Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operator support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

System analysis for the Huntsville Operational Support Center distributed computer system

A simulation model was developed and programmed in three languages BASIC, PASCAL, and SLAM. Two of the programs are included in this report, the BASIC and the PASCAL language programs. SLAM is not supported by NASA/MSFC facilities and hence was not included. The statistical comparison of simulations of the same HOSC system configurations are in good agreement and are in agreement with the operational statistics of HOSC that were obtained. Three variations of the most recent HOSC configuration was run and some conclusions drawn as to the system performance under these variations.

Ingels, E. M.↗

Transportation-Driven Mars Surface Operations Supporting an Evolvable Mars Campaign

This paper describes the results of a study evaluating options for supporting a series of human missions to a single Mars surface destination. In this scenario the infrastructure emplaced during previous visits to this site is leveraged in following missions. The goal of this single site approach to Mars surface infrastructure is to enable "Steady State" operations by at least 4 crew for up to 500 sols at this site. These characteristics, along with the transportation system used to deliver crew and equipment to and from Mars, are collectively known as the Evolvable Mars Campaign (EMC). Information in this paper is presented in the sequence in which it was accomplished. First, a logical buildup sequence of surface infrastructure was developed to achieve the desired "Steady State" operations on the Mars surface. This was based on a concept of operations that met objectives of the EMC. Second, infrastructure capabilities were identified to carry out this concept of operations. Third, systems (in the form of conceptual elements) were identified to provide these capabilities. This included top-level mass, power and volume estimates for these elements. Fourth, the results were then used in analyses to evaluate three options (18t, 27t, and 40t landed mass) of Mars Lander delivery capability to the surface. Finally, Mars arrival mass estimates were generated based upon the entry, descent, and landing requirements for inclusion in separate assessments of in-space transportation capabilities for the EMC.

Toups, Larry↗

Psychological Support Operations and the ISS One-Year Mission

Since NASA began human presence on the International Space Station (ISS) in November 1998, crews have spent two to seven months onboard. In March 2015 NASA and Russia embarked on a new era of ISS utilization, with two of their crewmembers conducting a one-year mission onboard ISS. The mission has been useful for both research and mission operations to better understand the human, technological, mission management and staffing challenges that may be faced on missions beyond Low Earth Orbit. The work completed during the first 42 ISS missions provided the basis for the pre-flight, in-flight and post-flight work completed by NASA's Space Medicine Operations Division, while our Russian colleagues provided valuable insights from their long-duration mission experiences with missions lasting 10-14 months, which predated the ISS era. Space Medicine's Behavioral Health and Performance Group (BHP) provided pre-flight training, evaluation, and preparation as well as in-flight psychological support for the NASA crewmember. While the BHP team collaboratively planned for this mission with the help of all ISS international partners within the Human Behavior and Performance Working Group to leverage their collective expertise, the US and Russian BHP personnel were responsible for their respective crewmembers. The presentation will summarize the lessons and experience gained within the areas identified by this Working Group as being of primary importance for a one-year mission.

Beven, G.↗

Space shuttle engineering and operations support. Orbiter to spacelab electrical power interface. Avionics system engineering

The results are presented of an investigation of the factors which affect the determination of Spacelab (S/L) minimum interface main dc voltage and available power from the orbiter. The dedicated fuel cell mode of powering the S/L is examined along with the minimum S/L interface voltage and available power using the predicted fuel cell power plant performance curves. The values obtained are slightly lower than current estimates and represent a more marginal operating condition than previously estimated.

Emmons, T. E.↗

Long duration mission support operations concepts

It is suggested that the system operations will be one of the most expensive parts of the Mars mission, and that, in order to reduce their cost, they should be considered during the conceptual phase of the Space Exploration Initiative (SEI) program. System operations of Space Station Freedom, Lunar outpost, and Mars Rover Sample Return are examined in order to develop a similar concept for the manned Mars mission. Factors that have to be taken into account include: (1) psychological stresses caused by long periods of isolation; (2) the effects of boredom; (3) the necessity of onboard training to maintain a high level of crew skills; and (4) the 40-min time delays between issuing and receiving a command, which make real-time flight control inoperative and require long-term decisions to be made by the ground support.

Eggleston, T. W.↗

Continuation of research into software for space operations support: Conversion of the display manager to X Windows/Motif, volume 2

NASA is currently using a set of applications called the Display Builder and Display Manager. They run on Concurrent systems and heavily depend on the Graphic Kernel System (GKS). At this time however, these two applications would more appropriately be developed in X Windows, in which a low X is used for all actual text and graphics display and a standard widget set (such as Motif) is used for the user interface. Use of the X Windows will increase performance, improve the user interface, enhance portability, and improve reliability. Prototype of X Window/Motif based Display Manager provides the following advantages over a GKS based application: improved performance by using a low level X Windows, display of graphic and text will be more efficient; improved user interface by using Motif; Improved portability by operating on both Concurrent and Sun workstations; and Improved reliability.

