Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning under uncertainty”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

The Completion of a Geosynchronous Earth Orbit Survey with the Eugene Stansbery-Meter Class Autonomous Telescope

The Eugene Stansbery-Meter Class Autonomous Telescope (ES-MCAT) is the primary optical sensor used by the NASA Orbital Debris Program Office (ODPO) to statistically characterize the geosynchronous Earth orbit (GEO) debris environment and support future Orbital Debris Engineering Model (ORDEM) releases. The ES-MCAT completed its first optical survey of the GEO region from 2020 to 2022. The primary goal of this survey was to autonomously collect and process GEO data with calculated photometric and astrometric uncertainties. A pointing plan was developed to provide uniform sampling within the region of interest (ROI) while accounting for predicted downtime due to insufficient observing conditions. Detections are autonomously correlated to the Space Surveillance Network (SSN) catalog to determine if objects are correlated targets (CTs) or uncorrelated targets (UCTs), the latter of which are of interest for modeling the GEO orbital debris environment. To assess the size detection sensitivity over time and monitor the general performance of the telescope’s optics and software, the optical throughput of the system and limiting magnitudes are evaluated on a routine basis. While the telescope’s ability to operate autonomously and remotely allowed for the GEO survey to continue throughout the COVID-19 pandemic, travel restrictions hampered routine cleaning of the optics during this time, and the primary mirror degraded enough to require recoating. The mirror was removed in 2022, concluding the first GEO survey. The primary mirror received a new coating designed to be more robust against the harsh environment surrounding the ES-MCAT’s location on Ascension Island, accounting for experience gained during operations over the first GEO survey. In early 2023, the recoated primary mirror was reinstalled, and the second GEO survey was initiated. The primary goal of the second GEO survey is to characterize the evolving GEO debris environment with updated optics, software, and pointing strategies while allowing for the inclusion of non-GEO regimes or those that are outside of the ROI. While the pointing method implemented in the first survey allowed for adequate coverage of the ROI over two years, it has been improved to include pointings that avoid the Moon’s position and the galactic plane to reduce software processing time and maximize the detection capabilities of fainter objects. This method also accounts for the changing weather patterns throughout the year and reduces coverage gaps in the ROI. Provided the success of the first two-year GEO survey using autonomous operations, the ODPO is actively collaborating with the United States Space Force (USSF) to make the ES-MCAT a contributing sensor to the SSN. This paper presents results from the first GEO survey including magnitude distributions and orbital parameters for CTs and UCTs. Details are provided for the automated processing pipeline and the optical system throughput for the previous and current primary mirror coatings. In addition, an updated strategy for the second GEO survey to optimize coverage over the ROI is discussed, as are preliminary results from the ongoing second survey.

Corbin Cruz↗

Real Options Analysis for Valuation of Climate Adaptation Pathways With Application to Transit Infrastructure

Climate change and sea level rise (SLR) are expected to increase the frequency and intensity of coastal flood events, posing risks to coastal communities and infrastructure. While regional climate adaptation investments can provide substantive flood protection, existing plans often neglect uncertainty in future climate conditions and adaptation performance, consequently neglecting the option value of flexibly implementing proposed projects. Addressing this gap, we develop and employ a generalizable real options analysis (ROA) valuation framework that considers how uncertainty in adaptation project costs, SLR, flood severity, and flood losses inform the full range of adaptation performance outcomes. We further propose and apply a novel, computationally efficient flood loss sampling algorithm to estimate the consequences of randomly arriving coastal flood events. We apply this ROA framework to assess the option value of flexibly timing adaptation investments over time, investigating an adaptation pathway proposed by the City of Boston from the perspective of the regional transit system manager. Our results suggest that flexible implementation can provide significant option value in the near-to mid-term(>30 years), with highest option values under low-probability, high consequence scenarios. Our results also suggest adaptation pathway performance in the latter half of the 21stcenturyis most sensitive to uncertainty in sea level rise, flood loss estimates, and flood frequency, underscoring the importance of uncertainty quantification in the long-term valuation of adaptation investments.

