Life science payload definition and integration study, task C and D. Volume 3: Appendices
Research equipment requirements were based on the Mini-7 and Mini-30 laboratory concepts defined in Tasks A and B of the intial LSPD contract. Modified versions of these laboratories and the research equipment within them were to be used in three missions of Shuttle/Sortie Module. These were designated (1) the shared 7-day laboratory (a mission with the life sciences laboratory sharing the sortie module with another scientific laboratory), (2) the dedicated 7-day laboratory (full use of the sortie module), and (3) the dedicated 30-day laboratory (full sortie module use with a 30-day mission duration). In defining the research equipment requirements of these laboratories, the equipment was grouped according to its function, and equipment unit data packages were prepared.