SEARCH · Engineering Papers
Results for “software cost estimation”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
NE-COST plug-in: Expanding ACCERT's Capabilities for Life-Cycle Cost Modeling
The Algorithm for the Capital Cost Estimation of Reactor Technologies (ACCERT) is a structured methodology and software tool designed to simplify and standardize cost estimation for nuclear reactor technologies [1]. By utilizing a relational database structure and modular cost estimation algorithms, ACCERT delivers a robust, flexible, and scalable framework for evaluating costs across various reactor types and configurations [2]. The recent integration of the NE-COST plugin further expands ACCERT’s scope by introducing detailed life-cycle cost modeling and probabilistic analysis of uncertainties. This addition enables users to evaluate costs across front-end processes such as uranium enrichment and fabrication, as well as back-end activities including waste disposal and geologic storage. Through Monte Carlo statistical cost simulations, the plugin provides probabilistic insights into cost ranges, offering critical decision-making support for stakeholders including reactor developers, policymakers, and researchers.
Online NASA Software Estimating Tools (ONSET): A Suite of Web-Based Cost Analysis Tools
No abstract provided
Software Transition Project Retrospectives and the Application of SEL Effort Estimation Model and Boehm's COCOMO to Complex Software Transition Projects
The Multimission Image Processing Subsystem (MIPS) at the Jet Propulsion Laboratory (JPL) has managed transitions of application software sets from one operating system and hardware platform to multiple operating systems and hardware platforms. As a part of these transitions, cost estimates were generated from the personal experience of in-house developers and managers to calculate the total effort required for such projects. Productivity measures have been collected for two such transitions, one very large and the other relatively small in terms of source lines of code. These estimates used a cost estimation model similar to the Software Engineering Laboratory (SEL) Effort Estimation Model. Experience in transitioning software within JPL MIPS have uncovered a high incidence of interface complexity. Interfaces, both internal and external to individual software applications, have contributed to software transition project complexity, and thus to scheduling difficulties and larger than anticipated design work on software to be ported.
Feasibility study for automatic reduction of phase change imagery
The feasibility of automatically reducing a form of pictorial aerodynamic heating data is discussed. The imagery, depicting the melting history of a thin coat of fusible temperature indicator painted on an aerodynamically heated model, was previously reduced by manual methods. Careful examination of various lighting theories and approaches led to an experimentally verified illumination concept capable of yielding high-quality imagery. Both digital and video image processing techniques were applied to reduction of the data, and it was demonstrated that either method can be used to develop superimposed contours. Mathematical techniques were developed to find the model-to-image and the inverse image-to-model transformation using six conjugate points, and methods were developed using these transformations to determine heating rates on the model surface. A video system was designed which is able to reduce the imagery rapidly, economically and accurately. Costs for this system were estimated. A study plan was outlined whereby the mathematical transformation techniques developed to produce model coordinate heating data could be applied to operational software, and methods were discussed and costs estimated for obtaining the digital information necessary for this software.
Incorporating Risk
This presentation is about cost risk identification and estimation which is only a part of risk management. The purpose of this step is to identify common software risks, to assess their impact on the cost estimate, and to make revisions to the estimate based on these impacts.
Cost benefits of advanced software: A review of methodology used at Kennedy Space Center
To assist rational investments in advanced software, a formal, explicit, and multi-perspective cost-benefit analysis methodology is proposed. The methodology can be implemented through a six-stage process which is described and explained. The current practice of cost-benefit analysis at KSC is reviewed in the light of this methodology. The review finds that there is a vicious circle operating. Unsound methods lead to unreliable cost-benefit estimates. Unreliable estimates convince management that cost-benefit studies should not be taken seriously. Then, given external demands for cost-benefit estimates, management encourages software enginees to somehow come up with the numbers for their projects. Lacking the expertise needed to do a proper study, courageous software engineers with vested interests use ad hoc and unsound methods to generate some estimates. In turn, these estimates are unreliable, and the cycle continues. The proposed methodology should help KSC to break out of this cycle.
