Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “interconnection equipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Recommendations for Data-in-Transit Requirements for Securing DER Communications

With the adoption of Distributed Energy Resource (DER) interoperability standards, common communication protocols are now being deployed between power system operators and DER devices. In 2018, a revision to the US interconnection and interoperability standard, Institute of Electrical and Electronics Engineers (IEEE) Std. 1547, required DER equipment to have an IEEE 2030.5, IEEE 1815, or SunSpec Modbus communication exchange interface. This change supports the future transition to secure connection and exchange of information between the DER equipment and implementing parties, such as grid operators. Adoption of standardized communication protocols and associated information models is a critical step toward interoperability between power system operators and DER, such as photovoltaic (PV) and energy storage systems. However, security requirements for these standardized communication protocols are not comprehensive, resulting in non-standard and vendor-specific implementation that may leave DER equipment susceptible to cyberattacks. This paper examines the data-in-flight security requirements for standardized DER communication protocols, per IEEE 1547-2018 revision, as it relates to device authentication, key management, and encryption. The state of the art for these security features is also explored, addressing their impact on communication and performance of low-cost single board computers, which are typical of DER devices. In conclusion, a recommendation is provided to adopt a common set of communication requirements, which are intended to achieve interoperability and implement data security over DER network pathways, while ensuring reliable, secure, and real-time information delivery.

42 ENGINEERING↗

A Comprehensive Method to Mitigate Forced Oscillations in Large Interconnected Power Grids

Multiple severe forced oscillation events have recently been observed across the North American interconnections and around the world. These forced oscillations have caused power swings, limited power transfer capability, damaged equipment, and persisted indefinitely until the driving source was located and removed. This paper proposes a comprehensive method to mitigate forced oscillations. Once a forced oscillation is detected, a new source location algorithm can be used to locate the source based on the oscillation mode angle without requiring system topology information. If the source cannot be quickly located and removed, a control strategy can be activated to modulate the active power of utility-scale inverterbased battery energy storage systems (BESSs) to reduce the energy of forced oscillations to a safe level and allow sufficient time for locating the exact source. The proposed source location algorithm is validated using measurements collected during the January 11, 2019 forced oscillation event in North America and other actual grid events, while the proposed control strategy is verified using the Eastern Interconnection dynamic model under the replicated January 11, 2019 forced oscillation event. The simulation results demonstrated that the proposed source location algorithm can accurately identify the forced oscillation source, and the proposed control strategy can significantly reduce forced oscillation energy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Best Practices Guide for Streamlining Solar Permitting & Inspections in Central Texas

The cost of solar installations can be generally separated into "hard" costs (i.e., the costs of physical components such as photovoltaic (PV) modules, metal mounting equipment, wiring, inverters, etc.) and "soft" costs (i.e., the cost of associated processes such as permitting, interconnection, rebate processing, and financing).

14 SOLAR ENERGY↗

Mobile Communication Via Satellite

System mixes real-time and delayed-transmission channels. Combination of L-band and SHF links connect fixed and mobile equipment on ground to satellite relay. Software and hardware architecture conforms structure of open-system-interconnection model suggested by International Standards Organization.

Yan, Tsun-Yee↗

Enabling Resiliency Operations across Multiple Microgrids with Grid Friendly Appliance Controllers

Changes in economic, technological, and environmental policies are resulting in a re-evaluation of the dependence on large central generation facilities and their associated transmission networks. Emerging concepts of smart communities/cities are examining the potential to leverage cleaner sources of generation, as well as integrating electricity generation with other municipal functions. When grid connected, these generation assets can supplement the existing interconnections with the bulk transmission system, and in the event of an extreme event, they can provide power via a collection of microgrids. To achieve the highest level of resiliency, it may be necessary to conduct switching operations to interconnect individual microgrids. While the interconnection of multiple microgrids can increase the resiliency of the system, the associated switching operations can cause large transients in low inertia microgrids. The combination of low system inertia and IEEE 1547 and 1547a-compliant inverters can prevent multiple microgrids from being interconnected during extreme weather events. This study will present a method of using end-use loads equipped with Grid Friendly™ Appliance controllers to facilitate the switching operations between multiple microgrids; operations that are necessary for optimal operations when islanded for resiliency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Great Lakes O shore Wind Project: Utility and Regional Integration Study

This project aims to identify transmission system upgrades needed to facilitate offshore wind projects as well as operational impacts of offshore generation on operation of the regional transmission system in the Great Lakes region. A simulation model of the US Eastern Interconnection was used as the test system as a case study for investigating the impact of the integration of a 1000MW offshore wind farm operating in Lake Erie into FirstEnergy/PJM service territory. The findings of this research provide recommendations on offshore wind integration scenarios, the locations of points of interconnection, wind profile modeling and simulation, and computational methods to quantify performance, along with operating changes and equipment upgrades needed to mitigate system performance issues introduced by an offshore wind project.

