA's decades-old Piano Chart + Ad Hoc Hybrid Methodology is described with a narrative of its strengths and weaknesses. Then its replacement, the MCDA /Analytical Hierarchy Process, is introduced with a discussion of its strengths and weaknesses. To generate a realistic Programmatic Asset Lifecycle Planning budget outlook, MESA used its rolling 20-year Extended Life Program Plan (MELPP) as a baseline. The new MCDA risk-based prioritization methodology implements DOE/NNSA guidelines for prioritization of DOE activities and provides a reliable, structured framework for combining expert judgement and stakeholder preferences according to an established scientific technique. An in-house Hybrid Decision Support System (HDSS) software application was developed to facilitate production of several key deliverables. The application enables analysis of the prioritization decisions with charts to display and provide linkage of MESA's funding requests to the stakeholders' priorities, strategic objectives, nuclear deterrence programs, MESA priorities, and much more.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FORCE Update 2024

The Framework for Optimization of Resources and Economics (FORCE) tool suite is the U.S. Department of Energy’s Nuclear Integrated Energy Systems (IES) Program flagship tool suite for technoeconomic IES analysis of IES. This tool suite is useful for analysis designed to evaluate and improve the technoeconomics of energy production systems, particularly for systems including nuclear technology. In this report, we document the development activity for the FORCE tool suite to extend its capabilities as performed during fiscal year 2024. In addition to reliability and accessibility, capability is one of the three standards guiding the development of the FORCE tool suite and the software codes that are its constituent parts. Extending the capabilities of the FORCE tool suite allows analysis both within the IES program as well as industry, university, and laboratory partners to perform analysis with more accuracy, insight, and impactful narrative. Four areas of capability development were the focus of activity this year: economic parameter uncertainty quantification, multiresolution analysis, components-to-optimization workflow automation, and statespace construction workflows for real-time optimal control. In economic parameter uncertainty quantification, the ability of HERON to capture risk due to scenarios (weather and energy demand uncertainty) was expanded to also include uncertainties in financial parameters such as capital cost or operation and maintenance costs. By including these sources of uncertainty, which are sometimes very large compared with scenario uncertainty, HERON is better able to capture the risk posed by investment in various IES technology. Because of this, analysts can also consider the reduction in risks that can be realized by choice of some technologies. In multiresolution analysis, development activity extended on work completed previously. In fiscal year 2023, methods for decomposing time series signals, such as demand, solar and wind availability, and price profiles, were analyzed and down-selected to those most effective at splitting signals into different resolutions. These resolutions allow considering the influence of different energy demand and supply behaviors across different time scales. For example, energy demand might be divided into seasonal, weekly, and hourly profiles. In fiscal year 2024, this preliminary work was extended and implemented within the Risk Analysis Virtual Environment (RAVEN) risk and uncertainty analysis platform, which is used throughout the FORCE framework. This development of the “multi-resolution time series analysis” (MR-TSA) module in RAVEN allows training synthetic history generators on complex time series. These synthetic history generators can then be used in HERON for generating scenarios that represent possible market and weather scenarios that can be analyzed on different time scales. We envision completing this work in the future, implementing multiresolution dispatch optimization strategies that can make the most beneficial use of these stratified time histories. In components-to-optimization workflow development, workflows for translating user inputs of components into algorithms for algebraic optimization were selected and implemented. Similar algorithms within the Holistic Energy Resource Optimization Network (HERON) were separated from the main code base of HERON and gathered with the components-to-optimization workflows in the new Dispatch Optimization Variable Engine (DOVE) software library. This modularization allows FORCE users to analyze dispatch optimization and energy system duty cycles independently of HERON, which previously was a burdensome task. Additionally, these dispatch optimization algorithms, set up in an independent library, can now be used across all software applications within FORCE, especially including the real-time optimal control software Optimization of Real-time Capacity Allocation (ORCA). Allowing FORCE software to share dispatch optimization algorithms within a single library allows for improved software maintenance and reliability. In statespace characterization workflow development, alternative workflows for optimizing dispatch with additional technical accuracy was the focus, particularly to improve the real-time optimization decision making in ORCA. Using algorithms and workflows initially developed for the Feasible Actuator Range Modifier (FARM), workflows for determining the statespace representation of IES were identified and demonstrated. The resulting dispatch optimization required a more robust optimization algorithm than that originally used in HERON (and moved to DOVE), which required adding an alternate workflow to DOVE that can more accurately match the behavior of physical systems using a partial differential equation representation. In conclusion, capability developments in the FORCE tool suite in fiscal year 2024 have improved the ability of the FORCE tool suite to perform

