Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “leak test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high-definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit of the ammonia leak were the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Darnell Cowan↗

Initial evaluation tests of Eagle-Picher Industries 9.0 ampere-hour nickel-cadmium spacecraft cells for the heat capacity mapping mission satellite and the stratospheric aerosol and gas experiment satellite

The results of tests to insure that all cells put into the life cycle program are of high quality are reported. The tests consisted of the following: phenolptalein leak tests, internal short test, charge efficiency test, and overcharge tests. The results of tests for 10 cells are tabulated.

Harkness, J. D.↗

Hermetic edge sealing of photovoltaic modules

The edge sealing technique is accomplished by a combination of a chemical bond between glass and aluminum, formed by electrostatic bonding, and a metallurgical bond between aluminum and aluminum, formed by ultrasonic welding. Such a glass to metal seal promises to provide a low cost, long lifetime, highly effective hermetic seal which can protect module components from severe environments. Development of the sealing techniques and demonstration of their effectiveness by fabricating a small number of dummy modules, up to eight inches square in size, and testing them for hermeticity using helium leak testing methods are reviewed. Non-destructive test methods are investigated.

Source record↗

Effects of Hypervelocity Impacts on Silicone Elastomer Seals and Mating Aluminum Surfaces

While in space silicone based elastomer seals planned for use on NASA's Crew Exploration Vehicle (CEV) are exposed to threats from micrometeoroids and orbital debris (MMOD). An understanding of these threats is required to assess risks to the crew, the CEV orbiter, and missions. An Earth based campaign of hypervelocity impacts on small scale seal rings has been done to help estimate MMOD threats to the primary docking seal being developed for the Low Impact Docking System (LIDS). LIDS is being developed to enable the CEV to dock to the ISS (International Space Station) or to Altair (NASA's next lunar lander). The silicone seal on LIDS seals against aluminum alloy flanges on ISS or Altair. Since the integrity of a seal depends on both sealing surfaces, aluminum targets were also impacted. The variables considered in this study included projectile mass, density, speed, incidence angle, seal materials, and target surface treatments and coatings. Most of the impacts used a velocity near 8 km/s and spherical aluminum projectiles (density = 2.7 g/cubic centimeter), however, a few tests were done near 5.6 km/s. Tests were also performed using projectile densities of 7.7, 2.79, 2.5 or 1.14 g/cubic centimeter. Projectile incidence angles examined included 0 degrees, 45 degrees , and 60 degrees from normal to the plane of the target. Elastomer compounds impacted include Parker's S0383-70 and Esterline's ELA-SA-401 in the as received condition, or after an atomic oxygen treatment. Bare, anodized and nickel coated aluminum targets were tested simulating the candidate mating seal surface materials. After impact, seals and aluminum plates were leak tested: damaged seals were tested against an undamaged aluminum plate; and undamaged seals were placed at various locations over craters in aluminum plates. It has been shown that silicone elastomer seals can withstand an impressive level of damage before leaking beyond allowable limits. In general on the tests performed to date, the diameter of the crater in either the elastomer, or the aluminum, must be at least as big as 80% to 90% of width of the bulb of the seal before significant leakage occurs.

deGroh, Henry C., III↗

Effects of Hypervelocity Impacts on Silicone Elastomer Seals and Mating Aluminum Surfaces

