DINGO: Digital assistant to grid operators for resilience management of power distribution system

With increasing adverse weather events and disasters, enabling resiliency of the power distribution system (PDS) is becoming increasingly important. Here in this work, resiliency is defined as the systems ability to keep supplying critical loads even with multiple contingencies. Resiliency may depend on: (a) advanced tools to assist operators in situational awareness and decision making with the increasing volume of data generated by the PDS, (b) visualization and ease of interaction with system resources and information, especially during extreme events and resulting human operator stress, and (c) flexible resources and autonomous control. Operators and support engineers need to interact with the system for key information and take action under stress, given the requirement for decisions in a short time. Integrated technological solutions are prevailing steps to support the most appropriate decision during critical times to serve essential loads. In order to meet the required goals, a Real-time Resiliency Monitoring and Operational Decision Support (RT-RMOD) tool have been developed. It supports various functionalities, including real-time monitoring, resilience assessment, and proactive decision support. However, this work makes advanced feature additions to the tool by developing data-enabled resilience management algorithms for (i) outage detection and localization, (ii) Resiliency-metric driven restoration and reconfiguration, and (iii) NLP based digital assistant for operators called DINGO (DIgital assistaNt to Grid Operators) to interact with Advanced Distribution Management System (ADMS) and RT-RMOD. The developed algorithm was validated for multiple cases of weather events using a real-world, off-grid microgrid system modeled in a real-time simulator, sensor data, and software tools.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Decommissioning Demonstration - San Onofre Nuclear Generating Station South Yard Facility - 16544

Following the decision to retire Units 2 and 3 at the San Onofre Nuclear Generating Station (SONGS), Southern California Edison (SCE) staffed a multi-discipline team to investigate decommissioning best practices. SCE also tasked this team with reducing the overall radiological footprint and radioactive material inventory in the near term. The SCE decommissioning activities investigation team targeted projects at the facility which could reduce the source term and risk, and investigate management approaches with decommissioning contractors. SCE, through this team, contracted EnergySolutions to provide a solution for processing and disposal of equipment and materials at a storage facility south of the plant. The South Yard Facility included offices, instrument repair facilities, a large machine shop, outage equipment storage, waste management facilities, and decontamination facilities. SCE contracted EnergySolutions to manage, supervise, plan, and provide labor for the disposition of the legacy waste stored at the South Yard to include the Radioactive Equipment/Materials Storage (REMS) Pad and South Yard Facility. Under the Contractor Work Authorization (CWA), SCE authorized EnergySolutions to consolidate, package, transport, and dispose of the Low Level Radioactive Waste (Class A) and Mixed Low Level Radioactive Waste from the aforementioned areas. The scope also included disposition of material that was expected to be free from radiological contamination, but required management as a hazardous waste. The legacy waste consisted of an inventory of containers designated as trash provided by SCE, as well as, all materials stored within the rooms of the SYF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fault Locating, Prediction and Protection (FLPPS)

