Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Evaluation of color in digital nuclear power plant control room displays

Human system interface design in industrial process control is guided by industry standards, human factors best practices, and domain-specific conventions, and often there is a conflict between one or more of the sources of design input for specific design elements. In the nuclear domain, one design element for which conflict arises is the use of color to represent equipment state. Here, this study evaluates the tradeoffs associated with using color in a process control display versus using white and shades of gray. The performance metrics were response time, accuracy, and eye movement metrics using a simplified experimental task and professional operators. Results revealed that adhering to color conventions in nuclear power yielded small advantages in simple tasks, but did not exist for more complex tasks. The results did not provide strong evidence for or against using a particular color scheme and revealed the need for further research on the use of color for commercial nuclear power plants and other process control industries.

99 GENERAL AND MISCELLANEOUS↗

Integrated ELM and divertor power flux control using RMPs with low input torque in EAST in support of the ITER research plan

Experiments have been carried out at the EAST tokamak to study ITER-relevant scenario integration issues, related to edge localized mode (ELM) control in H-mode plasmas by the application of three-dimensional (3D) resonant magnetic perturbations (RMPs), which have a large impact on the execution of the ITER research plan. The EAST experiments have successfully demonstrated ELM suppression at normalized torque inputs similar to ITER. The application of RMP fields with high toroidal mode number (n = 4) reduces the impact of ELM control on energy and particle confinement compared to those use lower n (n = 1, 2) RMPs. Injection of successive pellets is found to be effective in increasing the plasma density in ELM-suppressed H-modes and reducing the divertor power without triggering large ELMs at EAST. Access to high recycling and radiative divertor conditions while maintaining ELM suppression has been demonstrated in EAST by the use of gas fuelling and neon impurity seeding. Both approaches have been found to be effective in reducing power fluxes to the divertor strike points in near-separatrix lobes for both n = 2 and n = 4 RMPs. Furthermore, reduction of power fluxes in off-separatrix lobes is only effective for n = 4 RMP application, which is consistent with magnetic topology modelling (including plasma response) results showing a shallow penetration into the confined plasma region of field lines connected to these lobes compared to n = 2. The EAST results support the use of high n 3D fields for ELM suppression in ITER high Q DT scenarios since they provide optimum integration features regarding energy and particle confinement, pellet fuelling, radiative divertor operation while eliminating ELM transient power loads and being compatible with low torque input.

pellet fuelling↗

Optimal mitigation and control over power system dynamics for stochastic grid resilience

Optimal mitigation planning for highly disruptive contingencies to a transmission-level power system requires optimization with dynamic power system constraints, due to the key role of dynamics in system stability to major perturbations. We formulate a generalized disjunctive program to determine optimal grid component hardening choices for protecting against major failures, with differential algebraic constraints representing system dynamics (specifically, differential equations representing generator and load behavior and algebraic equations representing instantaneous power balance over the transmission system). We optionally allow stochastic optimal pre-positioning across all considered failure scenarios, and optimal emergency control within each scenario. This novel formulation allows, for the first time, analyzing the resilience interdependencies of mitigation planning, preventive control, and emergency control. Using all three strategies in concert is particularly effective at maintaining robust power system operation under severe contingencies, as we demonstrate on the western system coordinating council 9-bus test system using synthetic multi-device outage scenarios.

30 DIRECT ENERGY CONVERSION↗

Physics Informed Reinforcement Learning for Power Grid Control using Augmented Random Search

Wide adoption of deep reinforcement learning need to overcome several challenges in energy system domain, including scalability, learning from limited samples, and high-dimensional continuous state and action spaces. In this paper, we integrated physics-based information from the normal generator operation state formula in the reinforcement learning agent's neural network loss function, and applied an augmented random search agent to optimize the generator control under dynamic contingency. Simulation results demonstrated the reliability performance improvements in training speed, reward convergence, sampling efficiency, scalability, and transferability.

