Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Determining Reactor Operating Conditions to Prevent Xenon Walkaway Accident

The xenon walk-away is a postulated uncontrolled criticality that could occur if operators are forced to evacuate the control room in certain circumstances. This poster shows how previously held assumptions are not entirely valid and that less restrictions should be placed on operators and engineers than initially assumed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Impacts of Different Operation Conditions and Geological Formation Characteristics on CO2 Sequestration in Citronelle Dome, Alabama

Major concerns of carbon dioxide (CO2) sequestration in subsurface formations are knowledge of the well injectivity and gas storage capacity of the formation, the CO2 pressure and saturation plume extensions during and after injection, and the risks associated with CO2 leakage and fault reactivation. Saline reservoirs are considered as one of the target formations for CO2 sequestration through structural, residual, dissolution, and mineral trapping mechanisms. The boundary condition of the saline reservoir dictates the pressure and saturation plume extension of the injected supercritical CO2 that could expand over large distances. This can lead to sources of risk, e.g., leakage and/or fault reactivation due to presence of wells, thief zones, and geological discontinuities. Therefore, there is a critical need to develop a model that describes how risk-related performance metrics (i.e., the CO2 saturation plume size, the pressure differential plume area, and the pressure differential at specific locations) vary as a function of the size of injection, time following injection, injection operations, and geologic environment. In this study, a systematic reservoir modeling studies of anthropogenic CO2 sequestration in Citronelle dome, Alabama, was performed where all relevant scenarios and conditions to address the questions of the saturation and pressure plume size in the area of review (AoR) and post-injection site care (PISC) are considered. The objective for this study was firstly to systematically simulate CO2 sequestration, i.e., saturation dynamics, and pressure behavior over a range of operational and geological conditions and to derive conclusions about the factors influencing saturation and pressure plume size, post-injection behavior, and the risk associated with them, by developing third-generation reduced order models (ROMs) for reservoir behavior. Finally, to assess the uncertainty associated with our studies, Latin Hypercube Sampling (LHS) together with an experimental design technique, i.e., Plackett–Burman design, was used. Application of Pareto charts and respond surfaces enabled us to determine the most important parameters impacting saturation and pressure plume sizes and to quantify the auto- and cross-correlation among different parameters in both history-matched and upscaled models.

58 GEOSCIENCES↗

Design of Muon Campus Full Flow Purifier for Varying Operational Conditions and Horizontal Shipping

The Muon Campus g-2 experiment requires stable helium supply at 5 K to the superconducting magnet. After a short period of operations, the pressure drop across the magnet’s flow supply valve increases due to impurities, resulting in reduced excess capacity concurrently with drop in refrigerator expander efficiency. This requires periodic powering down of the magnet to allow for helium valve “flush” to remove accumulated contamination at the valve as well as warming up the refrigerator expander above 80 K to release contamination. A “mobile” purifier is used for this periodic process but only at 10% of total refrigerator flow such that the purification process is extended. After long duration of running, this purification procedure is required almost every two weeks to restore proper liquid helium supply to the magnet. This shows requirement for full flow purifier which can purify impurities from entire Muon Campus refrigerator system and mitigate existing impurities issue and associated experiment downtime.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Assessment of the Effect of Prototypic High-Burnup Operating Conditions of Fuel Fragmentation, Relocation, and Dispersal Susceptibility

The US nuclear energy industry is investigating strategies that further reduce the cost of energy production by using its existing fleet of nuclear generating stations. Most nuclear power plant operating costs are associated with purchasing fresh fuel assemblies or the efficiency of the reactor core design. Material costs are typically beyond the operator’s control; however, the core design optimizations offer potential operational savings. The core design envelope available to operators is constrained by two primary regulatory criteria: an enrichment limit of 5% 235 U and a burnup limit of 62 GWD/tU. These constraints have resulted in renewed efforts by the nuclear industry to pursue extending the peak rod-average burnup beyond 62 GWd/tU. This effort will likely require additional safety analyses beyond what is currently accepted by the US Nuclear Regulatory Commission. The purpose of this work is to demonstrate a best estimate plus uncertainty pin-by-pin high-burnup loss of coolant accident analysis technique to assess full-core high-burnup fuel fragmentation, relocation, and dispersal (FFRD) and identify approaches for minimizing or potentially mitigating FFRD through core design optimizations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Simulation Results of a Thermal Power Dispatch System from a Generic Pressurized Water Reactor in Normal and Abnormal Operating Conditions