One of the main objectives of this DOE-sponsored project was to reduce customer outage time. Fault location, prediction, and protection are the most important aspects of fault management for the reduction of outage time. In the past most of the research and development on power system faults in these areas has focused on transmission systems, and it is not until recently with deregulation and competition that research on power system faults has begun to focus on the unique aspects of distribution systems. This project was planned with three Phases, approximately one year per phase. The first phase of the project involved an assessment of the state-of-the-art in fault location, prediction, and detection as well as the design, lab testing, and field installation of the advanced protection system on the SCE Circuit of the Future located north of San Bernardino, CA. The new feeder automation scheme, with vacuum fault interrupters, will limit the number of customers affected by the fault. Depending on the fault location, the substation breaker might not even trip. Through the use of fast communications (fiber) the fault locations can be determined and the proper fault interrupting switches opened automatically. With knowledge of circuit loadings at the time of the fault, ties to other circuits can be closed automatically to restore all customers except the faulted section. This new automation scheme limits outage time and increases reliability for customers. The second phase of the project involved the selection, modeling, testing and installation of a fault current limiter on the Circuit of the Future. While this project did not pay for the installation and testing of the fault current limiter, it did perform the evaluation of the fault current limiter and its impacts on the protection system of the Circuit of the Future. After investigation of several fault current limiters, the Zenergy superconducting, saturable core fault current limiter was selected for installation. Because of some testing problems with the Zenergy fault current limiter, installation was delayed until early 2009 with it being put into operation on March 6, 2009. A malfunction of the FCL controller caused the DC power supply to the superconducting magnet to be turned off. This inserted the FCL impedance into the circuit while it was in normal operation causing a voltage resonance condition. While these voltages never reached a point where damage would occur on customer equipment, steps were taken to insure this would not happen again. The FCL was reenergized with load on December 18, 2009. A fault was experienced on the circuit with the FCL in operation on January 14, 2010. The FCL operated properly and reduced the fault current by about 8%, what was expected from tests and modeling. As of the end of the project, the FCL was still in operation on the circuit. The third phase of the project involved the exploration of several advanced protection ideas that might be at a state where they could be applied to the Circuit of the Future and elsewhere in the SCE electrical system. Based on the work done as part of the literature review and survey, as well as a number of internal meetings with engineering staff at SCE, a number of ideas were compiled. These ideas were then evaluated for applicability and ability to be applied on the Circuit of the Future in the time remaining for the project. Some of these basic ideas were implemented on the circuit including measurement of power quality before and after the FCL. It was also decided that we would take what was learned as part of the Circuit of the Future work and extend it to the next generation circuit protection for SCE. Also at this time, SCE put in a proposal to the DOE for the Irvine Smart Grid Demonstration using ARRA funding. SCE was successful in obtaining funding for this proposal, so it was felt that exploration of new protection schemes for this Irvine Smart Grid Demonstration would be a good use of the project resources. With this in mind, a protection system that uses fault interrupting switches, high speed communications, and looping two radial distribution circuits would have the potential for significant reductions in interruption time and number of interruptions for customers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methods to Automate Assessing the Outage Risk and Technical Specification Compliance for Planned Work and Current Plant Conditions. Light Water Reactor Sustainability Program report

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and the extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages. This is done through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and out of service equipment would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment necessary to meet the requirements of the nuclear safety plan. In addition, the operations and outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently during outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This particular report will provide a demonstration of the capabilities in the development of a predictive software platform for improving configuration control and accessing the plant risks associated with outage work protocols and illustrate how the software assists in strategies to minimize these interactions. In addition to maintaining nuclear safety, there are numerous administrative requirements that must be complied with during an outage. This report will discuss the use of logic modelling to monitor planned work against technical specification requirements for given plant conditions and to integrate these requirements with shutdown risk models, clearance order requirements and other plant condition requirements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of Commercially Available Proprietary Vehicle-to-Home Systems: A V2X Connect Project Report

Bidirectional charging and Vehicle-to-Home (V2H) technologies enable the energy stored in a plug-in hybrid electric vehicle’s (PHEV) or battery electric vehicle’s (BEV) onboard battery to supply residential loads during grid outages and support broader energy management objectives. Conventional backup solutions, such as Uninterruptible Power Supplies (UPS) and standalone inverter systems, are limited in capacity and scalability, whereas PHEV/BEV-based storage offers substantially greater energy reserves that can sustain household loads for extended periods.

33 ADVANCED PROPULSION SYSTEMS↗

Lightning Detection

Lightning causes an estimated $50 million annually in damages to power lines, transformers and other electric utility equipment. Lightning strikes are not yet predictable, but U.S. East Coast Lightning Detection Network (LDN) is providing utilities and other clients data on lightning characteristics, flash frequency and location, and the general direction in which lightning associated storms are heading. Monitoring stations are equipped with direction finding antennas that detect lightning strikes reaching the ground by measuring fluctuations in the magnetic field. Stations relay strike information to SUNY-Albany-LDN operations center which is manned around the clock. Computers process data, count strikes, spot their locations, and note other characteristics of lightning, LDN's data is beamed to a satellite for broadcast to client's receiving stations. By utilizing real-time lightning strike information, managers are now more able to effectively manage their resources. This reduces outage time for utility customers.

