Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “reduce task”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Portable Load Measurement Device for Use During ARED Exercise on ISS

The Advanced Resistive Exercise Device (ARED) (Fig.1) is unique countermeasure hardware available to crewmembers aboard the International Space Station (ISS) used for resistance exercise training to protect against bone and muscle loss during long duration space missions. ARED instrumentation system was designed to measure and record exercise load data, but: - Reliably accurate data has not been available due to a defective force platform. - No ARED data has been recorded since mid-2011 due to failures in the instrumentation power system. ARED load data supports on-going HRP funded research, and is available to extramural researchers through LSDA-Repository. Astronaut Strength, Conditioning, and Rehabilitation specialists (ASCRs) use ARED data to track training progress and advance exercise prescriptions. ARED load data is necessary to fulfill medical requirements. HRP directed task intends to reduce to program risk (HRP IRMA Risk 1735), and evaluate the XSENS ForceShoeTM as a means of obtaining ARED load data during exercise sessions. The XSENS ForceShoes"TM" will fly as a hardware demonstration to ISS in May 2014 (39S). Additional portable load monitoring devices (PLMDs) are under evaluation in the ExPC Lab. PLMDs are favored over platform redesign as they support future exploration needs.

Hanson, A.↗

Recent Status of SIM Lite Astrometric Observatory Mission: Flight Engineering Risk Reduction Activities

The SIM Lite Astrometric Observatory is a mission concept for a space-borne instrument to perform micro-arc-second narrow-angle astrometry to search 60 to 100 nearby stars for Earth-like planets, and to perform global astrometry for a broad astrophysics program. The instrument consists of two Michelson stellar interferometers and a telescope. The first interferometer chops between the target star and a set of reference stars. The second interferometer monitors the attitude of the instrument in the direction of the target star. The telescope monitors the attitude of the instrument in the other two directions. The main enabling technology development for the mission was completed during phases A & B. The project is currently implementing the developed technology onto flight-ready engineering models. These key engineering tasks will significantly reduce the implementation risks during the flight phases C & D of the mission. The main optical interferometer components, including the astrometric beam combiner, the fine steering optical mechanism, the path-length-control and modulation optical mechanisms, focal-plane camera electronics and cooling heat pipe, are currently under development. Main assemblies are built to meet flight requirements and will be subjected to flight qualification level environmental testing (random vibration and thermal cycling) and performance testing. This paper summarizes recent progress in engineering risk reduction activities.

astrometry↗

Status: Crewmember Noise Exposures on the International Space Station

The International Space Station (ISS) provides a unique environment where crewmembers from the US and our international partners work and live for as long as 6 to 12 consecutive months. During these long-durations ISS missions, noise exposures from onboard equipment are posing concerns for human factors and crewmember health risks, such as possible reductions in hearing sensitivity, disruptions of crew sleep, interference with speech intelligibility and voice communications, interference with crew task performance, and reduced alarm audibility. It is crucial to control acoustical noise aboard ISS to acceptable noise exposure levels during the work-time period, and to also provide a restful sleep environment during the sleep-time period. Acoustic dosimeter measurements, obtained when the crewmember wears the dosimeter for 24-hour periods, are conducted onboard ISS every 60 days and compared to ISS flight rules. NASA personnel then assess the acoustic environment to which the crewmembers are exposed, and provide recommendations for hearing protection device usage. The purpose of this paper is to provide an update on the status of ISS noise exposure monitoring and hearing conservation strategies, as well as to summarize assessments of acoustic dosimeter data collected since the Increment 36 mission (April 2013). A description of the updated noise level constraints flight rule, as well as the Noise Exposure Estimation Tool and the Noise Hazard Inventory implementation for predicting crew noise exposures and recommending to ISS crewmembers when hearing protection devices are required, will be described.

Limardo-Rodriguez, Jose G.↗

Considerations in Assuring Safety of Increasingly Autonomous Systems

Recent technological advances have accelerated the development and application of increasingly autonomous (IA) systems in civil and military aviation. IA systems can provide automation of complex mission tasks-ranging across reduced crew operations, air-traffic management, and unmanned, autonomous aircraft-with most applications calling for collaboration and teaming among humans and IA agents. IA systems are expected to provide benefits in terms of safety, reliability, efficiency, affordability, and previously unattainable mission capability. There is also a potential for improving safety by removal of human errors. There are, however, several challenges in the safety assurance of these systems due to the highly adaptive and non-deterministic behavior of these systems, and vulnerabilities due to potential divergence of airplane state awareness between the IA system and humans. These systems must deal with external sensors and actuators, and they must respond in time commensurate with the activities of the system in its environment. One of the main challenges is that safety assurance, currently relying upon authority transfer from an autonomous function to a human to mitigate safety concerns, will need to address their mitigation by automation in a collaborative dynamic context. These challenges have a fundamental, multidimensional impact on the safety assurance methods, system architecture, and V&V capabilities to be employed. The goal of this report is to identify relevant issues to be addressed in these areas, the potential gaps in the current safety assurance techniques, and critical questions that would need to be answered to assure safety of IA systems. We focus on a scenario of reduced crew operation when an IA system is employed which reduces, changes or eliminates a human's role in transition from two-pilot operations.