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

AOI.1 Application of Artificial Intelligence techniques enabling coal fired power plants the ability to achieve higher efficiency, improved availability, and increased reliability of their operations (Final Report)

During this effort, SparkCognition with support from the Electric Power Research Institute (EPRI) was tasked with applying artificial intelligence (AI) to improve the reliability, efficiency, and safety of operations at a coal-fired plant. By implementing AI techniques, like machine learning (ML), it is believed that operators can leverage existing data sources to gain more insights such as advanced warning of machine degradation. With enough lead time, a reliability engineer can take action to minimize, or even avoid, impact to production. To complete this work effort, SparkCognition developed and refined an ML-based model using sensor data for a Steam Turbine unit at a host site. The models were deployed in an online, web-based solution that allows users to visualize model outputs and supporting data. The final solution, based on SparkCognition’s proprietary software platform called SparkPredict®, was shared with EPRI who completed an online evaluation of results to determine the solution’s ability to detect actionable events.

20 FOSSIL-FUELED POWER PLANTS↗

Human factor engineering based design and modernization of control rooms with new I and C systems

Instrumentation and Control (I and C) systems of the latest nuclear power plants are based on the use of digital technology, distributed control systems and the integration of information in data networks (Distributed Control and Instrumentation Systems). This has a repercussion on Control Rooms (CRs), where the operations and monitoring interfaces correspond to these systems. These technologies are also used in modernizing I and C systems in currently operative nuclear power plants. The new interfaces provide additional capabilities for operation and supervision, as well as a high degree of flexibility, versatility and reliability. An example of this is the implementation of solutions such as compact stations, high level supervision screens, overview displays, computerized procedures, new operational support systems or intelligent alarms processing systems in the modernized Man-Machine Interface (MMI). These changes in the MMI are accompanied by newly added Software (SW) controls and new solutions in automation. Tecnatom has been leading various projects in this area for several years, both in Asian countries and in the United States, using in all cases international standards from which Tecnatom own methodologies have been developed and optimized. The experience acquired in applying this methodology to the design of new control rooms is to a large extent applicable also to the modernization of current control rooms. An adequate design of the interface between the operator and the systems will facilitate safe operation, contribute to the prompt identification of problems and help in the distribution of tasks and communications between the different members of the operating shift. Based on Tecnatom experience in the field, this article presents the methodological approach used as well as the most relevant aspects of this kind of project. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

GENTANGLE: integrated computational design of gene entanglements

The design of two overlapping genes in a microbial genome is an emerging technique for adding more reliable control mechanisms in engineered organisms for increased stability. The design of functional overlapping gene pairs is a challenging procedure, and computational design tools are used to improve the efficiency to deploy successful designs in genetically engineered systems. GENTANGLE (Gene Tuples ArraNGed in overLapping Elements) is a high-performance containerized pipeline for the computational design of two overlapping genes translated in different reading frames of the genome. This new software package can be used to design and test gene entanglements for microbial engineering projects using arbitrary sets of user-specified gene pairs.

59 BASIC BIOLOGICAL SCIENCES↗

Argonne Leadership Computing Facility 2011 annual report: Shaping future supercomputing

The ALCF's Early Science Program aims to prepare key applications for the architecture and scale of Mira and to solidify libraries and infrastructure that will pave the way for other future production applications. Two billion core-hours have been allocated to 16 Early Science projects on Mira. The projects, in addition to promising delivery of exciting new science, are all based on state-of-the-art, petascale, parallel applications. The project teams, in collaboration with ALCF staff and IBM, have undertaken intensive efforts to adapt their software to take advantage of Mira's Blue Gene/Q architecture, which, in a number of ways, is a precursor to future high-performance-computing architecture. The Argonne Leadership Computing Facility (ALCF) enables transformative science that solves some of the most difficult challenges in biology, chemistry, energy, climate, materials, physics, and other scientific realms. Users partnering with ALCF staff have reached research milestones previously unattainable, due to the ALCF's world-class supercomputing resources and expertise in computation science. In 2011, the ALCF's commitment to providing outstanding science and leadership-class resources was honored with several prestigious awards. Research on multiscale brain blood flow simulations was named a Gordon Bell Prize finalist. Intrepid, the ALCF's BG/P system, ranked No. 1 on the Graph 500 list for the second consecutive year. The next-generation BG/Q prototype again topped the Green500 list. Skilled experts at the ALCF enable researchers to conduct breakthrough science on the Blue Gene system in key ways. The Catalyst Team matches project PIs with experienced computational scientists to maximize and accelerate research in their specific scientific domains. The Performance Engineering Team facilitates the effective use of applications on the Blue Gene system by assessing and improving the algorithms used by applications and the techniques used to implement those algorithms. The Data Analytics and Visualization Team lends expertise in tools and methods for high-performance, post-processing of large datasets, interactive data exploration, batch visualization, and production visualization. The Operations Team ensures that system hardware and software work reliably and optimally; system tools are matched to the unique system architectures and scale of ALCF resources; the entire system software stack works smoothly together; and I/O performance issues, bug fixes, and requests for system software are addressed. The User Services and Outreach Team offers frontline services and support to existing and potential ALCF users. The team also provides marketing and outreach to users, DOE, and the broader community.