Source record↗

Enhanced Communication Network Solution for Positive Train Control Implementation

The commuter and freight railroad industry is required to implement Positive Train Control (PTC) by 2015 (2012 for Metrolink), a challenging network communications problem. This paper will discuss present technologies developed by the National Aeronautics and Space Administration (NASA) to overcome comparable communication challenges encountered in deep space mission operations. PTC will be based on a new cellular wireless packet Internet Protocol (IP) network. However, ensuring reliability in such a network is difficult due to the "dead zones" and transient disruptions we commonly experience when we lose calls in commercial cellular networks. These disruptions make it difficult to meet PTC s stringent reliability (99.999%) and safety requirements, deployment deadlines, and budget. This paper proposes innovative solutions based on space-proven technologies that would help meet these challenges: (1) Delay Tolerant Networking (DTN) technology, designed for use in resource-constrained, embedded systems and currently in use on the International Space Station, enables reliable communication over networks in which timely data acknowledgments might not be possible due to transient link outages. (2) Policy-Based Management (PBM) provides dynamic management capabilities, allowing vital data to be exchanged selectively (with priority) by utilizing alternative communication resources. The resulting network may help railroads implement PTC faster, cheaper, and more reliably.

Policy-Based Management (PBM)↗

Ten questions concerning reinforcement learning for building energy management

As buildings account for approximately 40% of global energy consumption and associated greenhouse gas emissions, their role in decarbonizing the power grid is crucial. The increased integration of variable energy sources, such as renewables, introduces uncertainties and unprecedented flexibilities, necessitating buildings to adapt their energy demand to enhance grid resiliency. Consequently, buildings must transition from passive energy consumers to active grid assets, providing demand flexibility and energy elasticity while maintaining occupant comfort and health. This fundamental shift demands advanced optimal control methods to manage escalating energy demand and avert power outages. Reinforcement learning (RL) emerges as a promising method to address these challenges. Here, in this paper, we explore ten questions related to the application of RL in buildings, specifically targeting flexible energy management. We consider the growing availability of data, advancements in machine learning algorithms, open-source tools, and the practical deployment aspects associated with software and hardware requirements. Our objective is to deliver a comprehensive introduction to RL, present an overview of existing research and accomplishments, underscore the challenges and opportunities, and propose potential future research directions to expedite the adoption of RL for building energy management.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DOE Hanford Network Upgrades and Disaster Recovery Exercise Support the Cleanup Mission Now and into the Future

In 2013, the U.S. Department of Energy's (DOE) Hanford Site, located in Washington State, funded an update to the critical network infrastructure supporting the Hanford Federal Cloud (HFC). The project, called ET-50, was the final step in a plan that was initiated five years ago called "Hanford's IT Vision, 2015 and Beyond." The ET-50 project upgraded Hanford's core data center switches and routers along with a majority of the distribution layer switches. The upgrades allowed HFC the network intelligence to provide Hanford with a more reliable and resilient network architecture. The culmination of the five year plan improved network intelligence and high performance computing as well as helped to provide 10 Gbps capable links between core backbone devices (10 times the previous bandwidth). These improvements allow Hanford the ability to further support bandwidth intense applications, such as video teleconferencing. The ET-50 switch upgrade, along with other upgrades implemented from the five year plan, have prepared Hanford's network for the next evolution of technology in voice, video, and data. Hand-in-hand with ET-50's major data center outage, Mission Support Alliance's (MSA) Information Management (IM) organization executed a disaster recovery (DR) exercise to perform a true integration test and capability study. The DR scope was planned within the constraints of ET-50's 14 hour datacenter outage window. This DR exercise tested Hanford's Continuity of Operations (COOP) capability and failover plans for safety and business critical Hanford Federal Cloud applications. The planned suite of services to be tested was identified prior to the outage and plans were prepared to test the services ability to failover from the primary Hanford data center to the backup data center. The services tested were: Core Network (backbone, firewall, load balancers); Voicemail; Voice over IP (VoIP); Emergency Notification; Virtual desktops; and, Select set of production applications and data. The primary objective of the exercise was to test COOP around the emergency operations at Hanford to provide information on capabilities and dependencies of the current system to insure improved focus of emergency, safety and security capacity in a disaster situation. The integration of the DR test into the ET-50 project allowed the testing of COOP at Hanford and allowed the lessons learned to be defined. These lessons learned have helped improve the understanding of Hanford's COOP capabilities and will be critical for future planning. With the completion of the Hanford Federal Cloud network upgrades and the disaster recovery exercise, the MSA has a clearer path forward for future technology implementations as well as network improvements to help shape the usability and reliability of the Hanford network in support of the cleanup mission.

