Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power generation planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Integrated solution techniques for security constrained unit commitment problem

Apparatus and methods are disclosed for solving Mixed Integer Programming (MIP) problems, such as Security Constrained Unit Commitment (SCUC) problems used by power grid authorities to perform day-ahead market clearing. In certain examples, a plurality of threads of a software tool implementing a concurrent optimizer can be executed concurrently and sequentially to generate new solutions to a SCUC problem for an upcoming planning horizon. Data can be shared among the concurrently executing threads, such as intermediate/incumbent solutions and hints regarding the fixing of variables and constraints to reduce the size of the SCUC problem. In some examples, the threads are seeded with historical solutions from prior planning horizons. The software tool can select a best solution from the solutions generated by the threads, and determine dispatch instructions for a device coupled to the power grid for the upcoming planning horizon based at least in part on the selected solution.

Pan, Feng↗

SCRES Energy Quest Workshop (Technical Report)

Energy Quest: Sitka’s Path to 2050 is a game based public engagement tool developed as part of the Sitka Community Renewable Energy Strategy and the U.S. Department of Energy’s Energy Transitions Initiative Partnership Project Cohort 3. Designed for Sitka’s isolated island microgrid, which is powered primarily by hydropower and depends on imported diesel for backup, the game translated complex long term energy planning questions into an interactive format. In facilitated workshops, residents built energy roadmaps to 2050, explored tradeoffs, and expressed priorities around four themes: affordability, reliability, self sufficiency, and innovation. Across sessions, participants showed strong support for increasing local self sufficiency and resilience, even when this required balancing near term affordability with long term investments. They emphasized reducing dependence on imported diesel, making better use of existing hydropower, and considering new renewable generation such as solar, wind, and additional hydropower. Survey and game responses also highlighted interest in using surplus hydropower to support new industries, expanding electrification of heating and transportation, and exploring emerging technologies and green fuels. The report organizes these findings into four scenario themes to guide Sitka’s 2050 energy planning. Affordability focuses on managing rate impacts, efficiency, and conservation. Reliability addresses diversified generation, backup power, and energy security. Self sufficiency emphasizes distributed generation and reduced reliance on imported fuels. Innovation explores new technologies, marine based energy solutions, and low carbon fuels. By grounding future planning in these community derived themes, Energy Quest shows how a game based approach can make technical energy planning more accessible and inclusive for remote communities. For questions about the game board and piece production email Dr. Sarah Troise (sarah.troise@pnnl.gov)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Alternating Direction Decomposition with Strong Bounding and Convexification (ADDSBC) for Solving Security Constrained AC Unit Commitment Problems

This project aims to develop efficient and robust computational methods for solving the security-constrained unit commitment and alternating current optimal power flow problem (SC-UC-ACOPF). The SC-UC-ACOPF problem is at the center of the short-term operation of the U.S. Power Grid. It is solved every week, every day, and every 10 minutes to plan for the optimal action of electricity generation and consumption by minimizing the generation cost and maintaining power system reliability against potential disruptions of equipment failures. In mathematical terms, SC-UC-ACOPF is a challenging large-scale mixed-integer nonlinear optimization model. This means that the decisions involve both discrete variables, e.g. the turning on and off of generators and switching of transmission lines and transformers, and continuous decisions, e.g. the amount of energy generated by each generator and the power flows in the power grid. The physics of the power flow is described by nonlinear equations involving real and reactive power and bus voltages. Another key feature is the large number of contingencies, i.e. the system needs to stay reliable in face of failure of any one equipment, such as transmission lines and generators. The U.S. power grids are extremely complicated and large scale with more than 5,000 generators, 50,000 buses, and 100,000 high-voltage transmission lines, making the SC-UC-ACOPF a very large-scale computation challenge. The research developed in this project aims to solve the SC-UC-ACOPF problems in the three timescales, i.e. weekly, daily, and every 10-min. The proposed computational methods are built on a principled algorithmic approach of decomposition and penalization. More specifically, the algorithm develops spatial and temporal decomposition by exploiting the strong temporal coupling and weak spatial coupling of the UC problem and the complementary feature, i.e. weak temporal coupling and strong spatial coupling of the ACOPF problem. The algorithm also leverages recent progresses in strong convex relaxation of ACOPF. A unique feature of the proposed approach is that it generates a valid, global upper bound on the optimal maximum profit. In this way, a global optimality gap is available to measure the quality of the solution. To further speed up computation, the research team has developed a plethora of effective heuristics to strengthen the iterative penalty-based decomposition framework. For instance, a heuristic is developed to construct inner approximations of the time coupling constraints within the time decoupled problems. Contingencies are pre-screened and low-rank matrix computation is exploited to find the almost unique solution to each contingency. A novel heuristic for line switching is proposed and tested with positive impacts on instances where line switching is beneficial. Taking a systematic approach and carefully handling every detail of the problem pays off. The TIM-GO’s performance throughout the trials and the final event was stellar. TIM-GO garnered the second highest total prize money and is ranked in the top three positions across all categories of comparison.