99 GENERAL AND MISCELLANEOUS↗

A Large-Scale Analysis to Optimize the Control and V2V Communication Protocols for CDA Agreement-Seeking Cooperation

Cooperative driving automation (CDA) Class C, agreement-seeking cooperation, is an innovative and practical solution that can promote cooperation among general passenger vehicles on the road. However, more comprehensive studies are needed before establishing the standard protocols of agreement-seeking cooperation, such as communication frequency and the duration of cooperation. Here, this article presents an initiative study on the impacts of communication capabilities on agreement-seeking cooperation. Through a large-scale analysis by regulating vehicle-to-vehicle (V2V) communication metrics, this work suggests desirable system parameters that can maximize the benefits of cooperation and ensure reliable operability while avoiding exhaustive communication loads. As the first step, an example agreement-seeking cooperation system is created for a car-following scenario, including decision-making and control algorithms for autonomous vehicles. Then, software-in-the-loop tests explore the performance of the developed system as it encounters various communication risks, such as latency and message packet drops. The system performance metrics are evaluated from various angles, including the time consumed for the agreement-seeking process, cooperation ratio, and the ratio of faulty cooperation. Energy saving from the cooperation is assessed by using simulation software that can run multiple high-fidelity vehicle models simultaneously. Based on the analyses, this article suggests the V2V communication requirements for the reliable operation of CDA agreement-seeking, which can be referred to when developing the standard protocols of agreement-seeking cooperation.

42 ENGINEERING↗

Detailed Study of Emergency Diesel Generator Performance Using EPIX/RADS Database

A recent report was published by the U.S. Nuclear Regulatory Commission – Industry-Average Performance for Components and Initiating Events at U.S. Commercial Nuclear Power Plants, NUREG/CR-6928. That report characterized industry performance (generally covering 1998 – 2002) for 51 component types found in commercial nuclear power plants. For example, for emergency diesel generators, three failure modes were identified: fail to start and reach rated speed and voltage, fail to load and run for one hour, and fail to run beyond one hour. Data from the U.S. industry contained in the Equipment Performance and Information Exchange (EPIX) database maintained by The Institute for Nuclear Power Operations were used to evaluate the failure probabilities and rates for these failure modes, covering 1998 – 2002. The software package Reliability and Availability Database System (RADS) was used to search and process the EPIX data. In addition, train test and maintenance unavailability was characterized for 34 train types. As a follow-on effort to this report, several components will be analyzed in more detail each year. These detailed studies include more recent data and analyze various subcategories such as manufacturer, system, size and type (as applicable). In addition, engineering insights such as piece part contribution to each failure mode and failure cause will be determined. This paper summarizes the preliminary results for emergency diesel generators. EPIX data coverage was expanded to include 1998 – 2007 and reliability results were compared with unplanned demand performance (bus under voltage events requiring the emergency diesel generator to start, load and run) over the same period. In addition, performance by manufacturer was evaluated. Finally, piece part contributions and failure causes were determined for each failure mode.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan

Ensuring the reliability of the NIF, including its support systems, laser systems, target diagnostic systems, and utilities, is essential to the availability of the NIF in its support of NNSA missions. NIF is a key capability in the DOE Stockpile Stewardship Program and supports high energy physics experiments for nuclear weapons, energy, and astrophysics applications. High system reliability provides opportunities for shots and scientific discoveries with opportunities to enhance and upgrade capabilities. This Maintenance Plan (MP) identifies the policies and procedures used to perform and support asset management of the NIF Facility and Infrastructure Systems (FInS), NIF Lasers & Alignment (LASE), NIF Target Experimental Operations (TOPS), NIF Target Area Science and Engineering (TASE), and NIF&PS Control Systems (NCS). The FInS systems include the facility, HVAC, contamination control, beampath, and Line Replaceable Units (LRUs) as well as utilities which create the beampath environments, such as vacuum, argon, or clean dry air. The LASE systems are Programmatic systems which include laser diagnostics, alignment, power conditioning, pulsed power, and input laser systems. The TOPS and TASE systems are also Programmatic systems which include target and diagnostic delivery systems and positioners, many different insertable and fixed target diagnostics, and cryogenic and target gas fill systems. Finally, the NCS systems include both software and hardware for industrial and shot operation control systems. Policies governing administrative and operational practices related to maintenance of FInS, LASE, TOPS, TASE, and NCS systems are described in this plan. In addition, the plan provides processes and procedures for managing, tracking, and documenting the work. This document, the NIF Operations Management Plan, NIF-5020544 (Ref. 1), and NIF Shot Operations Plan, NIF-5018506 (Ref. 2), together satisfy the requirements of the Conduct of Operations. Duties, responsibilities, and reporting requirements of the various positions associated with FInS, LASE, and TOPS maintenance are detailed in this plan. The FInS systems include both Real Property systems with asset management requirements specified in DOE Order 430.1C (Ref. 3) and Programmatic systems. In addition, for FInS, there is a list of the System Level Maintenance Plans (SLMPs) in NIF-1007419198 (Ref. 4) which provide the system descriptions and maintenance plan and schedule. In addition, the list includes the Reliability Centered Maintenance (RCM) and Experience Centered Maintenance (ECM) evaluations that have been performed for applicable FInS systems as well as reliability criticality per Section 3.5. The -AM version of the NIF Maintenance Plan focuses on the reliability program for FInS, LASE, TOPS, TASE, and NCS within the context of the overall NIF Reliability, Availability, and Maintainability (RAM) program and incorporates changes since the -AL version from August 2011 and has been updated to be fully consistent with the updates to Ref. 1. It also includes asset management considerations, updates to the Work Order (WO) process within the NIF Computerized Maintenance Management System (CMMS) which is EAM infor® System Maintenance and Reliability Tracking (SMaRT) (Ref. 5), and updates to metrics and key performance indicators (KPIs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Digital Infrastructure Migration Framework Report

This document presents a full-scope Digital Infrastructure implementation and associated lifecycle support recommendations that enable a plant life of 80+ years. Specific technologies and software applications are researched, developed, selected, implemented, and then integrated by utilities to enhance safety, reliability, and economic performance such that the result provides much more than the sum of its parts. Specific selection of these technologies is driven by business case analyses which are utility, station, and unit specific.

42 ENGINEERING↗

Common Cause Failure Evaluation of High Safety-significant Safety-related Digital Instrumentation and Control Systems

Digital instrumentation and control (DI&C) systems in nuclear power plants (NPPs) have many advantages over analog systems but also pose different engineering and technical challenges, such as potential threats due to common cause failures (CCFs). This paper proposes a Platform for Risk Assessment of DI&C (PRADIC) developed by Idaho National Laboratory for dealing with potential software CCFs in DI&C systems of NPPs. The methodology development of PRADIC on the quantitative evaluation of software CCFs in high safety-significant safety-related DI&C systems in NPPs is illustrated in this paper. In PRADIC, qualitative hazard analysis and quantitative reliability and consequence analysis are successively implemented to obtain quantitative risk information, compare with respective risk evaluation acceptance criteria, and provide suggestions for risk reduction and design optimization. A comprehensive case study was also performed and documented in this paper. Results show that PRADIC can effectively identify potential digital-based CCFs, estimate their failure probabilities, and evaluate their impacts to system and plant safety.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Developing a Supply Chain Security Program

Amid growing concerns over foreign manufacturing for components and devices deployed in critical energy infrastructure, this research from the national labs will highlight best practices for developing and maintaining a supply chain security program. Tools for asset inventory, tips for developing and maintaining software- and hardware-bills-of-materials (SBOMs and HBOMs), recommended contractual language for vendor agreements, and identification of responsibilities will be shared. We discuss the one-time requirements to enable a successful supply chain security program and the best ways to operationalize this program for maximum impact, including development of robust practices for vulnerability tracking, patch management, and workarounds, with understanding of the reliability and uptime requirements for utilities. The recommendations shared are based on a cyber-informed engineering approach to identification of high-consequence impacts and the engineering controls related to supply chain management that can best mitigate these impacts. This approach allows for prioritization of resources. Additionally, we highlight relative up-front and ongoing costs associated with recommended controls. Viewers will leave with an understanding what a supply chain security program is, and what steps, prioritized for resource-constrained organizations, can build a robust program.