97 MATHEMATICS AND COMPUTING↗

Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are optimally deployed with the least amount of delay and unproductive use of resources. The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how a Micro-Scheduling capability helps address those challenges, and provides a status update on work accomplished to date and the path forward.

99 GENERAL AND MISCELLANEOUS↗

GPS Receiver On-Orbit Performance for the GOES-R Spacecraft

This paper evaluates the on-orbit performance of the first civilian operational use of a Global Positioning System Receiver (GPSR) at a geostationary orbit (GEO). The GPSR is on-board the newly launched Geostationary Operational Environmental Satellite (GOES-R). GOES-R is the first of four next generation GEO weather satellites for NOAA, now in orbit GOES-R is formally identified as GOES-16. Among the pioneering technologies required to support its improved spatial, spectral and temporal resolution is a GPSR. The GOES-16 GPSR system is a new design that was mission critical and therefore received appropriate scrutiny. As ground testing of a GPSR for GEO can only be done by simulations with numerous assumptions and approximations regarding the current GPS constellation, this paper reveals what performance can be achieved in using on orbit data. Extremely accurate orbital position is achieved using GPS navigation at GEO. Performance results are shown demonstrating compliance with the1007575 meter and 6 cms radial/in-track/cross-track orbital position and velocity accuracy requirements of GOES-16. The aforementioned compliance includes station-keeping and momentum management maneuvers, contributing to no observational outages. This performance is achieved by a completely new system design consisting of a unique L1 GEOantenna, low-noise amplifier (LNA) assembly and a 12 channel GPSR capable of tracking the edge of the main beam and the side lobes of the GPS L1 signals. This paper presents the definitive answer that the GOES-16 GPSR solution exceeds all performance requirements tracking up to 12 satellites and achieving excellent carrier-to-noise density (C/N0). Additionally, these performance results show the practicality of this approach. This paper makes it clear that all future GEO Satellites should consider the addition of a GPSR in their spacecraft design, otherwise they may be sacrificing spacecraft capabilities and accuracy along with incurring increased and continual demand on ground support.

GEO GPS↗

Report on Internship Project: Risk-Informed Cost Reduction in Nuclear Power Plants

Several Nuclear Power Plants (NPPs) in USA are facing premature closures due to financial difficulties. A significant contributing factor in the NPP electricity generation cost is Operational and Maintenance (O&M) cost. This research aims to reduce O&M cost by developing a framework which creates flexibility in NPP maintenance program. This framework relies on FLEX portable equipment to reduce NPP risk and to substitute and/or backup fixed equipment in different NPP operation modes. Probabilistic Risk Assessment (PRA) methodology is used to quantify the change of plant risk to justify the framework's applicability. The framework enables plant managers to shift maintenance workload from refueling outage period into online maintenance programs. As a result, it is expected to increase NPP capacity factor while also reducing the risk of unexpected outage. These results are expected to increase NPP electricity generation revenue and decrease O&M costs while complying to existing nuclear safety regulations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