97 MATHEMATICS AND COMPUTING↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

Community Resilience Options: A Menu for Enhancing Local Energy Resilience

This document highlights areas of potential community resilience improvements, especially those that relate to clean energy deployment for communities and municipalities. The National Renewable Energy Laboratory (NREL) defines resilience as "a system's ability to anticipate, prepare for, and adapt to changing conditions and withstand, respond to, and recover rapidly from disruptions through sustainable, adaptable, and holistic planning and technical solutions." This document introduces 10 categories of resilience-enhancing projects at a high level, intended for community members and decision-makers new to the topic to build their understanding of which solutions fit their community best. These categories focus primarily on community-scale measures and different options may be available at larger scales. Full implementation of the measures described here requires in-depth, site-specific considerations that go beyond the scope of this document.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

IDAES Enterprise: Generation Expansion Planning with Enhanced Requirements for Capacity Adequacy Under Renewable Intermittency

Achieving net zero carbon emissions likely requires future power systems to integrate new, flexible energy technologies to accommodate higher levels of capacity from variable renewable energy sources. To determine the optimal deployment of new electricity capacity and to study the likelihood of deployments of new energy technologies, an expansion planning model has been developed as part of the IDAES-Enterprise suite of grid models. The Generation Expansion Planning (GEP) model is a multi-period model in which investment decisions occur yearly, and a Unit Commitment (UC) problem is examined on an hourly timescale. To reduce computational complexity of the GEP model, the UC problem is solved for average “representative days” which leaves out extreme, but relatively common, scenarios in which low renewable generation occurs, leaving the system with inadequacy in capacity. The IDAES-Enterprise GEP model has been modified to include these extreme scenarios while keeping the model reasonably tractable. Specifically, a lazy constraint technique was implemented to check for capacity adequacy on an hourly basis over a large data set of aligned load-wind-solar profiles. As a vast majority of the capacity constraints will not be violated, the technique lowers computational expense by searching for violated capacity constraints over an “iterative manner,” adding those infeasible constraints back into the model. Results on a test case of the Southwest Power Pool shows that the lazy constraint technique significantly reduces retirements and increases installments of natural gas combined cycles and flexible natural gas units. It also reduces some retirements of coal units. These modifications provide a more reasonable estimation of required dispatchable power generation capacity to ensure feasibility during peak net load.

