Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “maintenance optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Achieving Runtime State Verification Assurance in Critical Cyber-Physical Infrastructures

Industrial Cyber-Physical Systems (ICPS) are an essential backbone of national critical infrastructures. They help monitor and control crucial cyber-enabled services such as energy generation. Commonly ICPS monitors the physical process through Supervisory Control and Data Acquisition (SCADA) systems. The SCADA ecosystem takes critical real-time and future system operational decisions based on the runtime state behavior of field sensors. Traditional SCADA systems use legacy and insecure communication protocols such as the Modbus protocol that lack adequate security mechanisms to provide robust runtime state behavior assurance of constrained field sensors. Therefore, constrained field sensors are commonly vulnerable to standard semantic attacks that gradually change the behavior state of infected devices. This paper discusses process integrity assurance techniques necessary to enhance the security of behavior-based protocols such as the Modbus protocol. The Runtime State Verification (RSV) protocol proposed in this paper aims to address semantic attacks in the SCADA ecosystem by integrating behavior-based Mandatory Results Automata (MRA) and a Hyperledger Fabric (HLF) network. The RSV protocol provides high process integrity assurance through enhanced behavior-based MRA suitable for the constrained field devices. A proof of concept of the RSV protocol has been evaluated in an emulated water-tube boiler. Preliminary evaluations of the RSV protocol aimed to measure the efficiency of the proposed protocol by monitoring an Combustion Efficiency (CE) process necessary to preserve optimal combustion, thus minimizing costs and future maintenance of water-tube boilers. We analyze the overall network overhead and latency of the proposed RSV protocol by evaluating the HLF network performance and comparing the proposed RSV protocol with the state-ofart BloSPAI protocol. Through the preliminary evaluations of the proposed RSV protocol, this paper demonstrates that the proposed RSV protocol overcomes the shortcomings and network overhead of the BloSPAI protocol by integrating behavior-based authentication through novel MRAs and HLF networks.

Rivera, Abel Gomez↗

Platform for Remote Deployment and Training for Enhanced Building Operation Practices (Building Re-Tuning and On-going Commissioning)

While a building’s energy usage is driven largely by its design and use, building operator behavior has a strong influence on its energy consumption. This project developed and piloted a specific, data-driven coaching methodology to help operators understand how they can adjust operations and/or affect no/low-cost repairs or upgrades to their specific building HVAC systems to reduce energy consumption. Named BuildingCoach, the operational optimization method used is based on the Building Re-tuning approach developed by the Pacific Northwest National Laboratory. A building operations analytics market has matured over the past decade, though its potential to affect energy-saving changes has not been fully realized. Training operators to understand the methods for operational optimization with the explicit approach of using building-system performance data is hypothesized to create a more effective, longer lasting result in building energy efficiency, and this strategy is the fundamental premise of this project. With the support of an Industry Advisory Board, the project succeeded in developing materials and recruiting for and delivering three pilot cohorts. Deliverables included twenty-two self-paced training modules (accessed via a Learning Management System) and a web-based platform that includes access to real-time building system data and a repository for building system documentation. The project set out to have 100 participants from 50 buildings in three pilot cohorts. In the end, there were 28 participants from 17 buildings, i.e., a significant shortfall. The first two pilot cohorts had only two buildings in each, and this was partially due to difficulties in deploying the Building Operator Coaching Solution (“the BOCS”), which is technology that extracts the data from the controls network and presents it as prescribed for coaching. In the third cohort, the project team deployed the BOCS successfully to 13 buildings, the methodology was piloted as intended, and numerous opportunities for optimization were identified. The BuildingCoach business plan charts a path to an economically sustainable effort. However, even with a licensing model captured in the final version of the business plan, the scalability is still limited to keeping less than 1,000 buildings affected by 2033. Even so, there are unexplored paths to greater scalability that are being considered. CUNY BPL is working to perpetuate and grow the use of BuildingCoach. As of this writing, about twenty buildings have either been connected or will be connected with operators coached / to be coached in the NYC municipal portfolio, twelve buildings across four campuses in NY State will use BuildingCoach, a NY upstate county wishes for six or seven buildings to participate with the support of funding from NYSERDA, and others have also expressed interest. In the decades to come, there will be an increasing percentage of large and mid-sized buildings that incorporate automated system optimization (ASO), and the building operators’ role will shift to spend more time on maintenance and monitoring. Meanwhile, programs such as BuildingCoach will play a critical role in optimizing operations. And, regardless of the emergence of ASO, operators will still need to understand how their systems operate so that they can monitor them properly. Within that context, BuildingCoach is an important step towards operators’ understanding of efficient building system operations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Best Practices for Resilience Hub Development and Management