Michael V. Martello↗

Agile Science Operations: A New Approach for Primitive Exploration Bodies

Primitive body exploration missions such as potential Comet Surface Sample Return or Trojan Tour and Rendezvous would challenge traditional operations practices. Earth-based observations would provide only basic understanding before arrival and many science goals would be defined during the initial rendezvous. It could be necessary to revise trajectories and observation plans to quickly characterize the target for safe, effective observations. Detection of outgassing activity and monitoring of comet surface activity are even more time constrained, with events occurring faster than round-trip light time. "Agile science operations" address these challenges with contingency plans that recognize the intrinsic uncertainty in the operating environment and science objectives. Planning for multiple alternatives can significantly improve the time required to repair and validate spacecraft command sequences. When appropriate, time-critical decisions can be automated and shifted to the spacecraft for immediate access to instrument data. Mirrored planning systems on both sides of the light-time gap permit transfer of authority back and forth as needed. We survey relevant science objectives, identifying time bottlenecks and the techniques that could be used to speed missions' reaction to new science data. Finally, we discuss the results of a trade study simulating agile observations during flyby and comet rendezvous scenarios. These experiments quantify instrument coverage of key surface features as a function of planning turnaround time. Careful application of agile operations techniques can play a significant role in realizing the Decadal Survey plan for primitive body exploration

Agile science↗

The 55Fe X-ray Energy Response of Mercury Cadmium Telluride Near-Infrared Detector Arrays

A technique involving Fe-55 X-rays provides a straightforward method to measure the response of a detector. The detector's response can lead directly to a calculation of the conversion gain (e(-) ADU(-1) ), as well as aid detector design and performance studies. We calibrate the Fe-15 X-ray energy response and pair production energy of HgCdTe using 8 HST WFC3 1.7 micron flight grade detectors. The results show that each Ka X-ray generates 2273 +/- 137 electrons, which corresponds to a pair-production energy of 2.61 +/- 0.16 eV. The uncertainties are dominated by our knowledge of the conversion gain. In future studies, we plan to eliminate this uncertainty by directly measuring conversion gain at very low light levels.

Fox, Ori↗

Comet Halley ephemeris uncertainties in 1985-1986

For the planned flyby missions to Comet Halley in March 1986, the comet's ephemeris uncertainties completely dominate the spacecraft-comet miss distance. In an effort to determine realistic Comet Halley ephemeris uncertainties, a statistical covariance analysis was conducted using the actual data in 1909-1910-1911 and simulated data in 1984-1985-1986. In 1985-1986, Comet Halley's ephemeris uncertainties are very sensitive to the comet's orbital position, the optical data noise, data schedule, and whether or not the old data is included in the orbital solutions. The comet's ephemeris uncertainties in March 1986 are relatively insensitive to reasonable center of light/center of mass offsets and also to possible radar data taken in late November 1985. Accurate Space Telescope observations made in early March 1986 might significantly improve upon the comet's position uncertainties for the various intercepting spacecraft.

Yeomans, D. K.↗

Reopening California: Seeking robust, non-dominated COVID-19 exit strategies

The COVID-19 pandemic required significant public health interventions from local governments. Although nonpharmaceutical interventions often were implemented as decision rules, few studies evaluated the robustness of those reopening plans under a wide range of uncertainties. This paper uses the Robust Decision Making approach to stress-test 78 alternative reopening strategies, using California as an example. This study uniquely considers a wide range of uncertainties and demonstrates that seemingly sensible reopening plans can lead to both unnecessary COVID-19 deaths and days of interventions. We find that plans using fixed COVID-19 case thresholds might be less effective than strategies with time-varying reopening thresholds. While we use California as an example, our results are particularly relevant for jurisdictions where vaccination roll-out has been slower. The approach used in this paper could also prove useful for other public health policy problems in which policymakers need to make robust decisions in the face of deep uncertainty.

59 BASIC BIOLOGICAL SCIENCES↗

Mission to Planet Earth Strategic Enterprise Plan 1996-2002

Mission to Planet Earth's (MTPE's) first Strategic Enterprise Plan, issued in May 1995, defined the Agency's major goals and objectives as well as constraints. This update of the Strategic Enterprise Plan identifies the following major changes: a focused Science Research Plan that integrates space-based and in situ observational critical science to address critical science uncertainties; a technology infusion plan to reduce the cost of future missions; a series of flight opportunities to infuse new science into the overall program; and a tighter coupling between NASA and NOAA to reduce costs and to improve the overall program. Three important new initiatives are also under development and are described briefly in this plan: MTPE Education Strategy, MTPE Commercial Strategy, and an emerging concept for an Integrated Global Observing Strategy. This first update to the MTPE Strategic Enterprise Plan captures these new developments, and takes a significant step forward in planning this complex Earth system science endeavor. The plan and other information on MTPE may be viewed via the Internet at http://www.hq.nasa.gov/office/mtpe/.

