SRS Strategy for Tank 3 Salt Dissolution - Performance and Lessons Learned - 20441

The Savannah River Site (SRS) Tank Farms have 51 underground waste tanks used to store and process liquid nuclear waste materials. There are 4 different tank types, ranging in capacity from 2,840,000 to 4,920,000 L (750,000 to 1,300,000 Gal). Twenty-four of the tanks are older style and do not meet full secondary containment standards. The older style tanks are the initial focus of waste removal efforts for tank closure at SRS. Eight of these twenty-four tanks have completed waste removal and are filled with grout. Prior to salt dissolution, Tank 3 was a dry salt tank that contained 5.06 m (199.3 in) of salt and sludge waste. Additional salt waste was present on cooling coils above the salt layer up to approximately 5.59 m (220 in). Three mixing eductors were installed in Tank 3 to aid in dissolving salt waste in three tank riser access ports. A transfer pump was installed, and the transfer pump suction was located 25.4 cm (10 in) from the tank bottom. Well water was added to the tank through a downcomer until the dry bulk salt was covered with liquid. During the initial fill of Tank 3, approximately 242,000 L (64,000 Gal) of rain water were added from periodic F-Tank Farm (FTF) Catch Tank additions and approximately 17,000 L (4,500 Gal) of well water were added. Following liquid additions to cover the dry bulk salt, well water was added through the three mixing eductors in batches during each stage. Additionally, during the salt dissolution campaigns, the FTF Catch Tank was utilized to add rain water through a downcomer in the center tank riser access port as needed for volume relief in the FTF Catch Tank. Following liquid additions, the water was recirculated (internal to the tank) using the transfer pump, and a sample was pulled to confirm the target specific gravity (SpG) of the dissolved salt solution was achieved. The dissolved salt solution was then transferred to the receipt tank (Tank 7), and the mixing eductors were lowered as close to the new bulk salt layer as possible, to support subsequent dissolution campaigns. While the mixing jets were able to dissolve salt successfully in Tank 3, they did not do so in a completely uniform manner. Throughout dissolution, mounds were discovered under Riser 1, Riser 2, and the Center Riser. The mixing jets dissolved the salt around the edges of the tank well but were not as effective toward the center of the tank. FTF Catch Tank additions through the center tank riser access port downcomer were required to impact the mound under the center tank riser. FTF Catch Tank additions were sporadic as they were dependent on rainfall in the area. Additionally, all mixing jets were rarely able to be lowered to the same elevation, indicating some mounding in the bulk salt layer. Indexing of the mixing jets was also utilized to impact the salt mounds. Overall, Tank 3 salt dissolution was successful as approximately 1,476,000 L (390,000 Gal) of dissolved salt solution was transferred to Tank 7 over six stages. Slightly less than 852,000 L (225,000 Gal) of water were added to Tank 3. The original material balance prediction estimated that the bulk salt level in Tank 3 would be 3.88 m (152.8 in) after six salt dissolution stages. After six stages the actual bulk salt level was 3.38 m (133 in). This paper will discuss the salt removal strategy, each salt dissolution stage, and lessons learned for future salt dissolution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned in the Development of Industry Guidance - 20279

The availability of industry guidance on different aspects of waste management forms a valuable reference for waste practitioners. The guidance typically details the principles, processes and practices that should be consulted during each stage of the relevant activities. It also includes relevant regulatory and international requirements, appropriate case studies and examples of best practices to illustrate technical concepts and make the information available to the reader in an accessible manner. Over recent years Wood have developed (or are developing) a number of industry guidance documents on a range of topics including Solid Waste Characterization, Routine Water Quality Monitoring on Nuclear Sites: Pipeline Characterization: Determining Background Radioactivity for Land Quality Assessment: Interim Storage and Aqueous Waste Management. This talk provides an overview of lessons learned along the way including: - the importance of stakeholder engagement through the process: - how to identify 'good practice'; - the importance of iterative development; and - the selection of illustrative and informative case studies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Demolition of Hanford's Plutonium Finishing Plant - 20507

