Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “plug and process loads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence 9 - Raw Data

Sequences 8 and 9: Downwind Sonics (F,P) and Downwind Sonics Parked (P) This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speed ranged from 5 m/s to 25 m/s. Yaw angles of 0° to 60° were achieved. The blade tip pitch was 3°. The rotor rotated at 72 RPM during Sequence 8, but it was parked during Sequence 9. Blade pressure measurements were collected. The five-hole probes were removed and the plugs were installed. Plastic tape 0.03-mm-thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to –99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. During post-processing, the probe channels were set to read -99999.99. Sonic anemometers were mounted on a strut downwind of the turbine. The strut was mounted to the T-frame, which was rotated to align the anemometers aft of the 9% and 49% radius locations at hub height. Because of this configuration, the tunnel balance data are considered invalid. Sequence 9 was designed to compare the downwind sonic anemometer readings with the upwind sonic anemometers without interference from the turbine. The rotor was parked with the instrumented blade at 0° azimuth. All pressure measurements obtained in Sequence 9 are invalid because sufficient time for temperature stabilization did not occur, thus all associated data values were flagged as not applicable by setting the measured values in the data file to 0.0000 Pa. This test is further described in Appendix G.

17 WIND ENERGY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence M - Raw Data

Sequence M: Transition Fixed (P) Test sequence M used an upwind, rigid turbine with a 0° cone angle. The wind speed ranged from 5 m/s to 15 m/s. Yaw angles ranged from 0° to 90°. The blade tip pitch was 3°. The rotor rotated at 72 RPM. Blade pressure measurements were collected. The five-hole probes were removed and the plugs were installed. Plastic tape 0.03-mm-thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to –99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. During post-processing, the probe channels were set to read –99999.99. Zigzag tape was installed near the leading edge of the instrumented blade on both the upper and lower surfaces as described in Appendix K. In addition to the standard 30-second campaigns, yaw sweeps were done at 7 m/s and 10 m/s. These 90-second campaigns were collected while the yaw drive rotated the turbine 90° at a rate of 1°/s. The file names for these campaigns use the letter designation, followed by two digits for wind speed, followed by YSU, followed by 00.

17 WIND ENERGY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence R - Raw Data

Sequence R: Step AOA, No Probes (P) This sequence was designed to quantify the effect of the five-hole probes on the 3-D blade static angle-of-attack response in the presence of rotational influences by repeating Sequence K without five-hole probes. This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speeds ranged from 6 m/s to 20 m/s, and data were collected at yaw angles of 0° and 30°. The rotor rotated at 72 RPM. Blade pressure measurements were collected. The five-hole probes were removed and the plugs were installed. Plastic tape 0.03-mm-thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to –99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. During post-processing, the probe channels were set to read –99999.99. The blade pitch angle ramped continuously at 0.18°/s over a wide range of increasing and decreasing pitch angles. A step sequence was also performed. The blade pitch was stepped 5°; the flow was allowed to stabilize; and the pitch angle was held for 5 seconds. Then the pitch angle step was repeated. Again, a wide range of pitch angles was obtained, both increasing and decreasing. The file lengths for this sequence varied from 96 seconds to 6 minutes, depending on the pitch angle range. Some short points were collected at 0° yaw and 3° pitch to ascertain the functionality of the instrumentation and repeatability over time. The file name convention used the initial letter R, followed by two digits specifying wind speed, followed by two digits for yaw angle, followed by RU, RD, or ST, followed by the repetition digit. The angle of attack motion was differentiated by RU (ramp up), RD (ramp down), and ST (step down, then step up). This sequence is related to Sequences K and L.