While in space silicone based elastomer seals planned for use on NASA's Crew Exploration Vehicle (CEV) are exposed to threats from micrometeoroids and orbital debris (MMOD). An understanding of these threats is required to assess risks to the crew, the CEV orbiter, and missions. An Earth based campaign of hypervelocity impacts on small scale seal rings has been done to help estimate MMOD threats to the primary docking seal being developed for the Low Impact Docking System (LIDS). LIDS is being developed to enable the CEV to dock to the ISS (International Space Station) or to Altair (NASA's next lunar lander). The silicone seal on LIDS seals against aluminum alloy flanges on ISS or Altair. Since the integrity of a seal depends on both sealing surfaces, aluminum targets were also impacted. The variables considered in this study included projectile mass, density, speed, incidence angle, seal materials, and target surface treatments and coatings. Most of the impacts used a velocity near 8 km/s and spherical aluminum projectiles (density = 2.7 g/cubic cm), however, a few tests were done near 5.6 km/s. Tests were also performed using projectile densities of 7.7, 2.79, 2.5 or 1.14 g/cubic cm. Projectile incidence angles examined included 0 deg, 45 deg, and 60 deg from normal to the plane of the target. Elastomer compounds impacted include Parker's S0383-70 and Esterline's ELA-SA-401 in the as received condition, or after an atomic oxygen treatment. Bare, anodized and nickel coated aluminum targets were tested simulating the candidate mating seal surface materials. After impact, seals and aluminum plates were leak tested: damaged seals were tested against an undamaged aluminum plate; and undamaged seals were placed at various locations over craters in aluminum plates. It has been shown that silicone elastomer seals can withstand an impressive level of damage before leaking beyond allowable limits. In general on the tests performed to date, the diameter of the crater in either the elastomer, or the aluminum, must be at least as big as 80% to 90% of width of the bulb of the seal before significant leakage occurs.

deGroh, Henry C., III↗

Experimental Evaluation of Refrigerant Leak Characteristics for Different HVAC&R Equipment Types–Phase 2

The US Department of Energy (DOE) Building Technology Office (BTO) and the Air-conditioning, Heating & Refrigeration Technology Institute (AHRTI) collaborated to sponsor an experimental study of refrigerant leak characteristics at Oak Ridge National Laboratory (ORNL); AHRTI project 9012. The project has been conducted in two phases with objectives to conduct refrigerant leak tests on several heating, ventilating, air-conditioning and refrigeration (HVAC&R) systems under operating conditions representative of actual applications to document the pressure decay rate and the mass flow rate of leaked refrigerant as a function of time. Phase 1 of the project ran from late 2017 to late 2018 with refrigerant leaks imposed on five systems and the collection of data to meet the project objectives. Systems chosen covered three air-conditioning (AC) applications (packaged terminal AC or PTAC, 3-ton residential split system AC, and 5-ton packaged rooftop AC) and two refrigeration applications (split system unit cooler, and standalone display case). AHRTI members donated the test systems used for the project. The systems were tested at two different leak rates (catastrophic high rate simulating full line break and a lower flow rate), two leak locations (high-pressure side and low-pressure side), and two operating conditions (compressor ON or OFF). Phase 1 results were summarized in a project report by Baxter, et al. (2019)1. The leak rates imposed in Phase 1 led to much more rapid charge releases than the more typical much slower rates seen in practice that would take days, weeks, or months to empty a system of its entire charge. For Phase 2, the project sponsors asked that the “higher” leak rate target a total charge release time of about 4 min. This was intended to represent a “reasonable” worst case release scenario to match the refrigerant leak rate assumption used in the International Electrotechnical Commission (IEC) standard IEC 60335-2-40 (2016 version [IEC 2016]. A charge release time of about 20–40 min (leak release rate 5 to 10 times lower than higher rate) was targeted for the “lower” leak rate. This report provides a summary of the Phase 2 effort. Two additional HVAC systems were selected for testing in this phase. First was a multi-split air-conditioning (MS-AC) system with one outdoor section and two indoor units and a nameplate refrigerant charge of 1.75 kg (3.86 lb.) of R-410A. The MS-AC was tested in cooling only or AC operation. Second was a split system heat pump coupled to two different representative supply duct systems (HP-duct) and a nameplate charge of 3.83 kg (8.44 lb.) of R-410A. This system was tested in both space heating and AC modes. As in Phase 1 of the project, all tests were conducted using R-410A.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Expandable rubber plug seals openings for pressure testing

Plug assembly seals openings in piping systems, vessels, and chambers for low pressure leak testing. The assembly, which consists of a rubber sealing plug and the mechanism for expanding it into a pressure-tight configuration, adequately seals irregular diameters without damage to mating surfaces.

