Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “readiness review”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Considerations for Introducing Artificial Intelligence into Nuclear Power Plants

Advanced computational tools and techniques such as artificial intelligence and machine learning (AI/ML) can transform the nuclear power industry. This is necessary given that the economic viability of the existing fleet is in jeopardy and its labor-centric approach to operations and maintenance. Currently, AI/ML research is being undertaken for reactor system design and analysis including fault and accident prognosis, nuclear risk analysis such as plant safety and security evaluation, and plant operations and maintenance including predictive maintenance. Applications include both existing and advanced reactor technologies with the aim of improving operational and business efficiencies. Most every aspect of the organization can benefit, from instrumentation and control, to work planning, to human-machine interactions and business management. AI/ML in nuclear can simplify complex problems and produce more effective decision-making. Nonetheless, careful consideration must be given to the implementation of an AI/ML initiative. The aims of this research are to 1) review barriers to AI/ML adoption within the nuclear power industry, and 2) suggest potential solutions. These barriers are organized along five distinct categories (Figure 1) that are interconnected. The first are historical barriers that track the industry’s development over the decades including worldwide nuclear events that shaped public perceptions. The resulting federal scrutiny and intense safety culture that emerged are discussed. Technical barriers to AI/ML adoption are considerable, and include data privacy concerns, data governance, and the current lack of AI/ML expert knowledge at the plants. The main business case barrier remains cost, but an absence of an industry-wide vision and wide-scale adoption also produces reluctance. Stakeholder readiness is reviewed with special attention given to regulatory readiness. The 5-year strategic plan for AI readiness recently published by the U.S. Nuclear Regulatory Commission is highlighted. Last, adoption barriers at the user level are addressed including the importance of user experience and explainable AI. The AI adoption barriers described here are inter-related and ideally should be addressed in a holistic fashion.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

An experiment to assess the cost-benefits of code inspections in large scale software development

This experiment (currently in progress) is designed to measure costs and benefits of different code inspection methods. It is being performed with a real development team writing software for a commercial product. The dependent variables for each code unit's inspection are the elapsed time and the number of defects detected. We manipulate the method of inspection by randomly assigning reviewers, varying the number of reviewers and the number of teams, and, when using more than one team, randomly assigning author repair and non-repair of detected defects between code inspections. After collecting and analyzing the first 17 percent of the data, we have discovered several interesting facts about reviewers, about the defects recorded during reviewer preparation and during the inspection collection meeting, and about the repairs that are eventually made. (1) Only 17 percent of the defects that reviewers record in their preparations are true defects that are later repaired. (2) Defects recorded at the inspection meetings fall into three categories: 18 percent false positives requiring no author repair, 57 percent soft maintenance where the author makes changes only for readability or code standard enforcement, and 25 percent true defects requiring repair. (3) The median elapsed calendar time for code inspections is 10 working days - 8 working days before the collection meeting and 2 after. (4) In the collection meetings, 31 percent of the defects discovered by reviewers during preparation are suppressed. (5) Finally, 33 percent of the true defects recorded are discovered at the collection meetings and not during any reviewer's preparation. The results to date suggest that inspections with two sessions (two different teams) of two reviewers per session (2sX2p) are the most effective. These two-session inspections may be performed with author repair or with no author repair between the two sessions. We are finding that the two-session, two-person with repair (2sX2pR) inspections are the most expensive, taking 15 working days of calendar time from the time the code is ready for review until author repair is complete, whereas two-session, two-person with no repair (2sX2pN) inspections take only 10 working days, but find about 10 percent fewer defects.

Porter, A.↗

Chapter 8: Life-Cycle Testing and Analysis

Prior to a spacecraft launch, program mission assurance standards dictate that the flight battery power system should comply with mission requirements under the intended operating conditions. Ground life cycle testing (LCT) combined with an analysis on the electrical power system (EPS) battery is an empirical method used to demonstrate compliance to satellite service life requirements. The LCT compliance method adopted by the aerospace industry is based on demonstrating a space battery's life expectancy as a part of battery qualification. Real-time cell and lithium-ion battery (LIB) LCT data are commonly used for model inputs to EPS power and energy balance analyses, in LIB reliability analysis estimates, and to support on-orbit spacecraft mission life extension opportunities. This chapter describes the LCT planning steps, process approach, and analysis techniques commonly used to qualify space LIB power systems.

