Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “plutonium packaging container storage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

82 records · Page 5

Repackaging of High Fissile TRU Waste at the Transuranic Waste Processing Center - 13240

Twenty-six drums of high fissile transuranic (TRU) waste from Oak Ridge National Laboratory (ORNL) operations were declared waste in the mid-1980's and placed in storage with the legacy TRU waste inventory for future treatment and disposal at the Waste Isolation Pilot Plant (WIPP). Repackaging and treatment of the waste at the TRU Waste Packaging Center (TWPC) will require the installation of additional equipment and capabilities to address the hazards for handling and repackaging the waste compared to typical Contact Handled (CH) TRU waste that is processed at the TWPC, including potential hydrogen accumulation in legacy 6M/2R packaging configurations, potential presence of reactive plutonium hydrides, and significant low energy gamma radiation dose rates. All of the waste is anticipated to be repackaged at the TWPC and certified for disposal at WIPP. The waste is currently packaged in multiple layers of containers which presents additional challenges for repackaging activities due to the potential for the accumulation of hydrogen gas in the container headspace in quantities than could exceed the Lower Flammability Limit (LFL). The outer container for each waste package is a stainless steel 0.21 m{sup 3} (55-gal) drum which contains either a 0.04 m{sup 3} or 0.06 m{sup 3} (10-gal or 15-gal) 6M drum. The inner 2R container in each 6M drum is ∼12 cm (5 in) outside diameter x 30-36 cm (12-14 in) long and is considered to be a > 4 liter sealed container relative to TRU waste packaging criteria. Inside the 2R containers are multiple configurations of food pack cans, pipe nipples, and welded capsules. The waste contains significant quantities of high burn-up plutonium oxides and metals with a heavy weight percentage of higher atomic mass isotopes and the subsequent in-growth of significant quantities of americium. Significant low energy gamma radiation is expected to be present due to the americium in-growth. Radiation dose rates on inner containers are estimated to be 1-3 mSv/hr (100-300 mrem/hr) with an unshielded dose rate on the waste itself of over 10 mSv/hr (1 rem/hr). Additional equipment to be installed at the TWPC will include a new perma-con enclosure and a shielded/inert glovebox in the process building to repackage and stabilize the waste. All of the waste will be repackaged into Standard Pipe Overpacks. Most of the waste (21 of the 26 drums) is expected to be repackaged at the food-pack can level (i.e. the food-pack cans will not be opened). Five of the incoming waste containers are expected to be repackaged at the primary waste level. Three of the containers exceed the 200 gram Pu-239 Fissile Gram Equivalent (FGE) limit for the Standard Pipe Overpack. These three containers will be repackaged down to the primary waste level and divided into eight Standard Pipe Overpacks for shipment to WIPP. Two containers must be stabilized to eliminate any reactive plutonium hydrides that may be present. These containers will be opened in the inert, shielded glovebox, and the remaining corroded plutonium metal converted to a stable oxide form by using a 600 deg. C tube furnace with controlled oxygen feed in a helium carrier gas. The stabilized waste will then be packaged into two Standard Pipe Overpacks. Design and build out activities for the additional repackaging capabilities at the TWPC are scheduled to begin in Fiscal Year 2013 with repackaging, stabilization, and certification activities scheduled to begin in Fiscal Year 2014. Following repackaging and stabilization activities, the Standard Pipe Overpacks will be certified for disposal at WIPP utilizing Non-Destructive Examination (NDE) to verify the absence of prohibited items and Non-Destructive Assay (NDA) to verify the isotopic content under the TWPC WIPP certification program implemented by the Central Characterization Project (CCP). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Waste Inventory and License Limits at the Perma-Fix Northwest Facility to Meet CH2M Hill Plateau Remediation Company (CHPRC) American Recovery and Reinvestment Act (ARRA) Deliverables - 12335