Liu, Peng↗

Development of an Advanced Hydrogen Energy Storage System using Aerogel in a Cryogenic Flux Capacitor

The Cryogenic Flux Capacitor (CFC) is a cold, dense fluid storage core with integrated design features that afford the designer flexibility and provide new possibilities for the storage and discharge of energy. The stored energy, in this case, is represented by hydrogen physically bonded within the nanoscale pores within the aerogel composite blanket material, and the process of bonding or debonding is governed by the principles of physical adsorption (physisorption) and thermodynamics. The large surface area afforded by the nanoporous aerogel (~1,000 m 2 /g) allows for storage densities close to, or in some cases exceeding, that of normal boiling point liquids. Its performance easily exceeds what can be achieved via ambient temperature and high-pressure gas storage for an equivalent volume. CFC storage is predicted to be easily scalable, constructed from readily available commercial materials, and lends itself to a range of pressure applications. The project team designed and manufactured the CFC, integrating it into a set of temperature-controlled flow loops. The CFC test setup was validated against existing data from previous NASA work. Tests used bottled hydrogen gas for test validation. A cryogenic fluid, nitrogen, flowed through a metered control system. Hydrogen temperature, pressure, and flow rates, as well as the temperature control targets, provided all necessary control targets. The team analyzed the recorded data and updated the Technology Maturation Plan based on the results of the test, making recommendations for a follow-up test, scale-up, and maturation pathway. For the engineering development and maturation of CFC hydrogen storage technology, a Techno-Economic Assessment (TEA) and Commercialization Plan for the integration of this technology with various power generation assets were produced. A companion analytical model was developed, experimentally validated, compared against performance metric, and used to tune the model and scale up the technology.

08 HYDROGEN↗

Development of Renewable Energy Data for Facilitating the Clean Energy Transition in Vietnam

Vietnam is transforming its power system with an increasing share of variable renewable energy (VRE) in the generation mix and plans to achieve 27% VRE by capacity in 2030 and 42% by capacity in 2045, as indicated by the draft Eighth Power Development Plan for 2020–-2045 (PDP8). Further increase in VRE penetration is possible with data-driven analysis where availability of data, specifically VRE data, becomes critical. NREL has worked with various stakeholders in Vietnam to create high-resolution multi-year VRE data publicly available to all. This paper reviews this new VRE data for Vietnam and how different stakeholders can use this data to inform VRE deployment decisions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Seasonality and trade in hydro-heavy electricity markets: A case study with the West Africa Power Pool (WAPP)

Hydroelectric power plants account for 25% of West Africa's total installed capacity. In general, electricity generated by these plants is seasonal and intra-annual fluctuation has a considerable impact on electricity supply and cross-border electricity trade. We soft-linked a global hydrologic model to a multi-region capacity expansion and planning model for the West Africa Power Pool (WAPP) to examine the effects of seasonality in hydropower electricity generation on electricity trade, as well as the economic benefits of unconstrained cross-border electricity trade. We found that transitioning from rainy to dry season decreases hydroelectricity generation by an average of 40% in a normal year across the region. Between 2018 and 2050, satisfying the region's electricity demand will require significant capital investment; nevertheless, extending from current bilateral electricity trade agreements to a fully competitive cross-border electricity trade will result in net annual savings of $3 billion in 2015 USD. To achieve year-round energy security, countries should plan ahead and diversify their energy sources to ensure that supply reliability can be maintained in the case of lower supply during the dry season.

13 HYDRO ENERGY↗

System Resilience Benefits of Dual-Fuel Capable Generators

The growing dependency on natural gas (NG) for power generation raises challenges for ensuring the resilience of power systems during extreme cold weather. Dual-fuel capable generators that can switch from burning NG to distillate fuel oil during an NG shortage over one way to alleviate these challenges. In this study, the impacts of gas unavailability on the IEEE 73-bus reliability test system (RTS) with 2019 updated generation mixture are explored. An extension to the standard production cost model formulation of unit commitment and economic dispatch is proposed to allow the representation of dual-fuel capable generators that can switch fuels between NG and distillate oil with a specified oil tank capacity and tank refueling capability. The operation of the system under gas unavailability with 0%, 25%, 50%, 75%, and 100% of combined cycle and combustion turbine generators as dual-fuel capable with a one-day supply of fuel oil are simulated using PLEXOS, a production cost model. The dual-fuel generator performance, unserved energy, and system costs are fully assessed.