Amid economic pressures in the U.S. electricity market, nuclear utilities are exploring new revenue streams, including hydrogen production. A generic pressurized water reactor simulator was modified to incorporate a novel design for a TPD system coupled to a hydrogen production plant. Standard malfunctions were included in the simulation design, including steam line breaks at various system locations and flow interruptions in the hydrogen plant due to multiple faults, reflecting anticipated operational challenges. It is imperative that the TPD system operation has a minimal effect on the reactor power, primary coolant system, and turbine system operation and performance. Due to the specific design and application of this TPD system, with the proposed turbine control system changes, the overall impact on the existing plant systems is low. Normal TPD operating scenarios resulted in minor effects on the existing plant systems: reactor power changes by at most 0.2%, and gross generator output changes by 20.5 MWe from 100 MWt of TPD. The most severe malfunction analyzed in this work is a full TPD steam line break downstream of the extraction location, which results in an increase in reactor power of about 0.5%. The gross generator output decreases by 36 MWe, a total decrease of 60 MWe from the full power steady state (FPSS) condition. These results indicate that an industrial hydrogen production plant could be coupled thermally to a nuclear power plant with limited effects on the existing system operation and safety.

08 HYDROGEN↗

Design of Muon Campus full flow purifier for varying operational conditions and horizontal shipping

Constant ingress of impurities in Muon Campus g-2 experiment at Fermilab has resulted in reduction of efficiency of cryogenic expanders and occasional undesired downtime to flush the impurities. Due to insufficiency of current 0.06 kg/s mobile purifier, a full flow purifier is designed to be used in Muon Campus which purifies 0.24 kg/s of Helium throughput of 4 compressors through charcoal bed at 80 K and returns ambient Helium back to the system. The purifier is designed to be operated near liquid Nitrogen temperature during cold operations and up to 400 K during regeneration. Both warm and cold operational range of the purifier has required use of appropriate clearances in design due to expansion and contraction. The vessel of around 5.5 m height which is designed to be operated vertically is to be shipped horizontally. The asymmetrical position of heavy stainless steel heat exchanger in the purifier support frame and 5g vertical load design consideration for shipping has required use of shipping supports and heat exchanger rotational stops to comply with design requirements. FEA of purifier system is performed in cold, warm and shipping cases to verify that the purifier satisfies the design requirements.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

High precision moving magnet chopper for variable operation conditions

In the context of an ESTEC technology contract, a Chopping Mechanism was developed and built with the Far Infrared and Submillimeter Telescope (FIRST) astronomy mission as a reference. The task of the mechanism is to tilt the subreflector of the telescope with an assumed mass of 2.5 kg about one chopping axis at nominal frequencies of up to 5 Hz and chopping angles of up to +/- 11.25 mrad with high efficiency (minimum time for position change). The chopping axis is required to run through the subreflector vertex. After performing a concept trade-off also considering the low operational temperatures in the 130 K range, a design using moving magnet actuators was found to be the favorite one. In addition, a bearing concept using flexible pivots was chosen to meet the high chopping accuracy required. With this approach, a very reliable design could be realized, since the actuators work without any mechanical contact between its moving and fixed parts, and the only bearings used are two flexible pivots supporting the subreflector mounting interface. The mechanism was completely built in titanium in a lightweight and stiff design. The moving magnet actuators were designed to meet the stringent requirements for minimum risetime (time necessary to move from one angular position to a new one) in the 20 msec range. The angular position and the corresponding chopping frequency as well can be arbitrarily selected by the user.