The Carbon League and its community partners in East St. Louis, Illinois, have identified five facilities to serve as resilience hubs. These hubs are intended to support the local community through a range of services and resources during blue-sky (everyday), gray-sky (pre-event), and black-sky (emergency) conditions. Transforming these facilities into fully functional resilience hubs requires a broad operational improvement and programmatic planning roadmap. This memo outlines best practices to guide the development of these resilience hubs in East St. Louis, including recommendations for infrastructure services; safety and physical protection; community services; operational protocols; and a phased implementation strategy aligned with realistic funding and capacity constraints. Infrastructure recommendations include strengthening electric power, communications, water, sanitation, and transportation/logistics capabilities, all of which are essential for hubs that may serve as cooling and warming centers, distribution points, and information hubs during emergencies. Safety recommendations focus on accessibility, emergency action planning, indoor air quality, and secure storage of critical equipment. A phased roadmap provides guidance from immediate, low-cost readiness actions to long-term optimization and community integration. Performance metrics and maintenance protocols ensure continuous improvement and operational readiness. This guidance draws on best practices that can be used to support the development of resilient, community-centered hubs capable of enhancing public safety, health, and well-being during everyday operations and emergencies alike.

99 GENERAL AND MISCELLANEOUS↗

Dispatch optimization of electric thermal energy storage within System Advisor Model

A stand-alone electric thermal energy storage (ETES) system converts low-value electricity into heat using resistance heating elements. During periods of high-value electricity, an ETES system uses a thermodynamic power cycle to convert stored thermal energy back to electricity. These dispatchable systems derive value from their ability to store energy when prices are low and generate electricity when prices are favorable, i.e., energy arbitrage. Consequently, dispatch optimization of system operations, through maximizing revenue subject to system constraints, is essential to evaluate the economic value of a particular system design. While stand-alone ETES systems offer potential advantages as dispatchable grid storage technologies, there is a lack of a neutral third-party, publicly available, open-source model to evaluate the performance, dispatch, and financial viability of these systems. To address this problem, we have developed a techno-economic model for stand-alone ETES systems, within National Renewable Energy Laboratory's (NREL's) System Advisor Model (SAM). We implement a mixed-integer linear program to determine an ETES optimal operating schedule that maximizes electricity sales less maintenance costs caused by operation and cycling given temporal-varying grid electricity prices. Our contributions include a mixed-integer linear program for energy arbitrage of an ETES system, an ETES performance model through a publicly-available software (i.e., SAM), and an exercise of our model through case studies that compare ETES operational strategies and annual financial metrics. With our dispatch optimization model, we were able to improve revenue by 20% compared to a myopic heuristic while reducing the operational cost of the ETES system through decreases in cycle starts, cycles per day, and heater starts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessing the Impact of Lubrication on Efficiency and Life Cycle Economics of the US Wind Turbine Fleet: Cooperative Research and Development (Final Report)

As with any mechanical system, lubrication plays a key role in the performance of wind turbines used to generate electricity. The lubricant design offers a way to optimize the competing requirements of efficiency, component reliability, and maintenance strategy. This project will estimate the impact of improved lubrication on the levelized cost of energy of the US wind turbine fleet as a means of identifying opportunities for disruptive innovation or system-level optimization. The models developed will provide a clear understanding of the benefits and potential for advanced lubrication of wind turbines. The project will enable identification of high value targets for wind turbine component suppliers and a roadmap that highlights where the greatest return on technology investment can be achieved. This will promote efficient resource allocation in areas of new technology development.

