Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “programmatic risk integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Results From the John Glenn Biomedical Engineering Consortium. A Success Story for NASA and Northeast Ohio

The John Glenn Biomedical Engineering Consortium was established by NASA in 2002 to formulate and implement an integrated, interdisciplinary research program to address risks faced by astronauts during long-duration space missions. The consortium is comprised of a preeminent team of Northeast Ohio institutions that include Case Western Reserve University, the Cleveland Clinic, University Hospitals Case Medical Center, The National Center for Space Exploration Research, and the NASA Glenn Research Center. The John Glenn Biomedical Engineering Consortium research is focused on fluid physics and sensor technology that addresses the critical risks to crew health, safety, and performance. Effectively utilizing the unique skills, capabilities and facilities of the consortium members is also of prime importance. Research efforts were initiated with a general call for proposals to the consortium members. The top proposals were selected for funding through a rigorous, peer review process. The review included participation from NASA's Johnson Space Center, which has programmatic responsibility for NASA's Human Research Program. The projects range in scope from delivery of prototype hardware to applied research that enables future development of advanced technology devices. All of the projects selected for funding have been completed and the results are summarized. Because of the success of the consortium, the member institutions have extended the original agreement to continue this highly effective research collaboration through 2011.

Nall, Marsha M.↗

Assessment of Survey Results from Advanced Reactor Industry Domain Experts on Nonlinear Soil-Structure Interaction Analysis Software Verification and Validation

The seismic load case has a significant impact on the design and cost of nuclear power plants. Given the need to substantially reduce cost, advanced reactor designers are looking to leverage numerical tools that enable seismic analysis of an integrated vessel/support/structure/soil system. Modern nonlinear analysis tools provide a solution, capturing dynamic coupling between components (including soil-structure interaction (SSI)) concurrent with nonlinear behavior in one or more parts of the system. Although these methods have a rich history of technical development and implementation, software quality assurance (SQA) following nuclear industry standards remains a significant burden for those wishing to adopt such methods for advanced reactor design and licensing. To reduce the SQA burden, this project will develop the guidance for SQA verification and validation (V&V) of coupled nonlinear SSI analysis tools, to include a test matrix of software features and test problems to support commercial grade dedication (CGD). The guidance is intended to be technology-neutral: supporting designers of all advanced reactors. To maximize the value of the project to reactor designers, the project team performed focused surveys of and interviews with advanced reactor designers. Additionally, the project surveyed members of the broader industry involved in reactor design and licensing. The aggregated industry feedback consists of written survey responses, live polling responses, focused interviews, and informal feedback provided after outreach presentations, collectively referred to as “survey results”. Herein, the survey results are reported, reviewed, and assessed to inform follow-on project activities. The survey results confirmed the familiarity of the industry with the coupled nonlinear SSI analysis. They also affirm the project need based upon the expressed intent to (1) incorporate nonlinear features and (2) pursue the coupled nonlinear SSI analysis to reduce seismic demands and construction costs. All reactor designers indicated their intent to incorporate two or more nonlinear features, and all reactor designer respondents opined that the coupled nonlinear SSI analysis would allow for the optimization of the reactor design and construction. However, the programmatic challenges, whether real or perceived, present a significant barrier to reactor designers. The barrier most commonly identified by the reactor designer population was regulatory risk, with 70% citing this as a reason not to pursue the approach. The perceived regulatory risk identified by the reactor designers underscores the importance of regulator engagement and dialogue in this project. Additionally, half of the reactor designers identified cost and lack of guidance as a deterrent. The survey results also provide insights to tailor specific aspects of the guidance document and test matrix. The project plans to prepare both a formal referenceable guidance document and a collaborative, web-based test matrix and problem set. The project will focus on more complete test problem definitions for the prioritized nonlinear features over shallower problem descriptions for a larger set of features. The nonlinearities prioritized as high based upon survey feedback include fluid-structure interaction and seismic isolation and energy dissipation devices. The nonlinearities prioritized as intermediate include nonlinear geomaterials, nonlinear concrete, nonlinear steel, and interface/contact nonlinearity. Deep embedment and the associated nonlinear phenomena are assigned the lowest priority based upon survey feedback.

