Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch availability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Orbital Space Solar Power Option for a Lunar Village

One of the most significant challenges to the implementation of a continuously manned lunar base is power. During the lunar day (14 Earth days), it is conceptually simple to deploy solar arrays to generate the estimated 35 kilowatts of continuous power required. However, generating this level of power during the lunar night (also 14 Earth days) has been an extremely difficult problem to solve. Conventional solutions range from the requirement that the base be located at the lunar south pole so as to take advantage of the continuous sunshine available there to developing a space-qualified nuclear reactor and power plant to generate the needed energy. There is a third option: Use the soon-to-be-available Space Launch System to place a space based solar power station in lunar orbit that would beam the needed energy to the lunar base. Several detailed studies have been performed by NASA, universities and others looking at the lunar south pole for locating the base. The results are encouraging: by taking advantage of the moon's orbital tilt, large solar arrays can be deployed there to track the sun continuously and generate the power needed to sustain the base. The problem with this approach is inherent to its design: it will only work at the lunar south pole. There is no other site on the Moon with geometry favorable to generating continuous solar power. NASA has also considered the development of a compact fission reactor and power plant to generate the needed power, allowing the base to be sited anywhere on the Moon. The problem with this approach is that there are no space fission reactors available, none are being planned and the cost of developing one is prohibitively expensive. Using an orbiting space based solar power station to generate electrical power and beam it to a base sited anywhere on the moon should therefore be considered. The technology to collect sunlight, generate greater than the estimated 35 kilowatts of power, and beam it to the surface using microwaves is available today. The problem with this concept in the past would have been the mass and packaging volume (for launch) required to put such a system in place in lunar orbit. This problem is potentially solved with the advent of the Space Launch System (SLS). The SLS, with its 70 mT launch capacity, it more than capable of placing such a system into lunar orbit in a single launch. This paper will examine the potential use of an SLS-launched, space solar power system in lunar orbit as the primary power source for a first-generation, continuously-occupied lunar base and compare it with the other power generation and storage options previously considered.

Johnson, Les↗

Analysis of Envisat Orbit Maintenance Strategies to Improve/Increase Envisat ASAR Interferometry Opportunities

The biggest and most advanced Earth Observation Satellite in-orbit, developed by the European Space Agency (ESA) and its member states, is Envisat. It was launched on March 1, 2002 by an Ariane V from French Guyana and holds a total of 10 multi-disciplinary Earth observation instruments, among which an Advanced Synthetic Aperture Radar (ASAR). The ASAR user community requested the Flight Dynamics division of the European Space Operations Centre (ESOC) to investigate how the orbit control maintenance strategy for Envisat could be changed to optimize ASAR interferometry opportunities overall and in addition support the International Polar Year 2007/2008 initiative. The Polar Regions play a pivotal role in understanding our planet and our impact on it as they are recognized as sensitive barometers of environmental change. One of the main themes of the International Polar Year 2007/2008 is therefore the study of Earth s changing ice and snow, and its impact on our planet and our lives. Naturally, ESA would like to support this very important initiative. This paper presents the investigations that have been conducted to support these requests in the best possible way. It discusses the orbit maintenance strategy that has been in place since its launch, ensuring the actual orbit to be within 1 km of a so-called reference orbit, and presents the new orbit maintenance strategy that is aimed at improving/increasing the opportunities for Envisat ASAR interferometry, while preserving the fuel on board the spacecraft. The hydrazine on-board Envisat happens to be a precious resource as only approximately 300 kg of it was available at launch, like ERS-2. The difference being however that the mass of Envisat is approximately 3.2 times that of ERS-2.

Kuijper, D.↗

Confronting Future Models with Future Satellite Observations of Clouds and Aerosols