17 WIND ENERGY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence S - Raw Data

Sequences S, T, and U: Upwind, No Probes (F); Upwind 2° Pitch (F); Upwind 4° Pitch (F) This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speed ranged from 5 m/s to 25 m/s. Yaw angles of 0° to 180° were achieved for Sequence S, but the yaw angle remained at 0° for Sequences T and U. The blade tip pitch was 3° for Sequence S, 2° for Sequence T, and 4° for Sequence U. These three sequences were interleaved during testing because the pitch angle change was easily made by the turbine operator. The rotor rotated at 72 RPM. Blade pressure measurements were collected. The five-hole probes were removed and the plugs were installed. Plastic tape 0.03-mm-thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to -99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. During post-processing, the probe channels were set to read -99999.99. In addition to the standard 30-second campaigns, yaw sweeps were done at 7 m/s and 10 m/s for the Sequence S configuration. These 6-minute campaigns were collected while the yaw drive rotated the turbine 360° at a rate of 1°/s. The file names for these campaigns use the letter designation, followed by two digits for wind speed, followed by YSU, followed by 00.

17 WIND ENERGY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence T - Raw Data

Sequences S, T, and U: Upwind, No Probes (F); Upwind 2° Pitch (F); Upwind 4° Pitch (F) This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speed ranged from 5 m/s to 25 m/s. Yaw angles of 0° to 180° were achieved for Sequence S, but the yaw angle remained at 0° for Sequences T and U. The blade tip pitch was 3° for Sequence S, 2° for Sequence T, and 4° for Sequence U. These three sequences were interleaved during testing because the pitch angle change was easily made by the turbine operator. The rotor rotated at 72 RPM. Blade pressure measurements were collected. The five-hole probes were removed and the plugs were installed. Plastic tape 0.03-mm-thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to -99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. During post-processing, the probe channels were set to read -99999.99. In addition to the standard 30-second campaigns, yaw sweeps were done at 7 m/s and 10 m/s for the Sequence S configuration. These 6-minute campaigns were collected while the yaw drive rotated the turbine 360° at a rate of 1°/s. The file names for these campaigns use the letter designation, followed by two digits for wind speed, followed by YSU, followed by 00.

17 WIND ENERGY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence U - Raw Data

Sequences S, T, and U: Upwind, No Probes (F); Upwind 2° Pitch (F); Upwind 4° Pitch (F) This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speed ranged from 5 m/s to 25 m/s. Yaw angles of 0° to 180° were achieved for Sequence S, but the yaw angle remained at 0° for Sequences T and U. The blade tip pitch was 3° for Sequence S, 2° for Sequence T, and 4° for Sequence U. These three sequences were interleaved during testing because the pitch angle change was easily made by the turbine operator. The rotor rotated at 72 RPM. Blade pressure measurements were collected. The five-hole probes were removed and the plugs were installed. Plastic tape 0.03-mm-thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to -99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. During post-processing, the probe channels were set to read -99999.99. In addition to the standard 30-second campaigns, yaw sweeps were done at 7 m/s and 10 m/s for the Sequence S configuration. These 6-minute campaigns were collected while the yaw drive rotated the turbine 360° at a rate of 1°/s. The file names for these campaigns use the letter designation, followed by two digits for wind speed, followed by YSU, followed by 00.

17 WIND ENERGY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence V - Raw Data

Sequence V: Tip Plate (F) This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speed ranged from 5 m/s to 25 m/s, and the yaw angle was held at 0°. The blade pitch angle was 3°. The rotor rotated at 72 RPM. Blade pressure measurements were collected. The five-hole probes were removed and the plugs were installed. Plastic tape 0.03-mm-thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to –99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. During post-processing, the probe channels were set to read -99999.99. The standard tip blocks were replaced with a tip plate to simulate the effect of an undeployed tip-mounted aerodynamic brake as shown in Appendix A. Note that the blade radius was not changed during post-processing so the pressure tap locations are at the same radial location, but the reference to 30% represents 30% of 5.029 m, not 4.943 m. Throughout this report, references to the blade span are made for the 5.029- m radius, not the 4.943-m radius.