17 WIND ENERGY↗

Enhancement of operational Flexibility of Power Plants Using IN740

Headers are crucial components within diverse industries, especially in the energy sector, as they enable the efficient transfer of fluids. The selection of materials for headers is determined by their specific applications; for example, Grade 91 and Grade 92 steels are commonly utilized. In our research, we recommend the adoption of INCONEL alloy 740 due to its exceptional robustness and heat-resistant characteristics. One critical parameter in header systems is the heat transfer coefficient, which directly influences the efficiency of heat exchange processes and can thereby impact the structural integrity of the headers. This coefficient is closely linked with factors such as the Nusselt number, which is influenced by fluid flow characteristics and thermal properties. The flow direction within headers, whether unidirectional or multidirectional—significantly affects the overall dynamics of heat transfer. This research focuses on exploring the behavior of headers, a specific pipeline system component, using ANSYS simulation software. The study aims to predict heat transfer and mechanical behavior within headers under various conditions through steady-state and transient simulations (parts 1 and 2 of the report). Key parameters such as heat transfer coefficient, velocity, and temperature are examined with the goal of optimizing header design. Part 3 of the report addresses the critical yet underexplored relationship between pressure drop and heat transfer coefficients in the transient flow regime within headers, specifically focusing on smooth horizontal circular tubes. Limited experimental work has been conducted in this area, prompting the need for comprehensive analysis. By leveraging machine learning techniques, this research aims to establish a correlation between pressure drop and heat transfer across various flow conditions, including laminar, transient, quasi-turbulent, and turbulent regimes. The data utilized for this analysis were meticulously gathered from existing literature, capturing simultaneous measurements of pressure drops and heat transfer. Part 4: In the context of power plants, header pipes are essential components that significantly influence system performance by facilitating the collection and distribution of steam. This report highlights the critical role of header pipes in enhancing reliability, efficiency, and overall power plant performance. A key aspect of this investigation is shape optimization, which aims to maximize performance while minimizing material usage. By focusing on shape optimization, this research contributes to improved efficiency and a reduced environmental footprint for power plant installations. The methodology developed in this study emphasizes optimizing header shapes to decrease reliance on expensive alloy materials and lower maintenance costs. Furthermore, a case study was conducted using a header from an operational power plant to validate the proposed optimization techniques. Finally, part 5 addresses the challenges associated with flexible operations in boiler systems, the study outlines several strategies for enhancing the durability and reliability of steam headers. Key approaches include material selection, which involves utilizing advanced materials with superior high-temperature properties and enhanced fatigue resistance to extend the lifespan of steam headers. Design modifications are also recommended, focusing on implementing changes that mitigate thermal stress and cyclic loading to reduce the likelihood of failures under varying operating conditions. Additionally, the study emphasizes the importance of regular inspection and monitoring by establishing rigorous protocols to detect early signs of damage, allowing for timely maintenance and minimizing the risks of catastrophic failures. Furthermore, operational guidelines are developed to minimize the frequency and severity of thermal transients, ensuring stable and efficient operations. Collectively, these strategies provide a robust framework for overcoming the unique challenges posed by flexible operation in boiler systems, ultimately contributing to improved reliability and performance in power plant operations. Through this comprehensive approach, the study not only enhances the understanding of pressure drop and heat transfer relationships but also promotes advancements in design and operation that will benefit the entire power generation industry.

01 COAL, LIGNITE, AND PEAT↗

Substation-Level Grid Topology Optimization Using Bus Splitting

Operations of substation circuit breakers are important for maintenance needs and topology reconfiguration in power systems. Bus splitting is one type of topology change where the two bus bars at a substation can become electrically disconnected under certain actions of circuit breakers. Because these events involve detailed substation modeling, they are typically not considered in routine power system operation and control. In this paper, an improved substation-level topology optimization framework is developed by expanding traditional line switching decisions by breaker-level bus splitting, which can further reduce grid congestion and generation costs. A tight McCormick relaxation is proposed to reformulate the bilinear terms in the resultant optimization problem to linear inequality constraints. Thus, a tractable mixed-integer linear program reformulation is attained that allows for efficient solutions in real-time operations. Numerical studies on the IEEE 14-bus and 118-bus systems demonstrate the computational performance and economic benefits of the proposed topology optimization approach.

bus split↗

A Digital Twin Framework Utilizing Machine Learning for Robust Predictive Maintenance: Enhancing Tire Health Monitoring