Source record↗

Low-Earth Orbit Trajectory Optimization in the Presence of Atmospheric Uncertainty

The previous 20 to 25 years have seen a tremendous increase in space exploration, and with that an increase in the level of logistics planning needed to ensure mission success. For spacecraft that are designed to be periodically re-supplied, a key logistics consumable is propellant, as it constitutes the greatest up-mass on re-supply vehicles. A trajectory design strategy is therefore desired that minimizes propellant usage in order to ease the demand for propellant re-supply missions. This thesis develops such a strategy in three stages, and uses the International Space Station (ISS) as its testbed, as no other LEO spacecraft is more challenging from a space logistics standpoint. First, the ISS trajectory planning problem is formulated as a constrained burn optimization problem assuming a deterministic atmosphere. The cost function is total ∆v, with constraints imposed on longitude of ascending viii node (LAN) and semi-major axis (SMA) altitude. Analytic derivatives are constructed for both the cost and constraints, which are necessary given the 6-week to 2-year time frames being considered. A gradient-based optimizer is then utilized to find locally-optimal solutions to real-world ISS trajectory planning problems. Second, atmospheric uncertainty is addressed by constructing a probabilistic model of space weather data using Gaussian Processes (GPs). Bayesian inference is performed using the GP model to generate mean and covariance estimates for space weather predictions, whose pedigree is assessed against test data. The predictions are then mapped into atmospheric density via the analytic Jacchia-Roberts density model, and the effect of space weather uncertainty on orbital lifetime is examined. Third, an ISS burn execution uncertainty model is developed. This model, along with the space weather uncertainty model, are deployed in a linear covariance analysis to ascertain their combined effect on LAN and SMA altitude dispersions. The deterministic constraints from the original problem are re-formulated as stochastic constraints, where now the constraint uncertainty interval is required to fall within specified bounds. An updated optimization framework is constructed using the original ∆v cost function along with the stochastic constraints to solve the trajectory optimization problem under atmospheric uncertainty. Finally, the complete architecture is summarized for deployment in an operational setting.

Trajectory Optimization↗

A Stochastic Framework for Estimating Load Profiles at EV Fast Charging Stations

This paper formulates a methodology for estimating the average daily load profiles of EV fast charging stations over a planning horizon of five to ten years. The developed methodology uses historic vehicle registration data, state-level EV adoption targets, seasonal driving patterns, local demographics, competition, and traffic volume information to predict average station usage. Through Monte Carlo simulations, an average daily load profile is obtained for each month in the planning horizon, and prediction uncertainty is quantified. The proposed framework will facilitate the accurate estimation of energy and demand costs incurred by the charging station over the planning period, thereby informing return-on-investment calculations.

Biswas, Shuchismita↗

Electrifying Airport GSE: Monte Carlo Grid Impacts

Airports globally are shifting from ICE-powered to electric Ground Support Equipment (eGSE) to enhance efficiency, reduce operational costs, and improve operator health. Leveraging predictable routes, flat terrain, and low operational speeds, airports provide ideal conditions for electrification. This study evaluates freight GSE electrification at Dallas-Fort Worth International Airport (DFW), USA, using the Agile@ platform, which integrates three analytical methods: Freight Facility Model (FFM), Activity-Structure-Intensity-Fuel (ASIF), and Monte Carlo simulations. Results from 10,000 simulations indicate modest but critical increases in electricity demand and significant variability in GSE energy consumption. These insights emphasize the importance of data-driven scheduling, targeted maintenance, and strategic infrastructure planning. For high-uncertainty scenarios, airports are advised to deploy buffer energy storage systems (battery banks), implement demand-response charging strategies, schedule flexible workforce shifts, and prioritize proactive maintenance-particularly for equipment with higher operational uncertainty, such as tug tractors with trailers. Agile@ thus offers a robust, scalable, and data-driven framework to optimize long-term GSE planning and enhance reliability across diverse airport environments.

