Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Status of the NASA balloon program

The U.S. National Aeronautics and Space Administration (NASA) Balloon Program has been highly successful since recovering from the catastrophic balloon failure problems of the early to mid 1980s. Balloons have continued to perform at unprecedented success rates. The comprehensive research and development (R&D) effort has continued with advances being made across the spectrum of balloon related disciplines. The long duration balloon project will be transitioning from a development effort to an operational capability this year. Recently, emphasis has been placed on the development and implementation of new support systems and facilities. A new permanent launch facility at Fort Sumner, New Mexico has been established. New ground station support equipment is being implemented, and a new heavy load launch vehicle is scheduled to be implemented in 1992. The progress, status and future plans for these and other aspects of the NASA program will be presented.

Needleman, H. C.↗

Advanced Intelligent System Application to Load Forecasting and Control for Hybrid Electric Bus

The primary motivation for this research emanates from providing a decision support system to the electric bus operators in the municipal and urban localities which will guide the operators to maintain an optimal compromise among the noise level, pollution level, fuel usage etc. This study is backed up by our previous studies on study of battery characteristics, permanent magnet DC motor studies and electric traction motor size studies completed in the first year. The operator of the Hybrid Electric Car must determine optimal power management schedule to meet a given load demand for different weather and road conditions. The decision support system for the bus operator comprises three sub-tasks viz. forecast of the electrical load for the route to be traversed divided into specified time periods (few minutes); deriving an optimal 'plan' or 'preschedule' based on the load forecast for the entire time-horizon (i.e., for all time periods) ahead of time; and finally employing corrective control action to monitor and modify the optimal plan in real-time. A fully connected artificial neural network (ANN) model is developed for forecasting the kW requirement for hybrid electric bus based on inputs like climatic conditions, passenger load, road inclination, etc. The ANN model is trained using back-propagation algorithm employing improved optimization techniques like projected Lagrangian technique. The pre-scheduler is based on a Goal-Programming (GP) optimization model with noise, pollution and fuel usage as the three objectives. GP has the capability of analyzing the trade-off among the conflicting objectives and arriving at the optimal activity levels, e.g., throttle settings. The corrective control action or the third sub-task is formulated as an optimal control model with inputs from the real-time data base as well as the GP model to minimize the error (or deviation) from the optimal plan. These three activities linked with the ANN forecaster proving the output to the GP model which in turn produces the pre-schedule of the optimal control model. Some preliminary results based on a hypothetical test case will be presented for the load forecasting module. The computer codes for the three modules will be made available fe adoption by bus operating agencies. Sample results will be provided using these models. The software will be a useful tool for supporting the control systems for the Electric Bus project of NASA.

Momoh, James↗

Discovery and repair of software anomalies

The average time required to discover and repair anomalies which appear randomly in the end-to-end tests performed after program completion is evaluated. A model which explains anomaly discovery and repair phenomena when applied to variations in work load and multiple-stage testing is presented. The theory shows that estimates of anomaly levels and team capability can be predicted after a significant fraction of the anomalies have been found, and indicates procedures for applying these figures to schedule estimation and work-load assignment. Of particular interest is the demonstration that end-to-end testing of programs in other than the operational environment is not generally cost effective.

Tausworthe, R. C.↗

The JPL Resource Allocation Planning and Scheduling Office (RAPSO) process

The Jet Propulsion Laboratory's Resource Allocation Planning and Scheduling Office is chartered to divide the limited amount of tracking hours of the Deep Space Network amongst the various missions in as equitable allotment as can be achieved. To best deal with this division of assets and time, an interactive process has evolved that promotes discussion with agreement by consensus between all of the customers that use the Deep Space Network (DSN). Aided by a suite of tools, the task of division of asset time is then performed in three stages of granularity. Using this approach, DSN loads are either forecasted or scheduled throughout a moving 10-year window.