We introduce a novel digital twin (DT) framework for the predictive maintenance of long-term physical systems. Using monitoring tire health as an application, we show how the DT framework can be used to enhance automotive safety and efficiency, and how the technical challenges can be overcome using a three-step approach. First, to manage the data complexity over a long operation span, we employ data reduction techniques to concisely represent physical tires using historical performance and usage data. Relying on these data, for fast real-time prediction, we train a transformer-based model offline on our concise dataset to predict future tire health over time, represented as remaining casing potential (RCP). Based on our architecture, our model quantifies both epistemic and aleatoric uncertainties, providing reliable confidence intervals around predicted RCP. Second, to incorporate real-time data, we update the predictive model in the DT framework, ensuring its accuracy throughout its lifespan with the aid of hybrid modeling and the use of the discrepancy function. Third, to assist decision-making in predictive maintenance, we implement a tire state decision algorithm, which strategically determines the optimal timing for tire replacement based on RCP forecasted by our transformer model. This approach ensures that our DT accurately predicts system health, continually refines its digital representation, and supports predictive maintenance decisions. Furthermore, our framework effectively embodies a physical system, leveraging big data and machine learning (ML) for predictive maintenance, model updates, and decision-making.

advanced computing infrastructure↗

Optimal Electrification Using Renewable Energies: Microgrid Installation Model with Combined Mixture k-Means Clustering Algorithm, Mixed Integer Linear Programming, and Onsset Method

Optimal planning and design of microgrids are priorities in the electrification of off-grid areas. Indeed, in one of the Sustainable Development Goals (SDG 7), the UN recommends universal access to electricity for all at the lowest cost. Several optimization methods with different strategies have been proposed in the literature as ways to achieve this goal. This paper proposes a microgrid installation and planning model based on a combination of several techniques. The programming language Python 3.10 was used in conjunction with machine learning techniques such as unsupervised learning based on K-means clustering and deterministic optimization methods based on mixed linear programming. These methods were complemented by the open-source spatial method for optimal electrification planning: onsset. Four levels of study were carried out. The first level consisted of simulating the model obtained with a cluster, which is considered based on the elbow and k-means clustering method as a case study. The second level involved sizing the microgrid with a capacity of 40 kW and optimizing all the resources available on site. The example of the different resources in the Togo case was considered. At the third level, the work consisted of proposing an optimal connection model for the microgrid based on voltage stability constraints and considering, above all, the capacity limit of the source substation. Finally, the fourth level involved a planning study of electrification strategies based mainly on microgrids according to the study scenario. The results of the first level of study enabled us to obtain an optimal location for the centroid of the cluster under consideration, according to the different load positions of this cluster. Then, the results of the second level of study were used to highlight the optimal resources obtained and proposed by the optimization model formulated based on the various technology costs, such as investment, maintenance, and operating costs, which were based on the technical limits of the various technologies. In these results, solar systems account for 80% of the maximum load considered, compared to 7.5% for wind systems and 12.5% for battery systems. Next, an optimal microgrid connection model was proposed based on the constraints of a voltage stability limit estimated to be 10% of the maximum voltage drop. The results obtained for the third level of study enabled us to present selective results for load nodes in relation to the source station node. Finally, the last results made it possible to plan electrification using different network technologies and systems in the short and long term. The case study of Togo was taken into account. The various results obtained from the different techniques provide the necessary leads for a feasibility study for optimal electrification of off-grid areas using microgrid systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Co-design optimization of combined heat and power-based microgrids

With the emergent need for clean and reliable energy resources, hybrid energy systems, such as the microgrid, are widely adopted in the United States. A microgrid can consist of various distributed energy resources, for instance, combined heat and power (CHP) systems. Here, the CHP module is a distributed cogeneration technology that produces electricity and recaptures heat generated as a by-product. It is an energy-efficient technology converting heat that would otherwise be wasted to valuable thermal energy. For an optimal system configuration, this study develops a novel co-design optimization framework for CHP-based cogeneration microgrids. The framework provides the stakeholder with a method to optimize investments and attain resilient operations. The proposed co-design framework has a mixed integer programming (MIP) model that outputs decisions for both plant designs and operating controls. The microgrid considered in this study contains six components: the CHP, boiler, heat recovery unit, thermal storage system, power storage system, and photovoltaic plant. After solving the MIP model, the optimal design parameters of each component can be found to minimize the total installation cost of all components in the microgrid. Furthermore, the online costs from energy production, operation, maintenance, machine startup, and disruption-induced unsatisfied loads are minimized by solving the optimal control decisions for operations. Case studies based on designing a CHP-based microgrid with empirical data are conducted. Moreover, we consider both nominal and disruptive operational scenarios to validate the performance of the proposed co-design framework in terms of a cost-effective, resilient system.