Source record↗

Testing the Shuttle heat-protection armor

The article deals with the thermal protection system (TPS) designed to keep Space Shuttle structures at 350 F ratings over a wide range of temperatures encountered in orbit, but also during prelaunch, launch, deorbit and re-entry, landing and turnaround. The structure, function, fabrication, and bonding of various types of reusable surface insulation and composite materials are described. Test programs are developed for insulation, seals, and adhesion bonds; leak tests and acoustic fatigue tests are mentioned. Test facilities include arc jets, radiant heaters, furnaces, and heated tunnels. The certification tests to demonstrate TPS reusability, structural integrity, thermal performance, and endurance will include full-scale assembly tests and initial orbital flight tests.

Strouhal, G.↗

Seal testing of large diameter rocket motors

This investigative program examines leakage testing of elastomeric O-ring seals for a solid rocket casing and provides direction towards an improved nondestructive postassembly test. It also details test equipment for the Space Shuttle systems solid rocket boosters (SRB). The results are useful to designers of hardware for pressure containment vessels which use O-ring seals. Using several subscale seal and groove configuration test fixtures equipped with either two or three O-ring seals in series, seal integrity is investigated with both a pressure decay and flowmeter methods. Both types of test equipment adequately detect the practical range of expected seal leak rates of 1 to 0.0001 sccs. The flowmeter leak test equipment appears to reduce testing time substantially. Limited seal leakage testing is performed on full-sized rocket motor segment seals, a pre-Challenger short stack, providing comparison of bore seals to test specimen bore and face seals. The conclusions are that seal reliability, verified via a performance pressure test, can be affected by temperature, quantity of grease, test pressure, and seal pressure load direction. Potential seal failure scenarios including contamination, seal damage, and sealing surface damage are discussed. Recommendations are made for an improved test procedure.

Moore, N. B.↗

Leakage Through a Channel Formed by a Gasket, a Sealing Surface, and a Filament Trapped Between Them

Plumbing for the transport of liquid Hydrogen or liquid Oxygen at the Kennedy Space Center (KSC) is very critical. Every piece of hardware for handling such a hazardous cryogen is subject to testing prior to installation and use. Safe, realistic testing of all such hardware is prohibitively expensive, which leads, perforce, to expidients such as: (1) lead testing with non-flammable tracer fluids (e.g, liquid nitrogen) and (2) leak testing with room temperature tracer fluids (e.g. liquid helium). Such expedients undermine the realism of the tests. If however, one could apply rational fluid dynamics methods to derive a general analytical expression with which one could relate the throughput of gaseous Helium through a given leak channel to the throughput of liquid Hydrogen through the same channel, then one could recover much of the information that one would otherwise forfeit through these expedients. These facts lead to the following questions: (1) What would be an example of a generic flaw in a gasket?; and (2) How can one calculate the flow of fluid in it? The report addresses these questions. It considers a particular leak geometry, namely one formed by a gasket, a sealing surface, and a filament trapped between them (so that the cross section of the leak channel is a flat bottomed curvilinear triangle, two sides of which are circular arcs and which has cusps on all three corners).

Russell, John↗

Nondestructive testing of brazed rocket engine components

Report details study made of nondestructive radiographic, ultrasonic, thermographic, and leak test methods used to inspect and evaluate the quality of the various brazed joints in liquid-propellant rocket engine components and assemblies. Descriptions of some of the unique equipment and methods developed are included.

Adams, C. J.↗

Preparation of calibrated test packages for particle impact noise detection

A standard calibration method for any particle impact noise detection (PIND) test system used to detect loose particles responsible for failures in hybrid circuits was developed along with a procedure for preparing PIND standard test devices. Hybrid packages were seeded with a single gold ball, hermetically sealed, leak tested, and PIND tested. Conclusions are presented.