RAPSO Resource Allocation Planning and Scheduling ↗

Space Station Freedom Data Assessment Study

The SSF Data Assessment Study was initiated to identify payload and operations data requirements to be supported in the Space Station era. To initiate the study payload requirements from the projected SSF user community were obtained utilizing an electronic questionnaire. The results of the questionnaire were incorporated in a personal computer compatible database used for mission scheduling and end-to-end communications analyses. This paper discusses data flow paths and associated latencies, communications bottlenecks, resource needs versus availability, payload scheduling 'warning flags' and payload data loading requirements for each major milestone in the Space Station buildup sequence. This paper also presents the statistical and analytical assessments produced using the data base, an experiment scheduling program, and a Space Station unique end-to-end simulation model. The modeling concepts and simulation methodologies presented in this paper provide a foundation for forecasting communication requirements and identifying modeling tools to be used in the SSF Tactical Operations Planning (TOP) process.

Johnson, Anngienetta R.↗

Autonomous power expert system

The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control technologies to the Space Station Freedom Electrical Power Systems (SSF/EPS). The objectives of the program are to establish artificial intelligence/expert system technology paths, to create knowledge based tools with advanced human-operator interfaces, and to integrate and interface knowledge-based and conventional control schemes. This program is being developed at the NASA-Lewis. The APS Brassboard represents a subset of a 20 KHz Space Station Power Management And Distribution (PMAD) testbed. A distributed control scheme is used to manage multiple levels of computers and switchgear. The brassboard is comprised of a set of intelligent switchgear used to effectively switch power from the sources to the loads. The Autonomous Power Expert System (APEX) portion of the APS program integrates a knowledge based fault diagnostic system, a power resource scheduler, and an interface to the APS Brassboard. The system includes knowledge bases for system diagnostics, fault detection and isolation, and recommended actions. The scheduler autonomously assigns start times to the attached loads based on temporal and power constraints. The scheduler is able to work in a near real time environment for both scheduling and dynamic replanning.

Ringer, Mark J.↗

Autonomous power expert system

The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control technologies to the Space Station Freedom Electrical Power Systems (SSF/EPS). The objectives of the program are to establish artificial intelligence/expert system technology paths, to create knowledge based tools with advanced human-operator interfaces, and to integrate and interface knowledge-based and conventional control schemes. This program is being developed at the NASA-Lewis. The APS Brassboard represents a subset of a 20 KHz Space Station Power Management And Distribution (PMAD) testbed. A distributed control scheme is used to manage multiple levels of computers and switchgear. The brassboard is comprised of a set of intelligent switchgear used to effectively switch power from the sources to the loads. The Autonomous Power Expert System (APEX) portion of the APS program integrates a knowledge based fault diagnostic system, a power resource scheduler, and an interface to the APS Brassboard. The system includes knowledge bases for system diagnostics, fault detection and isolation, and recommended actions. The scheduler autonomously assigns start times to the attached loads based on temporal and power constraints. The scheduler is able to work in a near real time environment for both scheduling an dynamic replanning.

Ringer, Mark J.↗

Extension of constrained incremental Newton-Raphson scheme to generalized loading fields

This paper develops numerical strategies which enable the constrained incremental Newton-Raphson scheme to handle the static response of structure to loading fields with completely generalized histories. This is made possible through the use of specially warped hyperelliptic constraint surfaces which control successive or clustered load steps in the vicinity of loading events with specific timing schedules. Such an approach enables improved convergence and stability characteristics. Due to the generality of the methodology, pre- and postbuckling behavior caused by both kinematic and material nonlinearity can be handled. To demonstrate the scheme, the results of several bench-mark problems are also presented. These include situations involving nonlinear kinematics as well as highly history-dependent elastic-plastic and thermoelastic-plastic material behavior.

Padovan, J.↗

Automated Power-Distribution System

Autonomous power-distribution system includes power-control equipment and automation equipment. System automatically schedules connection of power to loads and reconfigures itself when it detects fault. Potential terrestrial applications include optimization of consumption of power in homes, power supplies for autonomous land vehicles and vessels, and power supplies for automated industrial processes.