42 ENGINEERING↗

Integrated Commercial Carbon Capture and Storage (CCS) Prefeasibility Study at Rock Springs Uplift, Wyoming (Final Report)

To establish the potential of safe, long-term commercial-scale carbon capture & storage (CCS) in southwestern Wyoming, the University of Wyoming formed a CCS coordination team (CCT) to complete a Phase I CarbonSAFE pre-feasibility study adjacent to the region’s largest coal-fired power plant, the Jim Bridger Plant (JBP). The study’s primary objective was to evaluate the potential of storing 50+ million metric tons of anthropogenic carbon dioxide (CO 2 ) in stacked reservoirs over a period of 25 years. In addition, this integrated study evaluated related aspects of carbon capture utilization & storage (CCUS) at the study site, including: (1) the CO 2 character of post-combustion flue gas from JBP and the technical capacity for retrofitting proven commercial-scale CO 2 capture technology relative to CO 2 source character and technological constraints; (2) utilization of the existing CO 2 pipeline network in the immediate vicinity of JBP for enhanced oil recovery (CO 2 -EOR) and utilizing that network as part of a regional hub for CO 2 storage from other anthropogenic sources; (3) assessment of the challenges and benefits of meeting all of CarbonSAFE programmatic Phase I goals relative to Wyoming’s carbon management regulatory framework; and (4) assessment of the community and environmental factors that may impact CCS at JBP. With respect to storage, we analyzed the potential of stacked Mesozoic reservoirs at the study site, focusing on the Entrada and Nugget sandstones. The reservoir response to injection simulations varied greatly between formations, though they both were capable of CO 2 storage. The Entrada Sandstone is relative thin (~40’) and heterogeneous; storage using one injection and production well was limited to 1.2 Mt over 25 years at the study site. The Nugget Sandstone is much thicker (> 400’) and generally homogeneous; storage using one injection and production well approached 15.0 Mt over 25 years; this scenario suggests that the storage potential in the Nugget Sandstone is close to the estimated P90 calculation of 9.6 Mt/mi 2 as models indicate a storage potential of 8.3 Mt/mi 2 at saturation. Both reservoirs’ storage capacity benefited greatly from coupling an injection well with an offset production well; total storage capacity increased and reservoir pressure stayed below critical thresholds. This indicates that implementing a pressure management strategy at the study site would optimize storage and decrease risk. Seals associated with the targeted reservoirs were shown to be capable of retaining the potential storage volumes, and the site benefits from multiple seal redundancies (i.e. > 7,000’ of seal formations). Furthermore, assessment of different reservoir variables (e.g., fluid composition, pressure, etc.) indicates all reservoirs at the study site are isolated. Storage assessments from Mesozoic reservoirs were coupled with simulations from the site’s Paleozoic reservoirs (the Weber Sandstone and Madison Limestone), which were the focus of previous study. The fully integrated stacked reservoir pre-feasibility studies suggest that the Nugget and Madison formations alone could safely store 50 million metric tons of CO 2 within the study site. Furthermore, both formations are true saline reservoirs near JBP, making them ideal target reservoirs for CO 2 sequestration. Analysis of Wyoming’s laws and regulations confirm that the State has a favorable policy environment for CCS/CCUS. The project’s economic models estimated that the following revenues collectively are sufficient to finance the project over its lifespan if CO 2 utilization is coupled with CCS via the following strategies: (1) sales of CO 2 for EOR (approximately $69 million/year); (2) use of CO 2 tax credits such as amended §45Q and §48A (approximately $484 million total); and (3) sales of low-carbon electricity and marketable carbon offset/credits into carbon-constrained markets (approximately $11-$17 million/year) to West Coast consumers. These revenue estimates are broadly consistent with other studies that concluded arbitrage in JBP retail electricity sales between California and Wyoming could help to support the cost of deploying CCS at JBP. The models also indicate that maintaining a successful business case for long-term CCS -- wherein associated capture, transportation and operational costs are fully addressed at JBP -- is reliant on numerous external factors that complicate predictions. This study suggests that this site meets the CarbonSAFE program’s requirements of being able to feasibly store 50+ million metric tons of CO 2 over 25 years within the site’s stacked reservoirs, especially if coupled with pressure management strategies. This study suggests that the Nugget Sandstone and the Madison Limestone are two of the best reservoirs in the State with respect to overall storage capacity. In addition, the site’s proximity to existing CO 2 transportation networks, CO 2 -EOR opportunities, ability to sell to markets that value low-carbon electricity, Wyoming’s existing carbon regulatory framework, and a public that is well-educated with respect to energy markets and issues collectively increase the potential for implementing commercial-scale CCS adjacent to the JBP. With respect to the available technical and non-technical site data, and the reservoir quality at the study site, we suggest that this site is capable of moving directly into Phase III of the CarbonSAFE program.

