Plan for the Development and Application of a Risk Assessment Approach for Transportation Package Approval of a Transportable Nuclear Power Plant for Maritime Shipment (Rev. 1)

This plan proposes a strategy for licensing a transportable nuclear power plant, containing its unirradiated and irradiated fuel, as a transportation package for maritime transport using a probabilistic risk assessment framework in order to meet the regulatory requirements of 10 CFR Part 71. It is anticipated that initially, the deterministic transportation package licensing approach will be challenging due to the functional requirements of the transportable nuclear power plant. As such, a partial exemption request from the U.S. Nuclear Regulatory Commission coupled with applied compensatory measures are anticipated in support of providing equivalent safety to the public, worker, and environment. A plan is outlined as to how this would be demonstrated and a pathway is primarily outlined using the accompanying low accident rates which in turn support very low probabilities of release for a maritime application. Wherever possible, the proposed plan is supported by actual accident (casualty) data. Additional supporting information regarding a highway transportation probabilistic risk assessment in support of the Project Pele demonstration reactor that is currently under development is also referenced and discussed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Optimizing long-term monitoring of radiation air-dose rates after the Fukushima Daiichi Nuclear Power Plant

Radiation air dose rates near the Fukushima Daiichi Nuclear Power Plant (FDNPP) have been steadily decreasing over the past eight years since the release of radioactive elements in March 2011. Currently, the radiation monitoring program is expected to transition to long-term monitoring after most of the remediation activities are completed. The main long-term monitoring objectives are to (1) confirm the continuing reduction of contaminant and hazard levels, (2) provide assurance for the public, (3) accumulate the basic datasets for scientific knowledge and future preparation, and (4) detect changes or anomalies in contaminant mobility (if they occur), or any unexpected processes or events. In this work, we have developed a methodology for optimizing the monitoring locations of radiation air dose-rate monitoring. Our approach consists of three steps in order to determine monitoring locations in a systematic manner: (1) prioritizing the critical locations, such as schools or regulatory requirement locations, (2) diversifying locations that cover the key environmental controls that are known to influence contaminant mobility and distributions, and (3) capturing the heterogeneity of radiation air-dose rates across the domain. Therefore, for the second step, we use a Gaussian mixture model to identify the representative locations among multiple environmental variables, such as elevation and land-cover types. For the third step, we use a Gaussian process model to capture and estimate the heterogeneity of air-dose rates across the domain. Employing an integrated dose-rate map derived from Bayesian geostatistical methods as a reference map, we distribute the monitoring locations in such a way as to capture the heterogeneity of the reference map. Our results have shown that this approach allows us to select monitoring locations in a systematic manner such that the heterogeneity of air dose rates is captured by the minimal number of monitoring locations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Evaluating Methods of Software Bill of Materials Generation to Enhance Nuclear Power Plant Cybersecurity

Instrumentation and control (I&C) systems in nuclear power plants (NPPs) are potential targets of cyberattacks and can prove deleterious for the safety of the NPPs. A Software Bill of Materials (SBOM) provides a detailed list of the various components and their dependencies in software, which helps in vulnerability and risk assessment for cyber hygiene and situational awareness. For an NPP, the process of generating an accurate SBOM report can be complex due to the legacy systems and firmware binaries involved. While most current SBOM tools are focused more on modern internet technology software, this research provides insights and guidelines for an NPP to generate an accurate and efficient SBOM. Here, the paper proposes a new methodology to help NPPs categorize software and use appropriate tools to generate SBOMs for their digital I&C systems.

SBOM↗

Assessment of Condition Monitoring Methods and Technologies for Inservice Inspection and Testing of Nuclear Power Plant Components

This report was prepared for the U.S. Nuclear Regulatory Commission (NRC) to explore the application of advanced technologies toward meeting the current and future regulatory requirements for maintenance and condition monitoring of structures, systems, and components. The advanced technologies considered in this work are advanced sensors and instrumentation, data analytics, machine learning and artificial intelligence (ML/AI), physics-based models, and digital twins (DT). The interest in the application of advanced technologies for condition monitoring in nuclear power plants continues to grow, and current and future licensees are expected to implement advanced technologies as part of their inservice inspection (ISI) and inservice testing (IST) programs. This report delineates the outcomes of an exploratory investigation into the implementation of advanced condition monitoring technologies to address ISI and IST requirements. A thorough review was conducted of the existing regulatory requirements for ISI and IST, along with an analysis of associated industry practices. Additionally, a state-of-the-art assessment was performed on advanced condition monitoring technologies frequently employed in non-nuclear sectors. This research incorporated two nuclear-specific case studies to illustrate the application of these technologies within the current nuclear fleet. The report provides an exhaustive discussion on the technical challenges, considerations, and opportunities associated with the deployment of advanced condition monitoring technologies. The following are key considerations in the application of advanced technologies for the ISI and IST of nuclear power plant components: • Developing adequate verification and validation procedures to confirm the functional and non-functional requirements, • Developing technical capabilities to conduct real-time asset condition monitoring, • Establishing guidance and protocol for modeling and simulation tools to continuously meet regulatory requirements, • Addressing trustworthiness, explainability, and interpretability of ML/AI methods, • Evaluating maintenance activities to maintain an adequate safety margin and avoid undesirable conditions, • Establishing cybersecure condition monitoring programs associated with a computer-based software system, and • Establishing standardized evaluation metrics for advanced condition monitoring programs. Interest in the use of advanced technologies for condition monitoring in ISI and IST programs continues to grow, and the technology is expected to experience rapid and wide industry adoption in the near future. Adoption of advanced technologies for condition monitoring could have novel and unique impacts on regulatory activities associated with ISI and IST programs. The NRC is continuing to explore the regulatory aspects of advanced technologies as part of ISI and IST programs by pursuing additional research in this technical area.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