Alves, Erin E.↗

Psychological and interpersonal adaptation to Mars missions

The crucial importance of a thorough understanding of the psychological and interpersonal dimensions of Mars flights is indicated. This is necessary both to reduce the chances that psychological problems or interpersonal frictions will threaten the success of Mars missions and to enhance the quality of life of the people involved. Adaptation to interplanetary flight will depend on an interplay of the psychological stresses imposed by the missions and the psychological strengths and vulnerabilities of the crewmembers involved. Stresses may be reduced through environmental engineering, manipulating crew composition, and the structuring of situations and tasks. Vulnerabilities may be reduced through improving personnel selection procedures, training personnel in psychological and group dynamics, and providing mechanisms for emotional support. It is essential to supplement anecdotal evidence regarding the human side of space travel with the results of carefully conducted scientific research.

Harrison, A. A.↗

ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

In 2007 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organizations to find ways to reduce the cost of operations for supporting the International Space Station (ISS) in the Mission Control Center (MCC). Each MOD organization was asked to define and execute projects that would help them attain cost reductions by 2012. The MOD Operations Division Flight Planning Branch responded to this challenge by launching several software automation projects that would allow them to greatly improve console operations and reduce ISS console staffing and intern reduce operating costs. These tasks ranged from improving the management and integration mission plan changes, to automating the uploading and downloading of information to and from the ISS and the associated ground complex tasks that required multiple decision points. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture; as well as engaging a previously TRL 4-5 technology developed by Ames Research Center (ARC) that utilized an intelligent agent-based system to manage and automate file traffic flow, archive data, and generate console logs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the goal of eliminating a second full time ISS console support position by 2012. The team will also reduce one long range planning console position by 2014. When complete, these Flight Planning Branch projects will account for the elimination of 3 console positions and a reduction in staffing of 11 engineering personnel (EP) for ISS.

Hall, Timothy A.↗

The Role of Trust and Interaction in Global Positioning System Related Accidents

The Global Positioning System (GPS) uses a network of satellites to calculate the position of a receiver over time. This technology has revolutionized a wide range of safety-critical industries and leisure applications. These systems provide diverse benefits; supplementing the users existing navigation skills and reducing the uncertainty that often characterizes many route planning tasks. GPS applications can also help to reduce workload by automating tasks that would otherwise require finite cognitive and perceptual resources. However, the operation of these systems has been identified as a contributory factor in a range of recent accidents. Users often come to rely on GPS applications and, therefore, fail to notice when they develop faults or when errors occur in the other systems that use the data from these systems. Further accidents can stem from the over confidence that arises when users assume automated warnings will be issued when they stray from an intended route. Unless greater attention is paid to the role of trust and interaction in GPS applications then there is a danger that we will see an increasing number of these failures as positioning technologies become integral in the functioning of increasing numbers of applications.

Johnson, Chris W.↗

Reduced mental capacity and behavior of a rider of a bicycle simulator under alcohol stress or under dual task load

Experiments were carried out on a bicycle simulator with alcohol administration and a binary choice task in separate sessions, intending to reduce the subject's mental capacity. Before and after such sessions a visual evoked response measurement was done. The subject's performance was analyzed with describing function techniques. The results indicate that the alcohol affects the course-following task as well as the balancing task. The binary choice task is more specifically influencing the course-following task. The dual task shows a more pronounced effect on the recovery of the evoked response. The alcohol is delaying the recovery curve of the evoked response. A tentative explanation can be given which agrees with the performance data.

Soede, M.↗

The National Launch System Advanced Development Program: A brief overview

A broad-based Advanced Development Program is being conducted to modernize the technological base and support the systems design of the National Launch System. While the principal concentration of efforts has been in propulsion, significant work is being accomplished in all of the disciplinary areas associated with space launch. Tasks are selected that offer reduced costs, increased reliability, and enhanced operability with anticipated task completion times which are consistent with NLS development.