accelerated aging↗

Readiness Evaluation for Sustained Operations

Readiness evaluation for sustained operations is a continuous function that progresses from overseeing establishment of five key programmatic elements during design and construction phases to monitoring the output of those elements performing during commissioning and operations. Continuously assessing readiness for sustained operations becomes an important business function for the U.S. Department of Energy’s Office of River Protection as competition for federal funds increases with increasing waste treatment operations throughout the Office of Environmental Management complex. The five key programmatic elements are as follows: Risk management – Risks and opportunities should prioritize continuous improvement initiatives and be informed by the design and technical authorities and stakeholder monitors. Continuous improvement – All levels of the project organization should exhibit commitment to continuous improvement and learning. Continuity of design and technical authorities – The authorities are responsible for managing knowledge for its effective use in the other elements. Stakeholder monitoring – Active and deliberate monitoring of stakeholder relationships. Sustained operations integrated business planning – Integrated business planning in a federal environment competitive for congressional funding.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SAND Report Guide

This SAND Report Guide offers support to authors, technical writers, principal investigators, and others involved in the process of creating, formatting, or refining a SAND Report. It details what you need to know before you begin compiling a SAND Report, directs you to the SAND Report templates, outlines the order of elements in a SAND Report, and explains what to do when your report is completed and ready for Review and Approval and subsequent distribution. Supporting information is provided in the appendix, such as where to get technical assistance, trademarks, Microsoft Word, and equations.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Electric propulsion research and technology in the United States

Near-, mid-, and long-term technology goals for space electric propulsion systems are reviewed. Technological readiness has been demonstrated for 8 cm, 5 mN, and 30 cm, 30 mN electrostatic thrusters, with major use seen for GEO communications satellites in the near-term, and space station orbit adjustments later. Ion thrusters and/or MPD thrusters are projected to become viable if a space nuclear reactor system is operational in the 1990s, allowing the transport of thousands of kilograms to the outer planets. Basic research is proceeding on the electrothermal propulsion concept to provide resistojet thrusters suitable for a space station by 1986, although the program is hindered by insufficient funding. A flight test for the ion auxiliary propulsion system is detailed, and test results of the solar electric rocket (SERT II) are reported. Particular note is made of the progress on the solar electric propulsion system for the Shuttle and the Nuclear electric propulsion system for thermal-to-electric conversion for mid-1990s applications.

Hudson, W. R.↗

Optimum-AIV: A planning and scheduling system for spacecraft AIV

A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.

Arentoft, M. M.↗

Towards a new surface and internal charging design guideline for the 21st century

This paper will describe the status of those on-going efforts to combine and update the two guidelines with emphasis on the proposed contents and on the differences and similarities between surface and internal charging mitigation techniques. It is planned to have a draft revision ready for review by the spacecraft charging community by the fall of 2005, with 2006 dedicated to implementing reviewers' comments and additions leading to a new, officially approved NASA guideline by the fall of 2006.

spacecraft charging↗

Managing Space Technology Development at NASA

NASA uses a structured process for managing projects that develop advanced space technologies and transition them into the designs of flight systems. The four-part process consists of formulation, approval, implementation, and transition. In the formulation phase, technology needs are derived from mission concept studies, various technical approaches for meeting the technology needs are identified, technical performance goals called Key Performance Parameters (KPPs) are established, and a project plan is developed. Prior to project approval, an Independent Formulation Review is conducted to ensure that the project objectives are aligned with the mission needs, and that the project is well planned to meet the objectives. In the implementation phase, the technology development project matures the technology, and progress towards the KPPs is evaluated in periodic status reviews. Technology Readiness Levels (TRLs) are used throughout the project lifecycle to assess the progress of technology maturation. In the transition phase, technologies that are successful in achieving the required level of maturity are transitioned to a customer for further development, are used in system designs, or are thoroughly documented for resumption of development at a later date. The customer or end-user of the technology is involved in all phases of the technology development process.

Moore, Christopher L.↗

Technological Readiness of Ceramic Matrix Composites: A Review

This review intends to provide a snapshot of the state of industry of ceramic matrix composites (CMC). It is therefore organized in terms of design needs, composite properties, system capabilities, and technological availability. This publication will cover CMCs in use and development, with technological readiness levels (TRL) from laboratory testing of coupons to flight proven hardware.

