Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integer optimal control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

IPIP: A new approach to inverse planning for HDR brachytherapy by directly optimizing dosimetric indices

Purpose: Many planning methods for high dose rate (HDR) brachytherapy require an iterative approach. A set of computational parameters are hypothesized that will give a dose plan that meets dosimetric criteria. A dose plan is computed using these parameters, and if any dosimetric criteria are not met, the process is iterated until a suitable dose plan is found. In this way, the dose distribution is controlled by abstract parameters. The purpose of this study is to develop a new approach for HDR brachytherapy by directly optimizing the dose distribution based on dosimetric criteria. Methods: The authors developed inverse planning by integer program (IPIP), an optimization model for computing HDR brachytherapy dose plans and a fast heuristic for it. They used their heuristic to compute dose plans for 20 anonymized prostate cancer image data sets from patients previously treated at their clinic database. Dosimetry was evaluated and compared to dosimetric criteria. Results: Dose plans computed from IPIP satisfied all given dosimetric criteria for the target and healthy tissue after a single iteration. The average target coverage was 95%. The average computation time for IPIP was 30.1 s on an Intel(R) Core{sup TM}2 Duo CPU 1.67 GHz processor with 3 Gib RAM. Conclusions: IPIP is an HDR brachytherapy planning system that directly incorporates dosimetric criteria. The authors have demonstrated that IPIP has clinically acceptable performance for the prostate cases and dosimetric criteria used in this study, in both dosimetry and runtime. Further study is required to determine if IPIP performs well for a more general group of patients and dosimetric criteria, including other cancer sites such as GYN.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Automated shaker placement and regularized input estimation for MIMO testing.

Multi-input, multi-output (MIMO) testing is used in component qualification to reproduce operational responses in the laboratory. It is often preferred to single-input and base-shake testing because of the potential for equivalent or better tests using smaller actuators and shorter test suites. Given a target response, two key steps in MIMO test design are selecting actuator locations and solving for input loads. Actuator locations are often manually selected using expert judgment. If an automatic method is used, locations are usually determined by simulating the vibration control problem and minimizing a combination of the input energy and control residuals. To select a configuration, the relative importance of input energy and residuals must be specified. Specifying relative weights is, in general, a manual and subjective process. This paper develops an objective function that compares actuator configurations based on control accuracy and required input energy without any manual parameter tuning. The objective function uses an optimally selected tradeoff parameter for each candidate configuration. To choose actuator locations using the new objective function, a pivoting algorithm for integer programming problems is developed. Starting with an initial configuration (such as the one generated by a greedy algorithm), the pivoting algorithm guarantees an objective function decrease in each iteration until convergence is reached. In a simulation featuring a structure excited by a diffuse acoustic field, electrodynamic shaker locations and regularized inputs are solved for without any analyst-specified parameters. Simulations are performed in MIMO configurations where the number of target responses is less than, equal to, and greater than the number of actuators.

Multi-input multi-output↗

Predictively Coordinated Vehicle Acceleration and Lane Selection Using Mixed Integer Programming

Autonomous vehicle technology provides the means to optimize motion planning beyond human capacity. In particular, the problem of navigating multi-lane traffic optimally for trip time, energy efficiency, and collision avoidance presents challenges beyond those of single-lane roadways. For example, the host vehicle must simultaneously track multiple obstacles, the drivable region is non-convex, and automated vehicles must obey social expectations. Furthermore, reactive decision-making may result in becoming stuck in an undesirable traffic position. This paper presents a fundamental approach to these problems using model predictive control with a mixed integer quadratic program at its core. Lateral and longitudinal movements are coordinated to avoid collisions, track a velocity and lane, and minimize acceleration. Vehicle-to-vehicle connectivity provides a preview of surrounding vehicles’ motion. Simulation results show a 79% reduction in congestion-induced travel time and an 80% decrease in congestion-induced fuel consumption compared to a rule-based approach.