17 WIND ENERGY↗

The design, construction, and operation of long-distance high-voltage electricity transmission technologies.

This report focuses on transmission lines, which operate at voltages of 115 kV and higher. Currently, the highest voltage lines comprising the North American power grid are at 765 kV. The grid is the network of transmission lines that interconnect most large power plants on the North American continent. One transmission line at this high voltage was built near Chicago as part of the interconnection for three large nuclear power plants southwest of the city. Lines at this voltage also serve markets in New York and New England, also very high demand regions. The large power transfers along the West Coast are generally at 230 or 500 kV. Just as there are practical limits to centralization of power production, there are practical limits to increasing line voltage. As voltage increases, the height of the supporting towers, the size of the insulators, the distance between conductors on a tower, and even the width of the right-of-way (ROW) required increase. These design features safely isolate the electric power, which has an increasing tendency to arc to ground as the voltage (or electrical potential) increases. In addition, very high voltages (345 kV and above) are subject to corona losses. These losses are a result of ionization of the atmosphere, and can amount to several megawatts of wasted power. Furthermore, they are a local nuisance to radio transmission and can produce a noticeable hum. Centralized power production has advantages of economies of scale and special resource availability (for instance, hydro resources), but centralized power requires long-distance transfers of power both to reach customers and to provide interconnections for reliability. Long distances are most economically served at high voltages, which require large-scale equipment and impose a substantial footprint on the corridors through which power passes. The most visible components of the transmission system are the conductors that provide paths for the power and the towers that keep these conductors at a safe distance from each other and from the ground and the natural and built environment. Common elements that are generally less visible (or at least more easily overlooked) include the maintained ROW along the path of the towers, access roads needed for maintenance, and staging areas used for initial construction that may be restored after construction is complete. Also visible but less common elements along the corridor may include switching stations or substations, where lines of similar or different voltages meet to transfer power.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NEXUS Scalable and Distributed Next-Generation Avionics Bus for Space Missions

A paper discusses NEXUS, a common, next-generation avionics interconnect that is transparently compatible with wired, fiber-optic, and RF physical layers; provides a flexible, scalable, packet switched topology; is fault-tolerant with sub-microsecond detection/recovery latency; has scalable bandwidth from 1 Kbps to 10 Gbps; has guaranteed real-time determinism with sub-microsecond latency/jitter; has built-in testability; features low power consumption (< 100 mW per Gbps); is lightweight with about a 5,000-logic-gate footprint; and is implemented in a small Bus Interface Unit (BIU) with reconfigurable back-end providing interface to legacy subsystems. NEXUS enhances a commercial interconnect standard, Serial RapidIO, to meet avionics interconnect requirements without breaking the standard. This unified interconnect technology can be used to meet performance, power, size, and reliability requirements of all ranges of equipment, sensors, and actuators at chip-to-chip, board-to-board, or box-to-box boundary. Early results from in-house modeling activity of Serial RapidIO using VisualSim indicate that the use of a switched, high-performance avionics network will provide a quantum leap in spacecraft onboard science and autonomy capability for science and exploration missions.

He, Yutao↗

A High-Fidelity Electromagnetic Transient Model of Inverter-based Resources Integrated to an IEEE-9 Bus System for Benchmarking Studies

An inverter-based resource (IBR) is a source of electricity that is asynchronously connected to the electrical grid via an electronic power converter. These power sources lack the intrinsic behaviors of the standard power plants, presenting specific challenges to system stability. These power sources lack the intrinsic behaviors of the standards power plants and their features are almost entirely defined by the control strategy used on them, presenting specific challenges to system stability as their penetration increases into the already fragile Bulk Power System (BPS). Utilizing renewable energy has a great upside but the electrical industry needs to understand the requirements like performing electromagnetic transient (EMT) simulation studies in planning and/or in interconnection studies. This paper presents the development of a high-fidelity EMT model based on commercial equipment and field parameters, which at the same time aims to study the increasing penetration of IBRs and their impact on the actual BPS. The open-source EMT model developed will be a benchmarking example that can be used to evaluate algorithms in the power grid (including evaluating grid-forming controls, power system monitoring and operation, etc.).