A Multi-Criteria Impact Evaluation Methodology Applied to FLEX Strategies in Nuclear Power Plants

As responses to Fukushima Dai-ichi nuclear accident, several advanced, near-term technologies have been or are being introduced to enhance safety of operating nuclear power plants (NPPs) as well as improving their sustainability. Examples include Accident-Tolerant Fuel designs, Diverse and Flexible Coping Strategies (FLEX), and passive cooling system designs. The combinations of these technologies, coupled with enhancements to plant components and systems and improved fuel cycle efficiency, constitute a concept of Enhanced Resilient Plant Systems, which is proposed and being explored by Idaho National Laboratory (INL) under the Risk-Informed Systems Analysis Pathway of the U.S. Department of Energy’s Light Water Reactor Sustainability Program. To decide if introducing a technology is necessary or worthy, the impacts of this technology on NPPs should be evaluated, preferably in a quantitative manner, and provided to decision makers. This paper summarizes an on-going work conducted by the authors on developing a multi-criteria impact evaluation methodology. This methodology is expected to be applicable to evaluate a variety of technologies, while FLEX strategy is adopted as a case study for this paper.

99 GENERAL AND MISCELLANEOUS↗

Planning for Nuclear Power Plant Site Visits - 20481

The U.5. Department of Energy Office of Integrated Waste Management (DOE-IWM) is planning for future large-scale transport of commercial spent nuclear fuel (SNF) and high-level radioactive waste (HLW) to eventual disposal and/or storage facilities. As part of its planning efforts, DOE conducts evaluations of removing SNF from nuclear power plant sites. Site visits are a pivotal piece in the site evaluations that are conducted by DOE, and significant planning efforts are undertaken to design and implement site visits. Site visits typically include three days of surveys and meetings, including one day each for the nuclear power plant site visit, evaluating near-site transportation infrastructure, and meeting with community engagement panels or advisory boards. This paper outlines DOE-IWM's planning process for conducting nuclear power plant site visits and summarizes the key activities carried out to prepare for a site visit, including a discussion of the background research conducted prior to a site visit. Additionally, the paper describes the development of reference databases for site visits, the identification of unique site characteristics, and the use of geographic information system (GIS) applications to enhance the quality of the information collected during a site visit. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview and Recommendations for Cyber Risk Assessment in Nuclear Power Plants

Digital instrumentation and control (I&C) systems are being deployed in nuclear power plants (NPPs) for both existing and advanced reactor designs. As I&C systems become more digitized to allow features like near autonomous control and remote operation, they introduce greater cyber risk to NPPs. Cyberattacks targeting industrial control systems (ICSs) are growing in both qualities and capabilities, which indicates that cybersecurity needs to be an integral part of risk assessment in the industry. Although there are some risk assessment methods in traditional information technology (IT) cybersecurity, the differences between IT and ICS cybersecurity make it infeasible to apply these risk assessment methods directly to ICSs. Some research has focused on risk assessment methods for ICSs, but few studies focus on applications to NPPs. Ideal risk frameworks for the nuclear industry are dynamic and account for system dependencies; this survey review focuses on such risk assessment methods both in and outside the nuclear field. In this article, the major challenges in cybersecurity risk assessment research are pointed out, and further research suggestions and considerations for cyber risk assessment in I&C systems are identified.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Evaluation of the Specification for Safety-Related Steel Structures for Nuclear Facilities, ANSI/AISC N690-18, for Application to Nuclear Power Plants