The NASA Aerosol, Clouds, Convection and Precipitation (ACCP) Study convened a workshop in November 2020 to understand the future of modeling aerosols, clouds, convection and precipitation, and how satellite data can contribute to that future. ACCP is a project to define a satellite mission to be launched late in the 2020’s to advance cloud and aerosol science, following the recommendations of the latest NASA Decadal Survey. The ACCP modeling workshop goal was to answer the following questions: 1. What will be the critical science questions for clouds and aerosols in 10 years? 2. Where will simulations of clouds and aerosols across scales of space (process models to global) and time (nowcasting to climate prediction) be in 10 years? 3. What data will be available from space? What data would provide the most benefit? 4. What are the state of the art methods for confronting models with cloud and aerosol observations, including assimilation and climatological analysis techniques? The virtual workshop was anchored by a series of pre-recorded talks. Two days of synchronous sessions focused on discussion of the talks, along with small group breakout exercises. After an introduction to the ACCP concept came a panel discussing the future of modeling clouds and aerosols across scales. Participants were then asked to contribute their ideas. On the second day, there were two panel discussions. First came a discussion of the future of satellite observing systems. Second was a discussion of model-data synthesis methods. Finally, participants were asked to develop their own model-data synthesis proposal. The meeting began with an overview of the ACCP mission concept by Graeme Stephens (NASA-JPL). ACCP is a satellite mission for clouds and aerosols, likely anchored by advanced active lidar and radar systems in space, designed to observe detailed aerosol profile and type information, as well as cloud microphysics and dynamics. ACCP will integrate across sensors and observational types to get multi-spectral views of the same scenes, with better resolution than is available today. Launch is scheduled for 2027 or 2029. ACCP is being thought of as a comprehensive mission that may comprise more than one platform and more than one orbit plane (i.e., inclined and polar), with multiple combinations of sensors.

Future Models↗

Project Antares: A low cost modular launch vehicle for the future

The single stage to orbit launch vehicle Antares is based upon the revolutionary concept of modularity, enabling the Antares to efficiently launch communications satellites, as well as heavy payloads, into Earth's orbit and beyond. The basic unit of the modular system, a single Antares vehicle, is aimed at launching approximately 10,000 kg into low Earth orbit (LEO). When coupled with a Centaur upper stage it is capable of placing 3500 kg into geostationary orbit. The Antares incorporates a reusable engine, the Dual Mixture Ratio Engine (DMRE), as its propulsive device. This enables Antares to compete and excel in the satellite launch market by dramatically reducing launch costs. Antares' projected launch costs are $1340 per kg to LEO which offers a tremendous savings over launch vehicles available today. Inherent in the design is the capability to attach several of these vehicles together to provide heavy lift capability. Any number of these vehicles, up to seven, can be attached depending on the payload and mission requirements. With a seven vehicle configuration Antares's modular concept provides a heavy lift capability of approximately 70,000 kg to LEO. This expandability allows for a wider range of payload options such as large Earth satellites, Space Station Freedom support, and interplanetary spacecraft, and also offers a significant cost savings over a mixed fleet based on different launch vehicles.

Aarnio, Steve↗

Report on ISS O2 Production, Gas Supply and Partial Pressure Management

Oxygen is used on International Space Station (ISS) for metabolic support and denitrogenation procedures prior to Extra-Vehicular Activities. Nitrogen is used to maintain total pressure and account for losses associated with leakage and operational losses. Oxygen and nitrogen have been supplied by various visiting vehicles such as the Progress and Shuttle in addition to the on-orbit oxygen production capability. Starting in 2014, new high pressure oxygen/nitrogen tanks are available to launch on commercial cargo vehicles and will replace the high pressure gas source that Shuttle used to provide. To maintain a habitable atmosphere the oxygen and nitrogen partial pressures are controlled between upper and lower bounds. The full range of the allowable partial pressures along with the increased ISS cabin volume are utilized as a buffer allowing days to pass between oxygen production or direct addition of oxygen and nitrogen to the atmosphere from reserves. This paper summarizes the amount of gas supplied and produced from all of the sources and describes past experience of managing partial pressures along with the range of management options available to the ISS.

Schaezler, Ryan N.↗

Ares V: Application to Solar System Scientific Exploration

The development of the Ares V launch vehicle will provide levels of performance unseen since the days of Apollo. This capability, like the Saturn V before it, is being developed primarily for crewed lunar missions. However, the tremendous jump in performance offered by the Ares V launch system has tremendous potential for the furtherance of robotic solar system exploration missions as well. Preliminary performance assessments indicate that Ares V could deliver 5 times the payload to Mars as compared to the most capable US expendable launch vehicle available today. Beyond Mars, the outer planets offer a number of high-priority investigations with compelling science. Presently, missions to these destinations are only achievable using indirect flights with gravity assist trajectories and, in many cases, suffer from long flight times. An Ares V with an upper stage could capture these missions using direct flights with shorter interplanetary transfer times that would enable extensive in situ investigations and possibly the return of samples to Earth. This paper lays out an estimate of Ares V performance for moderate and high C3 missions, and goes on to discuss a range of revolutionary mission concepts that could be enabled by this significant in-crease in launch capability.

