Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pullout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

74 records · Page 5

Design Considerations for a Mars Highland Helicopter

Mars is sharply divided into the relatively low-lying northern hemisphere, filled with plains, to the higher-elevation, rugged, southern hemisphere. All landers sent so far to Mars have only landed on the plains of the northern hemisphere. Access to the Martian Highlands would present an opportunity to acquire unique insights into the early geologic history of Mars. But landing on the Martian highlands presents many engineering challenges. A new approach has recently been proposed to consider the use of mid-air deployment, during the final subsonic stages of entry, descent, and landing, of a small rotorcraft from the aeroshell. The rotorcraft would enter a powered descent state (rotors would be spun to full speed at moderate collectives) after aeroshell release until reaching a modest altitude above the ground where the vehicle would pullout to level flight. After completing this initial EDL mid-air-deployment and landing, the rotorcraft, which would be capable of solar-electric recharging, would recharge over the course of a few days until ready for subsequent flight sorties to explore the highlands. This overall vehicle/mission concept is called the Mars Highland Helicopter. The paper will next demonstrate that a key necessary condition – efficient hover and forward flight under the much thinner atmospheric conditions of the highlands (0.01 kg/m3 vs. 0.015 kg.m3 for the Ingenuity Mars Helicopter Technology Demonstrator at Jezero Crater) – is indeed possible. This paper considers a number of EDL release/deployment strategies to minimize deployment aeroloads and maximize controllability during release from the EDL backshell. This mid-air-deployment discussion will be followed by a general analytical treatment of a Mars rotorcraft entering fully-powered descent and then forward flight cruise.

Mars Highland Helicopter↗

Design and Development of a Robust Chuck Mechanism for the Mars2020 Coring Drill

The Sampling and Caching Subsystem (SCS) onboard the Mars2020 rover includes a coring drill that can perform coring, abrasion, and regolith collection operations. The coring drill requires a chuck mechanism to allow for the changing of the bits needed to perform sampling. The chuck mechanism must be capable of securely connecting a bit under drilling, rover slip, and pullout loads, but also readily release a bit after application of these loads. The Mars2020 chuck consists of a ball lock mechanism that allows for robust engagement and release of bit assemblies that is preloaded to ensure a secure, stiff connection between the bit assembly and the rest of the corer. To prevent jamming, the chuck incorporates rollers to preload the ball lock. The rollers are mounted onto a flexured cam that minimizes changes in internal mechanism loads that result from thermally induced dimensional changes, further mitigating the potential for jamming. The chuck mechanism is moved between engaged, disengaged, and loose chuck positions by rotating the cam with a gearmotor that incorporates a magnetic detent brake that prevents inadvertent mechanism motion under design loads. Ongoing testing is occurring on the qualification model in a dirty environment while coring and abrading rocks in a Mars representative environment.

Barletta, Anthony↗