17 WIND ENERGY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence X - Raw Data

Sequence X: Elevated RPM (F) This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speed ranged from 5 m/s to 12 m/s, and yaw angles of ±30° were obtained. The blade pitch angle was 3°. The rotor rotated at 90 RPM. Blade pressure measurements were collected. The five-hole probes were removed and the plugs were installed. Plastic tape 0.03-mm-thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to –99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. During post-processing, the probe channels were set to read -99999.99. As described in Appendix F, the hydrostatic correction derived for operation at 72 RPM was applied to these data.

17 WIND ENERGY↗

Demand Side Management in the Smart Grid: Information Processing for the Power Switch

In this article we discuss the most recent developments in the area of load management, and consider possible interaction schemes of novel architectures with distributed energy resources (DER). In order to handle the challenges faced by tomorrow’s smart grid, which are caused by volatile load and generation profiles (from the large number of plug-in EVs and from renewable integration), the conventional grid operating principle of load-following needs to be changed into load-shaping or generation-following. Demand Side Management will be a most promising and powerful solution to the above challenges. However, many other issues such as load forecasting, pricing structure, market policy, renewable integration interface, and even the AC/DC implementation at the distribution side, need to be taken into the design in order to search for the most effective and applicable solution.

Demand Response↗

Yield stress and flow behavior of enzyme liquefied slurries from corn cobs and corn stover pellets

With the increase in population, the world will depend on renewable sources to meet the increasing energy needs. The use of lignocellulosic biomass as a renewable source has been proven efficient for conversion to cellulosic ethanol and capable of contributing to thresholds for energy demand while reducing greenhouse gases by 90% when compared with fossil fuels. However, limitations in feeding and flow within biorefineries is encountered when system plugging occurs due to biomass compaction and a high yield stress for slurries formed during its processing, thereby preventing transport of biomass materials between plant unit operations. In some cases, this leads to unexpected plant shutdowns increasing industrial operational costs. As an alternative, enzyme-assisted liquefaction for slurry creation from corn stover at solids loadings up to 30% is reported in this work. Two different kinds of biomass (pelleted corn stover and cobs) were liquefied in a fed-batch process using commercial enzymes Celluclast 1.5L or Ctec-2 at 1FPU or 3 FPU per gram of dry solids in 10 mM sodium citrate buffer solution (pH 4.8). Pellets were fed into a 1 L stirred bioreactor according to a pre-defined fed-batch protocol over the first 5 hours until reaching 30% of solids loading. After 6, 24 and 96 hours, samples were taken and characterized with respect to their sugar composition, rheology and water absorption. Successful slurry creation with dramatically reduced yield stress was achieved for corn stover for both assessed enzymes. Yield stresses of 178±7 Pa (3 FPU, Celluclast 1.5L) and 79±6 Pa (3 FPU, Ctec-2) were measured for corn stover at 24 hours, compared to 6,000 Pa for samples without enzyme. Yield stress was 155± 29 Pa (3FPU, Ctec-2) and 257 ± 72 Pa (1 FPU,Celluclast 1.5L) for corn cobs at 24 hours. Yield stress decreased when residence time increased with an enhanced fluidity noted for higher enzyme concentrations. A profile for 6, 24 and 96h of yield stress measurements is presented.

Guitierrez, Diana↗

Method of manufacturing a reinforced nuclear fuel cladding using an intermediate thermal deposition layer

A method is described that includes the steps of making a thin walled Zr alloy tube, loading nuclear fuel pellets into the tube, compressing the tube onto the fuel pellets to substantially reduce free space around the fuel pellets, positioning end plugs at each of two ends of the tube, filling the tube with a heat transferring gas, and coating the compressed tube with a corrosion resistant material using a thermal deposition process, such as cold spray, before inserting the tube into a pre-formed SiC composite cover having at least one closed end.