physics informed ML, Physics Informed Neural Netwo↗

Barrier Function-based Reinforcement Learning for Emergency Control of Power Systems

Under voltage load shedding has been considered as a standard and effective measure to recover the voltage stability of the electric power grid under emergency and severe conditions. However, this scheme usually trips a massive amount of load which can be unnecessary and harmful to customers. Recently, deep reinforcement learning (RL) has been regarded and adopted as a promising approach that can significantly reduce the amount of load shedding. However, like most existing machine learning (ML)-based control techniques, RL control usually cannot guarantee the safety of the systems under control. In this paper, we introduce a novel safe RL method for load shedding of power systems, that can enhance the safe voltage recovery of the electric power grid after experiencing faults. Unlike standard RL method, the safe RL method integrates a Barrier function into the reward function. Consequently, the optimal control policy can render the power system to avoid the safety bounds. This method is general and can be applied to other safety-critical control problems. Numerical simulations on the 39-bus IEEE benchmark is performed to demonstrate the effectiveness of the proposed safe RL emergency control, as well as its adaptive capability to faults not seen in the training.

Vu, Thanh Long↗

Model-Free Building Temperature Control and Power Allocation Under Measurement Time Delays

Taking a step towards a greener planet has created an increased need for a higher integration of renewable energy resources into the electric grid. Nonetheless, the intermittency and uncertainty associated with renewable generation have slowed down this integration. Demand response (DR) has been recently adopted to address this challenge by utilizing demand side flexibility and enabling the participation of many grid-interactive efficient buildings (GEBs). However, existing DR methods require significant modeling and/or training efforts and are computationally expensive. To address the aforementioned issues, we propose a model-free control (MFC)-based strategy that is robust to the time delays in the temperature measurements of the thermostatically controlled loads (TCLs). It assigns to each GEB a local controller to maintain the TCLs’ temperatures within desired comfort levels, while the load aggregator (LA) allocates the assigned reference power provided by the distribution system operator (DSO) to support a specific grid service, such as demand peak reduction, load shifting, balancing supply and demand, and consuming the solar photovoltaic power locally. We investigate the effects of such loss of information on the local control action as well as on meeting the power allocation constraint. We conclude that, for an appropriate choice of design parameters, the proposed MFC controller is satisfactorily robust to measurement time delays.

Telsang, Bhagyashri↗

Cyber-Resilient Frequency Control of Power Grids with Energy Storage Systems

The integration of synchronous generators and energy storage systems operated through communication networks introduces new challenges and vulnerabilities to the electric grid, where cyber attacks can corrupt sensor measurements or control inputs and interrupt functions such as frequency regulation. This paper proposes a defense methodology for the design of resilient operating constraints imposed on each generation and storage unit in order to prevent any attack sequence from driving the system's frequency to unsafe conditions. The resilient operating constraints are found by using ellipsoidal approximations of the reachable set of the power system, leading to a convex optimization problem with linear matrix inequalities. Numerical results in a single-area power system with synchronous generation and energy storage demonstrate how the resilient constraints provide security guarantees against any type of attack affecting frequency measurements or controller setpoints.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pulsed power to control growth of silicon nanoparticles in low temperature flowing plasmas

Low-temperature plasmas have seen increasing use for synthesizing high-quality, mono-disperse nanoparticles (NPs). Recent work has highlighted that an important process in NP growth in plasmas is particle trapping—small, negatively charged nanoparticles become trapped by the positive electrostatic potential in the plasma, even if only momentarily charged. In this article, results are discussed from a computational investigation into how pulsing the power applied to an inductively coupled plasma (ICP) reactor may be used for controlling the size of NPs synthesized in the plasma. The model system is an ICP at 1 Torr to grow silicon NPs from an Ar/SiH 4 gas mixture. This system was simulated using a two-dimensional plasma hydrodynamics model coupled to a three-dimensional kinetic NP growth and trajectory tracking model. The effects of pulse frequency and pulse duty cycle are discussed. We identified separate regimes of pulsing where particles become trapped for one pulsed cycle, a few cycles, and many cycles—each having noticeable effects on particle size distributions. For the same average power, pulsing can produce a stronger trapping potential for particles when compared to continuous wave power, potentially increasing particle mono-dispersity. Pulsing may also offer a larger degree of control over particle size for the same average power. Experimental confirmation of predicted trends is discussed.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Risk-Constrained Reinforcement Learning for Inverter-Dominated Power System Controls