This report describes the assessment of the recently published ANSI/AISC N690-18, Specification for Safety-Related Steel Structures for Nuclear Facilities. This work was performed for the U.S. Nuclear Regulatory Commission for potential endorsement of N690-18 for use in the design of nuclear power plants. Currently the NRC endorses the use of an earlier version: N690-1994 (R2004), and thus, a technical review of the updated N690 Specification, which contains significant changes, is warranted. The N690-18 Specification reflects advances and improvements in steel design gained from experience, analytical studies, and experimental data over the years. The N690-18 specification also contains a new Appendix N9 that addresses the design of safety-related steel-plate composite (SC) walls which are a relatively new type of structural member for which previously there has not been any U.S. code or standard that governs its design. The technical review of N690-18 was performed in order to assess the adequacy of the provisions for use by the NRC in updating its regulatory guidance for nuclear power plants. The research developed the technical basis for acceptance of the new specification and also identified areas where additional staff guidance is needed for the design of safety-related steel structures at nuclear power plants. The results of the research have determined that the N690-18 specification is a significant enhancement from the N690-1994 (R2004) edition. The new specification contains substantial upgrades in the design of structural steel and includes new provisions for design of SC wall sections, which can benefit the nuclear power industry as well as the NRC review process. All of the improvements, if endorsed by the NRC with certain regulatory positions, will allow clearer and more consistent regulatory guidance, and will avoid the need for justification by licensees and related reviews each time certain methods or approaches are used.

42 ENGINEERING↗

Using Qualified On-Site Nuclear Power Plant Simulators in Human Factors Validations of Control Room Upgrades

Existing commercial nuclear power plants (NPPs) are valuable assets in the infrastructure portfolio of the United States (U.S.) because they safely and reliably generate about 1/5th of all the electricity used. The instrumentation and control (I&C) systems in commercial NPPs are the ‘eyes and ears' of the operator, allowing operators to maintain situation awareness, thereby allowing the plant to operate safely and efficiently for all phases of operation. Because the I&C systems in NPPs are still mostly based on analog technologies, which are reliable but not especially cost-effective, upgrading the existing I&C in com-mercial NPPs to new digital I&C is very important. Furthermore, simulators and simulation are critical human factors engineering tools for this I&C modernization work. NPP control room simulators are essential test beds to simulate normal, abnormal, and emergency operations that allow human factors researchers to safely and realistically evaluate early design phase prototypes of the upgraded digital I&C, and validate final as-built digital I&C systems that have been modernized deployed in NPPs. This paper describes research performed using qualified on-site NPP simulators to perform human factors validations of digital I&C control room upgrades.

99 GENERAL AND MISCELLANEOUS↗

Potential of deep learning methods to enhance satellite-based monitoring of nuclear power plants focusing on remote operation evaluations

The anticipated expansion of the nuclear industry and the deployment of new nuclear reactors (200 + GW of new nuclear capacity by 2050) require the development of monitoring systems that align with safety and security concerns, providing enhanced evaluation capabilities. A remote monitoring system using satellites and deep learning techniques was evaluated for its ability to detect anomalies and capture various features of nuclear reactors independently of the conditions on the ground. Satellite images of current operational and under-construction nuclear power plants were collected from Google Earth Pro as a surrogate database. Subsequently, five datasets were created from the collected images. Transfer learning technique was used for several classification tasks utilizing VGG16, ResNet50V2, Xception, DenseNet121, and MobileNetV2 pre-trained models. In the first task, the capability of the monitoring system to detect abnormal conditions or processes in a nuclear power plant was investigated. In the second task, the ability to capture operational features remotely was examined. As an example, for the purposes of this study, these features included classifying reactors based on type, power range, or onsite condition. Several evaluation metrics were used to compare the performance of the pre-trained models and the overall monitoring system. Here, the evaluation results demonstrated that deep learning techniques and pre-trained models applied to satellite images have the potential to facilitate further and expand capabilities in monitoring systems to assess plant operation details.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Topical Analyses Related to Co-located Industrial Facilities at Nuclear Power Plants

This report investigates topics of interest with regard to Nuclear Power Plants (NPPs) utilizing flexible plant operations and generation (FPOG). Previous reports have identified the risk associated with co-located hydrogen generation facilities. This report evaluates special topics with regard to co-location of both hydrogen and syngas production facilities. A literature review was conducted to evaluate overpressure mitigation techniques that may be available to the NPP to reduce the consequence of an overpressure event. Also, the overpressure consequence of a catastrophic hydrogen storage tank failure event was analyzed. A comparison of the similarities and differences between the methodology utilized in HyRAM+ and Regulatory Guide 1.91 (R.G. 1.91) was performed for overpressure analysis. Also, the trinitrotoluene (TNT) equivalency methodology was utilized to evaluate an overpressure event at a Syngas production facility.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Multicriterion benefit evaluation methodology for safety enhancements in nuclear power plants and application for FLEX strategies