Battenburg, J. A.↗

Evaluation Of Performance Of A Telerobot

Paper presents evaluation of performance of six-axis telerobot system with shared control and advanced modes of force feedback. Various tasks performed with and without force feedback. Study found force feedback reduces average time required to complete task by about 30 percent. Also reduces sum of squared forces by factor of 7 and errors by 63 percent.

Hannaford, Blake↗

ATDRS payload technology research and development

Four technology development tasks were chosen to reduce (or at least better understand) the technology risks associated with proposed approaches to Advanced Tracking and Data Relay Satellite (ATDRS). The four tasks relate to a Tri-Band Antenna feed system, a Digital Beamforming System for the S Band Multiple Access System (SMA), an SMA Phased Array Antenna, and a Configuration Thermal/Mechanical Analysis task. The objective, approach, and status of each are discussed.

Anzic, G.↗

ATDRS payload technology R & D

Four technology development tasks were chosen to reduce (or at least better understand) the technology risks associated with proposed approaches to Advanced Tracking and Data Relay Satellite (ATDRS). The four tasks relate to a Tri-Band Antenna feed system, a Digital Beamforming System for the S Band Multiple-Access System (SMA), an SMA Phased Array Antenna, and a Configuration Thermal/Mechanical Analysis task. The objective, approach, and status of each are discussed.

Anzic, G.↗

Supporting Technology at GRC to Mitigate Risk as Stirling Power Conversion Transitions to Flight

Stirling power conversion technology has been reaching more advanced levels of maturity during its development for space power applications. The current effort is in support of the Advanced Stirling Radioisotope Generator (ASRG), which is being developed by the U.S. Department of Energy (DOE), Lockheed Martin Space Systems Company (LMSSC), Sunpower Inc., and the NASA Glenn Research Center (GRC). This generator would use two high-efficiency Advanced Stirling Convertors (ASCs) to convert thermal energy from a radioisotope heat source into electricity. Of paramount importance is the reliability of the power system and as a part of this, the Stirling power convertors. GRC has established a supporting technology effort with tasks in the areas of reliability, convertor testing, high-temperature materials, structures, advanced analysis, organics, and permanent magnets. The project utilizes the matrix system at GRC to make use of resident experts in each of the aforementioned fields. Each task is intended to reduce risk and enhance reliability of the convertor as this technology transitions toward flight status. This paper will provide an overview of each task, outline the recent efforts and accomplishments, and show how they mitigate risk and impact the reliability of the ASC s and ultimately, the ASRG.

Schreiber, Jeffrey G.↗

Supporting Technology at GRC to Mitigate Risk as Stirling Power Conversion Transitions to Flight

Stirling power conversion technology has been reaching more advanced levels of maturity during its development for space power applications. The current effort is in support of the Advanced Stirling Radioisotope Generator (ASRG), which is being developed by the U.S. Department of Energy (DOE), Lockheed Martin Space Systems Company (LMSSC), Sunpower Inc., and the NASA Glenn Research Center (GRC). This generator would use two high-efficiency Advanced Stirling Convertors (ASCs) to convert thermal energy from a radioisotope heat source into electricity. Of paramount importance is the reliability of the power system and as a part of this, the Stirling power convertors. GRC has established a supporting technology effort with tasks in the areas of reliability, convertor testing, high-temperature materials, structures, advanced analysis, organics, and permanent magnets. The project utilizes the matrix system at GRC to make use of resident experts in each of the aforementioned fields. Each task is intended to reduce risk and enhance reliability of the convertor as this technology transitions toward flight status. This paper will provide an overview of each task, outline the recent efforts and accomplishments, and show how they mitigate risk and impact the reliability of the ASC s and ultimately, the ASRG.

