Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “schedules”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Distributed project scheduling at NASA: Requirements for manual protocols and computer-based support

The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of Space Shuttle mission planning.

Richards, Stephen F.↗

Protocols for distributive scheduling

The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of space shuttle mission planning.

Richards, Stephen F.↗

Constraint-based integration of planning and scheduling for space-based observatory management

Progress toward the development of effective, practical solutions to space-based observatory scheduling problems within the HSTS scheduling framework is reported. HSTS was developed and originally applied in the context of the Hubble Space Telescope (HST) short-term observation scheduling problem. The work was motivated by the limitations of the current solution and, more generally, by the insufficiency of classical planning and scheduling approaches in this problem context. HSTS has subsequently been used to develop improved heuristic solution techniques in related scheduling domains and is currently being applied to develop a scheduling tool for the upcoming Submillimeter Wave Astronomy Satellite (SWAS) mission. The salient architectural characteristics of HSTS and their relationship to previous scheduling and AI planning research are summarized. Then, some key problem decomposition techniques underlying the integrated planning and scheduling approach to the HST problem are described; research results indicate that these techniques provide leverage in solving space-based observatory scheduling problems. Finally, more recently developed constraint-posting scheduling procedures and the current SWAS application focus are summarized.

Muscettola, Nicola↗

A format for the interchange of scheduling models

In recent years a variety of space-activity schedulers have been developed within the aerospace community. Space-activity schedulers are characterized by their need to handle large numbers of activities which are time-window constrained and make high demands on many scarce resources, but are minimally constrained by predecessor/successor requirements or critical paths. Two needs to exchange data between these schedulers have materialized. First, there is significant interest in comparing and evaluating the different scheduling engines to ensure that the best technology is applied to each scheduling endeavor. Second, there is a developing requirement to divide a single scheduling task among different sites, each using a different scheduler. In fact, the scheduling task for International Space Station Alpha (ISSA) will be distributed among NASA centers and among the international partners. The format used to interchange scheduling data for ISSA will likely use a growth version of the format discussed in this paper. The model interchange format (or MIF, pronounced as one syllable) discussed in this paper is a robust solution to the need to interchange scheduling requirements for space activities. It is highly extensible, human-readable, and can be generated or edited with common text editors. It also serves well the need to support a 'benchmark' data case which can be delivered on any computer platform.

Jaap, John P.↗

A Photo Album of Earth Scheduling Landsat 7 Mission Daily Activities

Landsat7 is a member of a new generation of Earth observation satellites. Landsat7 will carry on the mission of the aging Landsat 5 spacecraft by acquiring high resolution, multi-spectral images of the Earth surface for strategic, environmental, commercial, agricultural and civil analysis and research. One of the primary mission goals of Landsat7 is to accumulate and seasonally refresh an archive of global images with full coverage of Earth's landmass, less the central portion of Antarctica. This archive will enable further research into seasonal, annual and long-range trending analysis in such diverse research areas as crop yields, deforestation, population growth, and pollution control, to name just a few. A secondary goal of Landsat7 is to fulfill imaging requests from our international partners in the mission. Landsat7 will transmit raw image data from the spacecraft to 25 ground stations in 20 subscribing countries. Whereas earlier Landsat missions were scheduled manually (as are the majority of current low-orbit satellite missions), the task of manually planning and scheduling Landsat7 mission activities would be overwhelmingly complex when considering the large volume of image requests, the limited resources available, spacecraft instrument limitations, and the limited ground image processing capacity, not to mention avoidance of foul weather systems. The Landsat7 Mission Operation Center (MOC) includes an image scheduler subsystem that is designed to automate the majority of mission planning and scheduling, including selection of the images to be acquired, managing the recording and playback of the images by the spacecraft, scheduling ground station contacts for downlink of images, and generating the spacecraft commands for controlling the imager, recorder, transmitters and antennas. The image scheduler subsystem autonomously generates 90% of the spacecraft commanding with minimal manual intervention. The image scheduler produces a conflict-free schedule for acquiring images of the "best" 250 scenes daily for refreshing the global archive. It then equitably distributes the remaining resources for acquiring up to 430 scenes to satisfy requests by international subscribers. The image scheduler selects candidate scenes based on priority and age of the requests, and predicted cloud cover and sun angle at each scene. It also selects these scenes to avoid instrument constraint violations and maximizes efficiency of resource usage by encouraging acquisition of scenes in clusters. Of particular interest to the mission planners, it produces the resulting schedule in a reasonable time, typically within 15 minutes.

