Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integer optimal control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Control and Optimization of Energy Storage System in Power Distribution System

The widespread adoption of electric vehicles (EVs) and transportation electrification is encumbered by two chief barriers: i) the limited driving range of EVs in the market today and ii) inadequate fast-charging infrastructure for long-distance trips. Extreme fast charging (XFC) technology can recharge EVs in less than 10 minutes for 200 miles range. Firstly, a novel robust optimization-based mixed integer linear programming model is proposed to size a battery energy storage system (BESS) and PV system in an XFCS. In this part, it is assumed that the sizing and location of the XFCS are known. Secondly, the aforesaid assumption is relaxed, and a strategic multi-period coordinated planning model is proposed to optimally site and size BESS-assisted charging stations in a highway transportation network and PV systems in a power distribution network by considering the coupling between both networks. Optimal operation and control of BESS-assisted EV charging stations are vital to alleviate the adverse impact of extreme fast charging of EVs on the host power network. A joint solution is proposed to mitigate the steady state and transient impact of extremefast charging of EVs and ensure grid-friendly integration of XFCSs with the host grid. Lastly, to make the operation of the XFCS cost-effective, a multi-layered energy management framework is proposed for the XFCS by considering forecast uncertainties, monthly demand charges reduction, and BESS degradation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Model Predictive Control Based Generator Start-Up Optimization Strategy for Restoration With Microgrids as Black-Start Resources

Microgrids (MGs) can operate in an islanded mode and serve as black-start resources for power system restoration (PSR). Here, a model predictive control (MPC) based generator start-up optimization strategy for PSR is proposed utilizing MGs as black-start resources. First, the generator start-up sequence (GSUS) optimization is formulated as a mixed integer linear programming. Then, the uncertainties of MG black-start resources (MBSRs) are modeled by discretizing the probability distribution of the forecast errors, and representative scenarios for MBSRs extracted by formulating the probability mass transportation problem. Third, the generator start-up optimization strategy considering MBSRs is proposed utilizing the MPC technique, in which the optimization objective is to maximize the energy capability of the power systems and minimize the load curtailment of the MGs in each looking-ahead interval. Simulations on the IEEE 118 bus system with MGs and Zhejiang provincial power system in China verify that the introduced strategy for PSR can successfully restore the power system and effectively determine the optimal GSUS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Substation-Level Grid Topology Optimization Using Bus Splitting

Operations of substation circuit breakers are important for maintenance needs and topology reconfiguration in power systems. Bus splitting is one type of topology change where the two bus bars at a substation can become electrically disconnected under certain actions of circuit breakers. Because these events involve detailed substation modeling, they are typically not considered in routine power system operation and control. In this paper, an improved substation-level topology optimization framework is developed by expanding traditional line switching decisions by breaker-level bus splitting, which can further reduce grid congestion and generation costs. A tight McCormick relaxation is proposed to reformulate the bilinear terms in the resultant optimization problem to linear inequality constraints. Thus, a tractable mixed-integer linear program reformulation is attained that allows for efficient solutions in real-time operations. Numerical studies on the IEEE 14-bus and 118-bus systems demonstrate the computational performance and economic benefits of the proposed topology optimization approach.

bus split↗

A Cooperative Multi-Agent Deep Reinforcement Learning Framework for Real-Time Residential Load Scheduling

Internet-of-Things (IoT) enabled monitoring and control capabilities are enabling increasing numbers of household users with controllable loads to actively participate in smart grid energy management. Realizing an efficient real-time energy management system that takes advantage of these developments requires novel techniques for managing the increased complexity of the control action space in resolving multiple challenges such as the uncertainty in energy prices and renewable energy output along with the need to satisy physical grid constraints such as transformer capacity. Addressing these challenges, we develop a multi-household energy management framework for residential units connected to the same transformer and containing DERs such as PV, ESS and controllable loads. The goal of our framework is to schedule controllable household appliances and ESS such that the cost of procuring electricity from the utility over a horizon is minimized while physical grid constraints are satisfied at each scheduling step. Traditional energy management frameworks either perform global optimization to satisfy grid constraints but suffer from high computational complexity (for example Integer Program, Mixed Integer Programming frameworks and centralized reinforcement learning) or perform decentralized real-time energy management without satisfying global grid constraints (for example multi-agent reinforcement learning with no cooperation). In contrast, we propose a cooperative multiagent reinforcement learning (MARL) framework that i) operates in real-time, and ii) performs explicit collaboration to satisfy global grid constraints. The novelty in our framework is two fold. Firstly, our framework trains multiple independent learners (IL) for each household in parallel using historical data and performs real-time inferencing of control actions using the most recent system state. Secondly, our framework contains a low complexity knapsack based cooperation agent which combines the outputs of ILs to minimize cost while satisfying grid constraints. Simulation results show that our cooperative MARL approach achieves significant cost improvement over centralized reinforcement learning and day-ahead planning baselines. Moreover, our approach strictly satisfies physical constraints with no apriori knowledge of system dynamics while the baseline approaches have occasional violations. We also measure the training and inference time by ranging the number of households from 1 to 25. Results show that our cooperative MARL approach scales best among various approaches.