U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Areas Initiative's Port Granby Project: The Decontamination of Site Equipment from a Low Level Waste Facility - 20330

The Port Hope Area Initiative (PHAI) is the Government of Canada's response to the community recommended solutions for the remediation and safe, long-term management of historic low-level radioactive waste (LLRW) that was the result of uranium and radium processing operations in the Municipality of Port Hope, Ontario from the 1930's to the 1980's. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of approximately 1,200,000 m{sup 3} of historic low-level radioactive waste and marginally contaminated soil from the PGWMF to the newly constructed LTWMF. Since the project's inception in 2016, the bulk of the material has since been moved to the final long term storage cell. This has taken over 500,000 person-hours and a large amount of one site heavy equipment to accomplish including excavators, bulldozers, rock trucks, baker tanks and vacuum trucks. While many of the pieces of heavy equipment and water management equipment has further work to do on site, several of the sites larger items have already undergone the decontamination process prior to release from the site. This process has posed a serious challenge as the waste has a caustic nature to it and over the last few years it has had time to work its way into the metallic structures and framework of the equipment. Coupled with the tight work spaces and in some cases confined work areas there have been many issues that needed to be addressed to successfully reach a state where items can be free released to the unrestricted limits of the sites license. This ongoing process has led to a more refined decontamination program at the Port Granby Facility and has had a rather high success rate considering the length of time the equipment has been exposed to the waste materials on site. This paper discusses the varied challenges of decontamination faced at a low-level radioactive waste facility with a focus on the following aspects: - Challenges faced regarding different equipment types and the solutions implemented by Wood to address these challenges; - An examination of various decontamination methods employed throughout the project; and - Lessons learned over three years of remediation work and how they impact the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned Using Iridium to Communicate with a CubeSat in Low Earth Orbit

This paper presents the design and approval process for operating an Iridium transceiver on orbit and provide on-orbit performance data obtained from a CubeSat platform in Low Earth Orbit (LEO) (500 km orbit). On-orbit data demonstrates that use of a commercial, low-cost Iridium transceiver can serve as a valuable communication approach for low volume telemetry with less than a 30-minute lag for approximately 90% of the time. In this work, we also demonstrate that a radial differential velocity of 7 km/sec corresponding to about a 37.5kHz doppler shift and a distance of less than 2,000 km can be used for mission planning.

42 ENGINEERING↗

Retrieval of Transuranic Drums with Deflagration to Detonation Potential from a Vault at the Oak Ridge National Laboratory - 20207

During the final phase of a long-term project, a total of 80 TRU waste drums at ORNL have been retrieved from a below-grade storage vault in which they have remained untouched for about 25 years. The drums, which house material generated from past ORNL operations, are now stored and ready for eventual transfer to the Transuranic Waste Processing Center, located on Highway 95 in Oak Ridge. The Transuranic Waste Processing Center will process and ship the drums to WIPP in Carlsbad, New Mexico, for disposal. Workers lifted the drums one-by-one from the underground storage vault with a 110-ton crane over a one-week period in October 2017. Although the physical work was performed in one week, years of detailed planning preceded the fieldwork. A key obstacle needed to be overcome before the project could safely proceed. This obstacle involved the need to ensure controls were developed for the Deflagration to Detonation Transition (DDT) potential. DDT refers to a phenomenon in ignitable mixtures of a flammable gas and air (or oxygen) when a sudden transition takes place from a deflagration type of combustion to a detonation type of explosion. Basically, these drums, under certain circumstances, have a potential to detonate and overpressurize. Extensive analysis of the drums verified that detonation, while unlikely, was possible. Of the total 103 drums that were retrieved or moved in preparation for retrieval, 18 had DDT potential. Extensive security requirements were also necessary, due to the nature of the material, and this added another layer of complexity to the fieldwork. Prior to retrieving the drums from the underground storage vault, space needed to be made for them within the various above-grade facilities. Inventory and security requirements dictated what could be stored where, and the first step of the field work involved a number of drum movements in preparation for storage of the newly retrieved drums. This effort involved moving 21 drums already in the storage area to facilitate the addition of the newly retrieved ones. The retrieval project required a total of 107 critical lifts using the 110-ton crane, under 3 critical lift plans. The TRU waste storage facility is a Category 2 Nuclear Facility and is managed under an extensive Documented Safety Analysis. The TRU retrieval project was conducted in accordance with DOE Order 425.1D and included three Implementation Verification Reviews, two Management Assessments, one Readiness Assessment, and seven mock-ups in preparation for the field work. Despite being stored for 25 years, the drums were in good shape due to the integrity of the facilities where the drums were stored. Of the 80 drums that were retrieved, 12 were placed in special containers called 'overpacks' based on their content. The drums were removed safely and without incident, thanks to a lot of preparation and the efforts of a highly skilled team. Lessons learned through the DDT control development and the drum retrieval and overpacking process could be beneficial to others having to manage similar drums of TRU waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exploring the Use of Large Immersive Display Systems in the Nuclear Industry