Ashworth, Barry↗

Collaborative Resource Allocation

Collaborative Resource Allocation Networking Environment (CRANE) Version 0.5 is a prototype created to prove the newest concept of using a distributed environment to schedule Deep Space Network (DSN) antenna times in a collaborative fashion. This program is for all space-flight and terrestrial science project users and DSN schedulers to perform scheduling activities and conflict resolution, both synchronously and asynchronously. Project schedulers can, for the first time, participate directly in scheduling their tracking times into the official DSN schedule, and negotiate directly with other projects in an integrated scheduling system. A master schedule covers long-range, mid-range, near-real-time, and real-time scheduling time frames all in one, rather than the current method of separate functions that are supported by different processes and tools. CRANE also provides private workspaces (both dynamic and static), data sharing, scenario management, user control, rapid messaging (based on Java Message Service), data/time synchronization, workflow management, notification (including emails), conflict checking, and a linkage to a schedule generation engine. The data structure with corresponding database design combines object trees with multiple associated mortal instances and relational database to provide unprecedented traceability and simplify the existing DSN XML schedule representation. These technologies are used to provide traceability, schedule negotiation, conflict resolution, and load forecasting from real-time operations to long-range loading analysis up to 20 years in the future. CRANE includes a database, a stored procedure layer, an agent-based middle tier, a Web service wrapper, a Windows Integrated Analysis Environment (IAE), a Java application, and a Web page interface.

Wang, Yeou-Fang↗

Shuttle and ISS Food Systems Management

Russia and the U.S. provide the current International Space Station (ISS) food system. Each country contributes half of the food supply in their respective flight food packaging. All of the packaged flight food is stowed in Russian provided containers, which interface with the Service Module galley. Each country accepts the other's flight worthiness inspections and qualifications. Some of the food for the first ISS crew was launched to ISS inside the Service Module in July of 2000, and STS-106 in September 2000 delivered more food to the ISS. All subsequent food deliveries will be made by Progress, the Russian re-supply vehicle. The U.S. will ship their portion of food to Moscow for loading onto the Progress. Delivery schedules vary, but the goal is to maintain at least a 45-day supply onboard ISS at all times. The shelf life for ISS food must be at least one year, in order to accommodate the long delivery cycle and onboard storage. Preservation techniques utilized in the US food system include dehydration, thermo stabilization, intermediate moisture, and irradiation. Additional fresh fruits and vegetables will be sent with each Progress and Shuttle flights as permitted by volume allotments. There is limited refrigeration available on the Service Module to store fresh fruits and vegetables. Astronauts and cosmonauts eat half U.S. and half Russian food. Menu planning begins 1 year before a planned launch. The flight crews taste food in the U.S. and in Russia and rate the acceptability. A preliminary menu is planned, based on these ratings and the nutritional requirements. The preliminary menu is then evaluated by the crews while training in Russia. Inputs from this evaluation are used to finalize the menu and flight packaging is initiated. Flight food is delivered 6 weeks before launch. The current challenge for the food system is meeting the nutritional requirements, especially no more than 10 mg iron, and 3500 mg sodium. Experience from Shuttle[Mir also indicated insufficient caloric intake for many crewmembers. Additional thermostabilized and irradiated foods have been developed for ISS to improve the ease of preparation and overall acceptability. Dehydrated foods offer limited advantage, since water must be delivered to ISS. An effort is underway to introduce other International Partner's food into the ISS food system. At first this will be one or two selected foods with the potential for more as the program matures. An increase in the variety of available foods would improve the overall acceptability. Additional galley capability will be required when the crew size increases on ISS. Anticipated improvements include freezers, refrigerators and microwave ovens. All of the ISS food development efforts are devoted to improving the food acceptability and subsequent consumption and mission success

Kloeris, Vickie↗

Spacecraft loads methodology - Transient vs. shock spectra method

The methodology for the establishment of spacecraft loads is strongly influenced by project constraints which include the cost, schedule and allowable weight. The most rigorous approach is the transient loads analysis which requires a composite mathematical model of the spacecraft and launch vehicle. The structural member loads for the entire composite structure are computed by applying the forcing functions, which represent various dynamic environments during the mission, to the composite model. Although this method ideally leads to a lightweight design, it is costly and time consuming due to complex interfaces involving many organizations. To reduce complexity and cost a shock spectra method has been used to design spacecraft structures. This method utilizes envelopes of shock spectra of launch vehicle accelerations obtained from analysis and/or flight measurements. Since only limited information on the launch vehicle model is involved in this process the design loads iteration cycle can be rapidly performed within the payload organization. In the present paper, these two methods will be evaluated by comparing the loads for several spacecraft. Flight measured loads will also be used in the evaluation.