Lahoda, Edward J.↗

TRANSIENT HEAT TRANSFER ANALYSIS FOR ION-EXCHANGE WASTE REMOVAL PROCESS

The small column ion exchange (SCIX) process treats low curie salt (LCS) waste before feeding it to the saltstone facility to be made into grout. Through this process, radioactive cesium from the salt solution is absorbed into the CST bed. A CST column loaded with radioactive cesium will generate significant heat from radiolytic decay. If engineering designs of the CST sorption column can not handle this thermal load, hot spots may develop locally within the column and degrade the performance of the ion-exchange process. The CST starts to degrade at about 80 to 85 C, and the CST completely changes to another material above 120 C. In addition, the process solution will boil around 130 C. If the column boiled dry, the sorbent could plug the column and require replacement of the column module. The objective of the present work is to compute temperature distributions across the column as a function of transit time after the initiation of accidents when there is loss of the salt solution flow in the CST column under abnormal conditions of the process operations. In this situation, the customer requested that the calculations should be conservative in that the model results would show the maximum centerline temperatures achievable by the CST design configurations. The thermal analysis results will be used to evaluate the fluid temperature distributions and the process component temperatures within the ion exchange system. This information will also assist in the system design and maintenance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Solids Loading Aqueous Slurry Formation of Corn Stover Before Pretreatment in a Fed-batch Bioreactor

With the increase on population the world will depend on renewable sources to meet the increasingly energy needs. Use of lignocellulosic biomass as a renewable source has been proven efficient for conversion to cellulosic ethanol and capable of contributing to achieve the threshold on energy demand while reducing greenhouse gases in 90% when compared with fossil fuels (Wang et al., 2007, 2012). However, the processing of biomass encounters limitations in feeding and flow within biorefineries due to the system plugging by compaction and slurry high yield stress, preventing transport of biomass materials and in some cases unexpected plant shutdowns that results in high operational costs (dos Santos et al., 2021; Ximenes et al., 2021). Different solutions for biomass handling and slurry formation from densified materials like pellets have been studied. Cellulosic biomass residues are typically processed in pretreatment reactors to which acid or base is added (Humbird et al., 2002). Other pretreatments such as liquid hot water (LHW) and steam explosion that act without the addition of chemicals use pressures above the saturation vapor of water, to disrupt biomass structure (Ruiz et al., 2021). Although these methods are widely known, the use of pretreatments like acid digestion and LHW present challenges like waste disposal and could be energy inefficient (Mosier et al., 2005). Alternatively other approaches like enzymatic liquefaction have been applied for biomass transformation into slurries with promising results and without the use of pretreatments (dos Santos et al., 2021). Nevertheless, enzymatic liquefaction implementation faces difficulties due to the recalcitrant properties of biomass, its variability, and the release of enzyme inhibitors. While it has been proven that chemical composition properties in biomass have effects on enzyme inhibition (Huang et al., 2022; Kim et al., 2011; Zhai et al., 2018), hindering the efficiency of the liquefaction, not ample research has been conducted in understanding the physical properties as particle size, porosity, water adsorption retention and their effect in the ability to form a slurry at high solids concentration (Yan et al., 2020). In order to improve lignocellulosic biomass handling and formation of biomass slurries, enzyme assisted liquefaction for slurry creation from corn stover at solids loadings up to 30% is reported in this work. Two different kinds of biomass (pelleted corn stover and cobs) were liquefied in a fed-batch process using commercial enzymes Celluclast 1.5L or Ctec-2 at 1FPU or 3 FPU per gram of dry solids in 10 mM sodium citrate buffer solution (pH 4.8). Pellets were fed into a 1 L stirred bioreactor according to a predefined fed-batch protocol over the first 5 hours until reaching 30% of solids loading. After 6, 24 and 96 hours, samples were taken and characterized with respect to their sugar composition, rheology and water absorption. Successful slurry creation with dramatically reduced yield stress was achieved for corn stover for both assessed enzymes. Yield stresses of 178±7 Pa (3 FPU, Celluclast 1.5L) and 79±6 Pa (3 FPU, Ctec-2) were measured for corn stover at 24 hours, compared to 6,000 Pa for samples without enzyme. Yield stress was 155± 29 Pa (3FPU, Ctec-2) and 257 ± 72 Pa (1 FPU, Celluclast 1.5L) for corn cobs at 24 hours. Yield stress decreased when residence time increased with an enhanced fluidity noted for higher enzyme concentrations. A profile for 6, 24 and 96h of yield stress measurements is presented.

