Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

SFWST Disposal Research R&D 5-Year Plan - FY2021 Update.

In the planning for FY2020 in the U.S. DOE NE-81 Spent Fuel and Waste Science and Technology (SFWST) Campaign, the DOE requested development of a plan for activities in the Disposal Research (DR) Research and Development (R&D) over a five (5)-year period, and DOE requested periodic updates to this plan. The DR R&D 5-year plan was provided to the DOE based on the FY2020 priorities and program structure (Sassani et al., 2020) and represents a strategic guide to the work within the DR R&D technical areas (i.e., the Control Accounts), focusing on the highest priority technical thrusts. This FY2021 report is the first update to the DR R&D 5-year plan for the SFWST Campaign DR R&D activities. This 5-year plan will be a living document and is planned to be updated periodically to provide review of accomplishments and for prioritization changes based on aspects including mission progress, external technical work, and changes in SFWST Campaign objectives and/or funding levels (i.e., Program Direction). The updates to this 5-year plan will address the DR R&D that has been completed (accomplishments) and the additional knowledge gaps to be investigated, with any updates to the DR R&D priorities for the next stages of activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Principles for Equitable Transmission Planning

Energy justice is gaining traction in the planning processes that govern the generation and supply of electric power in the U.S., with a growing number of federal and state authorities applying it as a framework to ensure that the benefits of a clean energy future extend to all levels of society. However, the principles of energy justice have not yet been integrated into electric transmission planning processes, which are designed to meet established reliability criteria and have not historically considered externalities like social inequities. This paper presents a review of transmission planning requirements in the U.S. and existing literature on energy justice, then synthesizes them to propose a framework for incorporating energy justice principles into transmission planning processes to yield more equitable outcomes. By applying procedural and recognition justice principles to create more extensive, inclusive, and diverse public participation in the planning process, planners can gain insight into—and begin to correct—the inequities created by previous planning decisions. Equipped with this understanding and informed by affected communities, planners can improve the distributional outcomes of the planning process and identify opportunities for energy system investments that will restore communities and place them on more equitable footing.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Brazil's Action Plan for Rapid Decarbonization of Power Sectors

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The second cohort of action plans will be presented at CEM15 in Brazil. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Recent advances and challenges in optimization models for expansion planning of power systems and reliability optimization

Optimization models for expansion planning of power systems aim to determine capacities, investment timing, and location of power systems to satisfy the power demands while minimizing the total cost. The models have become complex in recent years to reflect both regulations on conventional energy sources and the increasing penetration of renewable energy sources (RES). This paper reviews the basic concepts and optimization models for expansion planning of power systems. We first explain the definition and features of generation expansion planning (GEP), transmission expansion planning (TEP), and generation and transmission expansion planning (GTEP). To address the computational challenges of large-scale expansion planning problems, we review several simplifications including temporal and spatial aggregation, and decomposition methods. This paper also addresses power system reliability defined as the probability of satisfying the load demand while withstanding failures of components. Finally, the goal of this paper is to provide a research overview, discuss trends in expansion planning of power systems, and suggest directions for future research.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Joint Planning of EV Fast Charging Stations and Power Distribution Systems With Balanced Traffic Flow Assignment

To tackle the challenges introduced by the fast-growing charging demand of electric vehicles (EVs), the power distribution systems (PDSs) and fast charging stations (FCSs) of EVs should be planned and operated in a more coordinated fashion. However, existing planning approaches generally aim to minimize investment costs in PDSs while ignoring the risk of worsening traffic conditions. To overcome this research gap, this article integrates the interests of traffic networks into PDS and FCS joint planning model to mitigate negative impacts on traffic conditions caused by installing FCSs. First, a novel microscopic method that is different from traditional assignment methods is proposed to simulate the influences of FCSs on traffic flows and EV charging loads. Then, a multiobjective joint planning model is developed to minimize both the planning costs and unbalanced traffic flows. A new bilayer Benders decomposition algorithm is designed to solve the proposed joint planning model. Numerical results on two practical systems in China validate the feasibility of our microscopic method by comparing the simulated results with real data. Compared with existing approaches, it is also demonstrated that the proposed joint planning approach helps to balance traffic flow assignments and relieve traffic congestion.

bilayer expanded Benders decomposition↗

INL Environmental Monitoring Plan (DOE/ID-11088 Rev. 5)

This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Non-routine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