01 COAL, LIGNITE, AND PEAT↗

The role of small missions in planetary and lunar exploration

The Space Studies Board of the National Research Council charged its Committee on Planetary and Lunar Exploration (COMPLEX) to (1) examine the degree to which small missions, such as those fitting within the constraints of the Discovery program, can achieve priority objectives in the lunar and planetary sciences; (2) determine those characteristics, such as level of risk, flight rate, target mix, university involvement, technology development, management structure and procedures, and so on, that could allow a successful program; (3) assess issues, such as instrument selection, mission operations, data analysis, and data archiving, to ensure the greatest scientific return from a particular mission, given a rapid deployment schedule and a tightly constrained budget; and (4) review past programmatic attempts to establish small planetary science mission lines, including the Planetary Observers and Planetary Explorers, and consider the impact management practices have had on such programs. A series of small missions presents the planetary science community with the opportunity to expand the scope of its activities and to develop the potential and inventiveness of its members in ways not possible within the confines of large, traditional programs. COMPLEX also realized that a program of small planetary missions was, in and of itself, incapable of meeting all of the prime objectives contained in its report 'An Integrated Strategy for the Planetary Sciences: 1995-2010.' Recommendations are provided for the small planetary missions to fulfill their promise.

Source record↗

The TPS Advanced Development Project for CEV

The CEV TPS Advanced Development Project (ADP) is a NASA in-house activity for providing two heatshield preliminary designs (a Lunar direct return as well as a LEO only return) for the CEV, including the TPS, the carrier structure, the interfaces and the attachments. The project s primary objective is the development of a single heatshield preliminary design that meets both Lunar direct return and LEO return requirements. The effort to develop the Lunar direct return capable heatshield is considered a high risk item for the NASA CEV development effort due to the low TRL (approx. 4) of the candidate TPS materials. By initiating the TPS ADP early in the development cycle, the intent is to use materials analysis and testing in combination with manufacturing demonstrations to reduce the programmatic risk of using advanced TPS technologies in the critical path for CEV. Due to the technical and schedule risks associated a Lunar return heatshield, the ADP will pursue a parallel path design approach, whereby a back-up TPS/heatshield design that only meets LEO return requirements is also developed. The TPS materials and carrier structure design concept selections will be based on testing, analysis, design and evaluation of scalability and manufacturing performed under the ADP. At the TPS PDR, the preferred programmatic strategy is to transfer the continued (detailed) design, development, testing and evaluation (DDT&E) of both the Lunar direct and LEO return designs to a government/prime contractor coordinated sub-system design team. The CEV prime contractor would have responsibility for the continued heatshield sub-system development. Continued government participation would include analysis, testing and evaluation as well as decision authority at TPS Final System Decision (FSD) (choosing between the primary and back-up heatshields) occurring between TPS PDR and TPS Critical Design Review (CDR). After TPS FSD the prime CEV contractor will complete the detailed design, certification testing, procurement, and integration of the CEV TPS.