Bose, Ranjan [ORNL] (ORCID:0009000791026327)↗

Using Flexible Execution, Replanning, and Model Parameter Updates to Address Environmental Uncertainty for a Planetary Lander

Planning in an unknown environment presents a number of challenges: incorrect world models, unpredictable variation in execution, and fixed depletable resources. Productivity in the face of these challenges requires an integrated approach to planning and execution that is capable of accomplishing goals, reacting to variation, and maximizing overall utility. We examine this problem in the context of a Europa Lander concept mission. We model the problem as a hierarchical task network, framing it as a utility maximization problem with a depletable energy resource. Then, we propose a planning and execution framework that responds to feedback using three techniques: flexible execution, periodic replanning, and online parameter estimation and re-goaling. We demonstrate the efficacy of each of these techniques through simulation of a Europa Lander mission, showing higher utility achievement compared to simpler approaches, when presented with variation in energy consumption. We demonstrate that an approach to scheduling and execution that is grounded in decision theory and integrated planning and execution will be an enabling technology for future tightly-constrained planetary surface missions.

Chien, Steve↗

An Integrated Gate Turnaround Management Concept Leveraging Big Data Analytics for NAS Performance Improvements

"Gate Turnaround" plays a key role in the National Air Space (NAS) gate-to-gate performance by receiving aircraft when they reach their destination airport, and delivering aircraft into the NAS upon departing from the gate and subsequent takeoff. The time spent at the gate in meeting the planned departure time is influenced by many factors and often with considerable uncertainties. Uncertainties such as weather, early or late arrivals, disembarking and boarding passengers, unloading/reloading cargo, aircraft logistics/maintenance services and ground handling, traffic in ramp and movement areas for taxi-in and taxi-out, and departure queue management for takeoff are likely encountered on the daily basis. The Integrated Gate Turnaround Management (IGTM) concept is leveraging relevant historical data to support optimization of the gate operations, which include arrival, at the gate, departure based on constraints (e.g., available gates at the arrival, ground crew and equipment for the gate turnaround, and over capacity demand upon departure), and collaborative decision-making. The IGTM concept provides effective information services and decision tools to the stakeholders, such as airline dispatchers, gate agents, airport operators, ramp controllers, and air traffic control (ATC) traffic managers and ground controllers to mitigate uncertainties arising from both nominal and off-nominal airport gate operations. IGTM will provide NAS stakeholders customized decision making tools through a User Interface (UI) by leveraging historical data (Big Data), net-enabled Air Traffic Management (ATM) live data, and analytics according to dependencies among NAS parameters for the stakeholders to manage and optimize the NAS performance in the gate turnaround domain. The application will give stakeholders predictable results based on the past and current NAS performance according to selected decision trees through the UI. The predictable results are generated based on analysis of the unique airport attributes (e.g., runway, taxiway, terminal, and gate configurations and tenants), and combined statistics from past data and live data based on a specific set of ATM concept-of-operations (ConOps) and operational parameters via systems analysis using an analytic network learning model. The IGTM tool will then bound the uncertainties that arise from nominal and off-nominal operational conditions with direct assessment of the gate turnaround status and the impact of a certain operational decision on the NAS performance, and provide a set of recommended actions to optimize the NAS performance by allowing stakeholders to take mitigation actions to reduce uncertainty and time deviation of planned operational events. An IGTM prototype was developed at NASA Ames Simulation Laboratories (SimLabs) to demonstrate the benefits and applicability of the concept. A data network, using the System Wide Information Management (SWIM)-like messaging application using the ActiveMQ message service, was connected to the simulated data warehouse, scheduled flight plans, a fast-time airport simulator, and a graphic UI. A fast-time simulation was integrated with the data warehouse or Big Data/Analytics (BAI), scheduled flight plans from Aeronautical Operational Control AOC, IGTM Controller, and a UI via a SWIM-like data messaging network using the ActiveMQ message service, illustrated in Figure 1, to demonstrate selected use-cases showing the benefits of the IGTM concept on the NAS performance.