54 ENVIRONMENTAL SCIENCES↗

Illinois Storage Corridor CarbonSAFE Phase III: Stakeholder Engagement and Outreach Plan

The Stakeholder Engagement and Outreach Plan provides a comprehensive framework for engaging stakeholders of the Illinois Storage Corridor (ISC) project. The ISC project is a CarbonSAFE Phase III project designed to facilitate commercial deployment of carbon capture, utilization, and storage (CCUS) in Illinois. The project aims to establish a multi-industry carbon storage corridor through development of storage sites near the One Earth Energy (OEE) ethanol production facility in north-central Illinois and the Prairie State Generating Company (PSGC) coal-fired power plant in south-central Illinois, with combined annual CO 2 capture ultimately exceeding 8.6 million tons per year. Stakeholder engagement is recognized as a critical component for successful CCUS deployment, alongside technical and economic considerations. As an emerging technology, CCUS may not be well understood by the general population, and lack of public awareness can lead to opposition that poses significant barriers to project development. This plan addresses this challenge through systematic stakeholder identification, analysis, planning, and implementation of engagement actions. The plan is structured around four main sections: Communication, Stakeholder Analysis, Stakeholder Engagement, and Environmental Justice. Activities will be conducted under Tasks 1 and 4 of the project's Statement of Project Objectives, with two key subtasks: (1) developing a stakeholder analysis and engagement plan through face-to-face meetings, facilitated discussions, and surveys; and (2) implementing stakeholder engagement and public outreach activities including meetings, open houses, and permit hearings. The Illinois State Geological Survey (ISGS) will manage engagement activities following DOE-NETL best practices, focusing on providing objective, fact-based information about CCUS and the ISC project. A comprehensive Communication Plan establishes protocols for media contacts, site visits, and crisis communications. The stakeholder analysis follows a structured workflow process divided into Pre-feasibility and Feasibility phases, incorporating contextual understanding, assessment, data collection, and analysis. Key stakeholder groups include government bodies, educational organizations, conservation and environmental groups, agricultural communities, and religious organizations. The plan addresses common stakeholder questions regarding project risks, benefits, safety, property values, liability, and environmental impacts. Recommendations emphasize developing clear messaging, creating informational materials, and preparing to address both project-specific and broader environmental concerns to ensure transparent communication and build stakeholder support throughout project implementation.

25 ENERGY STORAGE↗

Underground Test Area (UGTA) Sampling Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada National Security Site, Nevada, Revision 2

The purpose of this groundwater sampling plan (referred to herein as “the Plan”) is to describe the approach for collecting and analyzing groundwater samples to meet the objectives of the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity. The Plan is focused on the Central and Western Pahute Mesa corrective action units (CAUs 101 and 102), which are currently in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) stage of the Federal Facility Agreement and Consent Order (FFACO) UGTA Strategy. The remaining UGTA CAUs are in the final stage of the UGTA strategy (Closure Report [CR] stage), and monitoring requirements for these CAUs are described in the Federal Facility Agreement and Consent Order Nevada National Security Site Use Restriction Management Plan (DOE/EMNV, 2024a). The Plan supersedes the Nevada National Security Site Integrated Groundwater Sampling Plan and its ensuing Record of Technical Change (ROTC) (DOE/EMNV, 2019b).

54 ENVIRONMENTAL SCIENCES↗

Coordinated Natural Gas and Electric Planning: Case Studies of Current Approaches and Practices

This paper examines how natural gas and electric utilities across eight U.S. states and two Canadian provinces are beginning to coordinate historically separate planning processes in response to growing system interdependencies, policy mandates, aging infrastructure, and changing customer energy choices. Electricity planning has long relied on robust integrated resource planning frameworks that weigh numerous objectives, risks, and costs. Natural gas planning, on the other hand, is typically less transparent and more narrowly focused on safety and system integrity. As economic, reliability, and policy drivers place new and shared demands on both systems, jurisdictions and utilities are experimenting with approaches such as coordinated forecasting, non pipeline alternatives, and combined planning pilots. A few have issued regulatory or statutory directives for greater data sharing and methodological alignment. Case studies from British Columbia, California, Colorado, Illinois, Massachusetts, Minnesota, New York, Québec, Rhode Island, and Washington illustrate a wide range of approaches to rethinking siloed planning. The paper identifies several common themes across the jurisdictions examined. It provides observations on the methods, processes, and organizational steps that may be needed in the future to address the challenges being faced by states and utilities. Lastly, it identifies some initial steps that states and utilities can consider if they would like to pursue more integrated, cost-effective, policy-aligned energy system planning.