Aicher, Winfried↗

Tailoring the Mass Transport to Achieve High-Performing Unitized Regenerative Fuel Cells Considering Practical Operating Conditions

Unitized regenerative fuel cells (URFCs) convert electrical energy to chemical bonds in hydrogen during charge and convert chemical energy to output electricity during discharge, offering a promising solution to long-term energy storage. Recent studies indicate that the round-trip-voltaic efficiency (RTE) and longevity of URFCs are limited by complex mass transport during charging and discharging. Here, we first investigate how different porous transport layer (PTL) structures can impact URFC performance. The preferred PTL has a low tortuosity and high porosity, leading to a high RTE above 50% at 1 A cm −2 using Nafion 212. Moreover, thicker membranes, such as Solvay 90, are required to ensure mechanical stability and minimize H 2 crossover when operating under high differential pressure. Although this assembly inevitably leads to a higher ohmic loss, the RTE can be improved by further tailoring the electrode structures to facilitate mass transport by using supported catalyst, which still achieves over 50% RTEs at 1 A cm −2 . Optimization of porous structure to mitigate mass transport resistance with appropriate materials down selection considering practical application requirements can be a key design principle for achieving high-performing URFCs.

25 ENERGY STORAGE↗

Estimates of Optimal Operating Conditions for Hydrogen-Oxygen Cesium-Seeded Magnetohydrodynamic Power Generator

The value of percent seed, oxygen to fuel ratio, combustion pressure, Mach number, and magnetic field strength which maximize either the electrical conductivity or power density at the entrance of an MHD power generator was obtained. The working fluid is the combustion product of H2 and O2 seeded with CsOH. The ideal theoretical segmented Faraday generator along with an empirical form found from correlating the data of many experimenters working with generators of different sizes, electrode configurations, and working fluids, are investigated. The conductivity and power densities optimize at a seed fraction of 3.5 mole percent and an oxygen to hydrogen weight ratio of 7.5. The optimum values of combustion pressure and Mach number depend on the operating magnetic field strength.

Smith, J. M.↗

Analytical prediction with multidimensional computer programs and experimental verification of the performance, at a variety of operating conditions, of two traveling wave tubes with depressed collectors

Experimental and analytical results are compared for two high performance, octave bandwidth TWT's that use depressed collectors (MDC's) to improve the efficiency. The computations were carried out with advanced, multidimensional computer programs that are described here in detail. These programs model the electron beam as a series of either disks or rings of charge and follow their multidimensional trajectories from the RF input of the ideal TWT, through the slow wave structure, through the magnetic refocusing system, to their points of impact in the depressed collector. Traveling wave tube performance, collector efficiency, and collector current distribution were computed and the results compared with measurements for a number of TWT-MDC systems. Power conservation and correct accounting of TWT and collector losses were observed. For the TWT's operating at saturation, very good agreement was obtained between the computed and measured collector efficiencies. For a TWT operating 3 and 6 dB below saturation, excellent agreement between computed and measured collector efficiencies was obtained in some cases but only fair agreement in others. However, deviations can largely be explained by small differences in the computed and actual spent beam energy distributions. The analytical tools used here appear to be sufficiently refined to design efficient collectors for this class of TWT. However, for maximum efficiency, some experimental optimization (e.g., collector voltages and aperture sizes) will most likely be required.

Dayton, J. A., Jr.↗

Behavioral responses of fish to a current-based hydrokinetic turbine under mutliple operational conditions

There is significant international interest in developing current-based marine and hydrokinetic (MHK) technologies to capture the power of tidal energy. However, concerns have been raised regarding the ecological effects of these projects on fish, including the risk of blade collision and behavioral impacts such as the disruption of migratory behavior and food acquisition and displacement from preferred habitats. In this study, we conducted mobile hydroacoustic surveys to track fish as they approached a tidal turbine deployed in Cobscook Bay, Maine. There was a significant decline in fish numbers with decreasing distance to the turbine, beginning approximately 140 m from the turbine. Similar declines were not observed at control transects or when the turbine was not spinning. The decline in fish numbers appeared to be the result of horizontal displacement, not vertical, movements to avoid the turbine. Noise rather than visual cues or flow field disturbance seemed to be a likely explanation for the reduced number of fish near the turbine. This finding, combined with near-field blade collision studies indicating a low probability of encounter, suggests that a single turbine poses a low collision risk to pelagic fish and that a single turbine is likely to result in minimal behavioral responses by fish. However, the risk may be different with additional devices, which will become more relevant as commercial-scale MHK arrays come under consideration. Therefore, the risks associated with commercial-scale operations will ultimately have to be evaluated to fully understand the ecological impacts of MHK devices.