Large immersive display systems play a critical role in the nuclear industry by enabling advanced training, design reviews, scientific visualization, and safety simulations. These systems, such as CAVE and powerwalls, allow engineers and operators to interact with virtual nuclear environments in real-time, providing a deeper understanding of complex systems. Their ability to simulate real-world scenarios for testing and optimization in a safe, controlled environment ensures that operators and engineers can refine process, enhance safety protocols, and troubleshoot complex challenges. This article outlines key lessons learned from deploying these systems, practical insights into their applications, and considerations for future improvements, aiming to guide their broader adoption and effective use in the nuclear industry.

99 - GENERAL AND MISCELLANEOUS↗

Agent-Based Modeling for the Circular Economy: Lessons Learned From Three Case Studies

The circular economy (CE) aims at decoupling human activities from resource use, creating wealth in the process. Recently, many scholars have questioned the link between increased circularity and sustainability, resulting in many methodological approaches being developed for that purpose. This presentation summarizes the insights gained from the application of agent-based modeling (ABM) to study the techno-economic and social conditions promoting circularity and sustainability of three technologies: photovoltaic (PV) modules, hard disk drives (HDDs), and wind blades. Four main categories of agents are defined in the ABM: asset owners, service providers (e.g., refurbishers), recyclers, and manufacturers. Two main CE strategies are represented: lifetime extension (through repair or reuse) and recycling. The developed models start by projecting installed capacities and end-of-life (EOL) quantities. Then the theory of planned behavior - a social psychology model explaining behavior adoption based on attitude, peer influence, and costs - is used to model the asset owners' EOL decision (i.e., landfill, recycle or extend the lifetime of the asset). Then, the quantities of assets flowing to the recycler and service provider agents and quantities of materials flowing to manufacturers are computed. Recyclers' economies of scale are dynamically modeled, and the value generated by the CE strategies for the recyclers, service providers, and manufacturers is computed within the model. When data are available, avoided greenhouse gas emissions resulting from the CE strategies adoption are calculated exogenously from the ABM simulations. Results show that with improved used PV modules warranties, the reuse CE strategy adoption increases from 1% to 23% between 2020 and 2050. Similarly, improved standards could enhance HDDs end-users trust in data-wiping - a prerequisite to reuse - leading to a 3-fold increase in the reuse rate and avoid about 5 million tons of CO2 eq by 2050. Regarding wind blades, 5-15 years lifetime extension could reduce EOL blade quantities by 13%. High costs and logistic issues prevent blades from being recycled in greater quantities. One insight from the case studies is the necessity to have mature secondary markets for reuse to be a viable option. Interestingly, PV reuse is limited by the willingness of PV owners to purchase used modules (on the demand side), while HDDs reuse is constrained by the lack of trust toward data-wiping (limiting the supply of used HDDs). The six limits of the CE concepts presented by Korhonen et al. (2018) are finally used to interpret the results. The HDD case study is an exemplary lock-in, where the first accepted practice (shredding) retains most of the market. The PV results illustrate the technical limitation to reuse, as the growing demand cannot be supplied entirely with used PV modules. The wind case study shows the relevance of clearly defining physical flows - what type of waste should wind blades be considered, how should they be transported and landfilled? - a crucial consideration that also applies to PV modules. Finally, the three case studies highlight the relevance of studying a technology's technical, economic, and market material efficiency potentials altogether and the potential benefit of coupling ABM to life cycle assessment.