Dollar, Robert Austin↗

Resilient Distribution System by Microgrids Formation After Natural Disasters

Microgrids with distributed generation provide a resilient solution in the case of major faults in a distribution system due to natural disasters. This paper proposes a novel distribution system operational approach by forming multiple microgrids energized by distributed generation from the radial distribution system in real-time operations, to restore critical loads from the power outage. Specifically, a mixed-integer linear program (MILP) is formulated to maximize the critical loads to be picked up while satisfying the self-adequacy and operation constraints for the microgrids formation problem, by controlling the ON/OFF status of the remotely controlled switch devices and distributed generation. A distributed multi-agent coordination scheme is designed via local communications for the global information discovery as inputs of the optimization, which is suitable for autonomous communication requirements after the disastrous event. The formed microgrids can be further utilized for power quality control and can be connected to a larger microgrid before the restoration of the main grids is complete. Numerical results based on modified IEEE distribution test systems validate the effectiveness of our proposed scheme.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Loss Minimization With Optimal Power Dispatch in Multi-Frequency HVac Power Systems

Low-frequency high-voltage ac transmission scheme has recently been proposed as an alternative approach for bulk power transmission. This paper proposes a multi-period optimal power flow (OPF) for a multi-frequency HVac transmission system that interconnects both conventional 50/60-Hz and low-frequency grids using back-to-back converters with a centralized control scheme. The OPF objective is to minimize system losses by determining the optimal dispatch for generators, shunt capacitors, and converters. The OPF constraints include the operational constraints of all HVac grid and converter stations. The resulting mixed-integer nonlinear programing problem is solved using a proposed framework based on the predictor-corrector primal-dual interior-point method. The proposed OPF formulation and solution approach are verified using a multi-frequency HVac transmission system that is modified from the IEEE 57-bus system. Here, the results with the optimal dispatch from the proposed method during a simulated day show a significant loss reduction and an improved voltage regulation compared to those when an arbitrary dispatch is chosen.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Utilising demand response for distribution service restoration to achieve grid resiliency against natural disasters

The increased frequency of power outages due to natural disasters in recent years has highlighted the urgency of enhancing distribution grid resilience. The effective distribution service restoration (DSR) is an important measure for a resilient distribution grid. In this work, the authors demonstrate that DSR can be significantly improved by leveraging the flexibility provided by the inclusion of demand response (DR). The authors propose a framework for this by considering integrated control of household-level flexible appliances to vary the load demand at the distribution-grid level to improve DSR. The overall framework of the proposed system is modelled as a three-step method considering three optimization problems to (i) calculate feasible controllable aggregated load range for each bus, (ii) determine candidate buses to perform DR and their target load demand, and (iii) maintain the load level in each house through home energy management during the DSR, considering uncertainties in load and solar generation sequentially. The optimization problems are formulated as linear programming, mixed-integer linear programming, and multistage stochastic programming (solved using the stochastic dual dynamic programming) models. Finally, case studies performed in the IEEE 123-node test feeder show improvements in resilience in terms of energy restored compared to the restoration process without DR.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Approximate Scheduling of DERs with Discrete Complex Injections

Rapid penetration of renewable energy based Distributed Energy Resources (DER) has the potential to exacerbate the challenges inherent in grid frequency and voltage regulation. However, their real time controllability can be leveraged to not only mitigate such challenges, but improve the economics and quality of grid operations. A plethora of DER scheduling algorithms have been developed for fast and efficient scheduling of these resources. These algorithms schedule the complex - real and reactive power injected into (or drawn from) the grid by the DERs under various cost objective functions and grid constraints. However, a vast majority of such algorithms assume the feasible range of power injections to be continuous. In reality, the control options available for several DERs form a discrete space. This implies that the feasible range of power injections also forms a discrete space. This makes DER scheduling an NP-hard problem. Integer/Mixed Integer program based algorithms, which guarantee optimality in the objective value, have been developed. But these are prohibitively expensive in terms of computational time requirements. On the other hand, fast heuristic based solutions have also been developed. But as they do not provide any guarantee on the optimality of the objective, or on satisfying the constraints, they are unreliable for grid operations. Recent works have developed approximation algorithms which offer the best of both the approaches above: (near) optimality and low computational complexity, both of which are governed by a user defined accuracy parameter ϵ. In this work, we significantly improve upon such existing works by developing an approximation algorithm which schedules DERs with complex injections (as opposed to only real injection) and whose runtime is polynomial (as opposed to exponential) in 1/ϵ. We provide theoretical analysis and support them with experimental results to validate the guarantees provided by our approximation algorithm.