42 ENGINEERING↗

Wave energy in season: a comparative approach to feasibility of seasonal deployments for remote coastal communities

Remote coastal communities, which could be early adopters of wave energy projects, have concerns over costs, conflicts, and potential risks of development. Designers and developers are challenged to address these community concerns as they continue to develop wave energy technologies. One potential means of reducing costs, conflicts, and risks, especially for demonstration and pilot-scale projects, could be planning a deployment that operates for only a portion of the year—a seasonal deployment. Here, in this paper, we examine the impacts of a seasonal deployment in terms of cost, electricity production, operations and maintenance, environmental impacts, and community benefits. We take a holistic, comparative approach to feasibility that can be replicated for other comparative studies. We estimate electricity production using a point absorber WEC modeled near Sitka, AK, USA and optimized for the given sea conditions. We determine that, for remote community sized projects, seasonal deployments could result in small cost savings (less than 10 %), but larger decreases in annual energy production (around 30 % for our case study area). Seasonal deployments could be preferable in places with seasonal energy needs, if failures and device access become a major hindrance to wave energy technology development, or as a cautionary approach to introducing new technology to the oceans. We also determine that a highly seasonal wave resource is not necessarily a requirement for seasonal deployments to be considered. Seasonal deployments are an alternative to year-round deployments that can be considered in places where marine spatial conflict is a seasonal concern.

WEC optimizations↗

Optimal Control Strategy With Efficiency and Reliability Improvement for Offshore DC Microgrids

Offshore microgrids, due to their remote location and lack of external energy support, face significant challenges in wide-range load operation and maintenance. Consequently, efficiency and reliability are critical concerns for converters in offshore dc microgrids. This article presents an optimal control strategy aimed at enhancing both efficiency and reliability. A normalized nonlinear relationship between power loss and thermal stress of a paralleled converter is first established. Based on this, a dual-objective optimization function with an active weight function as well as a system overall performance index is established. The active weight function dynamically adjusts the control priority based on converter efficiency and switching device thermal stress. Then, the optimal power-sharing strategy is derived by the Lagrange multiplier method with the proposed optimal function. Additionally, to accommodate a wide load range, an optimal selection strategy for operating converter combinations is proposed, requiring only low-bandwidth communication. Experiment verification is given to validate the effectiveness of the proposed control strategy. The experiment results demonstrate that the proposed control strategy can improve the overall performance of offshore microgrids by optimizing efficiency and reliability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Co-Development of Oscillating Water Column (OWC) and Offshore Power Station

The project proposed an Oscillating Water Column (OWC) at a low power rating (1-5kW); to build a prototype and perform field testing within 1–3 years and achieving a commercial version of the OWC 3–5 years. We selected the OWC off-the-shelf components to secure the supply-chain sources and to warrant stable and minimum pricing. We want to curtail the capital cost by reducing the weight and volume of the overall system structure at the design level by designing a high-speed turbine generator and optimizing the airspeed amplification. We want to minimize the operational and maintenance (O&M) costs through simplified architecture, minimal parts, modular/plug-and-play, and easy access designs.

16 TIDAL AND WAVE POWER↗

Updates and Lessons Learned from NuMI Beamline at Fermilab

The Neutrinos at the Main Injector (NuMI) beamline at Fermilab generates an intense muon neutrino beam for the NOvA (NuMI Off-axis 𝜈𝑒 Appearance) long baseline neutrino experiment. Over the years, the NuMI beamline has been pivotal in advancing neutrino physics, providing invaluable data and insights. This presentation offers updates and a comprehensive review of the lessons learned from the operation, maintenance, and monitoring of the NuMI beamline. Key topics include the optimization of beam performance, challenges in maintaining beamline stability, and proposed Machine Learning implementations to enhance monitoring. The talk aims to share best practices and provide a roadmap for future beamline projects, including the Long-Baseline Neutrino Facility (LBNF).

Wickremasinghe, Athula↗

Updates and Lessons Learned from NuMI Beamline at Fermilab

The Neutrinos at the Main Injector (NuMI) beamline at Fermilab generates an intense muon neutrino beam for the NOvA (NuMI Off-axis $\nu_e$ Appearance) long-baseline neutrino experiment. Over the years, the NuMI beamline has been pivotal in advancing neutrino physics, providing invaluable data and insights. This proceeding paper discusses updates and the lessons learned from recent experiences during the beam operations, maintenance, and monitoring of the NuMI beamline. Key topics include the optimization of beam performance and challenges in maintaining beamline stability. The paper aims to share best practices and provide a road-map for future beamline projects, including the Long-Baseline Neutrino Facility (LBNF).