Reuther, James↗

Los Alamos National Laboratory Ten-Year Site Plan FY 2016

The Los Alamos National Laboratory will continue to face a significant challenge over the next 25 years in balancing near-term needs while transforming the infrastructure to ensure long-term viability. The 2014 Los Alamos National Laboratory Strategic Plan emphasized that infrastructure must be modernized and maintained to fulfill diverse, complex, and evolving missions in a period of fl at or decreasing budgets. The large number of existing facilities will continue to age while safety, security, sustainability and compliance requirements will likely increase. The Laboratory must also continue to act as an environmental steward, reduce environmental risk, and improve sustainability. This plan identifies strategies that will enable the Laboratory to provide a flexible, responsive infrastructure within available resources. At the end of the 25 year period, the Laboratory will have achieved the following: New facilities construction and enduring facilities reinvestment to support critical capabilities; Improved energy efficiency and long-term sustainability practices; Modernized utility infrastructure to support future programmatic needs; Legacy cleanup and long-term environmental stewardship goals; Footprint reduction and nuclear infrastructure consolidation. Even in the face of new and significant pressures, the Laboratory will continue to take substantial steps to streamline operations, modernize the infrastructure, and fulfill its vision of being the premier national security science laboratory. The fiscal year (FY) 2016 Ten-Year Site Plan (TYSP) is consistent with previous TYSPs and incorporates updated information in accordance with National Nuclear Security Administration (NNSA) guidance. The TYSP is a vital planning component to meet the NNSA commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory’s missions and workforce. Emphasizing the Laboratory’s core capabilities, this TYSP reflects the Laboratory’s role as a prominent contributor to NNSA missions through its programs and campaigns.

99 GENERAL AND MISCELLANEOUS↗

X-43D Conceptual Design and Feasibility Study

NASA s Next Generation Launch Technology (NGLT) Program, in conjunction with the office of the Director of Defense Research and Engineering (DDR&E), developed an integrated hypersonic technology demonstration roadmap. This roadmap is an integral part of the National Aerospace Initiative (NAI), a multi-year, multi-agency cooperative effort to invest in and develop, among other things, hypersonic technologies. This roadmap contains key ground and flight demonstrations required along the path to developing a reusable hypersonic space access system. One of the key flight demonstrations required for systems that will operate in the high Mach number regime is the X-43D. As currently conceived, the X-43D is a Mach 15 flight test vehicle that incorporates a hydrogen-fueled scramjet engine. The purpose of the X-43D is to gather high Mach number flight environment and engine operability information which is difficult, if not impossible, to gather on the ground. During 2003, the NGLT Future Hypersonic Flight Demonstration Office initiated a feasibility study on the X-43D. The objective of the study was to develop a baseline conceptual design, assess its performance, and identify the key technical issues. The study also produced a baseline program plan, schedule, and cost, along with a list of key programmatic risks.