14 SOLAR ENERGY↗

Automated Cache Performance Analysis And Optimization

While there is no lack of performance counter tools for coarse-grained measurement of cache activity, there is a critical lack of tools for relating data layout to cache behavior to application performance. Generally, any nontrivial optimizations are either not done at all, or are done ”by hand” requiring significant time and expertise. To the best of our knowledge no tool available to users measures the latency of memory reference instructions for particular addresses and makes this information available to users in an easy-to-use and intuitive way. In this project, we worked to enable the Open|SpeedShop performance analysis tool to gather memory reference latency information for specific instructions and memory addresses, and to gather and display this information in an easy-to-use and intuitive way to aid performance analysts in identifying problematic data structures in their codes. This tool was primarily designed for use in the supercomputer domain as well as grid, cluster, cloud-based parallel e-commerce, and engineering systems and middleware. Ultimately, we envision a tool to automate optimization of application cache layout and utilization in the Open|SpeedShop performance analysis tool. To commercialize this software, we worked to develop core capabilities for gathering enhanced memory usage performance data from applications and create and apply novel methods for automatic data structure layout optimizations, tailoring the overall approach to support existing supercomputer and cluster programming models and constraints. In this Phase I project, we focused on infrastructure necessary to gather performance data and present it in an intuitive way to users. With the advent of enhanced Precise Event-Based Sampling (PEBS) counters on recent Intel processor architectures and equivalent technology on AMD processors, we are now in a position to access memory reference information for particular addresses. Prior to the introduction of PEBS counters, cache behavior could only be measured reliably in the aggregate across tens or hundreds of thousands of instructions. With the newest iteration of PEBS technology, cache events can be tied to a tuple of instruction pointer, target address (for both loads and stores), memory hierarchy, and observed latency. With this information we can now begin asking questions regarding the efficiency of not only regions of code, but how these regions interact with particular data structures and how these interactions evolve over time. In the short term, this information will be vital for performance analysts understanding and optimizing the behavior of their codes for the memory hierarchy. In the future, we can begin to ask how data layouts might be changed to improve performance and, for a particular application, what the theoretical optimal performance might be. The overall benefit to be produced by this effort was a commercial quality easy-to- use and scalable performance tool that will allow both beginner and experienced parallel programmers to automatically tune their applications for optimal cache usage. Effective use of such a tool can literally save weeks of performance tuning effort. Easy to use. With the proposed innovations, finding and fixing memory performance issues would be more automated and hide most to all of the performance engineer expertise ”under the hood” of the Open|SpeedShop performance tool. One of the biggest public benefits from the proposed innovations is that it makes performance analysis more usable to a larger group of application developers. Intuitive reporting of results. The Open|SpeedShop performance analysis tool has a rich set of intuitive, yet detailed reports for presenting performance results to application developers. Our goal was to leverage this existing technology to present the results from our memory performance addition to Open|SpeedShop. Suitable for experts as well as novices. Application performance is getting more difficult to measure as the hardware platforms they run on become more complicated. This makes life difficult for the application developer, in that they need to know more about the hardware platform, including the memory system hierarchy, in order to understand the performance of their application. Some application developers are comfortable in that sceario, while others want to do their scientific research and not have to understand all the nuances in the hardware platform they are running their application on. Our proposed innovations were aimed to support both experts and novice performance analysts. Useful in many markets. The enhancement to Open|SpeedShop would appeal to a broader market space, as it will be useful in scientific, commercial, and cloud computing environments. Our goal was to use technology developed initially at the and Lawrence Livermore National Laboratory combined with the development and commercial software experience of the Argo Navis Technologies, LLC (ANT) to form a powerful combination to delivery these objectives.

97 MATHEMATICS AND COMPUTING↗

Common Cause Failure Evaluation of High Safety Significant Safety-related Digital Instrumentation and Control Systems using IRADIC Technology

Digital instrumentation and control (DI&C) systems in nuclear power plants (NPPs) have many advantages over analog systems but also pose different engineering and technical challenges, such as potential threats due to common cause failures (CCFs). This paper proposes an integrated risk assessment technology for DI&C systems (IRADIC) developed by Idaho National Laboratory for dealing with potential software CCFs in DI&C systems of NPPs. The methodology development of the IRADIC technology on the quantitative evaluation of software CCFs in high safety-significant safety-related DI&C systems in NPPs is illustrated in this paper. In IRADIC, qualitative hazard analysis and quantitative reliability and consequence analysis are successively implemented to obtain quantitative risk information, compare with respective risk evaluation acceptance criteria, and provide suggestions for risk reduction and design optimization. A comprehensive case study was also performed and documented in this paper. Results show that the IRADIC technology can effectively identify potential digital-based CCFs, estimate their failure probabilities, and evaluate their impacts to system and plant safety.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