Here, this paper develops a risk-aware controller for grid-forming inverters (GFMs) to minimize large frequency oscillations in GFM inverter-dominated power systems. To tackle the high variability from loads/renewables, we incorporate a mean-variance risk constraint into the classical linear quadratic regulator (LQR) formulation for this problem. The risk constraint aims to bound the time-averaged cost of state variability and thus can improve the worst-case performance for large disturbances. The resulting risk-constrained LQR problem is solved through the dual reformulation to a minimax problem, by using a reinforcement learning (RL) method termed as stochastic gradient-descent with max-oracle (SGDmax). In particular, the zero-order policy gradient (ZOPG) approach is used to simplify the gradient estimation using simulated system trajectories. Numerical tests conducted on the IEEE 68-bus system have validated the convergence of our proposed SGDmax for GFM model and corroborate the effectiveness of the risk constraint in improving the worst-case performance while reducing the variability of the overall control cost.

Frequency control↗

Comparative and Cost Analysis of a Novel Predictive Power Ramp Rate Control Method: A Case Study in a PV Power Plant in Puerto Rico

One of the most important aspects that need to be addressed to increase solar energy penetration is the power ramp-rate control. In weak grids such as the one found in Puerto Rico, it is important to smooth power fluctuations caused by the intermittence of passing clouds. In this work, a novel power ramp-rate control strategy is proposed. Additionally, a comparison with some of the most common power ramp-rate control methods is performed using a proposed model and real solar radiation data from the Coto Laurel photovoltaic power plant located in Ponce, Puerto Rico. The proposed model was validated using one-year real data from Coto Laurel. The power ramp-rate control methods were compared in real-time simulations using the OP5700 from Opal-RT Technologies considering power ramp rate fluctuations, power ramp-rate violations, fluctuations in the state-of-charge, among other indicators. Moreover, the proposed power ramp-rate control strategy, called predictive dynamic smoothing was explained and compared. Results indicate that the predictive dynamic smoothing produced a considerably reduced Levelized Cost of Storage compared to other power ramp-rate control methods and provided a higher lifetime expectancy for lithium batteries.

36 MATERIALS SCIENCE↗

Assessment and Commissioning of Electrical Substation Grid Testbed with a Real-Time Simulator and Protective Relays/Power Meters in the Loop

Electrical utility substations are wired with intelligent electronic devices (IEDs), such as protective relays, power meters, and communication switches. Substation engineers commission these IEDs to assess the appropriate measurements for monitoring, control, power system protection, and communication applications. Like real electrical utility substations, complex electrical substation grid testbeds (ESGTs) need to be assessed for measuring current and voltage signals in monitoring, power system protection, control (synchro check), and communication applications that are limited by small measurement percentage errors. In the process of setting an ESGT with real-time simulators and IEDs in the loop, protective relays, power meters, and communication devices must be commissioned before running experiments. In this study, an ESGT with IEDs and distributed ledger technology was developed. The ESGT with a real-time simulator and IEDs in the loop was satisfactorily assessed and commissioned. The commissioning and problem-solving tasks of the testbed are described to define a method with flowcharts to assess possible trouble-shooting in ESGTs. This method was based on comparing the simulations versus IED measurements for the phase current and voltage magnitudes, three-phase phasor diagrams, breaker states, protective relay times with selectivity coordination at electrical faults, communication data points, and time-stamp sources.