Potter, William↗

Managing Action Duration Uncertainty with Just-In-Case Scheduling

Some applications involve automatic generation and execution of schedules that contain actions with uncertain durations. Such uncertainty can cause schedules to break during execution. This paper presents a technique, called Just-In-Case scheduling or JIC, for building robust schedules that tend not to break. The technique implements the common sense idea of being prepared for likely errors, just in case they should occur. The JIC algorithm analyzes a given schedule, determines where it is likely to break, reinvokes the scheduler to generate a contingent schedule for each highly probable break case, and produces a "multiply contingent" schedule. The technique was developed for a real telescope scheduling problem, and the paper presents empirical results showing that Just-In-Case scheduling performs extremely well for this problem.

Bresina, John↗

Putting ROSE to Work: A Proposed Application of a Request-Oriented Scheduling Engine for Space Station Operations

Scheduling engines are found at the core of software systems that plan and schedule activities and resources. A Request-Oriented Scheduling Engine (ROSE) is one that processes a single request (adding a task to a timeline) and then waits for another request. For the International Space Station, a robust ROSE-based system would support multiple, simultaneous users, each formulating requests (defining scheduling requirements), submitting these requests via the internet to a single scheduling engine operating on a single timeline, and immediately viewing the resulting timeline. ROSE is significantly different from the engine currently used to schedule Space Station operations. The current engine supports essentially one person at a time, with a pre-defined set of requirements from many payloads, working in either a "batch" scheduling mode or an interactive/manual scheduling mode. A planning and scheduling process that takes advantage of the features of ROSE could produce greater customer satisfaction at reduced cost and reduced flow time. This paper describes a possible ROSE-based scheduling process and identifies the additional software component required to support it. Resulting changes to the management and control of the process are also discussed.

Jaap, John↗

Enhanced Software for Scheduling Space-Shuttle Processing

The Ground Processing Scheduling System (GPSS) computer program is used to develop streamlined schedules for the inspection, repair, and refurbishment of space shuttles at Kennedy Space Center. A scheduling computer program is needed because space-shuttle processing is complex and it is frequently necessary to modify schedules to accommodate unanticipated events, unavailability of specialized personnel, unexpected delays, and the need to repair newly discovered defects. GPSS implements constraint-based scheduling algorithms and provides an interactive scheduling software environment. In response to inputs, GPSS can respond with schedules that are optimized in the sense that they contain minimal violations of constraints while supporting the most effective and efficient utilization of space-shuttle ground processing resources. The present version of GPSS is a product of re-engineering of a prototype version. While the prototype version proved to be valuable and versatile as a scheduling software tool during the first five years, it was characterized by design and algorithmic deficiencies that affected schedule revisions, query capability, task movement, report capability, and overall interface complexity. In addition, the lack of documentation gave rise to difficulties in maintenance and limited both enhanceability and portability. The goal of the GPSS re-engineering project was to upgrade the prototype into a flexible system that supports multiple- flow, multiple-site scheduling and that retains the strengths of the prototype while incorporating improvements in maintainability, enhanceability, and portability.

Barretta, Joseph A.↗

Automated Long - Term Scheduling for the SOFIA Airborne Observatory

The NASA Stratospheric Observatory for Infrared Astronomy (SOFIA) is a joint US/German project to develop and operate a gyro-stabilized 2.5-meter telescope in a Boeing 747SP. SOFIA's first science observations were made in December 2010. During 2011, SOFIA accomplished 30 flights in the "Early Science" program as well as a deployment to Germany. The new observing period, known as Cycle 1, is scheduled to begin in 2012. It includes 46 science flights grouped in four multi-week observing campaigns spread through a 13-month span. Automation of the flight scheduling process offers a major challenge to the SOFIA mission operations. First because it is needed to mitigate its relatively high cost per unit observing time compared to space-borne missions. Second because automated scheduling techniques available for ground-based and space-based telescopes are inappropriate for an airborne observatory. Although serious attempts have been made in the past to solve part of the problem, until recently mission operations staff was still manually scheduling flights. We present in this paper a new automated solution for generating SOFIA long-term schedules that will be used in operations from the Cycle 1 observing period. We describe the constraints that should be satisfied to solve the SOFIA scheduling problem in the context of real operations. We establish key formulas required to efficiently calculate the aircraft course over ground when evaluating flight schedules. We describe the foundations of the SOFIA long-term scheduler, the constraint representation, and the random search based algorithm that generates observation and instrument schedules. Finally, we report on how the new long-term scheduler has been used in operations to date.