Gutierrez, Diana↗

Test/score/report: Simulation techniques for automating the test process

A Test/Score/Report capability is currently being developed for the Transportable Payload Operations Control Center (TPOCC) Advanced Spacecraft Simulator (TASS) system which will automate testing of the Goddard Space Flight Center (GSFC) Payload Operations Control Center (POCC) and Mission Operations Center (MOC) software in three areas: telemetry decommutation, spacecraft command processing, and spacecraft memory load and dump processing. Automated computer control of the acceptance test process is one of the primary goals of a test team. With the proper simulation tools and user interface, the task of acceptance testing, regression testing, and repeatability of specific test procedures of a ground data system can be a simpler task. Ideally, the goal for complete automation would be to plug the operational deliverable into the simulator, press the start button, execute the test procedure, accumulate and analyze the data, score the results, and report the results to the test team along with a go/no recommendation to the test team. In practice, this may not be possible because of inadequate test tools, pressures of schedules, limited resources, etc. Most tests are accomplished using a certain degree of automation and test procedures that are labor intensive. This paper discusses some simulation techniques that can improve the automation of the test process. The TASS system tests the POCC/MOC software and provides a score based on the test results. The TASS system displays statistics on the success of the POCC/MOC system processing in each of the three areas as well as event messages pertaining to the Test/Score/Report processing. The TASS system also provides formatted reports documenting each step performed during the tests and the results of each step. A prototype of the Test/Score/Report capability is available and currently being used to test some POCC/MOC software deliveries. When this capability is fully operational it should greatly reduce the time necessary to test a POCC/MOC software delivery, as well as improve the quality of the test process.

Hageman, Barbara H.↗

Extended Sleeve Products Allow Control and Monitoring of Process Fluid Flows Inside Shielding, Behind Walls and Beneath Floors - 13041

Throughout power generation, delivery and waste remediation, the ability to control process streams in difficult or impossible locations becomes increasingly necessary as the complexity of processes increases. Example applications include radioactive environments, inside concrete installations, buried in dirt, or inside a shielded or insulated pipe. In these situations, it is necessary to implement innovative solutions to tackle such issues as valve maintenance, valve control from remote locations, equipment cleaning in hazardous environments, and flow stream analysis. The Extended Sleeve family of products provides a scalable solution to tackle some of the most challenging applications in hazardous environments which require flow stream control and monitoring. The Extended Sleeve family of products is defined in three groups: Extended Sleeve (ESV), Extended Bonnet (EBV) and Instrument Enclosure (IE). Each of the products provides a variation on the same requirements: to provide access to the internals of a valve, or to monitor the fluid passing through the pipeline through shielding around the process pipe. The shielding can be as simple as a grout filled pipe covering a process pipe or as complex as a concrete deck protecting a room in which the valves and pipes pass through at varying elevations. Extended Sleeves are available between roughly 30 inches and 18 feet of distance between the pipeline centerline and the top of the surface to which it mounts. The Extended Sleeve provides features such as ± 1.5 inches of adjustment between the pipeline and deck location, internal flush capabilities, automatic alignment of the internal components during assembly and integrated actuator mounting pads. The Extended Bonnet is a shorter fixed height version of the Extended Sleeve which has a removable deck flange to facilitate installation through walls, and is delivered fully assembled. The Instrument Enclosure utilizes many of the same components as an Extended Sleeve, yet allows the installation of process monitoring instruments, such as a turbidity meter to be placed in the flow stream. The basis of the design is a valve body, which, rather than having a directly mounted bonnet has lengths of concentric pipe added, which move the bonnet away from the valve body. The pipe is conceptually similar to an oil field well, with the various strings of casing, and tubing installed. Each concentric pipe provides a required function, such as the outermost pipes, the valve sleeve and penetration sleeve, which provide structural support to the deck flange. For plug valve based designs, the next inner pipe provides compression on the environmental seals at the top of the body to bonnet joint, followed by the innermost pipe which provides rotation of the plug, in the same manner as an extended stem. Ball valve ESVs have an additional pipe to provide compressive loading on the stem packing. Due to the availability of standard pipe grades and weights, the product can be configured to fit a wide array of valve sizes, and application lengths, with current designs as short as seven inches and as tall as 18 feet. Central to the design is the requirement for no special tools or downhole tools to remove parts or configure the product. Off the shelf wrenches, sockets or other hand tools are all that is required. Compared to other products historically available, this design offers a lightweight option, which, while not as rigidly stiff, can deflect compliantly under extreme seismic loading, rather than break. Application conditions vary widely, as the base product is 316 and 304 stainless steel, but utilizes 17-4PH, and other allows as needed based on the temperature range and mechanical requirements. Existing designs are installed in applications as hot as 1400 deg. F, at low pressure, and separately in highly radioactive environments. The selection of plug versus ball valve, metal versus soft seats, and the material of the seals and seats is all dependent on the application requirements. The design of the Extended Sleeve family of products provides a platform which solves a variety of accessibility problems associated with controlling process flow streams in remote, hard to reach locations in harsh environments. Installation of the equipment described has shown to allow access to flow streams that otherwise would require exceptional means to access and control. The Extended Sleeve family of products provides a scalable solution to both control and monitor process fluid flow through shielding, walls or floors when direct connection is advantageous. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Process Improvements to Biomass Pretreatment of Fuels and Chemicals