Collier, Mark D.↗

Continuation of research into software for space operations support, volume 1

A prototype workstation executive called the Hardware Independent Software Development Environment (HISDE) was developed. Software technologies relevant to workstation executives were researched and evaluated and HISDE was used as a test bed for prototyping efforts. New X Windows software concepts and technology were introduced into workstation executives and related applications. The four research efforts performed included: (1) Research into the usability and efficiency of Motif (an X Windows based graphic user interface) which consisted of converting the existing Athena widget based HISDE user interface to Motif demonstrating the usability of Motif and providing insight into the level of effort required to translate an application from widget to another; (2) Prototype a real time data display widget which consisted of research methods for and prototyping the selected method of displaying textual values in an efficient manner; (3) X Windows performance evaluation which consisted of a series of performance measurements which demonstrated the ability of low level X Windows to display textural information; (4) Convert the Display Manager to X Window/Motif which is the application used by NASA for data display during operational mode.

Collier, Mark D.↗

TA-55 Forensic Support Operations Cross-Training Exercise

As part of the annual FBI/LANL training schedule, a joint training exercise was conducted during the week of 10FEB2020 with FBI HEAT members and LANL Fissile Material Handlers (FMHs). The joint training exercise was conducted in a non-radiological area to reduce cost and ensure the test object would not be contaminated. The exercise test object was fabricated by LANL using surrogate materials to represent an object containing Special Nuclear Material (SNM). Working with Jim Blankenship and Kevin Swearingen, functional requirements of the test object included the following: unclassified, disassembly (to include screws), and moderately heavy. To meet the objectives, the test object was fabricated by welding a custom aluminum box (8” x 8” x 12”) with a lid which was secured by four (4) screws. The custom box housed a track and field shot put (16 lbs.) that was anchored by a hose clamp. The intent of the training was to disassemble the test object and conduct traditional forensic determinations on the parts. This lessons learned report documents all of the associated aspects related to the joint training effort.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Evaluating Liquid Waste Transfers and their Impacts to the SRS Tank Farms to Support Operations and Closure

BACKGROUND • SRMC mission critical milestones – 34 million liters (9 million gallons) Salt Waste Processing Facility (SWPF) Processing Rate – Accelerated Waste Tank Closures • Results in an increase in Tank Farm transfers • Barriers – Equipment failures, replacements, and adjustments – Weather – Procedure development – Outside facility changes How has the Tank Farm adapted to meet these milestones? By improving the transfer evaluation process

Some considerations for Space Tug launch site support operations.

The study reported was undertaken to investigate the requirements placed on the Space Tug by the ground operations. On the basis of the results obtained, it will be possible to consider in future Tug systems studies the full spectrum of both ground and flight operations requirements in defining selected Tug configurations. The central core of the study consists of a functional analysis of ground operations during the Tug turnaround. Electronic system studies were initiated concurrently with the functional analysis study phase to evaluate interrelationships between ground and vehicle checkout and fault isolation capability.

Heald, D. A.↗

A computer simulation of Skylab dynamics and attitude control for performance verification and operational support

A simulation of the Skylab attitude and pointing control system (APCS) is outlined and discussed. Implementation is via a large hybrid computer and includes those factors affecting system momentum management, propellant consumption, and overall vehicle performance. The important features of the flight system are discussed; the mathematical models necessary for this treatment are outlined; and the decisions involved in implementation are discussed. A brief summary of the goals and capabilities of this tool is also included.

Buchanan, H.↗

Data collection operational support system, part 2

Calibrated signal-strength data obtained at 10 sites in the Rockies and NASA telemetry data regarding the signal levels in the ATS 6 spacecraft are presented along with methodology to use the data to compute the carrier-to-noise rations and signal-to-noise rations at each of the calibrated sites. The data and methodology are also used to estimate the median values of these quantities for sites in the Rockies, Alaska, and Appalachia. Results are discussed.

Source record↗

Sonic boom results for a nominal mission 3B. Space Shuttle engineering and operations support, engineering systems analysis

The results obtained in the analysis of the effects of sonic boom overpressures at ground level for a nominal Mission 3B with the current baseline guidance are reported. These results are in the form of ground level overpressures generated along the groundtrack out to lateral cutoff from Mach 3.0-1.10 at 0.10 (tenth) Mach intervals. Preliminary trajectory constraints which will reduce excess sonic boom overpressures to approximately 2.0 PSF are included.

Source record↗

Preliminary Entry Trajectory for 1st Orbital Flight Test (OFT). Space Shuttle Engineering and Operations Support, Engineering Systems Analysis

A preliminary trajectory from entry interface to terminal area energy management interface for the first orbital flight test is presented based on information in the Strawman master flight test assignments document Reference A. The enclosed point-mass trajectory may be utilized for preliminary purposes, meeting the requirements of this document. The trajectory was derived utilizing the January 1975 analytic drag control guidance, the latest thermal protection subsystem model information from NASA ES and December 1974 Aerodynamics for a mid center-of-gravity location.

Frohme, K. R.↗

Apu/hydraulic/actuator Subsystem Computer Simulation. Space Shuttle Engineering and Operation Support, Engineering Systems Analysis

Major developments are examined which have taken place to date in the analysis of the power and energy demands on the APU/Hydraulic/Actuator Subsystem for space shuttle during the entry-to-touchdown (not including rollout) flight regime. These developments are given in the form of two subroutines which were written for use with the Space Shuttle Functional Simulator. The first subroutine calculates the power and energy demand on each of the three hydraulic systems due to control surface (inboard/outboard elevons, rudder, speedbrake, and body flap) activity. The second subroutine incorporates the R. I. priority rate limiting logic which limits control surface deflection rates as a function of the number of failed hydraulic. Typical results of this analysis are included, and listings of the subroutines are presented in appendicies.

Source record↗