Martinez Montejano, Misael↗

Design of the MsAa-4 Moessbauer Spectrometer

An entirely new Moessbauer spectrometer MsAa-4 is currently being under design and construction. New features as compared to the basic features of the previous generation MsAa-3 spectrometer could be summarized as follows. Completely digital processing of the {gamma}-ray detector signal beyond the Gaussian shape filter/amplifier is to be implemented. The spectrometer is going to be able to accommodate external multiple detector heads. Up to 128 {gamma}-ray spectra in 16384 channels of 32-bit each and up to 512 Moessbauer spectra in 4096 channels of 32-bit each could be collected simultaneously, provided the proper external multiple detector head is used. The count-rate per single detector is limited to about 10{sup 5} counts per second in total. Improved precision of the reference function from 12-bit to 16-bit is to be provided. The reference function is stored in 8192 channels per a complete cycle. Addition of the random noise to the reference corner prism of the Michelson-Morley calibration interferometer is to be introduced to avoid spurious fringes due to the phase lock-up. An integrated universal temperature controller being able to use a variety of the temperature sensors is to be interconnected properly with the spectrometer. The spectrometer is now a stand-alone network device as it is equipped with the Ethernet connection to the outside world. Fast and high precision digital oscilloscope is to be incorporated to the spectrometer as the intrinsic unit. This oscilloscope could monitor signals at various crucial points of the internal spectrometer electronics. Modular design and use of the strict standards allows easy reconfiguration for other applications than Moessbauer spectroscopy.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Interconnection Standard Grid-Support Function Evaluations Using an Automated Hardware-in-the-Loop Testbed

Grid operators are increasingly turning to advanced grid-support functions in distributed energy resources (DER) to assist with distribution circuit voltage regulation, bulk system frequency control, and power system protection. The U.S. DER certification standard, Underwriters Laboratories (UL) 1741, was revised in September 2016 to add test procedures for multiple grid-support functions. Sandia National Laboratories, SunSpec Alliance, and growing community of collaborators have undertaken a multiyear effort to create an open-source system validation platform (SVP) that automates DER interconnection and interoperability test procedures by communicating with grid simulators, photovoltaic (PV) simulators, data acquisition systems, and interoperable equipment under test. However, the power hardware required for generating the test conditions may be untenable for many organizations. In this paper, we discuss development of the SVP testing capabilities for UL 1741 tests utilizing a controller hardware-in-the-loop testbed that precludes the need for power hardware using a 34.5 kW Austrian Institute of Technology smart grid controller. Finally, analysis of normal ramp rate, soft start ramp rate, specified power factor, volt-VAr, and frequency-watt advanced grid functions, and the effectiveness of the UL 1741 test protocols are included.

24 POWER TRANSMISSION AND DISTRIBUTION↗

State of the States 2009: Renewable Energy Development and the Role of Policy

This report tracks the progress of U.S. renewable energy development at the state level, with metrics on development status and reviews of relevant policies. The analysis offers state-by-state policy suggestions and develops performance-based evaluation metrics to accelerate and improve renewable energy development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Open System Interconnection - NASA program communications of the future

Open Systems Interconnection (OSI) standards are being developed by the ISO and the Consultative Committee on International Telephone and Telegraph with the support of industry. These standards are being developed to allow the interconnecting of computer systems and the interworking of applications such that the applications can be independent of any equipment manufacturer. Significant progress has been made, and the establishment of government OSI standards is being considered. There is considerable interest within NASA in the potential benefits of OSI and in communications standards in general. The OSI standards are being considered for possible application in the Space Station onboard data management system. The OSI standards have reached a high level of maturity, and it is now imperative that NASA plan for future migration to OSI where appropriate.