CH2M Hill Plateau Remediation Company (CHRPC) is a prime contractor to the U.S. Department of Energy (DOE) focused on the largest ongoing environmental remediation project in the world at the DOE Hanford Site Central Plateau, i.e. the DOE Hanford Plateau Remediation Contract. The East Tennessee Materials and Energy Corporation (M and EC); a wholly owned subsidiary of Perma-Fix Environmental Services, Inc. (PESI), is a small business team member to CHPRC. Our scope includes project management; operation and maintenance of on-site storage, repackaging, treatment, and disposal facilities; and on-site waste management including waste receipt from generators and delivery to on-site and off-site treatment, storage, and disposal facilities. As part of this scope, M and EC staffs the centralized Waste Support Services organization responsible for all waste characterization and acceptance required to support CHPRC and waste generators across the Hanford Site. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 cubic meters (m{sup 3}) of legacy waste was defined as 'no-path-forward waste'. A significant portion of this waste (7,650 m{sup 3}) comprised wastes with up to 50 grams of special nuclear materials (SNM) in oversized packages recovered during retrieval operations and large glove boxes removed from the Plutonium Finishing Plant (PFP). Through a collaborative effort between the DOE, CHPRC, and Perma-Fix Environmental Services, Inc. (PESI), pathways for these problematic wastes were developed that took advantage of commercial treatment capabilities at a nearby vendor facility, Perma-Fix Northwest (PFNW). In the spring of 2009, CHPRC initiated a pilot program under which they began shipping large package, low gram suspect TRU (<15 g SNM per container), and large package contact and remote handled MLLW to the off-site PFNW facility for treatment. PFNW is restricted by the SNM limits set for the total quantity of SNM allowed at the facility in accordance with the facility's radioactive materials license(s) (RML). While both CHPRC and PFNW maintain waste databases to track all waste movements, it became evident early in the process that a tool was needed that married the two systems to better track SNM inventories and sequence waste from the point of generation, through the PFNW facility, and back to the Hanford site for final disposition. This tool, known as the Treatment Integration and Planning Tool (TIPT), has become a robust planning tool that provides real-time data to support compliant and efficient waste generation, transportation, treatment, and disposition. TIPT is developing into the next generation tool that will change the way in which legacy wastes, retrieval wastes and decontamination and decommissioning operations are conducted on the Plateau Remediation Contract (PRC). The real value of the TIPT is its predictive capability. It allows the W and FMP to map out optimal windows for processing waste through the PFNW facility, or through any process that is in some way resource limited. It allows project managers to identify and focus on problem areas before shipments are affected. It has been modified for use in broader applications to predict turnaround times and identify windows of opportunity for processing higher gram wastes through PFNW and to allow waste generators, site-wide, to accurately predict scope, cost, and schedule for waste generation to optimize processing and eliminate storage, double handling, and related costs and unnecessary safety risks. The TIPT addresses the years old problem of how to effectively predict not only what needs to be done, but when. 'When' is the key planning parameter that has been ignored by the generator and processor for many years, but has proven to be the most important parameter for both parties. While further refinement is a natural part of any development process, the current improvements on the TIPT have shown that prediction is a powerful consideration. Even in lean times expected for the foreseeable future, the improved TIPT continues to play a central role in managing our way through those times to assure facilities remain viable and available. It is recommended that other major remediation projects and waste processing facilities incorporate a tool such as TIPT to improve customer-commercial supplier communications and better optimization of resources. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LANL Response to SRS Requirement G-ESR-G-00035 Item 11 Bed Temperature Requirements, For the Addition of Direct Metal Oxidation Unit 3, Revision 0

Los Alamos National Laboratory has identified a number of plutonium-bearing materials that will be placed in storage in 3013 containers per requirements of DOE-STD-3013-2004, or DOE-STD-3013-2012 when it is implemented in the LANL contract. Before these items can be considered for storage at Savannah River Site, 20 points of agreement, described in Savannah River Site (SRS) document G-ESR-G-00035, Revision 1, must be documented and provided to SRS for review. These agreements include documentation that the requirements of the 3013 Standard are met and the storage facility’s safety envelope is not compromised. Point 11 of the 20 points is the requirement that material be stabilized at 950°C for a minimum of two hours prior to packaging. This report addresses the Point 11 requirement, describing the controls used during stabilization to ensure that the material is properly stabilized using a continuous process (Advanced Recovery and Integrated Extraction System [ARIES] direct metal oxidation [DMO] and recycle oxide calcination). These controls include verification of the furnace controller thermocouple profile and verification of the profiles for the calciner tube hot zone. This report is specific to Direct Metal Oxidation Unit 3 (DMO-3). The point 11 requirements for DMO-2 and muffle furnace oxidation are covered in reference. This report does not replace reference. The process and methodology used in this report are similar to that used for Direct Metal Oxidation Unit 2, or DMO-2, as documented in reference. This report documents the performance for ARIES DMO-3. The temperature on the outside of the calciner tube must be at least 1,032°C. The auger rotation rate set point will be dependent on the pitch of the installed auger. For an auger pitch of 1.297 in/rev the auger set point will be 0.0777 rpm or less, which allows for at least 132 minutes calcination time based on worst case conditions (i.e., lowest possible powder density at the lowest initial powder temperature, and under the least favorable heat transfer conditions, and with the least favorable auger pitch of the currently installed auger.) A new auger design may be used in future modifications of DMO-3 that has an auger pitch of 1.400 ± 0.025 inches which would change the required auger set point to 0.0707 rpm or less.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Qualitative and Quantitative Assessment of Nuclear Materials Contained in High-Activity Waste Arising from the Operations at the 'SHELTER' Facility