Here we propose a multicriterion benefit evaluation (MCBE) methodology for evaluating costs and benefits of implementing safety enhancements in nuclear power plants. The MCBE methodology establishes a comprehensive evaluation scope using multiple evaluation criteria (including public risk, occupational risk, plant revenue, and plant cost) and multiple contexts (including plant normal operations, incidents, and accidents). The MCBE methodology formulates a benefit or cost element as the product of a monetary consequence and its occurrence-likelihood change. The MCBE methodology also incorporates a decision maker’ preferences toward occurrence likelihood and monetary consequence into cost and benefit estimations through a modified usage of cumulative prospect theory. This paper applies the MCBE methodology to the implementation of diverse and flexible coping strategy (FLEX) in a generic nuclear power plant as an illustrative example. The FLEX benefits are evaluated through three types of influence paths: plant safety enhancement, risk-informed activities, and potential additional credit of FLEX in supporting plant operation and maintenance-efficiency improvement. The benefit-to-cost ratio (BCR) of FLEX implementation is calculated. Sensitivity analyses are conducted to examine the impacts of modeling assumptions and input parameter values on the BCR.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Dosimetry and cancer risk estimations for different radiation protection solutions at decommissioning a contaminated nuclear power plant site

Contaminated sediments originating from dredging activities in a nuclear power plant site were placed in a pond, which has to be taken into consideration during the future decommissioning process. The sediments have to be handled to free release the site. The radionuclides Co-60 and Cs-137 were identified and the activity concentrations (Bq/kg) were quantified in the range of 10–6000 and 5–50 Bq kg -1 , respectively. The absorbed dose rate to individuals of various ages and sex present at the site of the dry pond area was estimated. The radiological impact in terms of lifetime attributable risk (LAR) and effective dose were calculated. For a 30-year-old male exposed during one year without any action regarding the sediments in the dried out pond, the LAR was predicted to be 0.0027, which recalculated to effective dose corresponds to 7.6 mSv year -1 . The calculations show that countermeasures will be needed for the contaminated site.

61 RADIATION PROTECTION AND DOSIMETRY↗

Nuclear Power Plant Physical Protection Recommendation Document

This document is aimed at providing guidance to the National Nuclear Security Administration’s (NNSA) Office of International Nuclear Security’s (INS) country and regional teams for implementing effective physical protection systems (PPSs) for nuclear power plants (NPPs) to prevent the radiological consequences of sabotage. This recommendation document includes input from the Physical Protection Functional Team (PPFT), the Response Functional Team (RFT), and the Sabotage Functional Team (SFT) under INS. Specifically, this document provides insights into increasing and sustaining physical protection capabilities at INS partner countries’ NPP sites. Nuclear power plants should consider that the intent of this document is to provide a historical context as well as technologies and methodologies that may be applied to improve physical protection capabilities. It also refers to relevant guidance from the International Atomic Energy Agency (IAEA) and the U.S. Nuclear Regulatory Commission (NRC).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Multi-Kernel Support Vector Machine based Predictive Maintenance of Circulating Water Pumps in Nuclear Power Plants

Multi-Kernel Support Vector Machine (MK-SVM) is a machine learning classification algorithm that can assist in the development of predictive maintenance strategies for nuclear power plant systems. Predictive maintenance can alleviate maintenance costs and enhance reliability of plant systems. In this work, MK-SVM is utilized for determining the health of the circulating water system (CWS) in a nuclear power plant.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Investigation of the Performance and Explainability Tradeoffs for Machine-Learning Models for Predictive Maintenance of Circulating Water Systems in Nuclear Power Plants

Predictive maintenance (PdM) has shown great potential for achieving substantial cost savings and enhancing the economic competitiveness of nuclear power plants (NPPs) in today's energy market. Among the different modeling approaches that exist, machine learning (ML) tools in particular have a demonstrated ability to handle high dimensional and multivariate data and to extract hidden relationships within data in industrial environments. While ML methods show great potential, their lack of explainability---especially for black-box models---is a major hurdle to their adoption. Moreover, considering the supposed trade-off between explainability and performance challenges, careful consideration must be made as to which of these quality aspects takes precedence in light of multiple modeling options, resource availability, and domain characteristics. The present work evaluates the performance of six ML models, each with a different degree of explainability, in classifying the conditions of circulating water pumps (CWPs) by utilizing sensor data from nuclear power plants. To determine the drivers behind the trade-offs presented by this array of models, this work also tests different combinations of CWP units as the training and testing data, degrees of data imbalance, and objective functions for hyperparameter tuning. It was found that black-box models tend to afford superior performance in cases where there are far more instances of one type of labeled data than of any other type. It is recommended that a guided procedure be followed for designing and delivering an ML system that is sufficiently explainable to all involved stakeholders.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)