14 SOLAR ENERGY↗

IPIP: A new approach to inverse planning for HDR brachytherapy by directly optimizing dosimetric indices

Purpose: Many planning methods for high dose rate (HDR) brachytherapy require an iterative approach. A set of computational parameters are hypothesized that will give a dose plan that meets dosimetric criteria. A dose plan is computed using these parameters, and if any dosimetric criteria are not met, the process is iterated until a suitable dose plan is found. In this way, the dose distribution is controlled by abstract parameters. The purpose of this study is to develop a new approach for HDR brachytherapy by directly optimizing the dose distribution based on dosimetric criteria. Methods: The authors developed inverse planning by integer program (IPIP), an optimization model for computing HDR brachytherapy dose plans and a fast heuristic for it. They used their heuristic to compute dose plans for 20 anonymized prostate cancer image data sets from patients previously treated at their clinic database. Dosimetry was evaluated and compared to dosimetric criteria. Results: Dose plans computed from IPIP satisfied all given dosimetric criteria for the target and healthy tissue after a single iteration. The average target coverage was 95%. The average computation time for IPIP was 30.1 s on an Intel(R) Core{sup TM}2 Duo CPU 1.67 GHz processor with 3 Gib RAM. Conclusions: IPIP is an HDR brachytherapy planning system that directly incorporates dosimetric criteria. The authors have demonstrated that IPIP has clinically acceptable performance for the prostate cases and dosimetric criteria used in this study, in both dosimetry and runtime. Further study is required to determine if IPIP performs well for a more general group of patients and dosimetric criteria, including other cancer sites such as GYN.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Low-complexity wavelet filter design for image compression

Image compression algorithms based on the wavelet transform are an increasingly attractive and flexible alternative to other algorithms based on block orthogonal transforms. While the design of orthogonal wavelet filters has been studied in significant depth, the design of nonorthogonal wavelet filters, such as linear-phase (LP) filters, has not yet reached that point. Of particular interest are wavelet transforms with low complexity at the encoder. In this article, we present known and new parameterizations of the two families of LP perfect reconstruction (PR) filters. The first family is that of all PR LP filters with finite impulse response (FIR), with equal complexity at the encoder and decoder. The second family is one of LP PR filters, which are FIR at the encoder and infinite impulse response (IIR) at the decoder, i.e., with controllable encoder complexity. These parameterizations are used to optimize the subband/wavelet transform coding gain, as defined for nonorthogonal wavelet transforms. Optimal LP wavelet filters are given for low levels of encoder complexity, as well as their corresponding integer approximations, to allow for applications limited to using integer arithmetic. These optimal LP filters yield larger coding gains than orthogonal filters with an equivalent complexity. The parameterizations described in this article can be used for the optimization of any other appropriate objective function.

Majani, E.↗

Automated shaker placement and regularized input estimation for MIMO testing.

Multi-input, multi-output (MIMO) testing is used in component qualification to reproduce operational responses in the laboratory. It is often preferred to single-input and base-shake testing because of the potential for equivalent or better tests using smaller actuators and shorter test suites. Given a target response, two key steps in MIMO test design are selecting actuator locations and solving for input loads. Actuator locations are often manually selected using expert judgment. If an automatic method is used, locations are usually determined by simulating the vibration control problem and minimizing a combination of the input energy and control residuals. To select a configuration, the relative importance of input energy and residuals must be specified. Specifying relative weights is, in general, a manual and subjective process. This paper develops an objective function that compares actuator configurations based on control accuracy and required input energy without any manual parameter tuning. The objective function uses an optimally selected tradeoff parameter for each candidate configuration. To choose actuator locations using the new objective function, a pivoting algorithm for integer programming problems is developed. Starting with an initial configuration (such as the one generated by a greedy algorithm), the pivoting algorithm guarantees an objective function decrease in each iteration until convergence is reached. In a simulation featuring a structure excited by a diffuse acoustic field, electrodynamic shaker locations and regularized inputs are solved for without any analyst-specified parameters. Simulations are performed in MIMO configurations where the number of target responses is less than, equal to, and greater than the number of actuators.