14 SOLAR ENERGY↗

Optimal Operation of Residential High Performance Water Heater for Reduction of Electricity Cost and Peak Demand Through Field Validation

Water heating accounts for about 18% of a typical US home’s energy use. Modern water heaters have enabled control options through APIs, offering customers the opportunity to reduce their energy cost and peak demand by dynamically adjusting settings. A water heater’s capacity to store energy using its storage tank makes it an asset for peak demand reduction and energy cost savings. For this reason, a mixed-integer linear programming model is proposed to minimize the energy cost of a high-performance water heater while also reducing the peak demand of the residential household under a time-of-use utility rate by dynamically changing the water heater’s running mode. Specifically, a multi-objective optimization model is formulated to determine the mode settings of the water heater considering hot water use, time-of-use rate, and peak demand limit of the residential household. The mode settings are associated with different dead bands of water temperature for triggering on/off action of the heat pump and heating element. A 66-gal hybrid electric high performance water heater was used for numerical simulation and practical experiments. The simulation results were well aligned with measurements of practical experiments, validating the soundness of the thermodynamic model. In addition, reductions of energy cost, enabling affordability, and reducing peak demand are demonstrated. The research team also developed a software framework with dashboards to automatically and continuously monitor and manage devices.

Liu, Guodong [ORNL] (ORCID:0000000213498608)↗

The use of multi-objective optimization to improve the design process of nuclear power plant systems

Multi-objective optimization is proposed to address the problem of design optimality in the nuclear power plant design process. This is done via the creation/development of the Optimization and Preference Tool for the Improvement of Nuclear Systems (OPTIONS). This work details applications of multi-objective optimization methods (in Python 3) to two different nuclear system design problems: the flash-Rankine power conversion system (PCS) of the I 2 S-LWR and the Passive Endothermic Reaction Cooling System (PERCS) attached to a standard PWR primary system (in RELAP5). The PCS design problem is first solved for three configurations using a specific particle swarm optimization method, achieving a thermodynamic efficiency of 34.81%. A new method, the Mixed-Integer Non-dominated Sorting Genetic Algorithm (MI-NSGA), is created and then used, solving a PCS superstructure of 22 configurations and achieving an efficiency of 35.63%. Finally, the OPTIONS tool is used to optimize the PERCS, improving cost, core temperature control, and cooling longevity.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Machine-learning-aided cognitive reconfiguration for flexible-bandwidth HPC and data center networks [Invited]

This paper proposes a machine-learning (ML)-aided cognitive approach for effective bandwidth reconfiguration in optically interconnected datacenter/high-performance computing (HPC) systems. The proposed approach relies on a Hyper-X-like architecture augmented with flexible-bandwidth photonic interconnections at large scales using a hierarchical intra/inter-POD photonic switching layout. We first formulate the problem of the connectivity graph and routing scheme optimization as a mixed-integer linear programming model. A two-phase heuristic algorithm and a joint optimization approach are devised to solve the problem with low time complexity. Then, we propose an ML-based end-to-end performance estimator design to assist the network control plane with intelligent decision making for bandwidth reconfiguration. Numerical simulations using traffic distribution profiles extracted from HPC applications traces as well as random traffic matrices verify the accuracy performance of the ML design estimator ( < <#comment/> 9 % <#comment/> error) and demonstrate up to 5 × <#comment/> throughput gain from the proposed approach compared with the baseline Hyper-X network using fixed all-to-all intra/inter-portable data center interconnects.