Elliott, John↗

Evolving Reliability and Maintainability Allocations for NASA Ground Systems

This paper describes the methodology that was developed to allocate reliability and maintainability requirements for the NASA Ground Systems Development and Operations (GSDO) program's subsystems. As systems progressed through their design life cycle and hardware data became available, it became necessary to reexamine the previously derived allocations. Allocating is an iterative process; as systems moved beyond their conceptual and preliminary design phases this provided an opportunity for the reliability engineering team to reevaluate allocations based on updated designs and maintainability characteristics of the components. Trade-offs in reliability and maintainability were essential to ensuring the integrity of the reliability and maintainability analysis. This paper will discuss the value of modifying reliability and maintainability allocations made for the GSDO subsystems as the program nears the end of its design phase.

allocations↗

Evolving Reliability and Maintainability Allocations for NASA Ground Systems

This paper describes the methodology and value of modifying allocations to reliability and maintainability requirements for the NASA Ground Systems Development and Operations (GSDO) programs subsystems. As systems progressed through their design life cycle and hardware data became available, it became necessary to reexamine the previously derived allocations. This iterative process provided an opportunity for the reliability engineering team to reevaluate allocations as systems moved beyond their conceptual and preliminary design phases. These new allocations are based on updated designs and maintainability characteristics of the components. It was found that trade-offs in reliability and maintainability were essential to ensuring the integrity of the reliability and maintainability analysis. This paper discusses the results of reliability and maintainability reallocations made for the GSDO subsystems as the program nears the end of its design phase.

reliability↗

Evolving Reliability and Maintainability Allocations for NASA Ground Systems

This paper describes the methodology and value of modifying allocations to reliability and maintainability requirements for the NASA Ground Systems Development and Operations (GSDO) program’s subsystems. As systems progressed through their design life cycle and hardware data became available, it became necessary to reexamine the previously derived allocations. This iterative process provided an opportunity for the reliability engineering team to reevaluate allocations as systems moved beyond their conceptual and preliminary design phases. These new allocations are based on updated designs and maintainability characteristics of the components. It was found that trade-offs in reliability and maintainability were essential to ensuring the integrity of the reliability and maintainability analysis. This paper discusses the results of reliability and maintainability reallocations made for the GSDO subsystems as the program nears the end of its design phase.

allocations↗

MSRR Rack Materials Science Research Rack

The Materials Science Research Rack (MSRR) is a research facility developed under a cooperative research agreement between NASA and the European Space Agency (ESA) for materials science investigations on the International Space Station (ISS). The MSRR is managed at the Marshall Space Flight Center (MSFC) in Huntsville, AL. The MSRR facility subsystems were manufactured by Teledyne Brown Engineering (TBE) and integrated with the ESA/EADS-Astrium developed Materials Science Laboratory (MSL) at the MSFC Space Station Integration and Test Facility (SSITF) as part of the Systems Development Operations Support (SDOS) contract. MSRR was launched on STS-128 in August 2009, and is currently installed in the U. S. Destiny Laboratory Module on the ISS. Materials science is an integral part of developing new, safer, stronger, more durable materials for use throughout everyday life. The goal of studying materials processing in space is to develop a better understanding of the chemical and physical mechanisms involved, and how they differ in the microgravity environment of space. To that end, the MSRR accommodates advanced investigations in the microgravity environment of the ISS for basic materials science research in areas such as solidification of metals and alloys. MSRR allows for the study of a variety of materials including metals, ceramics, semiconductor crystals, and glasses. Materials science research benefits from the microgravity environment of space, where the researcher can better isolate chemical and thermal properties of materials from the effects of gravity. With this knowledge, reliable predictions can be made about the conditions required on Earth to achieve improved materials. MSRR is a highly automated facility with a modular design capable of supporting multiple types of investigations. Currently the NASA-provided Rack Support Subsystem provides services (power, thermal control, vacuum access, and command and data handling) to the ESA developed Materials Science Laboratory (MSL) which accommodates interchangeable Furnace Inserts (FI). Two ESA-developed FIs are presently available on the ISS: the Low Gradient Furnace (LGF) and the Solidification and Quenching Furnace (SQF). Sample-Cartridge Assemblies (SCAs), each containing one or more material samples, are installed in the FI by the crew and can be processed at temperatures up to 1400 C. Once an SCA is installed, the experiment can be run by automatic command or science conducted via telemetry commands from the ground. This facility is available to support materials science investigations through programs such as the US National Laboratory, Technology Development, NASA Research Announcements, and others. TBE and MSFC are currently developing NASA Sample Cartridge Assemblies (SCA's) with a planned availability for launch in 2017.