Johnson, Donald B.↗

In Space Assembled Telescope (ISAT) Study Preliminary Findings

“When is it advantageous to assemble telescopes in space rather than deploying them from launch vehicle fairings”? This question forms the crux of the objectives of a NASA study we have been conducting in collaboration with colleagues from different NASA centers, industry and academia. In this study, we have engaged a broad cross section of experts from the various fields of optics engineering, that is, telescope design and instrument design, structure and thermal engineering, robotics, launch system engineering, orbital mechanics, integration and testing, astrophysics, and NASA programmatics among others. Initial efforts began with a quick review of the current state of art of the component technologies that contribute towards an in-space assembled telescope. Then, leveraging the collective expertise of the diverse group of experts, we formulated a reference telescope design and attempted to develop a baseline approach to modularize the telescope into components amenable for robotic assembly. The group identified different trades associated with modularization and also developed a set of criteria to discern between the different options as revealed by the trades. Based on the modularization of the telescope, we will assess the impact of various launch vehicles, orbits for assembly and operation, robotic systems and operational approaches, and other related variables. From this, a concept to assemble the reference telescope in space from modular components will be developed. Based on this concept, and definition of the modules, we will develop a mission lifecycle plan for an assembled telescope over different phases of preliminary design, detailed design, assembly-test-and-integration, and in space operations. The mission lifecycle plan will be used to evaluate cost and risk implications of in-space assembly toward answering our fundamental question of the advantages, if any, of assembling a telescope in space as compared to self-deployment. In this paper, we summarize the objectives of the study, a review of the status of the underlying component technologies, a description of the methodology, including three different multi-day technical interchange meetings (TIMs), summary of findings from the TIMs and other related activities. In addition, a detailed description of the various factors that impact in-space assembly, their interplay and criteria for discerning among them, a preliminary description of the life cycle plan, including the test and integration plan, and initial observations on cost and risk implications will be included in the paper.

Mukherjee, Rudranarayan↗

Identifying and Closing Medical Capability Gaps for Human Spaceflight Missions Beyond Low Earth Orbit

BACKGROUND: Features of human space missions beyond low Earth orbit such as increasing distance from Earth, lack of real-time communication, and limited or no evacuation or resupply capability are expected to drive an increase in medical risk and require crews to operate in an increasingly autonomous fashion. A diverse set of stakeholders at NASA are seeking to fund the development of concepts of operations, medical requirements, and medical capabilities for such missions. However, a systematic approach to identification of current medical capability gaps and a strategic framework to gap closure is needed. OVERVIEW: The Exploration Medical Integrated Product Team (XMIPT) has developed a list of nine high-level medical capability gaps and associated activities required for gap closure. The list was derived based on inputs from subject matter experts at NASA including flight surgeons, other clinical providers, as well as operational and research communities regarding medical capabilities required to support human missions to the Moon and the Mars surface. Responses were reviewed and distilled to identify common themes across capabilities. To ensure alignment with established human system risks, the gap list was further refined based on inputs from NASA’s Human System Risk Board. Relevant medical gap closure activities outside of those funded by the XMIPT were identified through solicitation of inputs from Elements of NASA’s Human Research Program (particularly Exploration Medical Capability), the broader medical operations community, and other stakeholders. This medical capability gap list is reviewed and updated regularly as new information becomes available or new stakeholders are identified. DISCUSSION: The medical capability gap list has matured to include a large group of NASA stakeholders and development activities. This has enabled articulation of priorities to funding entities and programmatic stakeholders, while serving as an accessible resource summarizing gap closure activities, relevant programmatic infusion points, and opportunities for collaboration between stakeholders. This presentation will provide an overview of the nine NASA medical capability gaps and their associated gap closure activities.

Moriah Thompson↗

Having a Come-Apart: Lessons Learned from Additively Manufactured Hardware Failures