42 ENGINEERING↗

Thermal and Evolved Gas Behavior of Calcite Under Mars Phoenix TEGA Operating Conditions

The Mars Phoenix Scout Mission with its diverse instrument suite successfully examined several soils on the Northern plains of Mars. The Thermal and Evolved Gas Analyzer (TEGA) was employed to detect organic and inorganic materials by coupling a differential scanning calorimeter (DSC) with a magnetic-sector mass spectrometer (MS). Martian soil was heated up to 1000 C in the DSC ovens and evolved gases from mineral decomposition products were examined with the MS. TEGA s DSC has the capability to detect endothermic and exothermic reactions during heating that are characteristic of minerals present in the Martian soil. Initial TEGA results indicated the presence of endothermic peaks with onset temperatures that ranged from 675 C to 750 C with corresponding CO2 release. This result suggests the presence of calcite (CaCO3. CaO + CO2). Organic combustion to CO2 is not likely since this mostly occurs at temperatures below 550 C. Fe-carbonate and Mg-carbonate are not likely because their decomposition temperatures are less than 600 C. TEGA enthalpy determinations suggest that calcite, may occur in the Martian soil in concentrations of approx.1 to 5 wt. %. The detection of calcite could be questioned based on previous results that suggest Mars soils are mostly acidic. However, the Phoenix landing site soil pH was measured at pH 8.3 0.5, which is typical of terrestrial soils where pH is controlled by calcite solubility. The range of onset temperatures and calcite concentration as calculated by TEGA is poorly con-strained in part because of limited thermal data of cal-cite at reduced pressures. TEGA operates at <30 mbar while most calcite literature thermal data was obtained at 1000 mbar or higher pressures.

Ming, D.W.↗

Hydrotreating pine-derived catalytic fast pyrolysis oil to jet fuel: Process durability and impact of operating conditions

Hydrotreating woody biomass-derived catalytic fast pyrolysis (CFP) oil to jet fuel has the potential to enhance energy security due to the large abundance of forest and woody resources. CFP oil produced from pine over ZSM-5 was hydrotreated over sulfided NiMo/Al 2 O 3 for 410 h to study the impact of hydrotreating conditions (pressure, temperature, and weight hourly space velocity (WHSV)). The degree of deoxygenation remained high across the tested hydrotreating conditions, and the products contained < 0.01 wt% oxygen. Increasing hydrotreating pressure from 84 to 125 bar enhanced hydrogenation of aromatic rings and the formation of cycloalkanes and increasing the temperature from 385 to 400 degrees C enhanced cracking and the formation of jet-range molecules. Decreasing the weight hourly space velocity from 0.2 to 0.1 g/(g cat h) further enhanced cracking and led to higher gasoline- and lower jet fuel-range fractions. The highest jet fuel fraction (49 wt%) was obtained at 400 degrees C, 125 bar, 0.2 g/(g cat h) WHSV. CFP oils produced from pine over phosphorous-modified ZSM-5 were hydrotreated at this condition for 588 h to investigate the process durability. The hydrogenation performance of the catalyst gradually stabilized in approximately 300 h after which the product composition remained constant. Of the final hydrotreated CFP oil, 53 wt% fell in the jet fuel range with most of the tested fuel properties meeting ASTM D4054 and/or ASTM D7566 specifications. The freeze points were < -50 degrees C vs. guideline of < -40 degrees C and the viscosities at -20 degrees C were 3.8-4.1 mm 2 /s vs guideline of 8 mm 2 /s. Increasing the fraction of cycloalkanes could increase the cetane number and heating value, which did not meet the guidelines.

09 BIOMASS FUELS↗