03 NATURAL GAS↗

Cooperation in Transmission Expansion Planning: Enhancing Grid Reliability and Efficiency Under a Changing Climate

Electricity grids are challenged to maintain reliability during more intense and frequent extreme weather events due to climate change. This challenge is exacerbated by multi-sector electrification and power sector decarbonization through increased reliance on variable renewable energy, which necessitates the expansion of transmission infrastructure. However, transmission expansion planning is often complicated by intertwined planning authorities and jurisdictions, and allocation of large capital investment needs. These factors cause authorities to manage transmission investments individually (i.e., only/mostly intraregional planning), which can lead to suboptimal transmission networks. This study investigates the potential benefits of cooperative transmission expansion planning (i.e., both intraregional and interregional planning that optimizes transmission investments across the entire physical system). Using sectoral and economic optimization, and machine learning models, it analyzes the impact of different levels of cooperation among transmission planning regions within U.S. Western Interconnection in 2019 and 2059 via an iterative investment process. Furthermore, it examines the effects of future climate change on transmission cooperation by simulating historical heat waves from 2019 under conditions of 2059. The results indicate that cooperative transmission planning leads to lower wholesale electricity prices, decreased energy outages, and reduced greenhouse gas emissions. However, the advantages of collaboration diminish during widespread heat waves, despite remaining beneficial especially for regions like California Independent System Operator with substantial solar installations. The study underscores the importance of transmission cooperation in reducing costs and enhancing reliability, emphasizing the need for strategic investments in storage to address challenges posed by future extreme weather events with varying spatial scales.

Capacity Expansion Model↗

Emerging Best Practices for Electric Utility Planning with Climate Variability: A Resource for Utilities and Regulators

This report is intended to support electric utilities and regulators as they work together to increase the climate resilience of the power system in the United States. It focuses on best practice methods and examples of conducting utility forecasting with climate change (Section 2) as well as three overlapping types of electric utility planning for climate change: resource planning (Section 3), asset planning (Section 4), and contingency planning (Section 5). This report also addresses data development and access (Section 6), emerging pathways for planning including decision-making under deep uncertainty and storylines approaches (Section 7), regulatory considerations (Section 8), and coordination and innovative funding and cost sharing approaches to planning for climate variability (Section 9).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Beginner's Guide to Understanding Power System Model Results for Long-Term Resource Plans

This guide was developed to improve decision-making in the electricity planning process by strengthening dialogue between electricity system planners and stakeholders throughout the process. This document was created for anyone who is first getting exposed to scenario results from power system planning models, or for those who are beginning to interact with power system modelers. It does not assume any experience with power system modeling, or familiarity with electricity planning concepts. This guide can be helpful to a wide range of people, including but not limited to state utility commissioners and commission staff, state energy offices, and intervenors in the planning process. It is targeted to those who are evaluating or reviewing model results presented by a utility, which typically span utility-scale generation and storage (and associated transmission) assets. This guide is designed to provide enough background and guidance that stakeholders can formulate and ask questions to evaluate model results through a deeper understanding of the key assumptions, data, and methods that drive decision outcomes. The ultimate purpose of this work is to increase transparency in the electricity planning process by enabling stakeholders to better engage and evaluate model results. A follow-on guide will provide a deeper dive into emerging topics, which are expected to become more prominent in the electricity planning process, but whose methods and approaches are still being refined.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Beginner's Guide to Understanding Power System Model Results for Long-Term Resource Plans

This presentation summarizes a recently published beginner's guide for understanding power system model results for long-term resource plans. This guide is designed to improve decision-making in the electricity planning process by strengthening dialogue between system planners and relevant stakeholders. It focuses on interpreting scenario results generated by power system planning models. These results are often used to inform integrated resource plans, which are long-term plans for a utility to meet future electricity requirements. Whether you are a state utility commissioner, commission staff, part of a state energy office, an intervenor in the planning process, or another stakeholder, this guide is designed to help you better weigh in on the modeling methods or interpret the model results to improve decision-making. This guide can enhance your understanding to ask the right questions, which can enable better understanding of results and key assumptions, data, and methods.