Brady, Charles D.↗

Assessment and Coordination of EVSE Cybersecurity Standards

Cybersecurity certification programs for Electric Vehicle Supply Equipment (EVSE) are fragmented due to no single certification covering all aspects of the device and additionally the existence of multiple programs and under different levels of regulation. These devices are also confronted by the intricate assembly of product software, firmware, and hardware. Devices contain both logical and physical interfaces. These multifaceted devices have vulnerabilities at many levels and interconnect with other potentially vulnerable systems including the electric vehicle, the cloud where data and payment information are stored, and the electric grid and electric grid equipment including utilities. Of the EVSE certification programs that are found, none are directly for the cybersecurity of EVSE. Many standards are for safety, specifically battery safety, some are cybersecurity standards for other types of equipment and can be modeled for EVSE. In specific, ISA/IEC 62443 is found to be significantly in line with EVSE security needs and will be used in future testing to certify EVSE and help guide the project to demonstrate where gaps exist, where strengths lie in the standard and how this can be used to lead the certification efforts in harmonizing EVSE cybersecurity standards. In addition, there are multiple efforts that are currently seeking to build EVSE standards or revise existing standards to address gaps. This effort is seeking to establish a cybersecurity program for EVSE that will inform customers and help increase the level of security across products and state EVSE procurements to achieve consistency across different jurisdictions.

33 ADVANCED PROPULSION SYSTEMS↗

Design and Analysis of a Region-Wide Remotely Controllable Electrical Lock-Out System

Electric utilities have a main responsibility to protect the lives and safety of their workers when they are working on low-, medium-, and high-voltage power lines and distribution circuits. With the anticipated widespread deployment of smart grids, a secure and highly reliable means of maintaining isolation of customer-owned distributed generation (DG) from the affected distribution circuits during maintenance is necessary to provide a fully de-energized work area, ensure utility personnel safety, and prevent hazards that can lead to accidents such as accidental electrocution from unanticipated power sources. Some circuits are serviced while energized (live line work) while others are de-energized for maintenance. For servicing de-energized circuits and equipment, lock-out tag-out (LOTO) programs provide a verifiable procedure for ensuring that circuit breakers are locked in the off state and tagged to indicate that status to operational personnel so that the lines will be checked for voltage to verify they are de-energized. The de-energized area is isolated from any energized sources, which traditionally are the substations. This procedure works well when all power sources and their interconnections are known armed with this knowledge, utility personnel can determine the appropriate circuits to de-energize for isolating the target line or equipment. However, with customer-owned DG tied into the grid, the risk of inadvertently reenergizing a circuit increases because circuit connections may not be adequately documented and are not under the direct control of the local utility. Thus, the active device may not be properly de-energized or isolated from the work area. Further, a remote means of de-energizing and locking out energized devices provides an opportunity for greatly reduced safety risk to utility personnel compared to manual operations. In this paper, we present a remotely controllable LOTO system that allows individual workers to determine the configuration and status of electrical system circuits and permit them to lock out customer-owned DG devices for safety purposes using a highly secure and ultra-reliable radio signal. The system consists of: (1) individual personal lockout devices, (2) lockout communications and logic module at circuit breakers, which are located at all DG devices, and (3) a database and configuration control process located at the utility operations center. The lockout system is a close permissive, i.e., loss of control power or communications will cause the circuit breaker to open. Once the DG device is tripped open, a visual means will provide confirmation of a loss of voltage and current that verifies the disconnected status of the DG. Further the utility personnel will be able to place their own lock electronically on the system to ensure a lockout functionally. The proposed LOTO system provides enhanced worker safety and protection against unintended energized lines when DG is present. The main approaches and challenges encountered through designing the proposed region-wide LOTO system are discussed in this paper. These approaches include: (1) evaluating the reliability of the proposed approach under N-modular redundancy with voter/spares configurations and (2) conducting a system level risk assessment study using the failure modes and effects analysis (FMEA) technique to identify and rank failure modes by probability of occurrence, probability of detection, and severity of consequences. This ranking allows a cost benefits analysis to be conducted such that dollars and efforts will be applied to the failures that provide greatest incremental gains in system capability (resilience, survivability, security, reliability, availability, etc.) per dollar spent whether capital, operations, or investment. Several simulation scenarios and their results are presented to demonstrate the viability of these approaches.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NDA SYSTEM RESPONSE MODELING AND ITS APPLICATION