Reagan, Shawn↗

Mars Rover and Sample Return Mission design

The current reference Mars Rover and Sample Return mission is described. Technical issues are outlined, including high-resolution image acquisition and reconstruction, approach navigation, ground and flight systems operational complexity, rover autonomy, autonomous rendezvous and docking in Mars orbit, aerocapture and aeromaneuver, estimating the probability of mission success, and end-to-end information system design. Focus is placed on lander hazard identification and avoidance, pinpoint landing guidance and control, Mars ascent vehicle guidance and control, planetary protection and quarantine, sample acquisition and preservation, project management and control, systems requirements and interface control, and costing. In addition, program issues such as international participation, fiscal constraints, and launch-vehicle availability are considered.

Kwok, Johnny H.↗

Potential commercial uses of EOS remote sensing products

The instrument complement of the Earth Observing System (EOS) satellite system will generate data sets with potential interest to a variety of users who are now just beginning to develop geographic information systems tailored to their special applications and/or jurisdictions. Other users may be looking for a unique product that enhances competitive position. The generally distributed products from EOS will require additional value added processing to derive the unique products desired by specific users. Entrepreneurs have an opportunity to create these proprietary level 4 products from the EOS data sets. Specific instruments or collections of instruments could provide information for crop futures trading, mineral exploration, television and printed medium news products, regional and local government land management and planning, digital map directories, products for third world users, ocean fishing fleet probability of harvest forecasts, and other areas not even imagined at this time. The projected level 3 product are examined that will be available at launch from EOS instruments and commercial uses of the data after value added processing is estimated.

Thompson, Leslie L.↗

Shape-Memory-Alloy Actuator For Flight Controls

Report proposes use of shape-memory-alloy actuators, instead of hydraulic actuators, for aerodynamic flight-control surfaces. Actuator made of shape-memory alloy converts thermal energy into mechanical work by changing shape as it makes transitions between martensitic and austenitic crystalline phase states of alloy. Because both hot exhaust gases and cryogenic propellant liquids available aboard launch rockets, shape-memory-alloy actuators exceptionally suited for use aboard such rockets.

Barret, Chris↗

Extreme Ultraviolet Imaging Telescope (EIT)

Efforts concentrated on development and implementation of the SolarSoft (SSW) data analysis system. From an EIT analysis perspective, this system was designed to facilitate efficient reuse and conversion of software developed for Yohkoh/SXT and to take advantage of a large existing body of software developed by the SDAC, Yohkoh, and SOHO instrument teams. Another strong motivation for this system was to provide an EIT analysis environment which permits coordinated analysis of EIT data in conjunction with data from important supporting instruments, including Yohkoh/SXT and the other SOHO coronal instruments; CDS, SUMER, and LASCO. In addition, the SSW system will support coordinated EIT/TRACE analysis (by design) when TRACE data is available; TRACE launch is currently planned for March 1998. Working with Jeff Newmark, the Chianti software package (K.P. Dere et al) and UV /EUV data base was fully integrated into the SSW system to facilitate EIT temperature and emission analysis.

Lemen, J. R.↗

Analysis of Trajectory Parameters for Probe and Round-Trip Missions to Venus

For one-way transfers between Earth and Venus, charts are obtained that show velocity, time, and angle parameters as functions of the eccentricity and semilatus rectum of the Sun-focused vehicle conic. From these curves, others are obtained that are useful in planning one-way and round-trip missions to Venus. The analysis is characterized by circular coplanar planetary orbits, successive two-body approximations, impulsive velocity changes, and circular parking orbits at 1.1 planet radii. For round trips the mission time considered ranges from 65 to 788 days, while wait time spent in the parking orbit at Venus ranges from 0 to 467 days. Individual velocity increments, one-way travel times, and departure dates are presented for round trips requiring the minimum total velocity increment. For both single-pass and orbiting Venusian probes, the time span available for launch becomes appreciable with only a small increase in velocity-increment capability above the minimum requirement. Velocity-increment increases are much more effective in reducing travel time for single-pass probes than they are for orbiting probes. Round trips composed of a direct route along an ellipse tangent to Earth's orbit and an aphelion route result in the minimum total velocity increment for wait times less than 100 days and mission times ranging from 145 to 612 days. Minimum-total-velocity-increment trips may be taken along perihelion-perihelion routes for wait times ranging from 300 to 467 days. These wait times occur during missions lasting from 640 to 759 days.