43 PARTICLE ACCELERATORS↗

High-burnup boiling water reactor steady-state operating conditions and fuel performance analysis

The primary operational costs for existing nuclear reactors are plant operation costs, maintenance costs, and fuel costs, all of which are influenced by the materials used and the design of the reactor core. Optimizing core design parameters—including burnup limits and enrichment levels—can lengthen cycles, reduce outages, reduce reload batch fractions and spent fuel storage requirements, and lower maintenance and operating expenses, thereby enhancing economic viability. Furthermore, developing higher-fidelity tools to simulate these parameters enables better identification of the available margin, improves overall plant safety, and improves the understanding a given plant’s responses to accident scenarios. Here, in the US, much of the research and development focus has traditionally been on pressurized water reactors (PWRs), but boiling water reactors (BWRs) comprise approximately one-third of the US reactor fleet. Modeling and simulation advances for BWRs and PWRs—particularly those achieved through the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program—are crucial to the long-term viability of the light–water reactor industry. A key research area of the high burnup and increased enriched fuel initiative is focused on addressing issues related to postulated loss-of-coolant accident (LOCA) scenarios. NEAMS has dedicated significant effort to enhancing tools to better support BWRs. A current focus is showcasing the BWR framework for high-burnup LOCA analysis. This high-fidelity steady-state analysis is a first step toward demonstrating a best-estimate, pin-by-pin high-burnup BWR LOCA analysis to assess full-core cladding rupture behavior for a representative BWR. The objective of this effort is to provide a modeling capability that will help elucidate and provide a best-estimate evaluation for cladding rupture susceptibility in BWRs. This modeling capability could then be used to prevent and/or mitigate cladding ruptures in postulated accident scenarios without penalizing operational parameters. Additionally, the results of this work will help identify strategies for finding additional margins or potentially limiting cladding ruptures through core design optimizations to enable more efficient core designs.

Capps, Nathan [Oak Ridge National Laboratory (ORNL↗

Predictive Analytics for Hydropower Fleet Intelligence

A primary challenge in hydropower industry is the ability to maintain cost-competitiveness, reliability, and security of hydropower assets through evolving power system contexts and aging of the fleet. Maintaining cost-effective and reliable operations under these conditions is expected to require new modernization and maintenance paradigms for changing contexts. Changes in existing practices for O&M will require an understanding of the current state and health of hydropower assets, and the impact of changing paradigms on asset health and reliability. The Hydropower Fleet Intelligence project is developing and evaluating standardized methodologies and analysis tools for data-driven asset reliability and management technologies for hydropower, leading to eventual predictive maintenance planning, repair/replacement decision making, and asset-reliability and cost-optimized operations. A key question is the feasibility of using existing data sets at hydropower facilities to perform assessments of asset reliability. This document uses data from hydropower facilities to assess the potential for using available analytics methods for asset reliability estimates. In addition to reliability assessments, the feasibility of using existing analytics techniques for several other potential applications is discussed. Finally, a case study that a data-driven model is trained to learn nominal operations via vibration data from an asset of a certain plant, and then utilized to identify anomalies on a similar asset from a different plant, highlighting the generic use of proposed Prognostics and Health Management (PHM) approaches.

Yucesan, Yigit↗

Ontario International Airport Fleet Electrification Blueprint: Zero-Emission Vehicle Technology Assessment for Energy Optimization [Slides]

Ontario International Airport Authority (OIAA)'s Electric Vehicle (EV) Blueprint project presentation focuses on the possibilities for fleet electrification, including medium heavy duty charging and hydrogen refueling and their associated planning, infrastructure, operation, and maintenance options. This report includes detailed list of available electric ground support equipment (GSE), description of NREL tools for EV infrastructure design and optimization, and analyses of the current fleet and the potential grid impacts of electrification. Key recommendations are made in regard to simulation-based and in-depth system analyses to identify optimal charging infrastructure and long-term grid stability, and to ensure that the selected station architecture will provide enough space and capacity for future expansion and resiliency.

30 DIRECT ENERGY CONVERSION↗