Schreiber, Jeffrey G.↗

Recent Electric Propulsion Development Activities for NASA Science Missions

(The primary source of electric propulsion development throughout NASA is managed by the In-Space Propulsion Technology Project at the NASA Glenn Research Center for the Science Mission Directorate. The objective of the Electric Propulsion project area is to develop near-term electric propulsion technology to enhance or enable science missions while minimizing risk and cost to the end user. Major hardware tasks include developing NASA s Evolutionary Xenon Thruster (NEXT), developing a long-life High Voltage Hall Accelerator (HIVHAC), developing an advanced feed system, and developing cross-platform components. The objective of the NEXT task is to advance next generation ion propulsion technology readiness. The baseline NEXT system consists of a high-performance, 7-kW ion thruster; a high-efficiency, 7-kW power processor unit (PPU); a highly flexible advanced xenon propellant management system (PMS); a lightweight engine gimbal; and key elements of a digital control interface unit (DCIU) including software algorithms. This design approach was selected to provide future NASA science missions with the greatest value in mission performance benefit at a low total development cost. The objective of the HIVHAC task is to advance the Hall thruster technology readiness for science mission applications. The task seeks to increase specific impulse, throttle-ability and lifetime to make Hall propulsion systems applicable to deep space science missions. The primary application focus for the resulting Hall propulsion system would be cost-capped missions, such as competitively selected, Discovery-class missions. The objective of the advanced xenon feed system task is to demonstrate novel manufacturing techniques that will significantly reduce mass, volume, and footprint size of xenon feed systems over conventional feed systems. This task has focused on the development of a flow control module, which consists of a three-channel flow system based on a piezo-electrically actuated valve concept, as well as a pressure control module, which will regulate pressure from the propellant tank. Cross-platform component standardization and simplification are being investigated through the Standard Architecture task to reduce first user costs for implementing electric propulsion systems. Progress on current hardware development, recent test activities and future plans are discussed.

Pencil, Eric J.↗

Supply and Resource Management to Progressively Enable EIMO

BACKGROUND: Current medical operations in Low Earth Orbit (LEO) allow for real-time audio-video communication with a flight surgeon at mission control, resupply, and medical evacuation to earth on the order of hours. As mission profiles change from LEO to the Moon, Mars, and beyond, medical risk as a contribution to overall mission risk is anticipated to rise substantially. Concurrently, due to the distance, the medical systems on board vehicles proposed for these mission types are expected to have reduced mass and volume allocation. Together, astronaut crews will be at a higher risk of major medical events, be required to perform a broader set of tasks, and have substantially reduced resources and support to do so. Earth Independent Medical Operations (EIMO) aims to identify and fill the gaps present in this progressively changing paradigm. OVERVIEW: Medical supplies, resources, and skills are central to spaceflight medical systems. Vehicles used for non-LEO missions are anticipated to be smaller and thus the medical system will also need to have reduced mass, volume, and power. Medical resources are another form of consumable and may need resupply or pre-deployment to meet crew needs. One particular concern is the degradation of medications which become less efficacious and potentially toxic with time, particularly given environmental conditions such as temperature, humidity, oxygen, and radiation which have not yet been fully studied. Supply and resource management in LEO is dependent on resupply, however the supply chain of transporting equipment does not yet have a clear infrastructure for missions beyond LEO. DISCUSSION: EIMO is intended to systemically identify and fill these gaps with forward-looking solutions. In mission monitoring of resources with technology like RFID, improving medical resource longevity, targeted resupply and careful pre-mission planning will be central to facilitate crew health and performance. One approach to optimizing resources is the Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) tool, which uses probabilistic risk assessment (PRA) to quantitatively predict medical risk and identify resources and skills that mitigate this risk. This evidence based, quantitative analysis prediction tool and several other approaches to meeting the challenge of supply and resource management are discussed.

Arian Anderson↗

Telerobotic research for in-space structural assembly and servicing

The paper reviews Langley's Telerobotic Technology Program and the recent and planned research in automated space assembly. Research areas include multiple manipulator coordination and control, automatic modes, evaluation of control modalities for teleoperated tasks, active sensing for world modeling and control, and architectures for distributed telerobotic systems. Studies of master/slave teleoperators performing representative space tasks showed that current teleoperator systems can be used to accomplish remote space operations. These studies also identified that research is required to improve the systems to reduce operator workload and task completion time. Closed-loop noncontact and contact sensor based control for automatic acquisition, positioning, and active compliance have been developed. A control structure for multiple manipulator coordination and control with manual, shared, and automatic modes performing space type tasks is being evaluated.

Meintel, Alfred J., Jr.↗

Space station - Technology development

The NASA manned space station program's systems technology effort involves the development of novel techniques that will reduce the scope of tasks neeeded for design, development, testing and evaluation of the hardware. Operations technology efforts encompass analyses that will define those techniques best able to improve the efficiency and reduce the costs of space station functions. The technology objective for data management calls for a fault-tolerant, distributed, expandable and adaptable, as well as repairable and user-friendly, flight data management system that employs state-of-the-art hardware and software. The space station's power system includes the largest element, a 'solar blanket', and the heaviest component, the batteries, of all the subsystems. A thermal management system for the power system is of paramount importance. Attention is also given to the exacting demands of attitude control and stabilization and a regenerative life support system of the requisite capacity and reliability.

Carlisle, R. F.↗