Chen, J. C.↗

Passive Aeroelastic Tailored Wing Modal Test Using the Fixed Base Correction Method

In modal testing and finite element model correlation, analysts desire modal results using free-free or rigid boundary conditions to ease comparisons of test versus analytical data. It is often expensive both in cost and schedule to build and test with boundary conditions that replicate the free-free or rigid boundaries. Static test fixtures for load testing are often large, heavy, and unyielding, but do not provide adequate boundaries for modal tests because they are dynamically too flexible and often contain natural frequencies within the frequency range of interest of the test article. Dynamic coupling between the test article and test fixture complicates the model updating process because significant effort is required to model the test fixture and boundary conditions in addition to the test article. If there were a way to correct the modal results for fixture coupling, then setups used for other structural testing could be adequate for modal testing. In the case described in this paper, a partial static loads testing setup was used, which allowed significant schedule and cost savings by eliminating a unique setup for a modal test. A fixed base correction technique was investigated during modal testing of a flexible wing cantilevered from part of a static test fixture. The technique was successfully used to measure the wing modes de-coupled from the dynamically active test fixture. The technique is promising for future aircraft applications, but more research is needed.

structural dynamics↗

Measurement of operator workload in an information processing task

This was an experimental study to develop an improved methodology for measuring workload in an information processing task and to assess the effects of shift length and communication density (rate of information flow) on the ability to process and classify verbal messages. Each of twelve subjects was exposed to combinations of three shift lengths and two communication densities in a counterbalanced, repeated measurements experimental design. Results indicated no systematic variation in task performance measures or in other dependent measures as a function of shift length or communication density. This is attributed to the absence of a secondary loading task, an insufficiently taxing work schedule, and the lack of psychological stress. Subjective magnitude estimates of workload showed fatigue (and to a lesser degree, tension) to be a power function of shift length. Estimates of task difficulty and fatigue were initially lower but increased more sharply over time under low density than under high density conditions. An interpretation of findings and recommedations for furture research are included. This research has major implications to human workload problems in information processing of air traffic control verbal data.

Jenney, L. L.↗

Plan, formulate, and discuss a NASTRAN finite element model of the AH-64A helicopter airframe

A discussion of modeling plan objectives, followed by a description of the AH-64A aircraft including all general features, major components, and primary and structure definitions are presented. Following the aircraft description, a discussion of the modeling guidelines and model checkout procedure are provided. The NASTRAN finite element analysis is set up to be suitable to predict both static internal loads and vibrations. Finally, the results, schedule, and planned versus actual manhours for this work are presented.

Christ, Richard A.↗

Developing scheduling benchmark tests for the Space Network

A set of benchmark tests were developed to analyze and measure Space Network scheduling characteristics and to assess the potential benefits of a proposed flexible scheduling concept. This paper discusses the role of the benchmark tests in evaluating alternative flexible scheduling approaches and defines a set of performance measurements. The paper describes the rationale for the benchmark tests as well as the benchmark components, which include models of the Tracking and Data Relay Satellite (TDRS), mission spacecraft, their orbital data, and flexible requests for communication services. Parameters which vary in the tests address the degree of request flexibility, the request resource load, and the number of events to schedule. Test results are evaluated based on time to process and schedule quality. Preliminary results and lessons learned are addressed.

Moe, Karen L.↗

Linear Quadratic Tracking Design for a Generic Transport Aircraft with Structural Load Constraints

When designing control laws for systems with constraints added to the tracking performance, control allocation methods can be utilized. Control allocations methods are used when there are more command inputs than controlled variables. Constraints that require allocators are such task as; surface saturation limits, structural load limits, drag reduction constraints or actuator failures. Most transport aircraft have many actuated surfaces compared to the three controlled variables (such as angle of attack, roll rate & angle of side slip). To distribute the control effort among the redundant set of actuators a fixed mixer approach can be utilized or online control allocation techniques. The benefit of an online allocator is that constraints can be considered in the design whereas the fixed mixer cannot. However, an online control allocator mixer has a disadvantage of not guaranteeing a surface schedule, which can then produce ill defined loads on the aircraft. The load uncertainty and complexity has prevented some controller designs from using advanced allocation techniques. This paper considers actuator redundancy management for a class of over actuated systems with real-time structural load limits using linear quadratic tracking applied to the generic transport model. A roll maneuver example of an artificial load limit constraint is shown and compared to the same no load limitation maneuver.

Burken, John J.↗