Dugan, James F., Jr.↗

A Performance Assessment of NASA's Heliophysics Program

Recognizing the importance of distributed observations of all elements of the Sun-to-Earth system and the synergies between observation and theory and between basic and targeted research, the National Research Council's 2003 solar and space physics decadal survey laid out an integrated research strategy that sought to extend and augment what has now become the Heliophysics Great Observatory as well as to enhance NASA, NOAA, NSF, and DOD's other solar and space physics research activities. The Integrated Research Strategy provided a prioritized list of flight missions and theory and modeling programs that would advance the relevant physical theories, incorporate those theories in models that describe a system of interactions between the Sun and the space environment, obtain data on the system, and analyze and test the adequacy of the theories and models. As directed by Congress in the NASA Authorization Act of 2005, the purpose of this report is to assess the progress of NASA's Heliophysics Division at the 5-year mark against the NASA goals and priorities laid out in the decadal survey. In addition to the Integrated Research Strategy, the decadal survey also considered non-mission-specific initiatives to foster a robust solar and space physics program. The decadal survey set forth driving science challenges as well as recommendations devoted to the need for technology development, collaborations and cooperation with other disciplines, understanding the effects of the space environment on technology and society, education and public outreach, and steps that could strengthen and enhance the research enterprise. Unfortunately, very little of the recommended NASA program priorities from the decadal survey s Integrated Research Strategy will be realized during the period (2004-2013) covered by the survey. Mission cost growth, reordering of survey mission priorities, and unrealized budget assumptions have delayed or deferred nearly all of the NASA spacecraft missions recommended in the survey. As a result, the status of the Integrated Research Strategy going forward is in jeopardy, and the loss of synergistic capabilities in space will constitute a serious impediment to future progress. Some of these factors were largely outside NASA's control, but as the assessments in Chapter 2 of this report detail, many factors were driven by subsequent NASA decisions about mission science content, mission size, and mission sequence. Overcoming these challenges, as well as other key issues like launch vehicle availability, will be critical if NASA is to realize more of the decadal survey's priorities over the next 5 years as well as priorities in solar and space physics research in the long term. Chapter 3 of this report provides recommendations about how NASA can better fulfill the 2003 decadal survey and improve future decadal surveys in solar and space physics.

Source record↗

Nuclear Thermal Propulsion Development Risks

There are clear advantages of development of a Nuclear Thermal Propulsion (NTP) for a crewed mission to Mars. NTP for in-space propulsion enables more ambitious space missions by providing high thrust at high specific impulse ((is) approximately 900 sec) that is 2 times the best theoretical performance possible for chemical rockets. Missions can be optimized for maximum payload capability to take more payload with reduced total mass to orbit; saving cost on reduction of the number of launch vehicles needed. Or missions can be optimized to minimize trip time significantly to reduce the deep space radiation exposure to the crew. NTR propulsion technology is a game changer for space exploration to Mars and beyond. However, 'NUCLEAR' is a word that is feared and vilified by some groups and the hostility towards development of any nuclear systems can meet great opposition by the public as well as from national leaders and people in authority. The public often associates the 'nuclear' word with weapons of mass destruction. The development NTP is at risk due to unwarranted public fears and clear honest communication of nuclear safety will be critical to the success of the development of the NTP technology. Reducing cost to NTP development is critical to its acceptance and funding. In the past, highly inflated cost estimates of a full-scale development nuclear engine due to Category I nuclear security requirements and costly regulatory requirements have put the NTP technology as a low priority. Innovative approaches utilizing low enriched uranium (LEU). Even though NTP can be a small source of radiation to the crew, NTP can facilitate significant reduction of crew exposure to solar and cosmic radiation by reducing trip times by 3-4 months. Current Human Mars Mission (HMM) trajectories with conventional propulsion systems and fuel-efficient transfer orbits exceed astronaut radiation exposure limits. Utilizing extra propellant from one additional SLS launch and available energy in the NTP fuel, HMM radiation exposure can be reduced significantly.

Kim, Tony↗