ENERGY PLANNING, POLICY, AND ECONOMY↗

A product data network to enable faster, easier, and better planning of building envelopes

The building envelopes contributes significantly to the energy-efficiency of the building. Building performance simulation has made it possible to compare façade technologies regarding energy demand, daylighting, thermal and visual comfort in detail. Planners, such as architects and engineers, need experience to find product data with the right quality and level of detail, and to process the data to fit the calculation and the application. In the available time, planners can compare only a limited number of products, which means that better solutions could go unnoticed. This paper presents a new concept for making product data easily accessible for building façade planning. The concept consists of a network of databases for the efficient exchange and use of optical and calorimetric data of glazing units, shading devices, and combinations of both. The paper presents the research questions, an analysis of the current challenges, six design goals for the product data network and its implementation together with a discussion. Many product data sources can be connected to many planning software applications via the specified application programming interface. When planning software connects to the product data network, the planning of building envelopes can be much faster because planners do not need to spend so much time to search and process product data manually. The planning of building envelopes can also become much easier, especially for planners with limited experience. They do not need to understand all the details about which data fits which calculation if the software company implements this. The planning of building envelopes can become much more reliable when software companies validate their use of the product data network, because the current manual process is prone to errors. The planning of building envelopes can also improve because more products can be compared in the available time, allowing better solutions to be found.

Maurer, Christoph↗

Carbon Transport and Storage Planning and Viability Support Tools

The EDX disCO2ver Carbon Transport and Storage Planning and Viability Support Tools are made up of the Carbon Storage Planning Inquiry Tool (CS PlanIT, Justman et al. 2024) and the Carbon Storage Technical Viability Approach Support Tool (CS TVA). Together, these tools support data access to support understanding data availability to support planning efforts for carbon transport and storage. The Carbon Storage Planning Inquiry Tool (CS PlanIT) is an online web mapping application designed to help users explore, query, and evaluate multiple data layers to support and accelerate carbon storage resource and feasibility assessments and planning efforts. CS PlanIT currently contains a range of datasets associated with geologic, technical, and infrastructure factors. The data sets can be filtered geographically for an area of interest to update statistics and charts within the dashboard. The dashboard is divided into different sections called widgets, relating to different steps in the carbon storage planning process. The resources in this submission include a link to PlanIT, as well as a data catalog and link to user documentation. The original citation for the CS PlanIT tool, which has now been integrated into the toolset here, was: - Devin Justman, Scott Pantaleone, Maneesh Sharma, Lucy Romeo, Paige Morkner, CS PlanIT (Carbon Storage Planning Inquiry Tool) , 6/28/2024, https://edx.netl.doe.gov/dataset/cs-planit-carbon-storage-planning-inquiry-tool, DOI: 10.18141/2377953 The Carbon Storage Technical Viability Approach Support (CS TVA) Tool displays spatial data availability for the many components of Geologic Carbon Storage (GCS) technical viability assessment (Creason al 2025). Identifying sites suitable for GCS requires evaluating the intersection of myriad factors, including reservoir conditions, subsurface and surface hazards, infrastructure requirements, and energy community metrics. The technical viability of a site can only be confirmed for instances where all these factors have data available, and where those data support viability. Additional Resources related to the Technical Viability Assessment Tool: - Julia Mulhern, Casey White, Araceli Lara, Neyda Cordero Rodriguez, Zachary Jackson, Jacob Shay, Gabriel Creason, MacKenzie Mark-Moser, Paige Morkner, Kelly Rose, Carbon Storage Technical Viability Approach (CS TVA) Database, 3/26/2025, https://edx.netl.doe.gov/dataset/edx4ccs-carbon-storage-technical-viability-approach-database , DOI:10.18141/1984655 - Julia Mulhern, MacKenzie Mark-Moser, Gabriel Creason, Casey White, Araceli Lara, Neyda Cordero Rodriguez, Zach Jackson, Paige Morkner, Kelly Rose, Carbon Storage Technical Viability Approach (CS TVA) Matrix, 3/27/2025, https://edx.netl.doe.gov/dataset/carbon-storage-technical-viability-approach-cs-tva-matrix , DOI: 10.18141/2539979 - Gabriel Creason, Zach Jackson, Neyda Cordero Rodriguez, Julia Mulhern, Casey White, Araceli Lara, MacKenzie Mark-Moser, Paige Morkner, Kelly Rose, Carbon Storage Technical Viability Approach (CS TVA) Data Availability Results Database, 3/27/2025, https://edx.netl.doe.gov/dataset/carbon-storage-technical-viability-approach-cs-tva-data-availability-results-database, DOI:10.18141/2538557