Systems Engineering and Integration (SE and I)
The issue of technology advancement and future space transportation vehicles is addressed. The challenge is to develop systems which can be evolved and improved in small incremental steps where each increment reduces present cost, improves, reliability, or does neither but sets the stage for a second incremental upgrade that does. Future requirements are interface standards for commercial off the shelf products to aid in the development of integrated facilities; enhanced automated code generation system slightly coupled to specification and design documentation; modeling tools that support data flow analysis; and shared project data bases consisting of technical characteristics cast information, measurement parameters, and reusable software programs. Topics addressed include: advanced avionics development strategy; risk analysis and management; tool quality management; low cost avionics; cost estimation and benefits; computer aided software engineering; computer systems and software safety; system testability; and advanced avionics laboratories - and rapid prototyping. This presentation is represented by viewgraphs only.
An Innovative Approach to Modeling VIPER Rover Software Life Cycle Cost
NASA’s “Volatiles Investigating Polar Exploration Rover” (VIPER) will be the first robotic mission to prospect for water ice near the south pole of the Moon in late 2023 on a 100-Earth-day mission. The information that the VIPER rover provides will help improve understanding of the composition, distribution, and accessibility of Lunar polar volatiles and will help determine how the Moon’s resources can support future human space exploration. VIPER, however, represents a radical departure from the way that NASA has traditionally developed planetary robotic missions. A key consequence of these differences is that estimating the cost of VIPER’s rover software is challenging and complex.For example, VIPER is being developed using management procedures typically applied to NASA research and technology projects, rather than space flight programs. In addition, key portions of the rover’s software are being designed as ground software to run on mission control computers (rather than on-board the rover as flight software as with prior planetary missions) taking advantage of continuous, interactive data communications between the Moon and Earth and higher performance computing available on the ground. Moreover, the rover’s software is being engineered using Agile software development practices and incorporates a significant amount of open-source, rather than following traditional (spiral, waterfall, etc.) development methods and in-house code. In this paper, we present an innovative process to estimate the life cycle cost of VIPER’s rover software. We first describe how we modeled the architecture and code counts for three software elements: Rover Flight Software (RFSW), Rover Ground Software (RGSW), and Rover Simulation Software (RSIM). We then discuss key challenges and unique aspects of our approach, such as the lack of Lunar rover analogies, the need to integrate and test large open source software, and the strategies developed to account for use of non-space flight management practices and the impact of the COVID-19 pandemic. We conclude with a summary of our results, including cumulative distribution, nearest neighbors and cluster analysis, as well as heuristics used to confirm the reasonableness of the cost estimate.
SMC-IT cost risk tutorial part 1 : incorporating risk
Explore the source record for details and available documents.
Towards a theory of economic value for modeling and simulation: incremental cost of parallel simulation (wip)
A useful perspective on the economic value of simulation in engineering comes from considering the role simulation plays in constructing a system. We propose a conceptual model that combines an embryonic concept of the value of an information bit with cost estimation tools used in software engineering. The model provides an economic justification for the common conception that models should be built to address specific questions rather than to comprehensively represent a referent system. Extending these ideas, we offer a model for the incremental value of parallel execution to explain why simulation applications that take advantage of sophisticated parallel discrete event simulation tools form a relatively narrow niche despite the ubiquity of parallel computing hardware. The proposed model enables us to bring value of information criteria into model development and to make predictions about the future of parallel simulation applications.
Understanding and Predicting the Process of Software Maintenance Releases
One of the major concerns of any maintenance organization is to understand and estimate the cost of maintenance releases of software systems. Planning the next release so as to maximize the increase in functionality and the improvement in quality are vital to successful maintenance management. The objective of this paper is to present the results of a case study in which an incremental approach was used to better understand the effort distribution of releases and build a predictive effort model for software maintenance releases. This study was conducted in the Flight Dynamics Division (FDD) of NASA Goddard Space Flight Center(GSFC). This paper presents three main results: 1) a predictive effort model developed for the FDD's software maintenance release process; 2) measurement-based lessons learned about the maintenance process in the FDD; and 3) a set of lessons learned about the establishment of a measurement-based software maintenance improvement program. In addition, this study provides insights and guidelines for obtaining similar results in other maintenance organizations.