NASA has been engaged with additively manufactured (AM) process and component development since the 2000’s. AM offers various technical advantages, such as enhanced hardware design complexity, part consolidation, and processing of novel alloys in addition to programmatic advantages for reduction in processing time and cost. The focus of much of the AM development at NASA has been to mature the various processes, characterize material properties, develop standards, produce demonstrator parts, and integrate AM hardware in liquid rocket engines. These aspects have been demonstrated through process and design iterations using a methodical characterization, test-fail-fix cycles, as well as application and dissemination of lessons learned. In addition to these fundamental demonstrations of the AM process and hardware development, alloys that provide performance advantages in the high temperature and high-pressure environments have been matured for use in rocket engines. These environments are challenging for any alloy and any design, and the AM process is required to fully meet the intended design requirements. The importance of proper AM process was made evident in the failure of a Laser Powder Bed Fusion (L-PBF) copper-alloy combustion chamber during a hot-fire test due to a degraded material quality resulted from an AM process issue. The hot-fire test aimed to demonstrate high duty cycle under a risk-tolerant development project, where consequences of component failure would be minimal. However, the unintentional component failure emphasized the necessity of robust material characterization and rigorous process control procedures for the safe use of AM components in critical applications. In part, such concerns motivate the AM certification approach that NASA has recently adopted in NASA-STD-6030 “Additive Manufacturing Requirements for Spaceflight Systems”. This presentation provides an overview of the previously mentioned failure, a discussion on the evaluation of the failed chamber and supplemental chambers produced at the same time, a representative material samples that included intentional build witness lines, and a summary of the key results and recommendations from the evaluations. NASA continues to approach AM processes and designs with a level of risk and acceptance of failures that is appropriate for the project objectives, with the overall goal of safe implementation of AM technology and transferring AM technology into commercial space applications. The objective of this presentation is to provide awareness to the community working critical and non-critical AM components and the lessons learned on proper implementation of AM.

Additive Manufacturing↗

Sampling Size Optimization for Bioburden Density Estimation in Planetary Protection

Planetary protection (PP) is a discipline that focuses on minimizing the biological contamination of spacecraft to ensure compliance with international policy. Precise estimation of bioburden - the total number of microbes in or on spacecraft hardware – and the bioburden density are of utmost importance for PP. Such estimation is the way concordance with requirements is demonstrated, and it is critical for quantifying the potential risk of inadvertently contaminating other planetary bodies. Although a suite of molecular techniques have been used to thoroughly characterize and profile the microbiome of various cleanroom environments and spacecraft, the gold standard remains the physical enumeration of microbes via culturing of samples directly taken from spacecraft and associated surfaces. However, due to technical, budgetary, and programmatic constraints, only a manageable portion (around 10%) of the entire spacecraft surface is directly sampled with cotton swabs or wipes. To generate the bioburden current best estimate (CBE) for components not directly verifiable, the accepted approach is to apply a NASA-defined bioburden estimate based on the components’ manufacturing or assembly environment. This approach utilizes a prespecified bioburden density estimation that applies a maximum value across the total surface area of the specified component. For hardware components that underwent similar assembly processes, an implied bioburden is adopted for all components, based on a direct verification of a representative component within the same lot. Once all components have a CBE, the bioburden estimates are generated. In previous publication [ 1], we have shown that statistical risks quantifying the accuracy of the estimates for sampled, prespecified, and implied components can be derived and ranked. For mean squared error (MSE) function, the risks are available analytically and hence a cost function can be obtained to optimize the risks with respect to the sampling area and sampling cost. Since the sampling area and sampling cost are two complimentary variables, their sum will have a well-defined minimum. This paper presents the multivariate optimization of the integrated risk of an empirical Bayes estimator to determine the optimal sampling schedule for a given number of components. It is assumed that given a number of components, N, the bioburden density for each component can either be sampled, implied, or prespecified. The multivariate optimization searches through different options to sample, imply or prespecify the bioburden density for a component, and account for the component’s surface area and cost of sampling. The idea of the optimization is based on the observation that the statistical risk of using an estimator is a monotonically decreasing function of the sampled area. The larger the sampled area, the lower the risk of using the estimator as the estimator becomes more and more accurate as the sampling area increases. On the other hand, the cost of sampling is monotonically increasing as the sampled surface grows. This makes the risk and total cost of sampling complimentary variables which can be counterbalanced to achieve an optimal overall value with respect to the sampled surface. In this paper, the integrated risk has been used to quantify the accuracy of the estimator. This risk has been selected because it depends on neither the true value of the parameter nor on the collected data. The cost of each sample was also available to obtain the total cost of sampling of N components. The paper will present the results based on computer-simulated data as well as the data collected during the InSight mission. The computer-simulated data have N components with randomly generated total areas and each component assigned to one of the three categories according to the method of estimating of bioburden density: sampled, implied, or prespecified. The cost of sampling is also available. The cost of sampling is estimated based on a cost model provided by the planetary protection group at JPL. For this paper, the overall cost was assumed to be a linear function of exposure. The optimization process finds the allocation of the components to the three categories that minimizes the tradeoff between integrated risk and total cost. For the InSight data, a set of components is selected representing all three categories, and optimization is performed to determine if the performed allocation was optimal or if a better allocation could have been obtained. To the best of our knowledge, this work is the first attempt not only perform an accurate estimation of bioburden density but also do it in an optimal way.

