DOE OSTI2015
Built in 1958 on the Marcoule CEA site, the UP1 facility, was the 1. French industrial (500 t U / year) reprocessing plant based on the PUREX process. The plant, which has stopped operation in 1997, constitutes with its auxiliary workshop (vitrification workshop, glass canister storage), one of the largest and most challenging decommissioning project in France. In about 40 years of operation, various type of fuels elements such as metallic uranium, U-Al fuel rods, Phenix breeder elements or PWR fuel have been reprocessed, thereby requiring several plant and process adaptations. Resulting from these complex process chemistry and operation history, significant fouling of the chemical plant circuits and components has occurred. The fission product (FP) concentration process is particularly concerned. Preliminary investigation performed in 2010 in the evaporator's feeding tanks revealed the presence of significant amounts of sludge and dose rates as high as 250 Gy/h. Therefore a thorough investigation campaign, including visual inspection, volume quantification, deposits sampling, and radiological characterization of the components of this workshop has been initiated in 2013. Chemical analysis performed so far show that the solids are mainly composed of zirconium phosphates, 'MoZr' compounds and nitrate salt precipitates. But the presence of insoluble fines arising from the dissolution workshop and organic residues resulting from the TBP decomposition has also been evidenced in some of the tanks. The numerous constraints associated with the management of such highly active sludge, with Cs-137 specific activity ranging from 1 to 10 GBq/g, and a complex physico-chemical composition, lead CEA to investigate the implementation of an in situ conditioning treatment able to produce a waste package complying with existing evacuation routes and/or on-site storage facilities. The full paper presents an overview of the UP1 D and D project and then focuses on the possible dismantling scenarios for the FP concentration workshop, including the evaluation of different strategies for the highly active deposits management. The investigations and deposits characterization program will be developed so as the sampling methodologies that has been specifically tuned. In the light of the best actual knowledge of the deposits properties, the recovery and conditioning treatment scenarios will be exposed, considering, as a case study, the development of a specific vitrification tool to be implemented In Situ and specifically designed to match the requirements and constraints of the D and D project: adequately dimensioned, compact, flexible with respect to the feed composition, for a limited duration of use and designed to be dismantled. (authors)
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