dual-fuel capable generator↗

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Glen Canyon Generation Loss

Colorado River Basin hydropower generation has faced challenges due to droughts and ecological and social water requirements. Specifically, Glen Canyon hydropower generation fluctuates substantially with recent extreme weather trends. Further, the western grid evolves with higher wind and solar share, and Glen Canyon hydropower's contribution to grid flexibility services is essential. The Western Area Power Administration (WAPA) markets and schedules electricity production at GCD, and the loss of this power could have significant financial consequences for the WAPA Colorado River Storage Project's (CRSP) Office because it may need to purchase relatively large amounts of energy to serve its firm electrical obligations. In addition, GCD provides grid reliability services for the WAPA Colorado-Missouri (WACM) balancing authority (BA). Both WAPA and DOE's Water & Power Technology Office (WPTO) are interested in researching how these drier hydrological conditions will impact federal electrical energy production, the Western Electricity Coordinating Council (WECC) power grid, and the value of hydropower in the face of lower production. We study multiple hydrologic and power grid scenarios to understand the grid impacts of the loss of Glen Canyon generation. The study uses a production cost model, water resources planning models, water-centric grid models, and various data analytic techniques. The study progress presentation discusses the selection of probable CRSP' hydropower scenarios and power grid scenarios to understand the impacts of Glen Canyon generation, which includes technologies that compensate the Glen Canyon energy and ancillary services contributions, transmission availability, and energy local marginal prices at interested grid locations of WAPA operation.

droughts↗

Preparing Distribution Utilities for the Future - Unlocking Demand-Side Management Potential: A Novel Analytical Framework

The balance of supply and demand in the power systems has traditionally been served solely through generation and network capacity planning and operations. However, with increased requirements for flexibility due to the uptake in variable renewable generation sources such as wind and solar there is a need to increased demand-side flexibility. In addition, there are increased communications and flexibility capabilities emerging on the demand-side from the adoption of advanced metering infrastructures and smart meter deployment and intelligent loads such as smart thermostats and schedulable white goods (e.g. dishwashers and washing machines). Unlocking demand-side flexibility can bring system benefits from peak load reduction bringing about generation capacity and network upgrade deferral, to reducing demand and more efficient utilization of generation and network capacity. Unlocking demand-side flexibility is an evolving process for utilities and solutions must be tailored to each specific customer group. Demand-side management (DSM) is a broad set of tools that can include demand response (both dispatchable and non-dispatchable), energy efficiency and distributed energy resources and demand-side technologies. The National Renewable Energy Laboratory (NREL), in collaboration with BSES Rajdhani Power Ltd. (BRPL) and Deloitte, examined the potential of DSM in BRPL’s service territory, developing detailed information on customer classes and willingness to participate in DSM. The study developed modeling frameworks for load analysis and the analysis tools to assess the potential of time-of-use tariffs in motivating customers to reduce their peak period energy consumption. The study shows that BRPL customers, specifically their domestic customers, are willing to participate in DSM programs and that time-of-use pricing can help BRPL reduce their peak demand and help unlock demand-side flexibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Effect of Power Electronic Loads on Western Interconnection Stability

The prevalence of power electronics in the bulk power system is increasing rapidly in both the generation and consumption of electricity. This work focuses on the effect of changing load composition - specifically the transition from single phase air conditioner motors to power electronics backed air conditioners - on power system stability. Various transmission and generation contingency events for the Western Interconnection were simulated using Positive Sequence Load Flow software and planning models from the Western Electricity Coordinating Council. In general, an increased proportion of power electronic load leads to more instability. For some specific faults resulting in fault-induced delayed voltage recovery, transitioning to higher proportions of power electronic loads helps expedite system recovery. These results demonstrate that load composition should be examined in conjunction with generation composition when evaluating system stability.