Multi-input multi-output↗

Predictively Coordinated Vehicle Acceleration and Lane Selection Using Mixed Integer Programming

Autonomous vehicle technology provides the means to optimize motion planning beyond human capacity. In particular, the problem of navigating multi-lane traffic optimally for trip time, energy efficiency, and collision avoidance presents challenges beyond those of single-lane roadways. For example, the host vehicle must simultaneously track multiple obstacles, the drivable region is non-convex, and automated vehicles must obey social expectations. Furthermore, reactive decision-making may result in becoming stuck in an undesirable traffic position. This paper presents a fundamental approach to these problems using model predictive control with a mixed integer quadratic program at its core. Lateral and longitudinal movements are coordinated to avoid collisions, track a velocity and lane, and minimize acceleration. Vehicle-to-vehicle connectivity provides a preview of surrounding vehicles’ motion. Simulation results show a 79% reduction in congestion-induced travel time and an 80% decrease in congestion-induced fuel consumption compared to a rule-based approach.

Dollar, Robert Austin↗

Resilient Distribution System by Microgrids Formation After Natural Disasters

Microgrids with distributed generation provide a resilient solution in the case of major faults in a distribution system due to natural disasters. This paper proposes a novel distribution system operational approach by forming multiple microgrids energized by distributed generation from the radial distribution system in real-time operations, to restore critical loads from the power outage. Specifically, a mixed-integer linear program (MILP) is formulated to maximize the critical loads to be picked up while satisfying the self-adequacy and operation constraints for the microgrids formation problem, by controlling the ON/OFF status of the remotely controlled switch devices and distributed generation. A distributed multi-agent coordination scheme is designed via local communications for the global information discovery as inputs of the optimization, which is suitable for autonomous communication requirements after the disastrous event. The formed microgrids can be further utilized for power quality control and can be connected to a larger microgrid before the restoration of the main grids is complete. Numerical results based on modified IEEE distribution test systems validate the effectiveness of our proposed scheme.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Loss Minimization With Optimal Power Dispatch in Multi-Frequency HVac Power Systems

Low-frequency high-voltage ac transmission scheme has recently been proposed as an alternative approach for bulk power transmission. This paper proposes a multi-period optimal power flow (OPF) for a multi-frequency HVac transmission system that interconnects both conventional 50/60-Hz and low-frequency grids using back-to-back converters with a centralized control scheme. The OPF objective is to minimize system losses by determining the optimal dispatch for generators, shunt capacitors, and converters. The OPF constraints include the operational constraints of all HVac grid and converter stations. The resulting mixed-integer nonlinear programing problem is solved using a proposed framework based on the predictor-corrector primal-dual interior-point method. The proposed OPF formulation and solution approach are verified using a multi-frequency HVac transmission system that is modified from the IEEE 57-bus system. Here, the results with the optimal dispatch from the proposed method during a simulated day show a significant loss reduction and an improved voltage regulation compared to those when an arbitrary dispatch is chosen.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Utilising demand response for distribution service restoration to achieve grid resiliency against natural disasters

The increased frequency of power outages due to natural disasters in recent years has highlighted the urgency of enhancing distribution grid resilience. The effective distribution service restoration (DSR) is an important measure for a resilient distribution grid. In this work, the authors demonstrate that DSR can be significantly improved by leveraging the flexibility provided by the inclusion of demand response (DR). The authors propose a framework for this by considering integrated control of household-level flexible appliances to vary the load demand at the distribution-grid level to improve DSR. The overall framework of the proposed system is modelled as a three-step method considering three optimization problems to (i) calculate feasible controllable aggregated load range for each bus, (ii) determine candidate buses to perform DR and their target load demand, and (iii) maintain the load level in each house through home energy management during the DSR, considering uncertainties in load and solar generation sequentially. The optimization problems are formulated as linear programming, mixed-integer linear programming, and multistage stochastic programming (solved using the stochastic dual dynamic programming) models. Finally, case studies performed in the IEEE 123-node test feeder show improvements in resilience in terms of energy restored compared to the restoration process without DR.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Approximate Scheduling of DERs with Discrete Complex Injections

Rapid penetration of renewable energy based Distributed Energy Resources (DER) has the potential to exacerbate the challenges inherent in grid frequency and voltage regulation. However, their real time controllability can be leveraged to not only mitigate such challenges, but improve the economics and quality of grid operations. A plethora of DER scheduling algorithms have been developed for fast and efficient scheduling of these resources. These algorithms schedule the complex - real and reactive power injected into (or drawn from) the grid by the DERs under various cost objective functions and grid constraints. However, a vast majority of such algorithms assume the feasible range of power injections to be continuous. In reality, the control options available for several DERs form a discrete space. This implies that the feasible range of power injections also forms a discrete space. This makes DER scheduling an NP-hard problem. Integer/Mixed Integer program based algorithms, which guarantee optimality in the objective value, have been developed. But these are prohibitively expensive in terms of computational time requirements. On the other hand, fast heuristic based solutions have also been developed. But as they do not provide any guarantee on the optimality of the objective, or on satisfying the constraints, they are unreliable for grid operations. Recent works have developed approximation algorithms which offer the best of both the approaches above: (near) optimality and low computational complexity, both of which are governed by a user defined accuracy parameter ϵ. In this work, we significantly improve upon such existing works by developing an approximation algorithm which schedules DERs with complex injections (as opposed to only real injection) and whose runtime is polynomial (as opposed to exponential) in 1/ϵ. We provide theoretical analysis and support them with experimental results to validate the guarantees provided by our approximation algorithm.