97 - MATHEMATICS AND COMPUTING↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2017 BEA Self-Assessment Report for Idaho National Laboratory

This report provides Battelle Energy Alliance’s (BEA) self-assessment of performance for the period of October 1, 2016, through September 30, 2017, as evaluated against the goals, performance objectives, and notable outcomes defined in the Fiscal Year (FY) 2017 Performance Evaluation and Measurement Plan (PEMP). BEA took into consideration and consolidated all input provided from internal and external sources (e.g., Contractor Assurance System [CAS], program and customer feedback, external and independent reviews, and Department of Energy [DOE] Idaho Operations Office [ID] quarterly PEMP reports and Quarterly Evaluation Reports). After considering the information related to performance during the rating period, including feedback from the Office of Nuclear Energy (NE), Idaho Operations Office (ID), and other programmatic sponsors, BEA has self-assessed the Laboratory’s performance at a grade of A, an adjectival rating of “Excellent.” Table 1 documents BEA’s assessment of performance to the goals and individual performance Objectives. Table 2 documents completion of the Notable Outcomes. A more-detailed assessment of performance for each individual performance objective is documented in the closeout reports (see the PEMP reporting system). Table 3 includes an update to “Performance Challenges” as reported in the FY 2016 Self-Assessment Report.

99 GENERAL AND MISCELLANEOUS↗

Light Water Reactor Sustainability Program Integrated Program Plan

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy's Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Light Water Reactor Sustainability Program Integrated Program Plan

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Light Water Reactor Sustainability Program Integrated Program Plan

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Low-Cost, Class D Testing of Spacecraft Photovoltaic Systems Can Reduce Risk

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! Specifically, the standard practice for doing so is the Large Area Pulsed Solar Simulation (LAPSS). A LAPSS test can characterize a photovoltaic system's efficiency via its response to rapidly applied impulses of simulated sunlight. However, a Class D program on a constrained budget and schedule may not have the resources to ship an entire satellite for a LAPSS test alone. Such was the case with the Lunar Atmospheric and Dust Environment Explorer (LADEE) program, which was also averse to the risk of hardware damage during shipment. When the Electrical Power System (EPS) team was denied a spacecraft-level LAPSS test, the lack of an end-to-end power generation test elevated to a project-level technical risk. The team pulled together very limited resources to not only eliminate the risk, but build a process to monitor the health of the system through mission operations. We discuss a process for performing a low-cost, end-to-end test of the LADEE photovoltaic system. The approach combines system-level functional test, panel-level performance results, and periodic inspection (and repair) up until launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of data. The process starts in manufacturing at the subcontractor. The panel manufacturer provides functional test and LAPSS data on each individual panel. We apply an initial assumption that the per-panel performance is sufficient to meet the power generation requirements. The manufacturer's data is also carried as the performance allocation for each panel during EPS system modeling and initial mission operations. During integration and test, a high-power, professional theater lamp system provides simulated sunlight to each panel on the spacecraft, thereby permitting a true end-to-end system test. A passing test results in a step response to nearly full-rated current at the appropriate solar array switch in the power system. A metal-halide bulb, infrared imagers, and onboard spacecraft measurements are utilized to minimize risk of thermal damage during test. Data is provided to support test results for both passing and marginal panels. Prior to encapsulation in the launch vehicle, each panel is inspected for damage by the panel manufacturer. Cracked cells or other damage is amended on-site. Because the photovoltaic test system is inexpensive and portable, each repaired panel can be re-verified immediately. Post-launch, the photovoltaic system is again characterized for per-panel deviations from the manufacturer's performance test. This proved especially tricky as the LADEE spacecraft performs only one current measurement on the entire array. The algorithm for Matlab tools to assess panel performance based on spacecraft attitude is discussed. While not as precise and comprehensive as LAPSS, the LADEE approach leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a spacecraft level performance test versus the programmatic risk of shipping the spacecraft to another facility. The resources required are a fraction of that for a LAPSS test, and is easy to repeat. Further, the test equipment can be handed down to future projects without building an on-site facility.