agent-based modeling↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Safety-Related Instrumentation & Control Pilot Upgrade Initiation Phase Implementation Report

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP) [Reference 2], NISP-EN-04, Standard Digital Engineering Process (SDEP) [Reference 3], and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Strength in Rotary Friction Welding of Five Dissimilar Nickel-Based Superalloys

Advanced manufacturing processes improve the cost and quality of goods. Rotary friction welding is a fast, energy-efficient, and reliable joining process for metals, but new applications are hindered by large development costs for each new alloy. Each alloy set has different welding characteristics; therefore, lessons learned from a single alloy are not always broadly applicable. To establish knowledge that is applicable across multiple alloys, a family of different superalloys were welded to discover process trends that were applicable beyond a single alloy set. In this study, weld symmetry did not correlate to weld strength across alloy systems. Some alloys’ strongest welds occurred at maximum symmetry, whereas high asymmetry was associated with different alloys’ maximum strength. High feed rates, high welding forces, low energy, and low temperatures all resulted in high-strength welds across all alloy and geometry combinations. Tensile strengths greater than 95% of base-metal strength were recorded for most alloy systems.

36 MATERIALS SCIENCE↗

Towards Field Emission Free Cavity Processing and String Assembly at Fermilab

Cavities and cryomodules assembled at Fermilab have demonstrated unprecedented field emission (FE) free gradients. However, consistent FE-free performance is not guaranteed. Many lessons were learned, and continued vigilance is a must. In addition, several improvements have been identified to further push the state-of-the-art low particulate cavity processing and assembly at Fermilab. Those included the optimization of nitrogen flow, robotic-assisted assembly, and low-particulate fasteners. We share our latest results and vision for the future clean assemblies of cavities and cryomodule strings.

43 PARTICLE ACCELERATORS↗

Marine Microeukaryote Metatranscriptomics: Sample Processing and Bioinformatic Workflow Recommendations for Ecological Applications

Microeukaryotes (protists) serve fundamental roles in the marine environment as contributors to biogeochemical nutrient cycling and ecosystem function. Their activities can be inferred through metatranscriptomic investigations, which provide a detailed view into cellular processes, chemical-biological interactions in the environment, and ecological relationships among taxonomic groups. Established workflows have been individually put forth describing biomass collection at sea, laboratory RNA extraction protocols, and bioinformatic processing and computational approaches. Here, we present a compilation of current practices and lessons learned in carrying out metatranscriptomics of marine pelagic protistan communities, highlighting effective strategies and tools used by practitioners over the past decade. We anticipate that these guidelines will serve as a roadmap for new marine scientists beginning in the realms of molecular biology and/or bioinformatics, and will equip readers with foundational principles needed to delve into protistan metatranscriptomics.