Chen, Xiaoliang (ORCID:0000000278056237)↗

Hierarchical Distributed Optimal Power Flow of HV and MV Distribution Networks With Continuous and Discrete Devices

With large-scale distributed photovoltaics (PVs) being integrated into distribution networks (DNs), coordinated optimal power flow (OPF) of high voltage (HV) and medium voltage (MV) DNs should be investigated to optimally dispatch the distributed PVs and other network devices. Here, this paper presents a hierarchical distributed OPF method for HV and MV DNs with on-load tap changers, reactive power compensators, feeder switches and distributed PVs. A hierarchical master-slave control architecture is applied to implement coordinated OPF of two-layer DNs. The HV master problem and MV subproblems are transformed into mixed-integer convex problems respectively with second order cone programming and LinDistFlow approximation. Since there is no efficient distributed algorithm to solve such OPF models with integer subproblems, a novel distributed algorithm is proposed in this paper to efficiently solve the hierarchical coordinated OPF model with integer subproblems in a distributed manner. In the proposed algorithm, the coordinated OPF model is solved in a branch-and-bound framework, where in each branch node generalized Benders decomposition (GBD) algorithm is applied to decompose the coordinated OPF model into a master problem and relaxed subproblems and solves them iteratively to get optimal solution. The GBD optimal and feasible cutting planes generated in a branch node are proved to be valid for its descendants. Moreover, three acceleration techniques are introduced into the proposed algorithm to improve computational efficiency. Finally, the effectiveness and accuracy of the proposed method are verified via simulation tests in Jinzhai DNs of China.

42 ENGINEERING↗

Physics-Informed Graph Neural Networks for Collaborative Dynamic Reconfiguration and Voltage Regulation in Unbalanced Distribution Systems

Network reconfiguration has long been employed as a strategic approach to minimize power distribution system losses and effectively regulate voltage levels. Tap-changing voltage regulators are also critical for controlling bus voltages, especially in accommodating the increasing integration of distributed energy resources (DERs) with intermittent outputs. This paper introduces novel methodologies to address the challenges of dynamic reconfiguration and optimal tap setting in unbalanced three-phase distribution systems. We propose an approximated mixed-integer quadratically constrained program (MIQCP) to model dynamic reconfiguration, along with a pioneering formulation for voltage regulator (VR) tap-setting based on Special Ordered Set type 1 (SOS1). To mitigate computational complexity, we propose a physics-informed spatial-temporal graph convolutional network (STGCN) with an integrated link classifier. The proposed approach enables efficient solution generation by fixing specific variables in the MIQCP instance and solving the simplified sub-MIP using an MIP solver. Numerical studies demonstrate the superior prediction accuracy of our STGCN model compared to baseline neural network models, resulting in reduced DER curtailment and voltage deviation with shorter computation time.

dynamic reconfiguration↗

Optimal Electric Grid Black Start Restoration Subject to Intentional Threats

Efficient restoration of the electric grid from significant disruptions – both natural and manmade – that lead to the grid entering a failed state is essential to maintaining resilience under a wide range of threats. Restoration follows a set of black start plans, allowing operators to select among these plans to meet the constraints imposed on the system by the disruption. Restoration objectives aim to restore power to a maximum number of customers in the shortest time. Current state-of-the-art for restoration modeling breaks the problem into multiple parts, assuming a known network state and full observability and control by grid operators. These assumptions are not guaranteed under some threats. This paper focuses on a novel integration of modeling and analysis capabilities to aid operators during restoration activities. A power flow-informed restoration framework, comprised of a restoration mixed-integer program informed by power flow models to identify restoration alternatives, interacts with a dynamic representation of the grid through a cognitive model of operator decision-making, to identify and prove an optimal restoration path. Application of this integrated approach is illustrated on exemplar systems. Validation of the restoration is performed for one of these exemplars using commercial solvers, and comparison is made between the steps and time involved in the commercial solver, and that required by the restoration optimization in and of itself, and by the operator model in acting on the restoration optimization output. Publications and proposals developed under this work, along with a path forward for additional expansion of the work, and summary of what was achieved, are also documented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations: Preprint