As a result of the nuclear accident at the Chernobyl NPP in 1986, the explosion dispeesed nuclear materials contained in the nuclear fuel of the reactor core over the destroyed facilities at Unit No. 4 and over the territory immediately adjacent to the destroyed unit. The debris was buried under the Cascade Wall. Nuclear materials at the SHELTER can be characterized as spent nuclear fuel, fresh fuel assemblies (including fuel assemblies with damaged geometry and integrity, and individual fuel elements), core fragments of the Chernobyl NPP Unit No. 4, finely-dispersed fuel (powder/dust), uranium and plutonium compounds in water solutions, and lava-like nuclear fuel-containing masses. The new safe confinement (NSC) is a facility designed to enclose the Chernobyl NPP Unit No. 4 destroyed by the accident. Construction of the NSC involves excavating operations, which are continuously monitored including for the level of radiation. The findings of such monitoring at the SHELTER site will allow us to characterize the recovered radioactive waste. When a process material categorized as high activity waste (HAW) is detected the following HLW management operations should be involved: HLW collection; HLW fragmentation (if appropriate); loading HAW into the primary package KT-0.2; loading the primary package filled with HAW into the transportation cask KTZV-0.2; and storing the cask in temporary storage facilities for high-level solid waste. The CDAS system is a system of 3He tubes for neutron coincidence counting, and is designed to measure the percentage ratio of specific nuclear materials in a 200-liter drum containing nuclear material intermixed with a matrix. The CDAS consists of panels with helium counter tubes and a polyethylene moderator. The panels are configured to allow one to position a waste-containing drum and a drum manipulator. The system operates on the ‘add a source’ basis using a small Cf-252 source to identify irregularities in the matrix during an assay. The platform with the source is placed under the measurement chamber. The platform with the source material is moved under the measurement chamber. The design allows one to move the platform with the source in and out, thus moving the drum. The CDAS system and radioactive waste containers have been built. For each drum filled with waste two individual measurements (passive/active) will be made. This paper briefly describes the work carried out to assess qualitatively and quantitatively the nuclear materials contained in high-level waste at the SHELTER facility. These efforts substantially increased nuclear safety and security at the facility.

Cherkas, Dmytro↗

Complex-wide representation of material packaged in 3013 containers

The DOE sites packaging plutonium oxide materials packaged according to Department of Energy 3013 Standard (DOE-STD-3013) are responsible for ensuring that the materials are represented by one or more samples in the Materials Identification and Surveillance (MIS) program. The sites categorized most of the materials into process groups, and the remaining materials were characterized, based on the prompt gamma analysis results. The sites issued documents to identify the relationships between the materials packaged in 3013 containers and representative materials in the MIS program. These “Represented” documents were then reviewed and concurred with by the MIS Working Group. However, these documents were developed uniquely at each site and were issued before completion of sample characterization, small-scale experiments, and prompt gamma analysis, which provided more detailed information about the chemical impurities and the behavior of the material in storage. Therefore, based on the most recent data, relationships between the materials packaged in 3013 containers and representative materials in the MIS program been revised. With the prompt gamma analysis completed for Hanford, Rocky Flats, and Savannah River Site 3013 containers, MIS items have been assigned to the 3013 containers for which representation is based on the prompt gamma analysis results. With the revised relationships and the prompt gamma analysis results, a Master “Represented” table has been compiled to document the linkages between each 3013 container packaged to date and its representative MIS items. This table provides an important link between the Integrated Surveillance Program database, which contains information about each 3013 container to the MIS items database, which contains the characterization, prompt gamma data, and storage behavior data from shelf-life experiments for the representative MIS items.