photovoltaic↗

Hanford Site Secondary Waste Roadmap

Summary The U.S. Department of Energy (DOE) is making plans to dispose of 54 million gallons of radioactive tank wastes at the Hanford Site near Richland, Washington. The high-level wastes and low-activity wastes will be vitrified and placed in permanent disposal sites. Processing of the tank wastes will generate secondary wastes, including routine solid wastes and liquid process effluents, and these need to be processed and disposed of also. The Department of Energy Office of Waste Processing sponsored a meeting to develop a roadmap to outline the steps necessary to design the secondary waste forms. Representatives from DOE, the U.S. Environmental Protection Agency, the Washington State Department of Ecology, the Oregon Department of Energy, Nuclear Regulatory Commission, technical experts from the DOE national laboratories, academia, and private consultants convened in Richland, Washington, during the week of July 21-23, 2008, to participate in a workshop to identify the risks and uncertainties associated with the treatment and disposal of the secondary wastes and to develop a roadmap for addressing those risks and uncertainties. This report describes the results of the roadmap meeting in Richland. Processing of the tank wastes will generate secondary wastes, including routine solid wastes and liquid process effluents. The secondary waste roadmap workshop focused on the waste streams that contained the largest fractions of the 129I and 99Tc that the Integrated Disposal Facility risk assessment analyses were showing to have the largest contribution to the estimated IDF disposal impacts to groundwater. Thus, the roadmapping effort was to focus on the scrubber/off-gas treatment liquids with 99Tc to be sent to the Effluent Treatment Facility for treatment and solidification and the silver mordenite and carbon beds with the captured 129I to be packaged and sent to the IDF. At the highest level, the secondary waste roadmap includes elements addressing regulatory and performance requirements, waste composition, preliminary waste form screening, waste form development, process design and support, and validation. The regulatory and performance requirements activity will provide the secondary waste-form performance requirements. The waste-composition activity will provide workable ranges of secondary waste compositions and formulations for simulants and surrogates. Preliminary waste form screening will identify candidate waste forms for immobilizing the secondary wastes. The waste form development activity will mature the waste forms, leading to a selected waste form(s) with a defensible understanding of the long-term release rate and input into the critical decision process for a secondary waste treatment process/facility. The process and design support activity will provide a reliable process flowsheet and input to support a robust facility design. The validation effort will confirm that the selected waste form meets regulatory requirements. The final outcome of the implementation of the secondary waste roadmap is the compliant, effective, timely, and cost-effective disposal of the secondary wastes. The work necessary to address the programmatic, regulatory, and technical risks and uncertainties identified through the Secondary Waste Roadmap Workshop are assembled into several program needs elements. Programmatic/Regulatory needs include: • Select and deploy Hanford tank waste supplemental treatment technology • Provide treatment capability for secondary waste streams from tank waste treatment • Develop consensus on secondary waste form acceptance. Technology needs include: • Define secondary waste composition ranges and uncertainties • Identify and develop waste forms for secondary waste immobilization and disposal • Develop test methods to characterize secondary waste form performance. Details for each of these program elements are provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