The recent increased interest in utilizing variable generation (VG) resources such as wind and solar in power systems has motivated investigations into new operating procedures. Although these resources provide desirable value to a system (e.g., no fuel costs or emissions), interconnecting them provides unique challenges. Their variable, non-controllable nature in particular requires significant attention, because it directly results in increased power system variability and uncertainty. One way to handle this is via new operating reserve schemes. Operating reserves provide upward and downward generation and ramping capacity to counteract uncertainty and variability prior to their realization. For instance, uncertainty and variability in real-time dispatch can be accounted for in the hour-ahead unit commitment. New operating reserve methodologies that specifically account for the increased variability and uncertainty caused by VG are currently being investigated and developed by academia and industry. This paper examines one method inspired by the new operating reserve product being proposed by the California Independent System Operator. The method is based on examining the potential ramping requirements at any given time and enforcing those requirements via a reserve demand curve in the market-clearing optimization as an additional ancillary service product.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Toward a MILP Modeling Framework for Distribution System Restoration

Large-scale blackouts and extreme weather events in recent decades raise the concern for improving the resilience of electric power infrastructures. Distribution service restoration (DSR), a fundamental application in outage management systems, allows restoration solutions for system operators when power outages happen. As distribution generators (DGs) and remotely controllable devices are increasingly installed in distribution systems, an advanced DSR framework is critical to perform optimally coordinated restoration that can achieve maximal restoration performance. This work introduces a DSR modeling framework, which can generate optimal switching sequences and estimated time of restoration in the presence of remotely controllable switches, manually operated switches, and dispatchable DGs. Two mathematical models, a variable time step model and a fixed time step model, are presented and compared. The proposed models are formulated as a mixed-integer linear programming model, and their effectiveness is evaluated via the IEEE 123 node test feeder.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Connected Vehicle-Based Traffic Signal Coordination

This study presents a connected vehicles (CVs)-based traffic signal optimization framework for a coordinated arterial corridor. The signal optimization and coordination problem are first formulated in a centralized scheme as a mixed-integer nonlinear program (MINLP). The optimal phase durations and offsets are solved together by minimizing fuel consumption and travel time considering an individual vehicle’s trajectories. Due to the complexity of the model, we decompose the problem into two levels: an intersection level to optimize phase durations using dynamic programming (DP), and a corridor level to optimize the offsets of all intersections. In order to solve the two-level model, a prediction-based solution technique is developed. The proposed models are tested using traffic simulation under various scenarios. Compared with the traditional actuated signal timing and coordination plan, the signal timing plans generated by solving the MINLP and the two-level model can reasonably improve the signal control performance. When considering varies vehicle types under high demand levels, the proposed two-level model reduced the total system cost by 3.8% comparing to baseline actuated plan. MINLP reduced the system cost by 5.9%. It also suggested that coordination scheme was beneficial to corridors with relatively high demand levels. For intersections with major and minor street, coordination conducted for major street had little impacts on the vehicles at the minor street.

42 ENGINEERING↗

Model predictive control for optimal dispatch of chillers and thermal energy storage tank in airports

Cost of energy consumption is one of the biggest operational cost for airports, and it is increasing from time to time as airports expand to support growing number of passengers. Various factors affect the energy consumption including efficiency of airport Heating Ventilation and Air conditioning (HVAC) systems, which in turn depends on the efficiency of individual subsystems. Here, in this paper, we present an optimal scheduling method for the central plant system at Dallas Fort Worth airport, involving chillers, pumps, and a thermal energy storage (TES) system. A model predictive control (MPC) problem is formulated to minimize both energy and demand charge costs while satisfying the cooling needs of the airport. The proposed Mixed-Integer Nonlinear Programming (MINLP) formulation includes performance curve based models for chillers and pumps and a simplified state of charge model for TES. The formulation also includes predictions of cooling load and chilled water return temperature. Simulation results for a month in summer show savings around 10% compared to the baseline. Initial recommendations based on insights from simulation results to the manual operation procedures resulted in significant savings. Field test results show a 7% chiller efficiency improvement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