Neergaard, Lynn↗

A NEA review on innovative structural materials solutions, including advanced manufacturing processes for nuclear applications based on technology readiness assessment

The Nuclear Energy Agency (NEA) Expert Group on Innovative Structural Materials (EGISM) was established in 2008 under the guidance of the Nuclear Science Committee (NSC). Its objectives are to conduct joint and comparative studies to support the development, selection and characterisation of innovative structural materials that can be implemented in advanced nuclear fuel cycles, under long service lifetime and extreme conditions, such as high temperature, high dose/dose rate and corrosive chemical environments. In this context of growing interest and initiatives, the EGISM initiated at the beginning of 2018 an activity among its members to: Identify, in a non-exhaustive way, the currently existing programs on innovative materials and fabrication processes in NEA member countries and China; Establish a first cartography of the activities that are underway on these topics and identify common subjects and thematic; Propose a Technology Readiness Level scale to estimate the maturity of both innovative materials and fabrication processes; Carry out a reflection on what the enablers are to quickly climb this TRL scale, as well as the obstacles, in order to identify solutions to overcome them. This paper first gives definitions shared between the EGISM members on what are considered as advanced structural materials solutions. Next, some international initiatives for the accelerated development of high performance materials are presented both in non-nuclear and nuclear fields. Then, the methodology adopted for technology readiness assessment is explained. A non-exhaustive synthesis of the projects identified among the EGISM members on innovative structural materials and advanced manufacturing solutions such as additive manufacturing is presented. The TRL level of these projects is evaluated. A focus is also made on some of these projects to illustrate and explain the TRLs chosen as well as highlighting enablers or obstacles identified to climbing up the TRL scale.

36 MATERIALS SCIENCE↗

NASA Processes and Requirements for Conducting Human-in-the-Loop Closed Chamber Tests

NASA has specific processes and requirements that must be followed for tests involving human subjects to be conducted in a safe and effective manner. There are five distinct phases of test operations. Phase one, the test request phase, consists of those activities related to initiating, processing, reviewing, and evaluating the test request. Phase two, the test preparation phase consists of those activities related to planning, coordinating, documenting, and building up the test. Phase three, the test readiness phase consists of those activities related to verifying and reviewing the planned test operations. Phase four, the test activity phase, consists of all pretest operations, functional checkouts, emergency drills, and test operations. Phase five, the post test activity phase, consists of those activities performed once the test is completed, including briefings, documentation of anomalies, data reduction and archiving, and reporting. Project management processes must be followed for facility modifications and major test buildup, which include six phases: initiation and assessment, requirements evaluation, preliminary design, detailed design, use readiness review (URR) and acceptance. Compliance with requirements for safety and quality assurance are documented throughout the test buildup and test operation processes. Tests involving human subjects must be reviewed by the applicable Institutional Review Board (IRB).

Barta, Daniel J.↗

Fourth Report of the Task Force on the Shuttle-Mir Rendezvous and Docking Missions

On December 6, 1994, the NASA Administrator, Mr. Daniel Goldin, requested that Lt. Gen. Thomas P. Stafford, in his role as the Chairman of the NASA Advisory Council Task Force on the Shuttle-Mir Rendezvous and Docking Missions, lead a team composed of several Task Force members and technical advisors' to Russia with the goal of reviewing preparations and readiness for the upcoming international Space Station Phase 1 missions. In his directions to Gen. Stafford, Mr. Goldin requested that the review team focus its initial efforts on safety of flight issues for the following Phase 1A missions: the Soyuz TM-21 mission which will carry U.S. astronaut Dr. Norman Thagard and cosmonauts Lt. Col. Vladimir Dezhurov and Mr. Gennady Strekalov aboard a Soyuz spacecraft to the Mir Station; the Mir 18 Main Expedition during which Thagard and his fellow cosmonauts, Dezhurov and Strokalov, will spend approximately three months aboard the Mir Station; the STS-71 Space Shuttle mission which will perform the first Shuttle-Mir docking, carry cosmonauts Col. Anatoly SoloViev and Mr. Nikolai Budarin to the Mir Station, and return Thagard, Dezhurov, and Strekalov to Earth.

Source record↗

Gulf of Mexico Offshore Wind Transmission - Literature Review and Gaps Analysis: Environmental Considerations, Community Readiness, and Infrastructure

The ability to effectively and efficiently connect offshore wind energy resources to end users in the Gulf of Mexico, requires coordinated transmission planning to ensure that electric transmission facilities can adequately support future offshore development. The Gulf of Mexico has substantial wind resources in both shallow shelf waters and deeper waters off the shelf where fixed bottom and floating wind technologies would be most appropriate. Most interest in offshore wind development to date has been in the central and western portions of the Gulf of Mexico (Louisiana and Texas) in federal and state waters. As a companion study to other federal activities in the offshore wind transmission space, including the Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis, the Atlantic Offshore Wind Transmission Study, the West Coast Offshore Wind Transmission Literature Review and Gaps Analysis, the West Coast Offshore Wind Transmission Study, and the Advancing Offshore Wind Energy in the United States: U. S. Department of Energy Strategic Contributions Toward 30 Gigawatts and Beyond Report, this literature review and gaps analysis for offshore wind transmission in the Gulf of Mexico builds off previous literature reviews and supports the role of federal leadership to facilitate offshore wind energy. The overarching goal of this document is to identify gaps and lay the groundwork to inform coordinated transmission planning, ocean co-use, existing energy infrastructure, and siting associated with offshore wind energy development in the Gulf of Mexico. There are unique regional considerations for offshore wind transmission, which are summarized herein based on a review and assessment of publicly available information.