National Airspace System Delay Estimation Using Weather Weighted Traffic Counts

Assessment of National Airspace System performance, which is usually measured in terms of delays resulting from the application of traffic flow management initiatives in response to weather conditions, volume, equipment outages and runway conditions, is needed both for guiding flow control decisions during the day of operations and for post operations analysis. Comparison of the actual delay, resulting from the traffic flow management initiatives, with the expected delay, based on traffic demand and other conditions, provides the assessment of the National Airspace System performance. This paper provides a method for estimating delay using the expected traffic demand and weather. In order to identify the cause of delays, 517 days of National Airspace System delay data reported by the Federal Aviation Administration s Operations Network were analyzed. This analysis shows that weather is the most important causal factor for delays followed by equipment and runway delays. Guided by these results, the concept of weather weighted traffic counts as a measure of system delay is described. Examples are given to show the variation of these counts as a function of time of the day. The various datasets, consisting of aircraft position data, enroute severe weather data, surface wind speed and visibility data, reported delay data and number of aircraft handled by the Centers data, and their sources are described. The procedure for selecting reference days on which traffic was minimally impacted by weather is described. Different traffic demand on each reference day of the week, determined by analysis of 42 days of traffic and delay data, was used as the expected traffic demand for each day of the week. Next, the method for computing the weather weighted traffic counts using the expected traffic demand, derived from reference days, and the expanded regions around severe weather cells is discussed. It is shown via a numerical example that this approach improves the dynamic range of the weather weighted traffic counts considerably. Time histories of these new weather weighted traffic counts are used for synthesizing two statistical features, six histogram features and six time domain features. In addition to these enroute weather features, two surface weather features of number of major airports in the United States with high mean winds and low mean visibility are also described. A least squares procedure for establishing a functional relation between the features, using combinations of these features, and system delays is explored using 36 days of data. Best correlations between the estimated delays using the functional relation and the actual delays provided by the Operations Network are obtained with two different combinations of features: 1) six time domain features of weather weighted traffic counts plus two surface weather features, and 2) six histogram features and mean of weather weighted traffic counts along with the two surface weather features. Correlation coefficient values of 0.73 and 0.83 were found in these two instances.

Chatterji, Gano B.↗

Residential Water Heating Demand Side Management (DSM) - South Africa

The electricity crisis in South Africa has deteriorated significantly, with the country experiencing frequent and prolonged rolling blackouts. These outages have severe economic repercussions, leading to decreased growth and productivity. Demand Side Management (DSM), particularly focusing on electric water heaters due to their significant energy consumption and peak demand contribution, is identified as a key strategy. The study aims to assess opportunities for DSM programs targeting water heating to reduce energy consumption and peak demand. It entails developing a bottom-up simulation model to establish a baseline scenario of water heating electricity load demand in 2023 and 2033, identifying technologies for energy reduction, estimating the impacts of a selected number of measures and providing recommendations to inform policy makers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Improving the Power Outage Resilience of Buildings with Solar PV through the Use of Battery Systems and EV Energy Storage

Buildings with solar photovoltaic (PV) generation and a stationary battery energy storage system (BESS) may self-sustain an uninterrupted full-level electricity supply during power outages. The duration of off-grid operation is dependent on the time of the power fault and the capabilities of the home energy management system (HEMS). In this paper, building resilience is quantified by analyzing the self-sustainment duration for all possible power outages throughout an entire year. An evaluation method is proposed and exercised on a reference house in California climate zone 9 for which the detailed electricity usage is simulated using the EnergyPlus software. The influence of factors such as energy use behavioral patterns, energy storage capacity from the BESS, and an electric vehicle (EV) battery on the building resilience is evaluated. Varying combinations of energy storage and controllable loads are studied for optimally improved resilience based on user preferences. It is shown that for the target home and region with a solar PV system of 7.2 kW, a BESS with a capacity of 11 kWh, and an EV with a battery of 80 kWh permanently connected to the home, off-grid self-sustained full operation is guaranteed for at least 72 h.