MBI, a 501c(3) company focusing on de-risking and scaling up bio-based technologies, has teamed with Michigan State University and the Idaho National Laboratory to develop and demonstrate process improvements to the ammonia fiber expansion (AFEX) pretreatment process. The logistical hurdles of biomass handling are well known, and the regional depot concept - in which small, distributed bioprocessing operations collect, preprocess, and densify biomass before shipping to a centralized refinery - is a promising alternative to centralized collection. AFEXTM (AFEX is a trademark of MBI) has unique features among pretreatments that would make it desirable as a pretreatment prior to densification at the depot scale. MBI has developed a novel design, using a packed bed reactor for the AFEX process that can be scaled down economically to the depot scale at a lower capital cost as compared to the traditional design (Pandia type reactor). Thus, the purpose of this project was to develop, scale-up, demonstrate, and improve this novel design The key challenges are the recovery of ammonia, consistent and complete pretreatment performance, and the overall throughput of the reactor. In this project an engineering scale packed bed AFEX system with 1-ton per day capacity was installed at MBI’s building. The system has been operational since mid-2013. During that time, MBI has demonstrated the robustness, reliability, and consistency of the process. To date, nearly 500 runs have been performed in the reactors. There have been no incidences of plugging (i.e., inability to remove ammonia from biomass after the treatment), nor has there been any instance of a major ammonia release into the atmosphere. Likewise, the sugar released via enzyme hydrolysis has remained consistent throughout these runs. Our economic model shows a 46% reduction in AFEX capital cost at the 100 ton/day scale compared to the traditional design of AFEX (Pandia type reactor). The key performance factors were demonstrated; >94% ammonia recovery, >75% sugar yields at high solid loading, and complete utilization of the sugars for ethanol production at the 2500 liter scale. Fermentation tests were performed using Zymomonas mobilis 8b and densified AFEX-treated corn stover at >20% solid loading. The obtained titer (~60g/l), productivity (2.5 g/L-h), and yield (330 L/tonne of biomass) exceeded the performance targets set out by NREL. The key findings from these efforts are: no contamination was observed, no cleanup of the sugar stream was required, and no major nutrient addition was required. Our economic model shows that using a packed bed design for the AFEX process and pelleted AFEX-treated biomass reduces the ethanol production cost by 24% when compared to using the traditional AFEX design.

09 BIOMASS FUELS↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

42 ENGINEERING↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly – 24139

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