08 HYDROGEN↗

Evolution of International Space Station Program Safety Review Processes and Tools

The International Space Station Program at NASA is constantly seeking to improve the processes and systems that support safe space operations. To that end, the ISS Program decided to upgrade their Safety and Hazard data systems with 3 goals: make safety and hazard data more accessible; better support the interconnection of different types of safety data; and increase the efficiency (and compliance) of safety-related processes. These goals are accomplished by moving data into a web-based structured data system that includes strong process support and supports integration with other information systems. Along with the data systems, ISS is evolving its submission requirements and safety process requirements to support the improved model. In contrast to existing operations (where paper processes and electronic file repositories are used for safety data management) the web-based solution provides the program with dramatically faster access to records, the ability to search for and reference specific data within records, reduced workload for hazard updates and approval, and process support including digital signatures and controlled record workflow. In addition, integration with other key data systems provides assistance with assessments of flight readiness, more efficient review and approval of operational controls and better tracking of international safety certifications. This approach will also provide new opportunities to streamline the sharing of data with ISS international partners while maintaining compliance with applicable laws and respecting restrictions on proprietary data. One goal of this paper is to outline the approach taken by the ISS Progrm to determine requirements for the new system and to devise a practical and efficient implementation strategy. From conception through implementation, ISS and NASA partners utilized a user-centered software development approach focused on user research and iterative design methods. The user-centered approach used on the new ISS hazard system utilized focused user research and iterative design methods employed by the Human Computer Interaction Group at NASA Ames Research Center. Particularly, the approach emphasized the reduction of workload associated with document and data management activities so more resources can be allocated to the operational use of data in problem solving, safety analysis, and recurrence control. The methods and techniques used to understand existing processes and systems, to recognize opportunities for improvement, and to design and review improvements are described with the intent that similar techniques can be employed elsewhere in safety operations. A second goal of this paper is to provide and overview of the web-based data system implemented by ISS. The software selected for the ISS hazard systemMission Assurance System (MAS)is a NASA-customized vairant of the open source software project Bugzilla. The origin and history of MAS as a NASA software project and the rationale for (and advantages of) using open-source software are documented elsewhere (Green, et al., 2009).

Ratterman, Christian D.↗

The Johnson Space Center Management Information Systems (JSCMIS): An interface for organizational databases

The Management Information and Decision Support Environment (MIDSE) is a research activity to build and test a prototype of a generic human interface on the Johnson Space Center (JSC) Information Network (CIN). The existing interfaces were developed specifically to support operations rather than the type of data which management could use. The diversity of the many interfaces and their relative difficulty discouraged occasional users from attempting to use them for their purposes. The MIDSE activity approached this problem by designing and building an interface to one JSC data base - the personnel statistics tables of the NASA Personnel and Payroll System (NPPS). The interface was designed against the following requirements: generic (use with any relational NOMAD data base); easy to learn (intuitive operations for new users); easy to use (efficient operations for experienced users); self-documenting (help facility which informs users about the data base structure as well as the operation of the interface); and low maintenance (easy configuration to new applications). A prototype interface entitled the JSC Management Information Systems (JSCMIS) was produced. It resides on CIN/PROFS and is available to JSC management who request it. The interface has passed management review and is ready for early use. Three kinds of data are now available: personnel statistics, personnel register, and plan/actual cost.

Bishop, Peter C.↗

NGST Science Instruments and Process

Possible NGST (Next Generation Space Telescope) instruments have been studied by NASA, ESA (European Space Agency), and CSA (Canadian Space Agency) teams, and their reports were presented at this meeting and published on the NGST web sites. The instrument capabilities will be evaluated by the Ad Hoc Science Working Group and the technical readiness will be reviewed by a technical panel. Recommendations will be made to the NASA Project Scientist, who will present a report for public comment. NASA. ESA, and the CSA will then allocate instrument, responsibilities in early 2000. NASA will choose its scientific investigations with instruments in 2002.

Mather, John↗