Narlesky, Joshua E.↗

The TRANSCEND University Consortium: Theme 4: Nuclear Materials - 20431

The safe and secure management of Pu is a matter of international concern, with ∼250 t of separated Pu currently stockpiled worldwide. The UK's civil inventory of nuclear materials contains significant stocks of separated Pu from the reprocessing of Magnox and AGR spent fuels. The preferred option for the 138.5 tonnes of Pu is re-use as mixed oxide (MOx) fuel, although 5% is not suitable for re-use and is recommended for direct disposal. However, it will take more than 15 years to implement re-use, requiring that the Pu be kept in interim storage in its current state for that period, i.e. as PuO{sub 2} powder within inert steel storage cans at Sellafield. The focus of the work presented here is thus plutonium storage and the direct disposal of plutonium. The Research and Development needs of both are now pressing: in the case of storage due to it being the current default; in the case of immobilization and disposal because of a comparative lack of Research and Development on Pu conditioning and packaging due to policy uncertainty as to whether it would be disposed of in a Geologic Disposal Facility (GDF). Addressing these needs is complicated by Pu's high radioactivity, decay heat and radiotoxicity, criticality, nuclear safeguard requirements and, for some UK Pu contaminated materials targeted for disposal, poor inventory. Thus, there is also a critical requirement for underpinning research on Pu bearing materials in these two contexts. In response to these needs, the TRANSCEND Consortium (Transformative Science and Engineering for Nuclear Decommissioning, a multi-disciplinary collaboration of 11 universities and 8 key industry partners from across the UK's civil nuclear sector) is seeking to provide technical underpinning to ongoing option development for the UK's civil Pu stockpile. Whilst understanding the behaviour of plutonium during its re-use as MOx is beyond the scope of the TRANSCEND Consortium work plan, the main objectives of the work are: (1) For interim storage: to understand how the surface structure and properties of pristine and radiation damaged PuO{sub 2} change with time in the absence and presence of water; and (2) For immobilization and disposal: to understand the mechanisms of incorporation of Pu into ceramic and glass-ceramic waste-forms, as well as the effect on these of self-induced radiation damage. Each objective is being addressed through separate work packages, the details of which are discussed in this paper. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Long-term Moisture Adsorption in Packaged Plutonium Oxide

In 2018, the Department of Energy National Nuclear Security Administration (DOE-NNSA) began implementing dilute and dispose to remove 34 metric tons (MT) of surplus weapons grade plutonium from the US stockpile. Under this plan, surplus plutonium material is converted into plutonium oxide (PuO 2 ) before being stored in metal containers and sent to the DOE Waste Isolation Pilot Plant (WIPP). The dilute and dispose project was implemented as a more cost-effective method for abiding by the Plutonium Management and Disposition Agreement (PMDA) between the USA and Russia, as compared to producing mixed oxide fuel (MOX). The PMDA was originally signed in 2000 and amended in 2010.2 The disassembly of pits and conversion to PuO 2 as part of dilute and dispose is carried out through the Advanced Recovery and Integrated Extraction System (ARIES) developed at Los Alamos National Laboratory (LANL). The dilute portion of dilute and dispose is carried out at Savannah River Site (SRS). With this program in place, it is necessary to ensure the safe, long-term storage of the PuO 2 generated during this process until final disposal at WIPP is accomplished.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conditioning of Pu-containing radioactive waste generated in the Hot-lab: where are we now - 15400