Civeit, Thomas↗

Simulation-based assessment on stochastic load scheduling for building cooling systems

Here, to fill knowledge gaps related to stochastic load scheduling, we performed a comprehensive evaluation of the stochastic load scheduling for building cooling systems. Specifically, we studied the common uncertain variables in the load scheduling process for building cooling systems and categorized those variables based on their dynamic patterns. We then developed a generic stochastic load scheduling framework and applied it to building cooling systems that served a simulated community. This community consists of 100 heterogeneous houses and serves as a virtual testbed for evaluating the performance of stochastic load scheduling. In this evaluation, we considered representatives of uncertain variables with different dynamic patterns and included 100 realizations of the considered uncertainty in the evaluation to better catch the probability distribution of the control performance. The evaluation results suggest that deterministic load scheduling can reduce the operating energy cost by 18% but its performance can be affected by uncertainty. Stochastic load scheduling can further decrease the operating energy cost under uncertainty compared to deterministic load scheduling. We also found that the effectiveness of stochastic load scheduling in handling uncertainty is not directly associated with the number of uncertainty scenarios that are considered in its formulation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Simulation Study of Bin-and-Sort Policies in a Distributed System for Flights Scheduling

This is a report on the results of a simulation experiment conducted on an automated distributed system for scheduling flights in a shared airspace. The scheduling is carried out by computer systems owned by the private operators of the flights, which interface through a centralized independent server. The scheduling requires determining which of the group of flights at hand (whether owned by the same operator or different ones) are to have the advantage of being scheduled before the others. A chosen method of grouping and prioritizing flights must: have the ability to schedule a flight promptly, prevent scheduling conflicts between pairs of overlapping flight routes, and be computationally feasible. Scheduling flights one by one is the First Come First Served policy. Scheduling too many at a time is infeasible. The type of scheduling policy proposed herein, called bin-and-sort, is an attempt to reach a compromise between these two extremes. Bin-and-sort allows for each operator to choose its criteria for prioritizing its flights, and for the centralized component to use different arbitration criteria. A number of these criteria are used in the simulation presented herein. The results of each criterion choice are reported and analyzed.

flight scheduling↗

A Simulation Study of Bin-and-Sort Policies in a Distributed System for Flights Scheduling

This is a report on the results of a simulation experiment conducted on an automated distributed system for scheduling flights in a shared airspace. The scheduling is carried out by computer systems owned by the private operators of the flights, which interface through a centralized independent server. The scheduling requires determining which of the group of flights at hand (whether owned by the same operator or different ones) are to have the advantage of being scheduled before the others. A chosen method of grouping and prioritizing flights must: have the ability to schedule a flight promptly, prevent scheduling conflicts between pairs of overlapping flight routes, and be computationally feasible. Scheduling flights one by one is the First Come First Served policy. Scheduling too many at a time is infeasible. The type of scheduling policy proposed herein, called bin-and-sort, is an attempt to reach a compromise between these two extremes. Bin-and-sort allows for each operator to choose its criteria for prioritizing its flights, and for the centralized component to use different arbitration criteria. A number of these criteria are used in the simulation presented herein. The results of each criterion choice are reported and analyzed.

flight scheduling↗

Evaluation of Self-Scheduling Exercises Completed by Analog Crewmembers in NASA's Human Exploration Research Analog (HERA)

NASA human spaceflight missions are inherently dynamic and require frequent scheduling changes in order to adapt to changing mission priorities and objectives. Tactical level changes to the mission plan are traditionally made by a team of expert planners and operations specialists on the ground. However, astronauts are expected to execute missions more autonomously during future long duration missions. Astronauts will need to take on some of the responsibility of managing their own schedule while still abiding by the numerous constraints required by human spaceflight operations. This paper summarizes salient elements of crew performance in NASA’s Human Exploration Research Analog Campaign 3. Analog crewmembers completed a series of self-scheduling exercises to evaluate Playbook’s usability towards enabling self-scheduling without support from ground control. Playbook is a self-scheduling software tool designed and developed by our team. We also investigated how to best communicate self-scheduling tasks and constraints to the crew in order to facilitate efficient self-scheduling during isolation in a realistic environment. Our analysis identified that 30 minutes was sufficient to complete complex self-scheduling tasks. Our evaluation also identified differences between individual and collaborative performance; analog crewmembers completed self-scheduling exercises more quickly as a team as opposed to individually and reported lower subjective difficulty ratings overall.