FIDVR↗

Scalable Stochastic Transmission Expansion: A Use Case for ExaSGD

The intermittent nature of renewable energy poses new challenges for power grids due to its variable and un- certain power output. These features of renewable generation are becoming more relevant to transmission planning as grids reach higher penetration levels of renewable energy. In this paper we present an approach for transmission planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using three-stage stochastic programming and the progressive hedging algorithm, we compute transmission expansion decisions on a modified RTS-GMLC test system. We augment the grid with large amounts of wind generation and consider many operational scenarios subject to wind uncertainty. This is an example of a possible use of the ExaSGD security constrained AC optimal power flow solver.

Exascale Computing Project↗

Power Supply Options for the Marpi Landfill, Saipan: Addendum to 2023 Feasibility Study

The Marpi Landfill (Marpi or the landfill), located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by an on-site diesel generator that only operates when the landfill is open and staffed. The CNMI Office of Planning and Development (OPD) aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location and to increase sustainable energy consumption within the CNMI. Pacific Northwest National Laboratory (PNNL) authored a feasibility study in 2023 that explores alternative power supply options for the landfill. This feasibility study (hereafter referred to as Phase I of this study) culminated in a report named “Power Supply Options for the Marpi Landfill, Saipan.” In Phase I, the project team investigated and prioritized seven different power supply scenarios (Table ES-1) for the landfill according to Solid Waste (SW) Taskforce priorities. The project team found that Scenario 4 (100 kW of solar photovoltaic [PV] generation, a 75 kW/300 kWh battery energy storage system [BESS], and 160 kW of diesel generation) ranked highest. Following the Phase I feasibility study, the SW Taskforce secured additional funding for PNNL to assess additional considerations regarding power supply options for Marpi. The purpose of Phase II of this study is to investigate these additional considerations, as compiled in this addendum. Some of the findings compiled here replace findings from the original report. The project team evaluated additional considerations regarding power supply options for the landfill, including modified operations to account for 24/7 power supply, electrified landfill equipment, new and replacement distribution line costs, and the social cost of carbon.

14 SOLAR ENERGY↗

Power Supply Options for the Marpi Landfill, Saipan: Feasibility Study

The Marpi Landfill, located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by an on-site diesel generator that only operates when the landfill is open and staffed. The CNMI Office of Planning and Development (OPD) aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location and to increase the use of sustainable energy within the CNMI. CNMI has a 20% target for renewable energy consumption, as documented in Sustainable Development Goal #7 in the Comprehensive Sustainable Development Plan (OPD 2021) and the renewable portfolio standard (GPO 2014). To accomplish these goals, the U.S. Department of Energy, through its Interagency Reimbursable Work Agreement with the Federal Emergency Management Agency, funded this feasibility study to assess and prioritize power supply options for the landfill. The availability of solar and wind resources varies seasonally, as does the load. A BESS can help to balance mismatches between generation and load on short (hourly or daily) timescales, but not across seasons. The microgrid scenarios evaluated for Marpi consider options for technology combinations that will both meet the load and utilize available resources, despite the challenge presented by higher loads and lower solar and wind availability during the rainy season, depicted in Figure ES-2. The seven scenarios evaluated are summarized in Table ES-1. Each scenario’s configuration was optimized to include component capacities that reduce capital and operating costs, meet the load, and minimize carbon emissions, as feasible. The costs and levelized cost of energy (LCOE) shown do not assume the use of any grant funding or incentives, although these options were also evaluated. To assist with decision-making, a prioritization matrix (Table ES-3) was created to compare the microgrid scenarios evaluated in this feasibility study according to various stakeholder priorities. The prioritization metrics were chosen based on discussions with OPD and will be finalized through stakeholder feedback. The scenarios were given a score between 1 and 7 for each prioritization metric (the lower the score, the higher the priority), and total scores were calculated using assigned weights based on the relative priority of each metric. The total scores were then ranked to produce a prioritized list of microgrid scenarios based on the metrics most important to the project stakeholders. As shown, scenario 4 (100 kW of solar PV, a 75 kW/300 kWh BESS, and 160 kW of diesel generation) ranks highest.

14 SOLAR ENERGY↗