Life cycle cost modeling of conceptual space vehicles
This paper documents progress to date by the University of Dayton on the development of a life cycle cost model for use during the conceptual design of new launch vehicles and spacecraft. This research is being conducted under NASA Research Grant NAG-1-1327. This research effort changes the focus from that of the first two years in which a reliability and maintainability model was developed to the initial development of a life cycle cost model. Cost categories are initially patterned after NASA's three axis work breakdown structure consisting of a configuration axis (vehicle), a function axis, and a cost axis. The focus will be on operations and maintenance costs and other recurring costs. Secondary tasks performed concurrent with the development of the life cycle costing model include continual support and upgrade of the R&M model. The primary result of the completed research will be a methodology and a computer implementation of the methodology to provide for timely cost analysis in support of the conceptual design activities. The major objectives of this research are: to obtain and to develop improved methods for estimating manpower, spares, software and hardware costs, facilities costs, and other cost categories as identified by NASA personnel; to construct a life cycle cost model of a space transportation system for budget exercises and performance-cost trade-off analysis during the conceptual and development stages; to continue to support modifications and enhancements to the R&M model; and to continue to assist in the development of a simulation model to provide an integrated view of the operations and support of the proposed system.
Software engineering project management - A state-of-the-art report
The management of software engineering projects in the aerospace industry was investigated. The survey assessed such features as contract type, specification preparation techniques, software documentation required by customers, planning and cost-estimating, quality control, the use of advanced program practices, software tools and test procedures, the education levels of project managers, programmers and analysts, work assignment, automatic software monitoring capabilities, design and coding reviews, production times, success rates, and organizational structure of the projects.
The impact of organizational structure on flight software cost risk
This paper summarizes the final results of the follow-up study updating the estimated software effort growth for those projects that were still under development and including an evaluation of the roles versus observed cost risk for the missions included in the original study which expands the data set to thirteen missions.
The NASA Analogy Software Cost Model: A Web-Based Cost Analysis Tool
This paper provides an overview of the many new features and algorithm updates in the release of the NASA Analogy Software Cost Tool (ASCoT). ASCoT is a web-based tool that provides a suite of estimation tools to support early lifecycle NASA Flight Software analysis. ASCoT employs advanced statistical methods such as Cluster Analysis to provide an analogy based estimate of software delivered lines of code and development effort, a regression based Cost Estimating Relationships (CER) model that estimates cost (dollars), and a COCOMO II based estimate. The ASCoT algorithms are designed to primarily work with system level inputs such as mission type (earth orbiter vs. planetary vs. rover), the number of instruments, and total mission cost. This allows the user to supply a minimal number of mission-level parameters which are better understood early in the life-cycle, rather than a large number of complex inputs.
New Method for Systems and Cost Analysis of Human Mars Entry Vehicles
Cost is one of the biggest obstacles to sending humans to Mars. However, spacecraft costs are typically not estimated until after the preliminary vehicle and mission concepts have been designed. By automating the cost estimation process, the effect of any change in vehicle or mission design on the mission cost can be determined more efficiently. This paper describes an extension to the tool SAPE (Systems Analysis for Planetary Entry, Descent, and Landing). This extension integrates the cost modeling software SEER-H (System Estimation and Evaluation of Resources-Hardware) with a number of systems analysis tools. This new method is used to analyze several trade spaces of a HIAD (Hypersonic Inflatable Aerodynamic Decelerator) entry vehicle for human Mars missions. Key findings include quantifying the impacts of ballistic coefficient, main engine specific impulse, and thrust-to-weight ratio on the overall cost of the vehicle, and how the payload per lander and number of landers affects the cost of a campaign to Mars.
Parametric Cost Modeling of a Mid-Lift-to-Drag Ratio Vehicle for Human Mars Entry, Descent, and Landing
Cost is one of the biggest obstacles to sending humans to Mars. However, spacecraft costs are typically estimated after the preliminary vehicle and mission concepts have been designed. By automating the cost estimation process, the effect of any change in vehicle or mission design on the mission cost can be determined more rapidly. This paper uses the tool SAPE-C (Systems Analysis for Planetary Entry, Descent, and Landing-Cost). SAPE-C integrates the cost modeling software SEER-H (System Estimation and Evaluation of Resources-Hardware) with a number of systems analysis tools and enables large design tradespace exploration early in the design process. SAPE-C is used to analyze several tradespaces of the Mid-Lift-to-Drag ratio rigid entry vehicle for human Mars missions. Key findings include quantifying the impacts of payload, vehicle length, and main engine specific impulse on the overall cost of the vehicle, and how the payload per lander and number of landers affects the cost of a campaign to Mars.