HERA↗

Quantum/AI Topology-Aware Latency-Adaptive HPC Workflow Scheduling Optimization

The growing demand for more powerful high-performance computing (HPC) systems has led to a steady rise in energy consumption by supercomputing worldwide. This study is focused on comparing our Application-Topology Mapper (ATMapper) to the popular Simple Linux Utility for Resource Management (SLURM) for the purpose of exploring methods that can further optimize job-scheduling within HPC systems. ATMapper is an Artificial-Intelligence based approach to job-scheduling that is currently being enhanced with quantum annealing (QA) to generate optimal schedules faster. We are applying QA to speedup our ATMapper process to achieve higher computing efficiency, thereby reducing HPC energy consumption. Here, we examine how four job-scheduling approaches perform in processor node assignment when using an example network architecture of 4 interconnected nodes. Using a specialized script, we are assessing the schedule of a computation flow with 11 interdependent tasks. The data movements among nodes were tracked to count for the number of interactions (network hops) between nodes needed to complete the tasks. The total number of hops and the job completion time were then used to quantify the efficiency of the different mapping approaches. In addition to SLURM, we also compare our ATMapper to the QA-enabled LBNL TIGER and the D-Wave Distributed Computing processor assignment approaches. The preliminary results showed that our topology-aware, latency-adaptive ATMapper is significantly more efficient when compared to the other scheduling approaches due to its load-imbalance network allocation. The scheduler displayed a computing efficiency of 53% by performing significantly fewer network hops than its alternatives. By reducing the number of hops, ATMapper was able to perform all 11 tasks by using only 3 nodes out of given 4. This research indicates the potential to use QA/AI for HPC job-scheduling. Later, we will test a SLURM simulator program to draw further comparisons on the effectiveness of ATMapper's scheduling approach. The results of this comparison will serve as a baseline for later improving SLURM's performance using a QA-enhanced ATMapper approach.

Caraveo, Braulio [University of Huston - Clear Lak↗

Analysis and design of gain scheduled control systems

Gain scheduling, as an idea, is to construct a global feedback control system for a time varying and/or nonlinear plant from a collection of local time invariant designs. However in the absence of a sound analysis, these designs come with no guarantees on the robustness, performance, or even nominal stability of the overall gain schedule design. Such an analysis is presented for three types of gain scheduling situations: (1) a linear parameter varying plant scheduling on its exogenous parameters, (2) a nonlinear plant scheduling on a prescribed reference trajectory, and (3) a nonlinear plant scheduling on the current plant output. Conditions are given which guarantee that the stability, robustness, and performance properties of the fixed operating point designs carry over to the global gain scheduled designs, such as the scheduling variable should vary slowly and capture the plants nonlinearities. Finally, an alternate design framework is proposed which removes the slowing varying restriction or gain scheduled systems. This framework addresses some fundamental feedback issues previously ignored in standard gain.

Shamma, Jeff S.↗

The scheduling techniques of ESP2

The Mission Analysis Division of the Systems Analysis and Integration Laboratory at the Marshall Space Flight Center has developed a robust automatic scheduler which can produce detailed schedules for the multi-step activities required for payload operations on the Space Station. This scheduler, a part of the Expert Scheduling Program (ESP2), has five components: the bookkeeper, checker, loader, selector, and explainer. The bookkeeper maintains the usage profiles for nondepletable resources, consumables, equipment, crew, and the times of all the steps for the payload activities for several different schedules simultaneously. The checker searches the data maintained by the bookkeeper and finds times when the constraints of each step of an activity are satisfied. The loader is an expert system that uses the techniques of forward chaining, depth-first searching, and backtracking to manage the workings of the checker so that activities are placed in the schedule without violating constraints (such as crew, resources, and orbit opportunities). The checker searches the data maintained by the bookkeeper and finds times when the constraints of each step of an activity are satisfied. The loader is an expert system which uses the techniques of forward chaining, depth-first searching, and backtracking to manage the workings of the checker so that activities are placed in the schedule without violating the constraints. The selector has several methods of choosing the next activity for the loader to schedule. The explainer shows the user why an activity was or was not scheduled at a certain time; it offers a unique graphical explanation of how the expert system (the loader) works.

Jaap, John P.↗

Spike: Artificial intelligence scheduling for Hubble space telescope

Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

Johnston, Mark↗

Balancing antagonistic time and resource utilization constraints in over-subscribed scheduling problems

In this paper, we report work aimed at applying concepts of constraint-based problem structuring and multi-perspective scheduling to an over-subscribed scheduling problem. Previous research has demonstrated the utility of these concepts as a means for effectively balancing conflicting objectives in constraint-relaxable scheduling problems, and our goal here is to provide evidence of their similar potential in the context of HST observation scheduling. To this end, we define and experimentally assess the performance of two time-bounded heuristic scheduling strategies in balancing the tradeoff between resource setup time minimization and satisfaction of absolute time constraints. The first strategy considered is motivated by dispatch-based manufacturing scheduling research, and employs a problem decomposition that concentrates local search on minimizing resource idle time due to setup activities. The second is motivated by research in opportunistic scheduling and advocates a problem decomposition that focuses attention on the goal activities that have the tightest temporal constraints. Analysis of experimental results gives evidence of differential superiority on the part of each strategy in different problem solving circumstances. A composite strategy based on recognition of characteristics of the current problem solving state is then defined and tested to illustrate the potential benefits of constraint-based problem structuring and multi-perspective scheduling in over-subscribe scheduling problems.

Smith, Stephen F.↗