14 SOLAR ENERGY↗

RePOWERD: Restoration of Power Outage from Wide-area Severe Weather Disruptions

The purpose of the RePOWERD project is to develop a probabilistic and a simulation based power restoration forecasting model for tropical storms based on geographic utility service areas, impacts to energy infrastructures and transportation networks, time-varying customer outage number, crew information (i.e., crew size, crew staging requirements), and utility restoration plans. Energy infrastructure is a critical lifeline essential for the United States’ national and economic security. Like other critical infrastructures, this infrastructure is aging and is at a high risk of damages from extreme weather events. Based on the number of reported outages in EAGLE-I during 2020 and 2021, it is evident that the current energy infrastructure is not equipped to handle extreme event impacts and will contribute to significant outages. From a resilience perspective, it is essential to forecast restoration time in the event of a severe weather induced power outage to assist the US Department of Energy, emergency managers, and first responders with resource planning. This project contributes to this crucial need. This report details the models, that were developed in this pilot study, to determine the rate of restoration and estimated time of restoration (ETR) during tropical storm events within counties and utility service areas based on damage to energy infrastructures and total number of customers experiencing outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

TASTI-GRID: Improving Electric Grid Resilience across the State of Tennessee

Residential, industrial, and large load data center facility expansion have exacerbated management backlogs. Additionally, as newer technologies emerge in larger utility providers, a chasm between urban and rural resilience grows – creating segmentation across the state. With new development, industries, and large load additions to the electric grid across the Volunteer state, utilities must contend with these new connections, management backlogs, and technology gaps – while addressing an increase in major outages with more frequent extreme weather events, such as Hurricane Helene in 2024. This issues, in turn, have given way to greater vulnerabilities in adjacent infrastructure – including transportation and emergency management services, among others.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design Concepts for an Outage Control Center Information Dashboard

The nuclear industry, and the business world in general, is facing a rapidly increasing amount of data to be dealt with on a daily basis. In the last two decades, the steady improvement of data storage devices and means to create and collect data along the way influenced the manner in which we deal with information. Most data is still stored without filtering and refinement for later use. Many functions at a nuclear power plant generate vast amounts of data, with scheduled and unscheduled outages being a prime example of a source of some of the most complex data sets at the plant. To make matters worse, modern information and communications technology is making it possible to collect and store data faster than our ability to use it for making decisions. However, in most applications, especially outages, raw data has no value in itself; instead, managers, engineers and other specialists want to extract the information contained in it. The complexity and sheer volume of data could lead to information overload, resulting in getting lost in data that may be irrelevant to the task at hand, processed in an inappropriate way, or presented in an ineffective way. To prevent information overload, many data sources are ignored so production opportunities are lost because utilities lack the ability to deal with the enormous data volumes properly. Decision-makers are often confronted with large amounts of disparate, conflicting and dynamic information, which are available from multiple heterogeneous sources. Information and communication technologies alone will not solve this problem. Utilities need effective methods to exploit and use the hidden opportunities and knowledge residing in unexplored data resources. Superior performance before, during and after outages depends upon the right information being available at the right time to the right people. Acquisition of raw data is the easy part; instead, it is the ability to use advanced analytical, data processing and data visualization methods to turn the data into reliable information and comprehensible, actionable information. Techniques like data mining, filtering and analysis only work reliably for well-defined and well-understood problems. The path from data to decision is more complex. The ability to communicate knowledge during outages and emergent issues is crucial. This paper presents an approach to turn the unused data into an opportunity: applying principles from semiotics, human factors and visual analytics to transform the traditional way of processing outage data into media that will improve the collective situation awareness, knowledge, decisions, actions and overall performance of the entire outage team, and also support the reliability, quality and overall effectiveness of maintenance work. The application of the proposed visualization methods will become the medium of a semi-automated analytical process where humans and machines cooperate using their respective, distinct capabilities for the most effective results.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