Efficent ATM systems↗

Uncertainty Analysis in Multi‐Sector Systems: Considerations for Risk Analysis, Projection, and Planning for Complex Systems

Abstract Simulation models of multi‐sector systems are increasingly used to understand societal resilience to climate and economic shocks and change. However, multi‐sector systems are also subject to numerous uncertainties that prevent the direct application of simulation models for prediction and planning, particularly when extrapolating past behavior to a nonstationary future. Recent studies have developed a combination of methods to characterize, attribute, and quantify these uncertainties for both single‐ and multi‐sector systems. Here, we review challenges and complications to the idealized goal of fully quantifying all uncertainties in a multi‐sector model and their interactions with policy design as they emerge at different stages of analysis: (a) inference and model calibration; (b) projecting future outcomes; and (c) scenario discovery and identification of risk regimes. We also identify potential methods and research opportunities to help navigate the tradeoffs inherent in uncertainty analyses for complex systems. During this discussion, we provide a classification of uncertainty types and discuss model coupling frameworks to support interdisciplinary collaboration on multi‐sector dynamics (MSD) research. Finally, we conclude with recommendations for best practices to ensure that MSD research can be properly contextualized with respect to the underlying uncertainties.

54 ENVIRONMENTAL SCIENCES↗

Probabilistic Reasoning for Plan Robustness

A planning system must reason about the uncertainty of continuous variables in order to accurately project the possible system state over time. A method is devised for directly reasoning about the uncertainty in continuous activity duration and resource usage for planning problems. By representing random variables as parametric distributions, computing projected system state can be simplified in some cases. Common approximation and novel methods are compared for over-constrained and lightly constrained domains. The system compares a few common approximation methods for an iterative repair planner. Results show improvements in robustness over the conventional non-probabilistic representation by reducing the number of constraint violations witnessed by execution. The improvement is more significant for larger problems and problems with higher resource subscription levels but diminishes as the system is allowed to accept higher risk levels.

autonomous planning↗

Risk Analysis for Resource Planning Optimization

This paper describes a systems engineering approach to resource planning by integrating mathematical modeling and constrained optimization, empirical simulation, and theoretical analysis techniques to generate an optimal task plan in the presence of uncertainties.

optimization↗

Dawn Statistical Maneuver Design for Vesta Operations

In July of 2011 the Dawn spacecraft is scheduled to begin orbital operations at Vesta, a large main-belt asteroid. Dawn is a NASA Discovery mission that uses solar-electric low-thrust ion propulsion for both interplanetary cruise and orbital operations. Navigating between the Dawn project's four targeted science orbits at Vesta requires a plan that accounts for uncertainties not only in thrust execution, orbit determination, and other spacecraft forces, but also large uncertainties in characteristics of Vesta - such as the asteroid's gravity field and pole orientation. Accommodating these uncertainties requires strategic use of low-thrust maneuvers reserved for statistical trajectory corrections. This paper describes the placement and evaluation of low-thrust statistical maneuvers during two key phases of the Vesta mission along with a discussion of the tools, constraints, and methods used to plan those maneuvers.

Solar Electric Propulsion↗

Demonstration of a Spoken Dialogue Interface for Planning Activities of a Semi-autonomous Robot

Planning and scheduling in the face of uncertainty and change pushes the capabilities of both planning and dialogue technologies by requiring complex negotiation to arrive at a workable plan. Planning for use of semi-autonomous robots involves negotiation among multiple participants with competing scientific and engineering goals to co-construct a complex plan. In NASA applications this plan construction is done under severe time pressure so having a dialogue interface to the plan construction tools can aid rapid completion of the process. But, this will put significant demands on spoken dialogue technology, particularly in the areas of dialogue management and generation. The dialogue interface will need to be able to handle the complex dialogue strategies that occur in negotiation dialogues, including hypotheticals and revisions, and the generation component will require an ability to summarize complex plans. This demonstration will describe a work in progress towards building a spoken dialogue interface to the EUROPA planner for the purposes of planning and scheduling the activities of a semi-autonomous robot. A prototype interface has been built for planning the schedule of the Personal Satellite Assistant (PSA), a mobile robot designed for micro-gravity environments that is intended for use on the Space Shuttle and International Space Station. The spoken dialogue interface gives the user the capability to ask for a description of the plan, ask specific questions about the plan, and update or modify the plan. We anticipate that a spoken dialogue interface to the planner will provide a natural augmentation or alternative to the visualization interface, in situations in which the user needs very targeted information about the plan, in situations where natural language can express complex ideas more concisely than GUI actions, or in situations in which a graphical user interface is not appropriate.

Dowding, John↗