Carbon storage↗

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

EHS Health Assessment & Health Action Plan Report (CY 2020)

Sandia National Laboratories (SNL) Employee Health Services (EHS) program believes that good health is essential to getting the most out of life, which is why we offer a variety of worksite wellness programs that put employees in control of their own health. These programs are based on current research and strategies that are proven to minimize risk and decrease the impact of illness through early detection and treatment. Services includes Health Assessments, the Virgin Pulse (VP) online wellness platform, and Health Action Plans (HAP) which include one-on-one education, organizational health initiatives, a video library, an events calendar, onsite fitness facilities, and group fitness classes. Participation in these programs help employees and their spouses earn funding for their Health Reimbursement Accounts (HRAs). The EHS Health Action Plan (HAP) initiative targets the key health risks identified through the 8-15-80 model by engaging employees to change their own healthcare story. EHS identified the most prevalent of the health risks amongst our population through Health Risk Assessment (HRA) and used that data to build Health Action Plans (HAPs). The 2020 Health Action Plans addressed improving upon inadequate sleep, lack of energy, stress, weight, physical inactivity, cardiometabolic issues (hypertension, high cholesterol, diabetes), low back pain, allergies, asthma, digestive health, tobacco use, and living well to maintaining low risk for those individuals who do not have a chronic condition to manage. These plans connect employees with our onsite registered dietitians, fitness professionals, health coaches, physical therapists, and physicians as appropriate. In addition to addressing the physical aspects of health, the plans also emphasized pre/post-assessments to encourage building behavioral and emotional skills that promote health and facilitate lifestyle changes over a minimum of three months. Just one risk reduction or behavior change can make an impact on the health of the participant’s Division as well as Sandia’s overall risk levels and ultimately its healthcare costs. Sandia employees achieved an Overall Wellness Score of 69 based on the WellSource Health Assessment (the same as last year). A score of 70-100 is considered “Doing Well”, and a score of 40-69 is in the “Caution” category. Overall in CY 2019, Sandia saw a 34% participation rate in Health Action Plan (HAP) programs (up from 33% in CY 2019) with an 89% completion rate (4% lower than CY 2019). Overall, 5,039 (347 more than CY 2019) individuals participated in 8,329 HAPs, which is 1,005 more than the last calendar year (7,324).

59 BASIC BIOLOGICAL SCIENCES↗

Radiological Monitoring Plan for the Oak Ridge Y-12 National Security Complex: Surface Water

DOE Order 458.1 requires that dose estimates consider contributions from all facilities. In the Y-12 Radiological Monitoring Plan (RMP), surface water is monitored at points that reflect individual facilities, as well as at points that reflect the combined contributions of all facilities. This monitoring plan does not consider other potential routes (i.e., airborne releases and food chains). Thus, a complete determination of total effective dose (TED) cannot be made based on this plan alone. The other routes from Y-12, and all routes from other DOE facilities on the Oak Ridge Reservation (e.g., Oak Ridge National Laboratory (ORNL) and The Heritage Center), must be considered in order to satisfy DOE Order 458.1 requirements. Determination of TED from all sites and pathways is done through the use of dose-assessment models and is documented in the Annual Site Environmental Report. This monitoring plan provides adequate monitoring goals for Y-12 surface water releases to provide input of sufficient sensitivity and accuracy to reliably determine the Y-12 surface water component of the TED. The routine radiological monitoring program is designed to monitor effluents at four types of locations: (1) treatment facilities, (2) other point and area source discharges, (3) instream locations, and (4) production building roof run-off. With this sampling and analysis program, data will be obtained on primary point sources as well as on locations that represent the composite of other potential sources. This plan will be reviewed periodically to determine necessary modifications to the sampling frequencies, parameters, and locations. Modifications, if any, will be based on the analysis of the previous data and its effectiveness in satisfying the objectives of this plan. Appendix A contains graphs of the sum of the DCS fractions for locations and frequencies contained in a previous version of this plan. The data was collected from January 2009 through December 2019. Each sample was analyzed, and each result was divided by the appropriate DCS to compute a DCS fraction. These fractions were summed for all isotopes. According to DOE –STD-1196-2011, the annual average of these sums should be below 1.

54 ENVIRONMENTAL SCIENCES↗