To achieve an optimal strategy for interim storage and final disposal, solid radioactive waste has to be sorted and treated. This strategy is based on the requirement to reduce the volume of waste designated for long term disposal, mainly for economical and safety reasons. In addition, the radiological limitations for shipping of the waste packages to a disposal site have to be taken into account as well as the improved regulatory requirements for material under IAEA control. In case of the operational Pu-contaminated and -containing waste from the PSI-Hot laboratory in Switzerland, the existing and over years practiced conditioning method needed improvement. The existing authorized specifications of the conditioning process had to be revised for an optimization of the interim-storage and the deep geological disposal. This was done by the PSI Section for Dismantling and Waste Management. The improvement focused on technical aspects as well as improvement of the documentation for the certification by final depositor (Nagra) and the safety authority (ENSI). This work started in 2008. In 2012 ENSI issued an authorization to realize the first conditioning according the new specification, formally as a certification test ('Type Test') prior to final approval by the ENSI. But, although a licensed method by the competent authority is available, modifications could be necessary and new tasks come up. In 2013 the PSI has produced 13 waste-packages as a Type Test. To obtain the legal authorization ('Type Approval'), some open issues ought to be answered. Waste is continuously generated and so the question arises: When will the next conditioning be done and applying which method? (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement of the plutonium hold-up in glove box before dismantling - 15111

The French Bruyeres-Le-Chatel CEA (Commissariat a l'Energie Atomique et aux Energies Alternatives - French Alternatives Energies and Atomic Energy Commission) research center is going through a period of cleaning and dismantling of theses old treatment facilities on fissile materials and others associated nuclides. Some very large glove boxes contained some machines like melting furnace which can't be moved and are dismantled in situ. We need to evaluate the quantity of fissile materials to prevent criticality risk, to bring the evidence to the safety authority, to manage for the best the radioprotection of the workers and to manage waste production. A melting furnace in a glove box was dismantled. Measurements by gamma spectrometry with an HPGe detector (High Purity Germanium) and passive neutron counting (coincidence counting with shift register) are done in situ (furnace in the glove box). In order to refine the measurements, some data acquisitions by sector of glove box were carried out. In view of the geometries to characterize, some modelings have been created, in order to correct the different attenuations and to determine the plutonium masses content in the glove box, including the use of infinite energy technique. For the measurement by passive neutron counting (coincidence counting with shift register), we have used two slabs in high density polythene including nine He3 counters in each slab. This measurement technique is complementary to gamma spectrometry, and allows quantizing the fissile material which would be included in interstice of high Z material. The 100-L and 200-L drums produced during the dismantling were also measured. Based on simplified assumptions to analyze in situ measurements, plutonium weight could be evaluated. This approach of measurement in amount, during and after dismantling, has allowed to quantize the fissile material mass present in the glove box and didn't produce waste package which wouldn't respected the technical specifications of storage outlets. The results show good agreement between in situ and waste measurements. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

The Off-Site Source Recovery Program Capabilities in Recovering Transuranic Sealed Sources - 17599

Over the past 16 years, the mission of the Off-Site Source Recovery Program (OSRP) has been recovering disused radioactive sealed sources in the interest of national security, public health and safety. This program, which is sponsored by the National Nuclear Security Administration's Office of Global Material Security's Office of Radiological Security, is managed at Los Alamos National Laboratory and Idaho National Laboratory and has recovered sources worldwide. To date, OSRP has recovered more than 38,000 sources from over 1,300 locations worldwide. Since its inception, OSRP has grown from recovering only sealed sources containing one transuranic (TRU) isotope, Pu-239, in the early days of the program, to recovering sealed sources containing several other TRU and non-TRU isotopes. Primarily, OSRP's mission includes Pu-238, Pu-239, Am-241, Cf-252, Cm-244, Sr-90, Cs-137, Co-60, Ir-192 and Ra-226 sources that are US-origin, defense related and not commercially disposable. Over the lifetime of this program the types of recoveries performed have expanded from a single site to multi-site round-up recoveries. An additional approach, referred to as self-ship recoveries, is also used in cases where only a few sources may be present at a licensee's site. In these situations, the licensee ships their source(s) to an OSRP staging facility for ultimate consolidation and disposal. OSRP recovers sources from many types of licensees, with the majority of sources being removed from industry, universities and hospitals. These include sealed sources used in industrial radiological devices like moisture-density gauges and thickness gauges, medical devices such as blood irradiators and radiotherapy devices and sealed sources from nuclear power plants, among others. The recovery and management of sealed sources is a complex process covering multidisciplinary areas, including source construction, characteristics of the radioactive material, source packaging and transportation per DOT regulations, safe and secure storage, and final disposition per waste acceptance criteria of repository sites. (authors)

07 ISOTOPE AND RADIATION SOURCES↗