Piesciorovsky, Emilio↗

Regional Real-Time PV Spinning Reserve Estimator

Curtailed photovoltaic (PV) generation is a zero-marginal-cost spinning reserve that can be used for a number of active power control services. Unlike traditional spinning reserve providers, however, i.e., fossil-fueled generators, which have well-defined operating characteristics, e.g., available headroom or potential high limit (PHL), PV plants have by nature variable and uncertain operating characteristics. To ensure the effective coordination between PV plants and the system operator during an active power control event, accurate knowledge of the PV PHL is essential. It ensures that enough headroom is reserved by the PV plants to deliver the award services in real time and informs feasible dispatch decisions made by the market operator. To tackle this challenge, a novel reference-control grouping-based PV plant reserve estimation method has been proposed by the National Renewable Energy Laboratory under past projects funded by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office. The estimation method separates inverters within a plant into two groups: a control group and a reference group. While the reference group is reserved to operate at its PHL, the control group can be curtailed to provide the grid services. Real-time outputs from the reference inverters are used to estimate the PHL for the whole plant based on the ratio between capacities of the reference group and of the plant. This work further enhances the methodology by (1) improving the model accuracy through machine learning; (2) automating the reference inverter selection through correlation analysis; (3) considering estimation look-ahead windows; and (4) applying to regional spinning reserve estimation. Significant performance improvement has been observed based on real-world data collected by CAISO, Southern Company, and Terabase Energy. Compared with the original scaling method, the newly proposed machine learning-based approach reduces the estimation errors by 30% and 13% at the plant level and region level, respectively. Results obtained from this project are intended to be used by grid operators, market operators, balancing authorities, and PV plant owners and operators to facilitate PV participation in ancillary service markets. Regulators, policymakers, and system planners can also consider the results of this work in their decision-making processes. In addition to the performance improvement on the existing reference-control based grouping method, we also investigated how the variability of PV generation from a single PV inverter can be used to represent the variability of PV generation at the plant level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Report for 2.2.1 Task 5: Develop and Document a State-Based Alarm System for a Nuclear Power Plant Control Room Using Machine Learning

Idaho National Laboratory (INL) has contracted IFE to support human factors research and the development of leading-edge technology to support control room operators as the U.S. fleet undergoes modernization and digitalization in legacy plants and control rooms. As the nuclear industry starts to shift to more digital controls and systems, these upgrades provide more information to the main control room in the form of digital signals and values. Also, an increase in the number of alarms points is provided by the vendors. New digital control rooms shift from main control boards to soft controls, and alarm panels to a single display. This change to a single display has created a problem of alarm waterfall, a situation in which the addition of new alarm points causes an overload of information to the operator during either a plant disturbance or other than normal full power operations. IFE’s goal is to find a workable solution to assist operators in both handling and understanding incoming alarms during emergency situations under these waterfall conditions.

99 GENERAL AND MISCELLANEOUS↗

Real-Time Regional PV Spinning Reserve Estimator with AGC Look-Ahead Windows

Curtailed PV generation is a zero-marginal cost spinning reserve that can be used for a number of active power control services. However, unlike the traditional spinning reserve providers, i.e., fossil-fueled generators, who have well-defined operating characteristics, e.g., available headroom or potential high limit (PHL), PV plants have by nature variable and uncertain operating characteristics. To ensure the effective coordination between PV plants and the system operator during an active power control event, accurate forecasts of the PV PHL are essential. A novel reference-control grouping based scaling method has been proposed by NREL to estimate the PV PHL in real-time. This work further enhances the methodology by: 1) improving the model accuracy through machine learning; 2) considering look-ahead windows introduced by the computation and communication latencies; 3) applying the method to regional spinning reserve estimation. A significant performance improvement, over 99% of estimation error reduction, has been observed based on real-world data collected by CAISO and PV plant operators.

potential high limit↗