14 SOLAR ENERGY↗

Aerospace applications of integer and combinatorial optimization

Research supported by NASA Langley Research Center includes many applications of aerospace design optimization and is conducted by teams of applied mathematicians and aerospace engineers. This paper investigates the benefits from this combined expertise in solving combinatorial optimization problems. Applications range from the design of large space antennas to interior noise control. A typical problem, for example, seeks the optimal locations for vibration-damping devices on a large space structure and is expressed as a mixed/integer linear programming problem with more than 1500 design variables.

Padula, S. L.↗

Optimal Operation of Residential High Performance Water Heater for Reduction of Electricity Cost and Peak Demand Through Field Validation

Water heating accounts for about 18% of a typical US home’s energy use. Modern water heaters have enabled control options through APIs, offering customers the opportunity to reduce their energy cost and peak demand by dynamically adjusting settings. A water heater’s capacity to store energy using its storage tank makes it an asset for peak demand reduction and energy cost savings. For this reason, a mixed-integer linear programming model is proposed to minimize the energy cost of a high-performance water heater while also reducing the peak demand of the residential household under a time-of-use utility rate by dynamically changing the water heater’s running mode. Specifically, a multi-objective optimization model is formulated to determine the mode settings of the water heater considering hot water use, time-of-use rate, and peak demand limit of the residential household. The mode settings are associated with different dead bands of water temperature for triggering on/off action of the heat pump and heating element. A 66-gal hybrid electric high performance water heater was used for numerical simulation and practical experiments. The simulation results were well aligned with measurements of practical experiments, validating the soundness of the thermodynamic model. In addition, reductions of energy cost, enabling affordability, and reducing peak demand are demonstrated. The research team also developed a software framework with dashboards to automatically and continuously monitor and manage devices.

Liu, Guodong [ORNL] (ORCID:0000000213498608)↗

The use of multi-objective optimization to improve the design process of nuclear power plant systems

Multi-objective optimization is proposed to address the problem of design optimality in the nuclear power plant design process. This is done via the creation/development of the Optimization and Preference Tool for the Improvement of Nuclear Systems (OPTIONS). This work details applications of multi-objective optimization methods (in Python 3) to two different nuclear system design problems: the flash-Rankine power conversion system (PCS) of the I 2 S-LWR and the Passive Endothermic Reaction Cooling System (PERCS) attached to a standard PWR primary system (in RELAP5). The PCS design problem is first solved for three configurations using a specific particle swarm optimization method, achieving a thermodynamic efficiency of 34.81%. A new method, the Mixed-Integer Non-dominated Sorting Genetic Algorithm (MI-NSGA), is created and then used, solving a PCS superstructure of 22 configurations and achieving an efficiency of 35.63%. Finally, the OPTIONS tool is used to optimize the PERCS, improving cost, core temperature control, and cooling longevity.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Machine-learning-aided cognitive reconfiguration for flexible-bandwidth HPC and data center networks [Invited]

This paper proposes a machine-learning (ML)-aided cognitive approach for effective bandwidth reconfiguration in optically interconnected datacenter/high-performance computing (HPC) systems. The proposed approach relies on a Hyper-X-like architecture augmented with flexible-bandwidth photonic interconnections at large scales using a hierarchical intra/inter-POD photonic switching layout. We first formulate the problem of the connectivity graph and routing scheme optimization as a mixed-integer linear programming model. A two-phase heuristic algorithm and a joint optimization approach are devised to solve the problem with low time complexity. Then, we propose an ML-based end-to-end performance estimator design to assist the network control plane with intelligent decision making for bandwidth reconfiguration. Numerical simulations using traffic distribution profiles extracted from HPC applications traces as well as random traffic matrices verify the accuracy performance of the ML design estimator ( < <#comment/> 9 % <#comment/> error) and demonstrate up to 5 × <#comment/> throughput gain from the proposed approach compared with the baseline Hyper-X network using fixed all-to-all intra/inter-portable data center interconnects.

Chen, Xiaoliang (ORCID:0000000278056237)↗