Source record↗

Upgrade of the ILC Cryomodule

Results of testing modified components for the cryomodule of the International Linear Collider (ILC) are summarized. To reduce the ILC project cost, it is proposed to replace titanium cryomodule components with stainless steel (SS) ones. New bimetallic transitions (Ti/SS, Nb/SS) have been produced by a unique method based on explosion welding. Successive upgrading of these components to the latest version of the Nb/Ti/SS transition element has led to improvement of the ILC cryomodule. This new component resolves problems of residual stress, and its specific design prevents the possibility of a shift due to the difference in the linear expansion coefficients of the constituent metals. Furthermore, leak tests with the He gas revealed no leaks at the background rate of ≈0.2 × 10$^{–10}$ atm cc/s. The test results are very encouraging. The up-to-date design of trimetallic Nb/Ti/SS element promises technologically simpler and less expensive manufacture. Investigations have shown that explosion welding allows unique trimetallic components to be made not only for cryogenic units of accelerators but also for laboratory equipment and for general engineering applications.

43 PARTICLE ACCELERATORS↗

Modeling and measurement of the performance of a branched conduit sampling system in a mass spectrometer leak detector

In the leak testing of a large engineering system, one may distinguish three stages, namely leakage measurement by an overall enclosure, leak location, and leakage measurement by a local enclosure. Sniffer probes attached to helium mass spectrometer leak detectors are normally designed for leak location, a qualitative inspection technique intended to pinpoint where a leak is but not to quantify its rate of discharge. The main conclusion of the present effort is that local leakage measurement by a leak detector with a sniffer probe is feasible provided one has: (1) quantitative data on the performance of the mass separator cell (a device interior to the unit where the stream of fluid in the sample line branches); and (2) a means of stabilizing the mass transfer boundary layer that is created near a local leak site when a sniffer probe is placed in its immediate vicinity. Theoretical models of the mass separator cell are provided and measurements of the machine-specific parameters in the formulas are presented. A theoretical model of a porous probe end for stabilizing the mass transfer boundary is also presented.

Russell, John M.↗

Analysis of a Memory Device Failure

The recent failure of a vintage memory device presented a unique challenge to failure analysts. Normally device layouts, fabrication parameters and other technical information were available to assist the analyst in the analysis. However, this device was out of production for many years and the manufacturer was no longer in business, so the information was not available. To further complicate this analysis, the package leads were all but removed making additional electrical testing difficult. Under these conditions, new and innovative methods were used to analyze the failure. The external visual exam, radiography, PIND, and leak testing were performed with nominal results. Since electrical testing was precluded by the short lead lengths, the device was delidded to expose the internal structures for microscopic examination. No failure mechanism was identified. The available electrical data suggested an ESD or low level EOS type mechanism which left no visible surface damage. Due to parallel electrical paths, electrical probing on the chip failed to locate the failure site. Two non-destructive Scanning Electron Microscopy techniques, CIVA (Charge Induced Voltage Alteration) and EBIC (Electron Beam Induced Current), and a liquid crystal decoration technique which detects localized heating were employed to aid in the analysis. CIVA and EBIC isolated two faults in the input circuitry, and the liquid crystal technique further localized two hot spots in regions on two input gates. Removal of the glassivation and metallization revealed multiple failure sites located in the gate oxide of two input transistors suggesting machine (testing) induced damage.