The Portsmouth gaseous diffusion plant (PORTS) is a uranium enrichment facility that was historically used to enrich uranium to levels that range from 2% to greater than 97%. The feed material for PORTS was obtained from the Paducah Gaseous Diffusion Plant (PGDP) that produced uranium in the form of UF6 that was enriched to about 1 to 2%. The enrichment process involves a multistage process by which gaseous UF{sub 6} passed through a diffusion barrier in each stage. The porous diffusion barrier in each stage retards the rate of the diffusion of the heavier {sup 238}U atoms relative to the diffusion of the lighter {sup 235}U atoms. By this process the product stream is slightly enriched by each stage of the process. Each stage consists of a compressor, converter and a motor. There are more than 4000 stages that are linked together with piping of various diameters to form the PORTS cascade. The cascade spans three interconnected buildings and comprises miles of piping, thousands of seals, converters, valves, motors, and compressors. During operation, PORTS process equipment contained UF{sub 6} gas with uranium enrichment that increased in the process stream from the first to the last stage in a known manner. Gaseous UF{sub 6} moving through the PORTS process equipment had potential to form deposits within the process equipment by several mechanisms, including solidification due to incorrect temperature and pressure conditions during the process, inleakage of atmospheric moisture that chemically reacts with UF{sub 6} to form hydrated uranyl fluoride solids, reduction reactions of UF{sub 6} with cascade metals, and UF{sub 6} condensation on the internal equipment surfaces. As a result, the process equipment of the PORTS contains a variable and unknown quantity of uranium with variable enrichment that has been deposited within the equipment during plant operations. The exact chemical form of this uranium is variable, although it is expected that the bulk of the material is of the form of uranyl fluoride that will become hydrated on exposure to moisture in air when the systems are no longer buffered. The deposit geometry and thickness is uncertain and variable. However, a reasonable assessment of the level of material holdup in this equipment is necessary to support decommissioning efforts. The assessment of nuclear material holdup in process equipment is a complex process that requires integration of process knowledge, nondestructive assay (NDA) measurements, and computer modeling to maximize capabilities and minimize uncertainty. The current report is focused on the use of computer modeling and simulation of NDA measurements.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SCSI Communication Test Bus

Small Computer System Interface (SCSI) communication test bus provides high-data-rate, standard interconnection enabling communication among International Business Machines (IBM) Personal System/2 Micro Channel, other devices connected to Micro Channel, test equipment, and host computer. Serves primarily as nonintrusive input/output attachment to PS/2 Micro Channel bus, providing rapid communication for debugger. Opens up possibility of using debugger in real-time applications.

Hua, Chanh V.↗

Wind Generation on Winnebago Tribal Lands

The Winnebago Wind Energy Study evaluated facility-scale, community-scale and commercial-scale wind development on Winnebago Tribal lands in northeastern Nebraska. The Winnebago Tribe of Nebraska has been pursuing wind development in various forms for nearly ten years. Wind monitoring utilizing loaned met towers from NREL took place during two different periods. From April 2001 to April 2002, a 20-meter met tower monitored wind data at the WinnaVegas Casino on the far eastern edge of the Winnebago reservation in Iowa. In late 2006, a 50-meter tower was installed, and subsequently monitored wind data at the WinnaVegas site from late 2006 through late 2008. Significant challenges with the NREL wind monitoring equipment limited the availability of valid data, but based on the available data, average wind speeds between 13.6 – 14.3 miles were indicated, reflecting a 2+/3- wind class. Based on the anticipated cost of energy produced by a WinnaVegas wind turbine, and the utility policies and rates in place at this time, a WinnaVegas wind project did not appear to make economic sense. However, if substantial grant funding were available for energy equipment at the casino site, and if either Woodbury REC backup rates were lower, or NIPCO was willing to pay more for wind power, a WinnaVegas wind project could be feasible. With funding remaining in the DOE-funded project budget,a number of other possible wind project locations on the Winnebago reservation were considered. in early 2009, a NPPD-owned met tower was installed at a site identified in the study pursuant to a verbal agreement with NPPD which provided for power from any ultimately developed project on the Western Winnebago site to be sold to NPPD. Results from the first seven months of wind monitoring at the Western Winnebago site were as expected at just over 7 meters per second at 50-meter tower height, reflecting Class 4 wind speeds, adequate for commercial development. If wind data collected in the remaining months of the twelve-month collection period is consistent with that collected in the first seven months, the Western Winnebago site may present an interesting opportunity for Winnebago. Given the distance to nearby substations, and high cost of interconnection at higher voltage transmission lines, Winnebago would likely need to be part of a larger project in order to reduce power costs to more attractive levels. Another alternative would be to pursue grant funding for a portion of development or equipment costs, which would also help reduce the cost of power produced. The NREL tower from the WinnaVegas site was taken down in late 2008, re-instrumented and installation attempted on the Thunderway site south of the Winnebago community. Based on projected wind speeds, current equipment costs, and the project’s proximity to substations for possible interconnection, a Thunderway community-scale wind project could also be feasible.

17 WIND ENERGY↗