Cohen, Natalie R.↗

Developments in algal processing

Macroalgae and microalgae, including cyanobacteria, are primarily photosynthetic organisms grown for the production of renewable biomass for foods, feedstocks, and high-value specialty chemicals. While there are differences in cultivating and harvesting macro- and microalgae due to scale, many of the same downstream techniques can be used for processing algal biomass. This chapter will outline various developments in processing technologies used for the treatment of algal biomass with discussion of scalability, cost, time, and efficacy. Topics will cover methods for harvesting and dewatering algae, drying algal biomass, biomass disruption, and nutrient recovery, including case studies with lessons learned. Here, the final section presents biomass applications and product considerations. While there is no universally-adopted approach for processing algal biomass, these studies provide the foundation for making informed decisions, considering the unique properties of the algae and the integrity of the desired end products.

09 BIOMASS FUELS↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotics for Systems Integration in Buildings - Pilot Study of Viable Approaches to Install Hygrothermal and Rigid Electrical Systems: Preprint

The Industrialized Construction Innovation (ICI) team at the National Renewable Energy Laboratory (NREL) has been exploring the use of robotics to integrate hygrothermal, mechanical, electrical, and plumbing systems in prefabricated building assemblies (offsite construction) and 3D Printed buildings (onsite construction). Such multi-system integration tasks often require specialized robots and custom end-effectors for handling a range of rigid and non-rigid building components. This paper begins with a brief overview of the current state of robotics in construction, followed by a pilot study exploring the use of robotics to integrate a simple prototype multi-trade wall assembly composed of structural studs, hygrothermal layer, wall finishing, and electrical fixtures. The study was funded by the Department of Energy's (DOE) Advanced Materials and Manufacturing Technologies Office (AMMTO). Insights about the implementation of design for manufacturing and assembly (DfMA) principles in designing the prototype wall for robotic assembly, and selection of appropriate robotic end effector hardware for handling these components are included. Detailed comparison of computational toolpath simulations of the robotic assembly process and real-life demonstration of the same is presented. Finally, limitations and lessons learned from this study along with future research recommendations for robotic assembly of more complex multi-trade assemblies, including potential scenarios such as robotic outfitting of facilities in extra-terrestrial environments is included.

advanced manufacturing↗

Robotics for Systems Integration in Buildings: Pilot Study of Viable Approaches to Install Hygrothermal and Rigid Electrical Systems

The Industrialized Construction Innovation (ICI) team at the National Renewable Energy Laboratory (NREL) has been exploring the use of robotics to integrate hygrothermal, mechanical, electrical, and plumbing systems in prefabricated building assemblies (off-site construction) and 3D-printed buildings (on-site construction). Such multisystem integration tasks often require specialized robots and custom end effectors to handle a range of rigid and nonrigid building components. This paper begins with a brief overview of the current state of robotics in construction, followed by a pilot study exploring the use of robotics to integrate a simple prototype multitrade wall assembly composed of structural studs, hygrothermal layer, wall finishing, and electrical fixtures. The study was funded by the US Department of Energy's (DOE's) Advanced Materials and Manufacturing Technologies Office (AMMTO). Insights about the implementation of design for manufacturing and assembly (DfMA) principles in designing the prototype wall for robotic assembly, and selection of appropriate robotic end-effector hardware to handle these components are included. Detailed comparison of computational toolpath simulations of the robotic assembly process and real-life demonstration of the same are presented. Finally, limitations and lessons learned from this study are included, along with future research recommendations for robotic assembly of more complex multitrade assemblies, including potential scenarios such as robotic outfitting of facilities in extraterrestrial environments.

advanced manufacturing↗

Preliminary Results of a Multi-Sensor Data Science System for Monitoring a Solvent Extraction Process

Idaho National Laboratory is building a test bed to allow researchers the opportunity to study nuclear fuel processing operations. This includes studying the solvent extraction process and the use of centrifugal contactors. The goal of this project is to develop a system that utilizes non-traditional measurement sources such as vibration, acoustics, current, color, flow, and temperature in conjunction with data-based, machine learning techniques that will allow for signal discovery. This multi-sensor data supports the development of safeguards by design, provides operator process awareness, and aids in the discovery of process anomalies. This paper highlights some of the preliminary results from initial data collection campaigns and shares some of the lessons learned.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