Nicolas, David P.↗

Alternatives to Silicon Rubber Thermal Barrier in RSRM Nozzle Joints

Thiokol Propulsion encountered a situation where gas path can form in the Filler material in joints between the phenolic in the Space Shuttle Reusable Solid Rocket Motor nozzle. An investigation determined that the method for injecting the filler material into the joint created a pressurized pocket of air that forced its way to the surface while the filler was curing. The path that the air took remained open some situations leaving a path for hot gas to get deep into the joint. The condition that created the gas path has been corrected by modifications to the manufacturing process, but a design solution that would reduce processing time is being pursued. A strip of open cell installed deep into the joint, can serve as a barrier to the Filler material. Testing indicates that the foam eliminates the pressure pocket, and does not prevent detection of leakage of the o-ring seals during leak test. Open cell foam does not have thermal resistance capability and mechanical structure, which would be required in the event of a gas path. A replacement to open cell foam is now being considered. Braided carbon fiber rope has the permeability characteristics of foam and it has thermal resistance characteristics as well. Braided carbon fiber rope (BCFR) has been tested in simulated joints in subscale rocket motor. Results of the testing indicate that braided carbon fiber rope can significantly reduce gas temperature by as much es 3000 F in a nozzle joint configuration. BCFR can be installed as a barrier to stop the joint filler material or it can used as the thermal barrier alone.

Totman, Peter D.↗

Nitrile/Buna N Material Failure Assessment for an O-Ring used on the Gaseous Hydrogen Flow Control Valve (FCV) of the Space Shuttle Main Engine

After the rollout of Space Shuttle Discovery in April 2005 in preparation for return-to-flight, there was a failure of the Orbiter (OV-103) helium signature leak test in the gaseous hydrogen (GH2) system. Leakage was attributed to the Flow Control Valve (FCV) in Main Engine 3. The FCV determined to be the source of the leak for OV-103 is designated as LV-58. The nitrile/Buna N rubber O-ring seal was removed from LV-58, and failure analysis indicated radial cracks providing leak paths in one quadrant. Cracks were eventually found in 6 of 9 FCV O-rings among the three Shuttle Orbiters, though none were as severe as those for LV-58, OV-103. Testing by EM10 at MSFC on all 9 FCV O- rings included: laser dimensional, Shore A hardness and properties from a dynamic mechanical analyzer (DMA) and an Instron tensile machine. The following test data was obtained on the cracked quadrant of the LV-58, OV-103 O-ring: (1) the estimated compression set was only 9.5%, compared to none for the rest of the O-ring; (2) Shore A hardness for the O.D. was higher by almost 4 durometer points than for the rest of the O-ring; and (3) DMA data showed that the storage/elastic modulus E was almost 25% lower than for the rest of the O-ring. Of the 8 FCV O-rings tested on an Instron, 4 yielded tensile strengths that were below the MIL spec requirement of 1350 psi-a likely influence of rubber cracking. Comparisons were made between values of modulus determined by DNA (elastic) and Instron (Young s). Each nitrile/Buna N O-ring used in the FCV conforms to the MIL-P-25732C specification. A number of such O-rings taken from shelf storage at MSFC and Kennedy Space Center (KSC) were used to generate a reference curve of DMA glass transition temperature (Tg) vs. shelf storage time ranging from 8 to 26 years. A similar reference curve of TGA onset temperature (of rubber weight loss) vs. shelf storage time was also generated. The DMA and TGA data for the used FCV O-rings were compared to the reference curves. Correlations were also made between the DMA modulus (at 22 C) and Shore A hardness for all 9 of the FCV O-rings used among the three Shuttle Orbiters. The radial cracking in the FCV O-rings was determined to be due to ozone attack, as nitrile/Buna N rubber is susceptible to such attack. Nitrile/Buna N material under MIL-P25732C should be used in a hydraulic fluid environment to help protect it from cracking. However, the FCV O-rings were used in an air only environment. The FCV design has as much as a 9-mil gap that allows the O.D. of the O-ring to be directly exposed to ozone, pressurized air and some elevated temperatures, accelerating the weathering process that leads to O-ring cracking. Space Shuttle flights will likely not continue past 2010. Therefore, Shuttle management decided to continue using the nitrile/Buna N material for the FCVs, but have each O-ring replaced after 3 years to minimize any chances for crack initiation.

Wingard, Doug↗